Bulandshahr, Uttar Pradesh
Recent activity
All 4 in the last 60 days- 10 Oct 2026 · Details soughtAdditional details soughtProposed Project for Cement Grinding Unit for Production of 2.5 MTPA by M/s Kanodia Cem Private Limited
- 5 Oct 2026 · DecidedTerms of Reference grantedDevelopment of Jewar Airport to Ganga Expressway via Bulandshahr Link Expressway" in the State of Uttar…
- 2 Oct 2026 · ClosedDelisted automaticallyProposed Project for Cement Grinding Unit for Production of 2.5 MTPA by M/s Kanodia Cem Private Limited
- 2 Sept 2026 · FiledSubmittedBailone Soil Mining Project
Dated by the portal's own appraisal history, converted to India Standard Time; a proposal with no recorded history appears on its register submission date.
Other clearances these proposals declare
- Forest land diversion declared
- 1
- Forest land sought for diversion
- Area not stated
- Wildlife board recommendation declared
- 0
- In or near a protected area
- 0
- In an eco-sensitive zone
- 0
These counts are taken from the application forms of the 15 of 15 proposals naming this district whose forms have been read for these questions. In 7 of those forms at least one question was left blank, and a blank answer is counted as unknown. The forest area is the area stated for forest clearance, with each forest proposal counted once, in the district where its project is primarily sited.
- Proposals naming this district
- 15
- Category A proposals
- 1
- Families declared displaced
- 270
- Families declared affected
- 270
Displacement figures are the proponents’ own declarations. A project sited across several districts declares one figure for the whole project, and that figure is counted once, in the district where the project is primarily sited.
Fifth Schedule status
Not within a Fifth Schedule Scheduled Area
No Presidential Order under paragraph 6 of the Fifth Schedule declares any Scheduled Area in Uttar Pradesh, so no part of this district is one and PESA does not apply.
OrderMinistry of Tribal Affairs, Scheduled Areas declared under paragraph 6 of the Fifth Schedule to the Constitution
What the record shows
Applicants for projects sited mainly in this district have declared 270 families to be displaced. The figure comes from their applications, and we have not verified it.
Each of these observations appears when a fixed rule is met by the figures on this page, so the same figures always give the same sentences. None of them is a view on whether a project should go ahead.
Who lives there
Figures from Census 2011, each compared with the all-India value computed on the same definition.
- Total population
- 34,99,171
- Households
- 5,87,529
- Average household size
- 5.96
- 1.11 above India's 4.85India
- Scheduled Tribe share of population
- 0.0%
- 8.5 points below IndiaIndia
- Scheduled Caste share of population
- 20.7%
- 4.1 points above IndiaIndia
- Children aged 0-6
- 15.7%
- 2.1 points above IndiaIndia
- Literacy rate
- 68.9%
- 4.1 points below IndiaIndia
- Sex ratio
- 896
- 46.3 below India's 942.6India
What they live on
How the district's workers earn a living, from Census 2011. The land-dependent share counts cultivators and agricultural labourers as a share of all workers, and it is the group most directly affected when land is acquired.
- Total workers
- 11,73,260
- Work participation rate
- 33.5%
- 6.3 points below IndiaIndia
- Workers dependent on land
- 48.9%
- 5.7 points below IndiaIndia
- Cultivators
- 28.3%
- 3.7 points above IndiaIndia
- Agricultural labourers
- 20.6%
- 9.4 points below IndiaIndia
- Marginal workers
- 24.6%
- 0.2 points below IndiaIndia
- Household industry workers
- 5.6%
- 1.8 points above IndiaIndia
How households live
Land, income and work among rural households, from the Socio Economic and Caste Census 2011, which recorded these where the population census did not. Only the survey's rural part is used here, so urban households do not appear.
- Rural households owning land
- 52.0%
- 5.9 points above IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
- Rural households whose highest earner makes over ₹5,000 a month
- 33.8%
- 9.4 points above IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
- Rural households living mainly on manual casual labour
- 52.4%
- 0.6 points above IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
- Rural households with a salaried member
- 9.4%
- 1.1 points above IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
When these were filed
Each proposal is dated by the first step in its appraisal history, the dated record of steps the portal keeps for it.
The timeline counts 14 of the 15 proposals here. The first filing date comes from each proposal's appraisal history, and we have not yet read it for the other 1, so they are left out. Most of them are older proposals, so the early part of the timeline undercounts what was filed then. The register itself records a date for each of them; the gap is in our copy of the histories.
Hatched columns undercount, so they cannot be compared with solid ones.
What kind of projects these are
The proposals naming this district, grouped by the sector each was filed under.
- Non-Coal Mining 33.3%
- Industrial Projects - 2 33.3%
- INFRA-2 13.3%
- Industrial Projects - 1 13.3%
- Other (1) 6.7%
The four largest sectors are shown by name and the rest are grouped as Other.
What is proposed here
These are the proposals in the national environmental clearance register whose application names a site in this district, newest first. A project with sites in several districts appears under each of them.
- Category B2Under Verification2026-09-02
Bailone Soil Mining Project
DEEPAK KUMAR · Non-Coal Mining
- Category AForwarded to MS SPCB/PCC by MS2026-07-25declares affected families
Development of Jewar Airport to Ganga Expressway via Bulandshahr Link Expressway" in the State of Uttar Pradesh. (Total length — 74.467 km.) by UPEIDA.
UTTAR PRADESH EXPRESSWAYS INDUSTRIAL DEVELOPMENT AUTHORITY (UPEIDA) · INFRA-1
- Category B1Forwarded to MS SPCB/PCC by MS2026-04-13
Proposed Project of riverbed Ordinary Sand Mining project located on Ganga River at Khand No. 01, Gata No. 01, Area- 9.8790 ha in Village- Unchagaon Khadar, Tehsil- Dibai, District- Bulandshahr, Uttar Pradesh of M/s Shakti Construction, Prop. Shri Sharad
SHARAD · Non-Coal Mining
- Category B2EC Granted2026-01-20
Proposed Group Housing “Golden Nest” At Plot No- CP-12 Yamuna Puram Residential / Commercial Scheme, District: Bulandshahr. Uttar Pradesh
Golden nest buildcon bsr · INFRA-2
- Category B1Referred to SEAC2025-12-19
Proposed Project for Cement Grinding Unit for Production of 2.5 MTPA by M/s Kanodia Cem Private Limited
KANODIA CEM PRIVATE LIMITED · Industrial Projects - 1
- Category B1EC Granted2025-09-29
“Ordinary Sand (Category-I) Mining” from Riverbed of Ganga River at Village- Dillipur, Gata No.- 550, Lease area- 18.00 ha., Tehsil- Gunnaur, District- Sambhal, Uttar Pradesh, Project Proponent- M/s S.S. Infratech (Prop. - Shri Raj Kumar Sharma)
RAJ SHARMA · Non-Coal Mining
- Category B1ToR Granted2025-05-06
“Ordinary Sand (Category-I) Mining” from Riverbed of Ganga River at Village- Dillipur, Gata No.- 550, Lease area- 18.00 ha., Tehsil- Gunnaur, District- Sambhal, Uttar Pradesh, Project Proponent- M/s S.S. Infratech (Prop. - Shri Raj Kumar Sharma)
RAJ SHARMA · Non-Coal Mining
- Category B1Standard ToR Granted2024-10-23
Proposed Project for Cement Grinding Unit for Production of 2.5 MTPA by M/s Kanodia Cem Private Limited
KANODIA CEM PRIVATE LIMITED · Industrial Projects - 1
- Category B1EC Granted2024-09-02
Proposed expansion of existing Sugar unit from 4500 TCD to 10000 TCD along with Co gen power plant expansion from 6.0 MW to 21 MW within existing premises at Village- Bhandoria, P.O.- Aurangabad, District- Bulandshahr (U.P.) by M/s Anamika Sugar Mills Pvt Ltd (A Unit of Shree Renuka Sugars Limited)
ANAMIKA SUGAR MILLS PRIVATE LIMITED · Industrial Projects - 2
- Category B1EC Granted2024-08-30
Expansion of existing Sugar unit from 7000 TCD to 10,000 TCD and expansion in co gen power capacity from 13.5 MW to 16.5 MW within existing industry premises at village-Sabitgarh, Tehsil: Khurja, District: Bulandshahr, Uttar Pradesh by M/s Triveni Engineering Industries Limited, (Unit: Sabitgarh, Division: Sugar)
TRIVENI ENGINEERING AND INDUSTRIES LTD · Industrial Projects - 2
- Category B1Referred to SEAC2024-07-06
COMMON BIO MEDICAL WASTE TREATMENT FACILITY
SANGAM MEDISERVE PVT LTD · INFRA-2
- Category B1Standard ToR Granted2024-02-05
Expansion of existing Sugar unit from 7000 TCD to 10,000 TCD and expansion in co gen power capacity from 13.5 MW to 16.5 MW within existing industry premises at village-Sabitgarh, Tehsil: Khurja, District: Bulandshahr, Uttar Pradesh by M/s Triveni Engineering Industries Limited, (Unit: Sabitgarh, Division: Sugar)
TRIVENI ENGINEERING AND INDUSTRIES LTD · Industrial Projects - 2
- Category B1Standard ToR Granted2024-01-29
Proposed expansion of existing Sugar unit from 4500 TCD to 10000 TCD along with Co gen power plant expansion from 6.0 MW to 21 MW within existing premises at Village- Bhandoria, P.O.- Aurangabad, District- Bulandshahr (U.P.) by M/s Anamika Sugar Mills Pvt Ltd (A Unit of Shree Renuka Sugars Limited)
ANAMIKA SUGAR MILLS PRIVATE LIMITED · Industrial Projects - 2
- Category B2EC Granted2023-09-21
EXPANSION OF DISTILLERY FROM 200 KLD (B-HEAVY MOLASSES) TO 450 KLD THROUGH ADDITION OF 250 KLD DISTILLERY (B-HEAVY MOLASSES/CANE JUICE SYRUP/GRAINS) ALONG WITH COGENERATION POWER PLANT FROM 7.0 MW TO 10.0 MW UNDER EBP AT VILL- SABITGARH, KARORA, TEH – KHURJA & DISTT - BULANDSHAHAR, UP BY M/S TRIVENI ENGINEERING & INDUSTRIES LIMITED, UNIT SABITGARH
TRIVENI ENGINEERING & INDUSTRIES LIMITED · Industrial Projects - 2
- Category B1EC Granted2023-01-24
Sand Mining at Ganga Riverbed,
SHRI SATISH KUMAR S/O SHRI ZILE SINGH · Non-Coal Mining
All 15 proposals that name this district, newest first.