Bijnor, Uttar Pradesh

Not a Scheduled AreaCensus 2011 district code 134
  1. 26 Oct 2026 · FiledSubmittedProposed Project of “RBM Mine (Mixed Form)” located at Gata No. 70 Mi, Total area- 1.265 Ha., (Mining Plan…
  2. 17 Oct 2026 · DecidedEnvironmental clearance granted“R.B.M. [Sand, Bajri, Boulder (In Mix Form)] Mining” Project at Gata No.- 400 Mi, 442Ta, Village-…
  3. 12 Oct 2026 · FiledSubmittedOrdinary Soil Mine
  4. 10 Oct 2026 · Details soughtAdditional details sought“Proposed Project of Mining of Sand-Bajri- Boulders in (Mixed Formed/RBM) Project on Riverbed of Ramganga…
  5. 7 Oct 2026 · FiledSubmittedOrdinary Soil Mine
  6. 28 Sept 2026 · DecidedTerms of Reference grantedDevelopment of High Speed Access Controlled Corridor from Shamli - Gorakhpur (Phase-I) in the state of…
  7. 28 Sept 2026 · FiledSubmittedSoil Mine Project, Village- Khanpur Raidas. , Tehsil - Chandpur,District- Bijnor (U.P.) at Gata No. 31, 40…

Dated by the portal's own appraisal history, converted to India Standard Time; a proposal with no recorded history appears on its register submission date.

Other clearances these proposals declare

Forest land diversion declared
4
Forest land sought for diversion
Area not stated
Wildlife board recommendation declared
1
In or near a protected area
0
In an eco-sensitive zone
0

These counts are taken from the application forms of the 33 of 33 proposals naming this district whose forms have been read for these questions. In 10 of those forms at least one question was left blank, and a blank answer is counted as unknown. The forest area is the area stated for forest clearance, with each forest proposal counted once, in the district where its project is primarily sited.

Proposals naming this district
33
Category A proposals
7
Families declared displaced
221
Families declared affected
346

Displacement figures are the proponents’ own declarations. A project sited across several districts declares one figure for the whole project, and that figure is counted once, in the district where the project is primarily sited.

Fifth Schedule status

Not within a Fifth Schedule Scheduled Area

No Presidential Order under paragraph 6 of the Fifth Schedule declares any Scheduled Area in Uttar Pradesh, so no part of this district is one and PESA does not apply.

OrderMinistry of Tribal Affairs, Scheduled Areas declared under paragraph 6 of the Fifth Schedule to the Constitution

What the record shows

  • Applicants for projects sited mainly in this district have declared 221 families to be displaced. The figure comes from their applications, and we have not verified it.

Each of these observations appears when a fixed rule is met by the figures on this page, so the same figures always give the same sentences. None of them is a view on whether a project should go ahead.

Who lives there

Figures from Census 2011, each compared with the all-India value computed on the same definition.

Total population
36,82,713
Households
6,33,197
Average household size
5.82
0.97 above India's 4.85India
Scheduled Tribe share of population
0.1%
8.5 points below IndiaIndia
Scheduled Caste share of population
21.4%
4.7 points above IndiaIndia
Children aged 0-6
15.3%
1.7 points above IndiaIndia
Literacy rate
68.5%
4.5 points below IndiaIndia
Sex ratio
917
25.7 below India's 942.6India

What they live on

How the district's workers earn a living, from Census 2011. The land-dependent share counts cultivators and agricultural labourers as a share of all workers, and it is the group most directly affected when land is acquired.

Total workers
10,88,036
Work participation rate
29.5%
10.2 points below IndiaIndia
Workers dependent on land
50.0%
4.6 points below IndiaIndia
Cultivators
21.3%
3.3 points below IndiaIndia
Agricultural labourers
28.6%
1.3 points below IndiaIndia
Marginal workers
22.8%
1.9 points below IndiaIndia
Household industry workers
4.8%
1.0 points above IndiaIndia

How households live

Land, income and work among rural households, from the Socio Economic and Caste Census 2011, which recorded these where the population census did not. Only the survey's rural part is used here, so urban households do not appear.

Rural households owning land
36.3%
9.8 points below IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households whose highest earner makes over ₹5,000 a month
30.0%
5.6 points above IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households living mainly on manual casual labour
52.0%
0.2 points above IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households with a salaried member
5.7%
2.6 points below IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

When these were filed

Each proposal is dated by the first step in its appraisal history, the dated record of steps the portal keeps for it.

2024-Q12026-Q4

The timeline counts 27 of the 33 proposals here. The first filing date comes from each proposal's appraisal history, and we have not yet read it for the other 6, so they are left out. Most of them are older proposals, so the early part of the timeline undercounts what was filed then. The register itself records a date for each of them; the gap is in our copy of the histories.

Hatched columns undercount, so they cannot be compared with solid ones. 2026-Q4 was still running when the register was read, so its column counts only the filings made up to that date.

What kind of projects these are

The proposals naming this district, grouped by the sector each was filed under.

  • Non-Coal Mining 69.7%
  • Industrial Projects - 2 21.2%
  • INFRA-1 9.1%

The four largest sectors are shown by name and the rest are grouped as Other.

What is proposed here

These are the proposals in the national environmental clearance register whose application names a site in this district, newest first. A project with sites in several districts appears under each of them.

  1. Category B2Forwarded to MS SPCB/PCC by MS2026-10-26

    Proposed Project of “RBM Mine (Mixed Form)” located at Gata No. 70 Mi, Total area- 1.265 Ha., (Mining Plan Period- 6 Months), Village –Abdulfazalpur Pahara, Tehsil- Nagina, District- Bijnor (U.P.), M/s Pratap Construction Partner. - Shri Rana Pratap Singh

    rana pratap singh · Non-Coal Mining

  2. Category B2Forwarded to MS SPCB/PCC by MS2026-10-12

    Ordinary Soil Mine

    ankush kumar · Non-Coal Mining

  3. Category B2Forwarded to MS SPCB/PCC by MS2026-10-07

    Ordinary Soil Mine

    rajveer · Non-Coal Mining

  4. Category B2Forwarded to MS SPCB/PCC by MS2026-09-28

    Soil Mine Project, Village- Khanpur Raidas. , Tehsil - Chandpur,District- Bijnor (U.P.) at Gata No. 31, 40 Mi,39 Mi, Total Area- 1.5317Ha. Proponent- Tarun Kumar

    TARUN KUMAR · Non-Coal Mining

  5. Category B2Pending at MS SEIAA2026-08-18

    Proposed Soil Mining Project located at Gata No. 52/3, 52/4मि, 52/467, 60, 62, 64, 65मि, 66, 67मि, 67/1, 68मि, 68/2, 69मि, 70/5मि, 71, 73, 74मि, 76मि, Area- 4.012 ha located at Village- Hakimpur Karan, Tehsil- Dhampur, District- Bijnor, State- Uttar Pradesh of Shri Pushpendar Singh

    PUSHPENDAR SINGH · Non-Coal Mining

  6. Category AToR Granted2026-08-07declares affected families

    Development of High Speed Access Controlled Corridor from Shamli - Gorakhpur (Phase-I) in the state of Uttar Pradesh (Package 2 Ch 86+860 Km to Ch 142+195 Km)

    NATIONAL HIGHWAY AUTHORITY OF INDIA · INFRA-1

  7. Category B2Pending at MS SEIAA2026-08-06

    Ordinary Soil Mine

    PRAMOD KUMAR · Non-Coal Mining

  8. Category B1ADS Raised2026-05-06

    “Proposed Project of Mining of Sand-Bajri- Boulders in (Mixed Formed/RBM) Project on Riverbed of Ramganga River” at Gata No. 199/3, Mining Lease Area 10.77 Ha, Village – Rasoolpur Abad, Tehsil – Dhampur, District – Bijnor, Uttar Pradesh.M/s Shree Yamunotri Infrastructure Prop. Shri Amit Sehrawat.

    amit sehrawat · Non-Coal Mining

  9. Category B1EC Granted2026-04-24

    Proposed expansion of Sugar unit from 14000 TCD to 15000 TCD without change in Co gen power plant – 60 MW within existing premises, at village – Alhepur, Block: Dhampur (Alehpur), Tehsil -Dhampur, District: Bijnor, Uttar Pradesh by M/s Dhampur Sugar Mills Ltd, (Unit: Dhampur).

    DHAMPUR SUGAR MILLS LIMITED · Industrial Projects - 2

  10. Category B2EC Granted2026-03-20

    “RBM (Mixed Form)” at Gata No. 2/102, Area- 1.215 Ha, Village- Shah Alipur Kotra, Tehsil- Nagina, District- Bijnor, Uttar Pradesh, M/s Team Growth Private Limited. Director- Shri Prateek Pramod Bhatnagar S/o-Shri Pramod Bhatnagar

    prateek pramod bhatnagar · Non-Coal Mining

  11. Category B1EC Granted2026-03-20

    “R.B.M. [Sand, Bajri, Boulder (In Mix Form)] Mining” Project at Gata No.- 400 Mi, 442Ta, Village- Kamruddin Nagar, Tehsil- Nagina, District- Bijnor, U.P. (Applied Area : 9.240 ha.) M/s Mineshaft Traders & Consultants Prop.- Shri Ashok Kumar Singh

    Ashok Kumar Singh · Non-Coal Mining

  12. Category AToR Granted2026-01-23declares affected families

    Development of High Speed Access Controlled Corridor from Shamli - Gorakhpur (Phase-l) in the state of Uttar Pradesh (Package 4 (Moradabad Spur, from Ch. 00+000 to Ch. 42+230).

    NATIONAL HIGHWAY AUTHORITY OF INDIA · INFRA-1

  13. Category AToR Granted2026-01-23declares affected families

    Development of High Speed Access Controlled Corridor from Shamli - Gorakhpur (Phase-I) in the state of Uttar Pradesh (Package 2 Ch 86+860 Km to Ch 142+195 Km)

    NATIONAL HIGHWAY AUTHORITY OF INDIA · INFRA-1

  14. Category B1EC Granted2025-10-11

    Proposed Project of “Sand- Bajri-Boulders in Mixed State (RBM) Mine” located at Gata No. 421 Mi, Village- Kamruddin Nagar Tehsil- Nagina, and District- Bijnor (U.P.) PROP. SHRI IQBAL AHMED.

    iqbal ahmad · Non-Coal Mining

  15. Category B2EC Granted2025-09-05

    Sundarwali Sand Mining Project, Located on river bed of Khoh River (1.960 ha)

    SUBHASH SINGH · Non-Coal Mining

  16. Category AProposal returned in present form2025-07-23

    Thana Bhawan to Bijnor Connectivity 18"/16" Dia Steel Gas Pipeline (Approx. Pipeline Length: 89.00 KM) From Thana Bhawan to Bijnor Town in Muzaffarnagar, Shamli & Bijnor District in Uttar Pradesh Region.

    HINDUSTAN PETROLEUM CORPORATION LIMITED · Industrial Projects - 2

  17. Category B2EC Granted2025-05-15

    Mirpur Durg RBM Mining Project, Proponent Team Growth Private Limited, Prateek Pramod Bhatnagar. Gata No. 183, Village Mirpur Durg, Tehsil Najibabad, District Bijnor Uttar Pradesh, Area 1.078 ha

    prateek pramod bhatnagar · Non-Coal Mining

  18. Category B1ToR Granted2025-04-24

    “Proposed Project of Mining of Sand-Bajri- Boulders in (Mixed Formed/RBM) Project on Riverbed of Ramganga River” at Gata No. 199/3, Mining Lease Area 10.77 Ha, Village – Rasoolpur Abad, Tehsil – Dhampur, District – Bijnor, Uttar Pradesh.M/s Shree Yamunotri Infrastructure Prop. Shri Amit Sehrawat.

    amit sehrawat · Non-Coal Mining

  19. Category B2EC Granted2025-04-12

    “Proposed Project of Mining of RBM (Mixed form) on Riverbed of Malin River” located at Gata No. 193, Mining Lease Area 1.34 ha., Village – Biruwala, Tehsil- Najibabad, District- Bijnor, Uttar Pradesh .M/s Team Growth Private Limited Director- Shri Prateek Bhatnagar

    prateek pramod bhatnagar · Non-Coal Mining

  20. Category B1ToR Granted2025-01-27

    Proposed Project of “Sand- Bajri-Boulders in Mixed State (RBM) Mine” located at Gata No. 421 Mi, Village- Kamruddin Nagar Tehsil- Nagina, and District- Bijnor (U.P.) PROP. SHRI IQBAL AHMED.

    iqbal ahmad · Non-Coal Mining

  21. Category B1ToR Granted2024-12-14

    Proposed expansion of Sugar unit from 14000 TCD to 15000 TCD without change in Co gen power plant – 60 MW within existing premises, at village – Alhepur, Block: Dhampur (Alehpur), Tehsil -Dhampur, District: Bijnor, Uttar Pradesh by M/s Dhampur Sugar Mills Ltd, (Unit: Dhampur).

    DHAMPUR SUGAR MILLS LIMITED · Industrial Projects - 2

  22. Category B2EC Granted2024-10-10

    “R.B.M. (In mix form) Mining” Project at Gata No.- 413, 414, 221, 222, 223, 218, Village- Biruwala, Tehsil- Najibabad, District- Bijnor, U.P. (Applied Area : 2.10 ha.) Prop.- Shri Kafil Ahmad S/o Shri Shabbir Ahmad

    Kafil ahmad · Non-Coal Mining

  23. Category B1ToR Granted2024-10-10

    “R.B.M. [Sand, Bajri, Boulder (In Mix Form)] Mining” Project at Gata No.- 400 Mi, 442Ta, Village- Kamruddin Nagar, Tehsil- Nagina, District- Bijnor, U.P. (Applied Area : 9.240 ha.) M/s Mineshaft Traders & Consultants Prop.- Shri Ashok Kumar Singh

    Ashok Kumar Singh · Non-Coal Mining

  24. Category B2EC Granted2024-10-09

    “RBM (MIXED FORM) Mining Project” at Gata No. – 70Mi, (Total area 1.265 Ha.) located in village Abdulfazalpur Pahara, Tehsil-Nagina District- Bijnor, Uttar Pradesh.

    SATISH KUMAR · Non-Coal Mining

  25. Category AEC Granted2024-08-05

    ESTABLISHMENT OF CANE JUICE SYRUP / GRAINS / B-HEAVY MOLASSES OR C HEAVY MOLASSES BASED DISTILLERY HAVING CPAPACITY – 690 KLD ALONG WITH 15.0 MW CO GEN POWER OF M/S BAJAJ HINDUSTHAN SUGAR LIMITED, UNIT: BILAI.

    BAJAJ HINDUSTHAN SUGAR LIMITED · Industrial Projects - 2

  26. Category B2EC Granted2024-03-19

    Shahalipur Gudad RBM Mining Project

    MAYA DEVI · Non-Coal Mining

  27. Category AStandard ToR Granted2024-01-19

    Thana Bhawan to Bijnor Connectivity 18"/16" Dia Steel Gas Pipeline (Approx. Pipeline Length: 89.00 KM) From Thana Bhawan to Bijnor Town in Muzaffarnagar, Shamli & Bijnor District in Uttar Pradesh Region.

    HINDUSTAN PETROLEUM CORPORATION LIMITED · Industrial Projects - 2

  28. Category B2EC Granted2023-11-16

    RBM (Mixed Form) Mining Project at (Khoh River)

    CHANDRA JAISWAL · Non-Coal Mining

  29. Category B2EC Granted2023-11-16

    RBM (Mixed Form) Mining Project

    MOHD SHAHID · Non-Coal Mining

  30. Category B2EC Granted2023-08-30

    River bed Material Deposit of River bed of Khoh River at Khand no. 121, 122 & 123 Village Nasiruddinwala, Tehsil Nagina, District Bijnour, Uttar Pradesh of M/S Maalpani Traders

    VIKAS MAHESHWARI · Non-Coal Mining

  31. Category ATOR GRANTED2023-03-27

    ESTABLISHMENT OF CANE JUICE SYRUP / GRAINS / B-HEAVY MOLASSES OR C HEAVY MOLASSES BASED DISTILLERY HAVING CPAPACITY – 690 KLD ALONG WITH 15.0 MW CO GEN POWER OF M/S BAJAJ HINDUSTHAN SUGAR LIMITED, UNIT: BILAI.

    BAJAJ HINDUSTHAN SUGAR LIMITED · Industrial Projects - 2

  32. Category B1EC Granted2022-11-15

    Proposed expansion of sugar mill cane crushing capacity from 10000 TCD to 13000 TCD along with Co- Gen power from 24.0 MW to 44.9 MW within existing premises by M/s Avadh Sugar & Energy Limited, Unit: Seohara

    M/S AVADH SUGAR AND ENERGY LIMITED · Industrial Projects - 2

  33. Category B2EC Granted2022-09-28

    RBM (MIxed Form) Mining project

    DIPANSHU DHAKA · Non-Coal Mining

All 33 proposals that name this district, newest first.