← All districts

Hardoi, Uttar Pradesh

Not a Scheduled AreaCensus 2011 district code 155
  1. 21 Oct 2026 · FiledSubmittedProposed Integrated Manufacturing & Logistic Cluster (IMLC) Hardoi at Villages - Kausiya, Sarsai,…
  2. 17 Oct 2026 · DecidedTerms of Reference grantedExpansion of Existing Integrated Paint plant with addition of Drier manufacturing Facility at plot no. B4…
  3. 14 Oct 2026 · FiledSubmittedOrdinary Earth Excavation at Gata No:-399 Mi., Village-Palia Purva Sisala, Tehsil-Sawayajpur,…
  4. 2 Oct 2026 · FiledSubmittedEnvironmental clearance of proposed ordinary soil mining at Gata Nos. 25 & 28 Area-2.5590 Ha at…
  5. 8 Sept 2026 · FiledSubmittedOrdinary Earth Excavation at Gata No. –228, 222, 293 & 188, in Village: Murauli Katheria, Tehsil: Bilgram,…

Dated by the portal's own appraisal history, converted to India Standard Time; a proposal with no recorded history appears on its register submission date.

Other clearances these proposals declare

Forest land diversion declared
1
Forest land sought for diversion
Area not stated
Wildlife board recommendation declared
0
In or near a protected area
0
In an eco-sensitive zone
1

These counts are taken from the application forms of the 42 of 42 proposals naming this district whose forms have been read for these questions. In 15 of those forms at least one question was left blank, and a blank answer is counted as unknown. The forest area is the area stated for forest clearance, with each forest proposal counted once, in the district where its project is primarily sited.

Proposals naming this district
42
Category A proposals
None
Families declared displaced
None declared
Families declared affected
None declared

Displacement figures are the proponents’ own declarations. A project sited across several districts declares one figure for the whole project, and that figure is counted once, in the district where the project is primarily sited. 2 of the proposals listed below declare displacement and are sited primarily in another district, so their figures are counted in that district’s total.

Fifth Schedule status

Not within a Fifth Schedule Scheduled Area

No Presidential Order under paragraph 6 of the Fifth Schedule declares any Scheduled Area in Uttar Pradesh, so no part of this district is one and PESA does not apply.

OrderMinistry of Tribal Affairs, Scheduled Areas declared under paragraph 6 of the Fifth Schedule to the Constitution

What the record shows

  • Cultivators and agricultural labourers make up 76% of workers here, against 55% nationally, so at least three in four people who work here do so on the land.

Each of these observations appears when a fixed rule is met by the figures on this page, so the same figures always give the same sentences. None of them is a view on whether a project should go ahead.

Who lives there

Figures from Census 2011, each compared with the all-India value computed on the same definition.

Total population
40,92,845
Households
7,30,442
Average household size
5.60
0.75 above India's 4.85India
Scheduled Tribe share of population
0.0%
8.5 points below IndiaIndia
Scheduled Caste share of population
31.1%
14.5 points above IndiaIndia
Children aged 0-6
15.9%
2.4 points above IndiaIndia
Literacy rate
64.6%
8.4 points below IndiaIndia
Sex ratio
868
75.0 below India's 942.6India

What they live on

How the district's workers earn a living, from Census 2011. The land-dependent share counts cultivators and agricultural labourers as a share of all workers, and it is the group most directly affected when land is acquired.

Total workers
13,18,946
Work participation rate
32.2%
7.6 points below IndiaIndia
Workers dependent on land
76.1%
21.5 points above IndiaIndia
Cultivators
45.3%
20.6 points above IndiaIndia
Agricultural labourers
30.9%
0.9 points above IndiaIndia
Marginal workers
26.5%
1.7 points above IndiaIndia
Household industry workers
4.5%
0.7 points above IndiaIndia

How households live

Land, income and work among rural households, from the Socio Economic and Caste Census 2011, which recorded these where the population census did not. Only the survey's rural part is used here, so urban households do not appear.

Rural households owning land
64.2%
18.1 points above IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households whose highest earner makes over ₹5,000 a month
17.2%
7.1 points below IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households living mainly on manual casual labour
33.8%
18.0 points below IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households with a salaried member
3.1%
5.2 points below IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

When these were filed

Each proposal is dated by the first step in its appraisal history, the dated record of steps the portal keeps for it.

2024-Q12026-Q4

The timeline counts 35 of the 42 proposals here. The first filing date comes from each proposal's appraisal history, and we have not yet read it for the other 7, so they are left out. Most of them are older proposals, so the early part of the timeline undercounts what was filed then. The register itself records a date for each of them; the gap is in our copy of the histories.

Hatched columns undercount, so they cannot be compared with solid ones. 2026-Q4 was still running when the register was read, so its column counts only the filings made up to that date.

What kind of projects these are

The proposals naming this district, grouped by the sector each was filed under.

  • Non-Coal Mining 50%
  • Industrial Projects - 3 23.8%
  • Industrial Projects - 2 11.9%
  • INFRA-1 9.5%
  • Other (1) 4.8%

The four largest sectors are shown by name and the rest are grouped as Other.

What is proposed here

These are the proposals in the national environmental clearance register whose application names a site in this district, newest first. A project with sites in several districts appears under each of them.

  1. Category B1Under Verification2026-10-21

    Proposed Integrated Manufacturing & Logistic Cluster (IMLC) Hardoi at Villages - Kausiya, Sarsai, Deoniyapur Sarsai and Semar Jhala, Tehsil - Sawayajpur, District - Hardoi, State - Uttar Pradesh by Uttar Pradesh Expressways Industrial Development Authority (UPEIDA).

    UTTAR PRADESH EXPRESSWAYS INDUSTRIAL DEVELOPMENT AUTHORITY (UPEIDA) · INFRA-1

  2. Category B2Forwarded to MS SPCB/PCC by MS2026-10-14

    Ordinary Earth Excavation at Gata No:-399 Mi., Village-Palia Purva Sisala, Tehsil-Sawayajpur, District-Hardoi, State- Uttar Pradesh area 1.0120 ha, by M/s Baba Shyam Traders Authorised Person Shri Nanhe S/o Shri Rajjan.

    Nanhe · Non-Coal Mining

  3. Category B2Forwarded to MS SPCB/PCC by MS2026-10-02

    Environmental clearance of proposed ordinary soil mining at Gata Nos. 25 & 28 Area-2.5590 Ha at Village-Babnapur, Tehsil & District -Hardoi,Uttar Prades , of Proponent- Shri Vinay Kumar Singh

    Vinay Kumar Singh · Non-Coal Mining

  4. Category B2Under Verification2026-09-08

    Ordinary Earth Excavation at Gata No. –228, 222, 293 & 188, in Village: Murauli Katheria, Tehsil: Bilgram, District- Hardoi, Uttar Pradesh, area 2.2742 ha, by M/s Jai Durge Construction, Authorised Person Shri Vikas Mishra S/o Shri Rakesh Kumar.

    Vikas Mishra · Non-Coal Mining

  5. Category B1Forwarded to MS SPCB/PCC by MS2026-08-05

    Expansion of Existing Integrated Paint plant with addition of Drier manufacturing Facility at plot no. B4 & B5 of Sandila Industrial area, Phase I, Dist. Hardoi, Uttar Pradesh

    BERGER PAINTS INDIA LIMITED · Industrial Projects - 3

  6. Category B2Under Verification2026-07-30

    Proposed “Ordinary Soil Mining Project” at Gata No.- 303/2, 713/3, 538/1, 564, 552/2, 713/2/20, 576/1, 575/2, 575/3, 538/2, 539, 544, 545, 557, 713/6, 713/38 in Village- Sekhaura, Tehsil- Hardoi, District- Hardoi, Uttar Pradesh. (Lease Area: 2.0615 hectares) by Shri Ajay Pratap S/o Shri Jagannath

    ajay pratap · Non-Coal Mining

  7. Category B2Under Verification2026-07-23

    Proposed “Ordinary Soil Mining Project” at Gata No.- 538Mi & 539Mi in Village- Jura, Tehsil- Hardoi, District- Hardoi, Uttar Pradesh. (Lease Area: 2.450 hectares) by M/s Maa Katyani Enterprises, Proprietor- Shri Ashish Kumar Mishra

    ashish kumar mishra · Non-Coal Mining

  8. Category B2Proposal Accepted and Referred to SEAC2026-07-17

    Ordinary Soil Excavation Project at Gata No.- 3658 मि, 3675 मि, 3633 मि, 3633मि., 3683 मि, Village- Kurseli, Tehsil- Hardoi, District- Hardoi, State- Uttar Pradesh, area 1.6880 ha, by M/s Maa Enterprises, Authorised Person- Shri Sumit Kumar Singh S/o Shri Harinam Singh

    SUMIT SINGH · Non-Coal Mining

  9. Category B2Under Verification2026-07-17

    Ordinary Earth Excavation Project at Gata No.- 89, 103, 103मि, Village-Bheekhpur, Tehsil-Hardoi, District-Hardoi, State- Uttar Pradesh area 0.9783 ha, by M/s Maa Enterprises, Authorised Person - Shri Sumit Kumar Singh

    SUMIT SINGH · Non-Coal Mining

  10. Category B1Pending at MS SEIAA2026-07-17declares affected families

    Development of Agra-Lucknow Expressway to Ganga Expressway via Farrukhabad Link Project in the State of Uttar Pradesh by UPEIDA.

    UTTAR PRADESH EXPRESSWAYS INDUSTRIAL DEVELOPMENT AUTHORITY (UPEIDA) · INFRA-1

  11. Category B2Under Verification2026-07-15

    Proposed “Ordinary Soil Mining Project” at Gata No.- 876, 262झ, 844, 1032अअ, 10, 1032झ, 1032अआ in Village- Patkuawan, Tehsil- Hardoi, District- Hardoi, Uttar Pradesh. (Lease Area: 2.0302 hectares) by M/S Chandra Construction, Proprietor-Shri Suhail Haseeb

    SUHAIL HASEEB · Non-Coal Mining

  12. Category B2Proposal Accepted and Referred to SEAC2026-07-06

    Ordinary Earth Excavation Project at Gata No.- 104सं., 104मि., 104मि., 104मि., Village-Sakaha, Tehsil-Hardoi, District- Hardoi, State- Uttar Pradesh, area 2.2452 ha, by M/s Ranveer Yadav Construction and Supplier, Authorised Person, Shri Ranveer Yadav

    RANVEER YADAV · Non-Coal Mining

  13. Category B2Pending at MS SEIAA2026-05-18

    "Ordinary Earth Mining Project" at Gata No.- 447, 451, 452, 503, 506, in Village- Saidapur, Tehsil- Bilgram, District- Hardoi, State- Uttar Pradesh over an area of 3.4296 ha. by M/s Vinai Kumar Singh, Authorized Person, Shri Vinay Kumar Singh

    Vinay Kumar Singh · Non-Coal Mining

  14. Category B2EC Granted2026-04-14

    Proposed “Ordinary Soil Mining Project” at Gata No.- 100, 95, 58, 80, 94 & 66 in Village- Dudhiya, Tehsil- Hardoi, District- Hardoi, Uttar Pradesh. (Lease Area: 1.7737 Ha.) by M/S Chandra Construction, Proprietor-Shri Suhail Haseeb

    SUHAIL HASEEB · Non-Coal Mining

  15. Category B1Proposal pulled back (withdrawn)2026-04-03

    Expansion of Existing Integrated Paint plant with addition of drier manufacturing Facility at plot no. B4 & B5 of Sandila Industrial area, Phase I, Dist. Hardoi, UP

    BERGER PAINTS INDIA LIMITED · Industrial Projects - 3

  16. Category B2EC Granted2026-03-23

    Proposed “Ordinary Soil Mining Project” at Gata No.- 146Mi & 129Mi in Village- Ramapur Raholiya, Tehsil- Hardoi, District- Hardoi, Uttar Pradesh. (Lease Area: 1.366Ha.)

    SUHAIL HASEEB · Non-Coal Mining

  17. Category B2EC Granted2026-01-30

    Ordinary Earth Mining project at Gata No.- 143mi, 175, 176, 177, 179, 185, Village- Dudhiya, Tehsil- Hardoi, District- Hardoi, State- Uttar Pradesh, area-1.5987 ha. by M/s Maa Enterprises, Authorized Person- Shri Sumit Kumar Singh.

    SUMIT SINGH · Non-Coal Mining

  18. Category B1Forwarded to MS SPCB/PCC by MS2025-12-15declares affected families

    Development of Agra-Lucknow Expressway to Ganga Expressway via Farrukhabad Link Project in the State of Uttar Pradesh by UPEIDA.

    UTTAR PRADESH EXPRESSWAYS INDUSTRIAL DEVELOPMENT AUTHORITY (UPEIDA) · INFRA-1

  19. Category B1EC Granted2025-11-28

    Environmental Clearance for Proposed Project of Manufacturing of Different Types of Resin by M/s Tajpuria Panels Private Limited

    ASHOK KUMAR AGARWAL · Industrial Projects - 3

  20. Category B1ToR Granted2025-10-18

    Proposed Integrated Manufacturing & Logistic Cluster (IMLC) Hardoi at Villages - Kausiya, Sarsai, Deoniyapur Sarsai and Semar Jhala, Tehsil - Sawayajpur, District - Hardoi, State - Uttar Pradesh by Uttar Pradesh Expressways Industrial Development Authority (UPEIDA).

    UTTAR PRADESH EXPRESSWAYS INDUSTRIAL DEVELOPMENT AUTHORITY (UPEIDA) · INFRA-1

  21. Category B2EC Granted2025-10-10

    proposed “Soil Excavation Project” at Gata No. 90, 56,150,144, Mining Lease Area 2.8943 ha, Village- Shapur Mugul, Tehsil & District: Hardoi, Uttar Pradesh for M/s Ranveer Yadav Construction and Supplier Proprietor- Shri Ranveer Yadav .

    RANVEER YADAV · Non-Coal Mining

  22. Category B2EC Granted2025-10-08

    Ordinary Earth Mining Project" at Gata No.– 72, 73, 133, 134, Village- Darra, Tehsil- Shahabad, District- Hardoi of State- Uttar Pradesh, Area- 2.3526 ha By Shri Amit Kumar Dixit

    AMIT KUMAR DIXIT · Non-Coal Mining

  23. Category B1ToR Granted2025-10-03

    Proposed expansion of existing Distillery (Grain Based) from 66 KLD to 100 KLD and Addition of 100 KLD new Distillery setup based on Molasses/Grain (Total Capacity after expansion – 200 KLD) with Co-Gen Power Expansion from 2.4 MW to 6.0 MW at B-2/6 & B-2/7 UPSIDC Industrial Area, Sandila Phase-IV, Lucknow Hardoi Road, Tehsil -Sandila, District- Hardoi, Uttar Pradesh

    SHRI GANG INDUSTRIES AND ALLIED PRODUCTS LIMITED · Industrial Projects - 2

  24. Category B1ToR Granted2025-09-13

    Riverbed Ordinary sand mining” having lease area- 6.8250 ha along river Garra at Gata No. 7, 8, 9, 10, 11, 85, 86, 87, 88, 89, 90, 91, 92, 93, 94, 105, 106, 107, 115, 116, 117, Village – Pariyal Panchshala, Tehsil - Shahabad, District -Hardoi, Uttar Pradesh of M/s Bala Ji Construction

    GANGA RAM · Non-Coal Mining

  25. Category B1ToR Granted2025-05-21

    Environmental Clearance for Proposed Project of Manufacturing of Different Types of Resin by M/s Tajpuria Panels Private Limited

    ASHOK KUMAR AGARWAL · Industrial Projects - 3

  26. Category B2EC Granted2025-01-06

    “Ordinary Earth Mining Project” at Gata No.-114/12/1, 114/12/1/, 114/12 Mi, 113Mi, 114/5, 114/14, 273, 274/1, 272/1, 588/3, 280, 584, 330/2, 325/6, 588/1, 114/13 Village: Sekhaura, Tehsil:Hardoi, District- Hardoi, Uttar Pradesh.

    RANVEER YADAV · Non-Coal Mining

  27. Category B2EC Granted2024-12-17

    Ordinary Soil Excavation Mining Project

    farooq ahmad · Non-Coal Mining

  28. Category B1EC Granted2024-07-23

    Expansion of Integrated Paints Plant at Plot no. B4 & B5, Sandila Industrial Area, Dist. Hardoi, Uttar Pradesh

    BERGER PAINTS INDIA LIMITED · Industrial Projects - 3

  29. Category B1EC Granted2024-06-19

    M/S. GREENPLY SANDILA PRIVATE LIMITED

    GREENPLY SANDILA PRIVATE LIMITED · Industrial Projects - 3

  30. Category B1EC Granted2024-05-24

    Proposed Development of 1,000 acre (404.69 Ha.) Mega Integrated Textile Region and Apparel Park at Lucknow

    KAILASH VERMA · INFRA-2

  31. Category B1EC Granted2024-04-27

    EXPANSION OF EXISTING 55 KLD DISTILLERY TO 66 KLD GRAIN BASED DISTILLERY PLANT ALONG WITH CO GEN POWER FROM – 2.0 MW TO 2.4 MW WITHIN EXISTING PREMISES AT B-2/6 & B-2/7 UPSIDC INDUSTRIAL AREA, SANDILA PHASE-IV, LUCKNOW HARDOI ROAD, TEHSIL -SANDILA, DISTRICTHARDOI, UTTAR PRADESH BY M/S SHRI GANG INDUSTRIES AND ALLIED PRODUCTS LIMITED

    SHRI GANG INDUSTRIES AND ALLIED PRODUCTS LIMITED · Industrial Projects - 2

  32. Category B1Under Examination2024-04-26

    EXPANSION OF EXISTING 55 KLD DISTILLERY TO 66 KLD GRAIN BASED DISTILLERY PLANT ALONG WITH CO GEN POWER FROM – 2.0 MW TO 2.4 MW WITHIN EXISTING PREMISES AT B-2/6 & B-2/7 UPSIDC INDUSTRIAL AREA, SANDILA PHASE-IV, LUCKNOW HARDOI ROAD, TEHSIL -SANDILA, DISTRICTHARDOI, UTTAR PRADESH BY M/S SHRI GANG INDUSTRIES AND ALLIED PRODUCTS LIMITED

    SHRI GANG INDUSTRIES AND ALLIED PRODUCTS LIMITED · Industrial Projects - 2

  33. Category B1EC Granted2024-04-17

    Expansion of existing Sugar unit from 7500 TCD to 15,000 TCD along with expansion of existing co gen power capacity from 25 MW to 50 MW within existing industry premises at village-Loni, Tehsil: Shahabad, District– Hardoi, Uttar Pradesh by M/s DCM Shriram Ltd., Sugar Unit- Loni.

    DCM SHRIRAM LIMITED · Industrial Projects - 2

  34. Category B1EC Granted2024-04-01

    Riverbed Ordinary sand mining” having lease area- 6.8250 ha along river Garra at Gata No. 7, 8, 9, 10, 11, 85, 86, 87, 88, 89, 90, 91, 92, 93, 94, 105, 106, 107, 115, 116, 117, Village – Pariyal Panchshala, Tehsil - Shahabad, District -Hardoi, Uttar Pradesh of M/s Bala Ji Construction

    GANGA RAM · Non-Coal Mining

  35. Category B1Standard ToR Granted2024-03-05

    Proposed Development of 1,000 acre (404.69 Ha.) Mega Integrated Textile Region and Apparel Park at Lucknow

    KAILASH VERMA · INFRA-2

  36. Category B1TOR Granted2023-11-23

    Environmental Clearance of manufacturing of synthetic organic chemicals for the existing production capacity of 40,000 Ton/Year Formaldehyde under Violation Category at Plot No. K-1, Phase 1, UPSIDC, Industrial Area Sandila, Hardoi - 241127

    FOCUS MERCHANTS LIMITED · Industrial Projects - 3

  37. Category B1TOR GRANTED2023-10-16

    Expansion of existing Sugar unit from 7500 TCD to 15,000 TCD along with expansion of existing co gen power capacity from 25 MW to 50 MW within existing industry premises at village-Loni, Tehsil: Shahabad, District– Hardoi, Uttar Pradesh by M/s DCM Shriram Ltd., Sugar Unit- Loni.

    DCM SHRIRAM LIMITED · Industrial Projects - 2

  38. Category B1TOR GRANTED2023-08-29

    M/S. GREENPLY SANDILA PRIVATE LIMITED

    GREENPLY SANDILA PRIVATE LIMITED · Industrial Projects - 3

  39. Category B1TOR Granted2023-05-16

    Riverbed Ordinary sand mining” having lease area- 6.8250 ha along river Garra at Gata No. 7, 8, 9, 10, 11, 85, 86, 87, 88, 89, 90, 91, 92, 93, 94, 105, 106, 107, 115, 116, 117, Village – Pariyal Panchshala, Tehsil - Shahabad, District -Hardoi, Uttar Pradesh of M/s Bala Ji Construction

    GANGA RAM · Non-Coal Mining

  40. Category B2EC Granted2023-04-17

    Ordinary Earth Mining Project

    SUMIT SINGH · Non-Coal Mining

  41. Category B1EC Granted2022-12-01

    Expansion of Integrated Paints Plant at Plot no. B4 & B5, Sandila Industrial Area, Dist. Hardoi, Uttar Pradesh

    BERGER PAINTS INDIA LIMITED · Industrial Projects - 3

  42. Category B1TOR Granted2022-10-14

    Environmental Clearance of manufacturing of synthetic organic chemicals for the existing production capacity of 1 TPD Crotonaldehyde under Violation Category at Plot No. A-20, UPSIDC, Phase-2, Industrial Area Sandila, Hardoi, Uttar Pradesh of M/s The Lakshmiji Organics Pvt. Ltd

    M/S THE LAKSHMIJI ORGANICS PVT. LTD. · Industrial Projects - 3

All 42 proposals that name this district, newest first.