← All districts

Rampur, Uttar Pradesh

Not a Scheduled AreaCensus 2011 district code 136
  1. 28 Sept 2026 · DecidedTerms of Reference granted“Sand or Bajri or Boulder RBM Mining” from Riverbed of Kosi River at Village- Pattikala, Gata No.- 726 Mi…

Dated by the portal's own appraisal history, converted to India Standard Time; a proposal with no recorded history appears on its register submission date.

Other clearances these proposals declare

Forest land diversion declared
2
Forest land sought for diversion
Area not stated
Wildlife board recommendation declared
0
In or near a protected area
0
In an eco-sensitive zone
0

These counts are taken from the application forms of the 14 of 14 proposals naming this district whose forms have been read for these questions. In 4 of those forms at least one question was left blank, and a blank answer is counted as unknown. The forest area is the area stated for forest clearance, with each forest proposal counted once, in the district where its project is primarily sited.

Proposals naming this district
14
Category A proposals
2
Families declared displaced
None declared
Families declared affected
None declared

Displacement figures are the proponents’ own declarations. A project sited across several districts declares one figure for the whole project, and that figure is counted once, in the district where the project is primarily sited. 2 of the proposals listed below declare displacement and are sited primarily in another district, so their figures are counted in that district’s total.

Fifth Schedule status

Not within a Fifth Schedule Scheduled Area

No Presidential Order under paragraph 6 of the Fifth Schedule declares any Scheduled Area in Uttar Pradesh, so no part of this district is one and PESA does not apply.

OrderMinistry of Tribal Affairs, Scheduled Areas declared under paragraph 6 of the Fifth Schedule to the Constitution

What the record shows

  • Literacy was 53.3% in 2011 against 72.98% nationally, so notices and documents issued in writing during a consultation may reach fewer people here.

Each of these observations appears when a fixed rule is met by the figures on this page, so the same figures always give the same sentences. None of them is a view on whether a project should go ahead.

Who lives there

Figures from Census 2011, each compared with the all-India value computed on the same definition.

Total population
23,35,819
Households
3,93,736
Average household size
5.93
1.08 above India's 4.85India
Scheduled Tribe share of population
0.0%
8.5 points below IndiaIndia
Scheduled Caste share of population
13.2%
3.5 points below IndiaIndia
Children aged 0-6
16.2%
2.7 points above IndiaIndia
Literacy rate
53.3%
19.6 points below IndiaIndia
Sex ratio
909
34.1 below India's 942.6India

What they live on

How the district's workers earn a living, from Census 2011. The land-dependent share counts cultivators and agricultural labourers as a share of all workers, and it is the group most directly affected when land is acquired.

Total workers
7,37,261
Work participation rate
31.6%
8.2 points below IndiaIndia
Workers dependent on land
60.3%
5.7 points above IndiaIndia
Cultivators
29.1%
4.4 points above IndiaIndia
Agricultural labourers
31.2%
1.3 points above IndiaIndia
Marginal workers
23.5%
1.3 points below IndiaIndia
Household industry workers
7.4%
3.6 points above IndiaIndia

How households live

Land, income and work among rural households, from the Socio Economic and Caste Census 2011, which recorded these where the population census did not. Only the survey's rural part is used here, so urban households do not appear.

Rural households owning land
42.5%
3.7 points below IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households whose highest earner makes over ₹5,000 a month
23.2%
1.1 points below IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households living mainly on manual casual labour
43.4%
8.4 points below IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households with a salaried member
3.3%
4.9 points below IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

When these were filed

Each proposal is dated by the first step in its appraisal history, the dated record of steps the portal keeps for it.

2023-Q42026-Q2

The timeline counts 8 of the 14 proposals here. The first filing date comes from each proposal's appraisal history, and we have not yet read it for the other 6, so they are left out. Most of them are older proposals, so the early part of the timeline undercounts what was filed then. The register itself records a date for each of them; the gap is in our copy of the histories.

Hatched columns undercount, so they cannot be compared with solid ones. One of them covers a period for which we have read few filing dates so far, and it counts only the proposals whose date we have.

What kind of projects these are

The proposals naming this district, grouped by the sector each was filed under.

  • Non-Coal Mining 50%
  • Industrial Projects - 2 28.6%
  • INFRA-1 14.3%
  • INFRA-2 7.1%

The four largest sectors are shown by name and the rest are grouped as Other.

What is proposed here

These are the proposals in the national environmental clearance register whose application names a site in this district, newest first. A project with sites in several districts appears under each of them.

  1. Category B1ToR Granted2026-05-14

    “Sand or Bajri or Boulder RBM Mining” from Riverbed of Kosi River at Village- Pattikala, Gata No.- 726 Mi & 726 Mi, Lease Area- 1.2570 Ha., Tehsil- Swar, District- Rampur, Uttar Pradesh, Project Proponent- Shri Dharamjeet Singh S/o Harmel Singh

    Dharamjeet Singh · Non-Coal Mining

  2. Category AProposal returned in present form2026-04-27declares affected families

    Development of High Speed Access Controlled Corridor from Shamli - Gorakhpur (Phase-I) in the state of Uttar Pradesh (Package-5, Ch. from 214+350 to Ch. 273+415).

    NATIONAL HIGHWAY AUTHORITY OF INDIA · INFRA-1

  3. Category AToR Granted2026-01-23declares affected families

    Development of High Speed Access Controlled Corridor from Shamli - Gorakhpur (Phase-I) in the state of Uttar Pradesh (Package-5, Ch. from 214+350 to Ch. 273+415).

    NATIONAL HIGHWAY AUTHORITY OF INDIA · INFRA-1

  4. Category B2EC Granted2025-10-20

    “Ordinary Sand (Category-II) Mining” from Riverbed of Kosi River at Village- Dundawala Ahatmali, Gata No.- 644 Mi, Lease Area- 3.5870 Ha., Tehsil– Swar, District– Rampur, Uttar Pradesh, Project Proponent- M/s Abdul Salam Contractor (Prop.- Abdul Salam)

    ABDUL SALAM · Non-Coal Mining

  5. Category B2Proposal Withdrawal Request Accepted2025-05-02

    Proposed sand, bajri & boulders Mine (Area = 1.0 ha) at Vill.- Sultanpur, Tehsil- Bazpur, & District- Udham Singh Nagar, Uttarakhand

    SHIV KUMAR GUPTA · Non-Coal Mining

  6. Category B1EC Granted2024-10-28

    Expansion of existing Sugar unit from 5,000 TCD to 10,000 TCD along with expansion of existing co gen power capacity from 10 MW to 18 MW within existing industry premises at village-Milak Narayanpur, Tehsil- Tanda, District– Rampur, Uttar Pradesh by M/s Triveni Engineering & Industries Limited, (Unit: Milak Narayanpur, Division: Sugar)

    TRIVENI ENGINEERING & INDUSTRIES LIMITED · Industrial Projects - 2

  7. Category B2EC Granted2024-04-30

    Area- 1.8210 Ha River Bed Mineral (R.B.M) (Sand/Bajri/Boulder) Mining Project at Gata No- 728 Mi Village- Pattikalan, Tehsil- Suar, District- Rampur Uttar Pradesh.

    Rajesh Kumar Gupta · Non-Coal Mining

  8. Category B2EC Granted2023-12-07

    Grain Based Distillery Plant of 125 KLD along with Co-generation Power Plant of 3.5 MW” located at Village- Khata, Tehsil- Bilaspur, District-Rampur, Uttar Pradesh.

    UNI ETHANOL BIO GREEN ENERGY PRIVATE LIMITED · Industrial Projects - 2

  9. Category B2EC Granted2023-11-16

    Proposed “R.B.M. Mining” Project at Gata No.- 565, Village- Patti Kalan, Tehsil- Swar, District- Rampur, U.P. (Area : 1.380 ha.)

    BALVINDER SINGH · Non-Coal Mining

  10. Category B2EC Granted2023-10-12

    Environment Clearance of Proposed group housing project “Sobti Sapphire” at Gata No. 47, 66Mi, 67Mi, 106Mi, 110Mi, 113Mi, 140Mi, 142Mi, 143Mi, village- Dibdiba, Tehsil – Bilaspur, District – Rampur, Uttar Pradesh, developed by M/s Sobti Buildwell Limited

    SOBTIS BUILDWELL LIMITED · INFRA-2

  11. Category B1TOR GRANTED2023-09-02

    Expansion of existing Sugar unit from 5,000 TCD to 10,000 TCD along with expansion of existing co gen power capacity from 10 MW to 18 MW within existing industry premises at village-Milak Narayanpur, Tehsil- Tanda, District– Rampur, Uttar Pradesh by M/s Triveni Engineering & Industries Limited, (Unit: Milak Narayanpur, Division: Sugar)

    TRIVENI ENGINEERING & INDUSTRIES LIMITED · Industrial Projects - 2

  12. Category B2EC Granted2023-04-11

    Proposed 500 KLPD Grain based Ethanol Plant along with 7.5 MW Cogeneration Power Plant at Village Karimganj, Tehsil Shahabad, District Rampur, Uttar Pradesh by M/s. Ajudhia Biofuels Private Limited

    AJUDHIA BIOFUELS PRIVATE LIMITED · Industrial Projects - 2

  13. Category B1EC Granted2022-11-27

    ORDINARY SAND MINE

    SUNNY GARG · Non-Coal Mining

  14. Category B1EC Granted2022-09-23

    “Ordinary Sand Mining” Project

    ABDUL VAHAB · Non-Coal Mining

All 14 proposals that name this district, newest first.