Rae Bareli, Uttar Pradesh
Recent activity
All 4 in the last 60 days- 18 Oct 2026 · DecidedEnvironmental clearance grantedRiverbed ordinary sand” mining having lease area - 11.30 ha along River Ganga in Khand No. -2, Gata No.…
- 8 Oct 2026 · FiledSubmittedProposed “Ordinary Earth Excavation/Mining Project” at Gata No.- 60 Village: Nandakheda, Tehsil:…
- 7 Oct 2026 · FiledSubmittedProposed “Ordinary Earth Excavation/Mining Project” at Gata No.- 198, 199, 242, 245, 246, 248 Village:…
- 31 Aug 2026 · Details soughtAdditional details soughtOrdinary Earth Mining Project Gata No.- 516, 480 Village: Jaraula, Tehsil: Raebareli, District- Raebareli,…
Dated by the portal's own appraisal history, converted to India Standard Time; a proposal with no recorded history appears on its register submission date.
Other clearances these proposals declare
- Forest land diversion declared
- 0
- Forest land sought for diversion
- None declared
- Wildlife board recommendation declared
- 0
- In or near a protected area
- 0
- In an eco-sensitive zone
- 0
These counts are taken from the application forms of the 35 of 35 proposals naming this district whose forms have been read for these questions. In 21 of those forms at least one question was left blank, and a blank answer is counted as unknown. The forest area is the area stated for forest clearance, with each forest proposal counted once, in the district where its project is primarily sited.
- Proposals naming this district
- 35
- Category A proposals
- 3
- Families declared displaced
- 135
- Families declared affected
- 135
Displacement figures are the proponents’ own declarations. A project sited across several districts declares one figure for the whole project, and that figure is counted once, in the district where the project is primarily sited.
Fifth Schedule status
Not within a Fifth Schedule Scheduled Area
No Presidential Order under paragraph 6 of the Fifth Schedule declares any Scheduled Area in Uttar Pradesh, so no part of this district is one and PESA does not apply.
OrderMinistry of Tribal Affairs, Scheduled Areas declared under paragraph 6 of the Fifth Schedule to the Constitution
What the record shows
Agricultural labourers, who work other people's land for wages, make up 42% of workers here. Compensation for acquired land is paid to those who hold title to it, so it does not reach them. They can still claim the rehabilitation and resettlement entitlements of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (RFCTLARR), because its section 3(c) counts a family whose livelihood depends on the land as an affected family, wherever that Act governs how the land is obtained.
Applicants for projects sited mainly in this district have declared 135 families to be displaced. The figure comes from their applications, and we have not verified it.
Each of these observations appears when a fixed rule is met by the figures on this page, so the same figures always give the same sentences. None of them is a view on whether a project should go ahead.
Who lives there
Figures from Census 2011, each compared with the all-India value computed on the same definition.
- Total population
- 34,05,559
- Households
- 6,19,707
- Average household size
- 5.50
- 0.65 above India's 4.85India
- Scheduled Tribe share of population
- 0.1%
- 8.5 points below IndiaIndia
- Scheduled Caste share of population
- 30.3%
- 13.6 points above IndiaIndia
- Children aged 0-6
- 14.2%
- 0.6 points above IndiaIndia
- Literacy rate
- 67.3%
- 5.7 points below IndiaIndia
- Sex ratio
- 943
- 0.60 above India's 942.6India
What they live on
How the district's workers earn a living, from Census 2011. The land-dependent share counts cultivators and agricultural labourers as a share of all workers, and it is the group most directly affected when land is acquired.
- Total workers
- 12,04,710
- Work participation rate
- 35.4%
- 4.4 points below IndiaIndia
- Workers dependent on land
- 68.5%
- 13.9 points above IndiaIndia
- Cultivators
- 26.3%
- 1.7 points above IndiaIndia
- Agricultural labourers
- 42.2%
- 12.2 points above IndiaIndia
- Marginal workers
- 46.5%
- 21.7 points above IndiaIndia
- Household industry workers
- 5.0%
- 1.2 points above IndiaIndia
How households live
Land, income and work among rural households, from the Socio Economic and Caste Census 2011, which recorded these where the population census did not. Only the survey's rural part is used here, so urban households do not appear.
- Rural households owning land
- 60.3%
- 14.2 points above IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
- Rural households whose highest earner makes over ₹5,000 a month
- 23.7%
- 0.6 points below IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
- Rural households living mainly on manual casual labour
- 56.4%
- 4.6 points above IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
- Rural households with a salaried member
- 6.3%
- 2.0 points below IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
When these were filed
Each proposal is dated by the first step in its appraisal history, the dated record of steps the portal keeps for it.
The timeline counts 27 of the 35 proposals here. The first filing date comes from each proposal's appraisal history, and we have not yet read it for the other 8, so they are left out. Most of them are older proposals, so the early part of the timeline undercounts what was filed then. The register itself records a date for each of them; the gap is in our copy of the histories.
Hatched columns undercount, so they cannot be compared with solid ones. 2026-Q4 was still running when the register was read, so its column counts only the filings made up to that date.
What kind of projects these are
The proposals naming this district, grouped by the sector each was filed under.
- Non-Coal Mining 65.7%
- Industrial Projects - 1 14.3%
- Thermal Projects 8.6%
- Industrial Projects - 3 5.7%
- Other (1) 5.7%
The four largest sectors are shown by name and the rest are grouped as Other.
What is proposed here
These are the proposals in the national environmental clearance register whose application names a site in this district, newest first. A project with sites in several districts appears under each of them.
- Category B2Forwarded to MS SPCB/PCC by MS2026-10-08
Proposed “Ordinary Earth Excavation/Mining Project” at Gata No.- 60 Village: Nandakheda, Tehsil: Raebareli, District- Raebareli, Uttar Pradesh.
SUNIL KUMAR · Non-Coal Mining
- Category B2Forwarded to MS SPCB/PCC by MS2026-10-07
Proposed “Ordinary Earth Excavation/Mining Project” at Gata No.- 198, 199, 242, 245, 246, 248 Village: Haivatmau, Tehsil: Raebareli, District- Raebareli, Uttar Pradesh.
ABHISHEK YADAV · Non-Coal Mining
- Category AUnder Processing with Authority2026-08-13declares affected families
Feroze Gandhi Unchahar Thermal Power Station, Stage - II (2x210MW)
NTPC LIMITED · Thermal Projects
- Category AEC Granted2026-06-18
Expansion by addition of 500 MW (Stage-IV) Coal Based Thermal Power Plant at Feroz Gandhi Unchahar Thermal Power Station at Raebareli District in Uttar Pradesh- reg. Environmental Clearance
NTPC LIMITED · Thermal Projects
- Category B2ADS Raised2026-05-23
Ordinary Earth Mining Project Gata No.- 516, 480 Village: Jaraula, Tehsil: Raebareli, District- Raebareli, Uttar Pradesh.
SHAILENDRA KUMAR · Non-Coal Mining
- Category B2EC Granted2026-03-29
Ordinary Earth Mining Project Gata No.- 1903, Village: Lodhwari, Tehsil: Raebareli, District- Raebareli, Uttar Pradesh.
SHAILENDRA KUMAR · Non-Coal Mining
- Category AProposal returned in present form2026-03-13
1x210 MW Feroze Gandhi Unchahar Thermal Power Project (FGUTPP) Stage-III expansion at Unchahar, Distt. Raebareli, Uttar Pradesh of NTPC Ltd
NTPC LIMITED · Thermal Projects
- Category B2EC Granted2026-02-25
Ordinary Earth Mining Project Gata No.- 355, 356, 280, 9, 271, 12, 15, 24 Village: Nakphulha, Tehsil: Raebareli, District- Raebareli, Uttar Pradesh.
UDAI CHAUDHARI · Non-Coal Mining
- Category B2EC Granted2026-02-17
Proposed “Belakhara Soil Deposit Mining Project” of Shri Raghvinder S/o Shri Dal Bahadur, located at Gata No. 1888Mi (Khata No. 15), 1888Mi (Khata No. 121), 1856Mi (Khata No. 213) & 1856Mi (Khata No. 927), Area- 1.264 ha located at Village- Belakhara, Tehsil- Raebareli, District- Raebareli, State- Uttar Pradesh
RAGHVINDDAR · Non-Coal Mining
- Category B2EC Granted2026-02-17
Proposed Ordinary Earth Mining Project of Bhuvnesh Pratap Singh S/o Shri Samarjeet Singh, located at Gata No. 424,425,437, Area- 2.7220 ha located at Village- Mohgawan, Tehsil- Raebareli, District- Raebareli, State- Uttar Pradesh
BHUVNESH SINGH · Non-Coal Mining
- Category B2EC Granted2025-12-01
Ordinary Soil Mining Project
Abhishek Shukla · Non-Coal Mining
- Category B2EC Granted2025-11-30
“Ordinary Soil Mining Project” at Gata No.- 1466, 1468 & 1473 in Village-Rupamau, Tehsil- Raebareli & Distt- Raebareli, Uttar Pradesh. (Lease Area: 0.822Ha.) Project Proponent - Shri Saurabh Srivastava
SAURABH SRIVASTAVA · Non-Coal Mining
- Category B2EC Granted2025-09-24
Proposed “Ordinary Earth Mining Project” of M/s Navneet Trading Company, Pro. Shri Abhishek Srivatava, located at Gata No. 164, 190, Area- 0.9906 ha located at Village- Lalupur Khas, Tehsil- Raebareli, District- Raebareli, and State- Uttar Pradesh
ABHISHEK SRIVASTAVA · Non-Coal Mining
- Category B2EC Granted2025-09-16
Proposed “Ordinary Earth Mining Project” of Bhuvnesh Pratap Singh S/o Shri Samar Jeet Singh, located at Gata No. 144, 145, 172, 201, 154, 189, 70, 179mi, 173mi, 198, Area- 2.2190 ha located at Village- Khanuva, Tehsil- Raebareli, District- Raebareli, State- Uttar Pradesh
BHUVNESH SINGH · Non-Coal Mining
- Category B1EC Granted2025-09-15
Riverbed ordinary sand” mining having lease area - 11.30 ha along River Ganga in Khand No. -2, Gata No. 1395mi at Village-Khajurgaon, Tehsil-Lalganj, District – Raebareli, Uttar Pradesh
BHOOPENDER SINGH · Non-Coal Mining
- Category B1EC Granted2025-04-23
Sand Mining at river Bed of Ganga River Khand No.-1, Gata No 1395 mi Village – Khajurgaon , Tehsil - Lalganj, District – Raebareli, Uttar Pradesh
BHOOPENDER SINGH · Non-Coal Mining
- Category B2EC Granted2025-04-18
Proposed “Ordinary Earth Mining Project” of Pradeep Kumar S/o Shri Suresh Kumar, located at Gata No. 549, Area- 1.9820 ha located at Village- Amanwa, Tehsil- Raebareli, District- Raebareli, State- Uttar Pradesh
PRADEEP KUMAR · Non-Coal Mining
- Category B2EC Granted2025-04-18
Proposed “Ordinary Earth Mining Project” of Shri Raghvinder S/o Shri Dal Bahadur, located at Gata No. 693, 698, 707, 689, 687, Area- 1.2270 ha located at Village- Behta Khurd, Tehsil- Raebareli, District- Raebareli, State- Uttar Pradesh.
RAGHVINDDAR · Non-Coal Mining
- Category B1ToR Granted2024-10-18
Riverbed ordinary sand” mining having lease area - 11.30 ha along River Ganga in Khand No. -2, Gata No. 1395mi at Village-Khajurgaon, Tehsil-Lalganj, District – Raebareli, Uttar Pradesh
BHOOPENDER SINGH · Non-Coal Mining
- Category B1ToR Granted2024-10-18
Sand Mining at river Bed of Ganga River Khand No.-1, Gata No 1395 mi Village – Khajurgaon , Tehsil - Lalganj, District – Raebareli, Uttar Pradesh
BHOOPENDER SINGH · Non-Coal Mining
- Category B2EC Granted2024-02-07
Proposed Ordinary Soil Mining Project of Prop. Shri Ajay Singh located at Khasra / Gata No. 453,223,243,211,212, Village – Sulakhiyapur, Tehsil- Rae Bareli, District- Rae Bareli, Uttar Pradesh. Sanctioned Lease Area – 1.9960 ha
BHUVNESH SINGH · Non-Coal Mining
- Category B2EC Granted2024-02-05
Proposed Ordinary Soil Mining Project of Prop. Shri Raghvinddar located at Khasra / Gata No. Gata(s) no. 323, Village – Jaraula, Tehsil- Rae Bareli, District- Rae Bareli, Uttar Pradesh. Sanctioned Lease Area – 0.816 ha.
RAGHVINDDAR · Non-Coal Mining
- Category B2EC Granted2024-02-03
Proposed Ordinary Soil Mining Project of M/s Maa Ganga Enterprises, Prop. Shri Ramesh Kumar Singh located at Khasra / Gata No. Gata(s) no. 119mi, 130mi, 136mi,136mi, 135, 131mi,432, 130s, 131s, 131mi, Village – Mohgawan, Tehsil- Rae Bareli, District- Rae Bareli, Uttar Pradesh. Sanctioned Lease Area – 1.7400 ha
RAMESH · Non-Coal Mining
- Category B2EC Granted2024-02-01
Proposed Ordinary Soil Mining Project of Prop. Shri Ajay Singh located at Khasra / Gata No. Gata(s) no. 500, Village – Nanda Kheda, Tehsil- Rae Bareli, District- Rae Bareli, Uttar Pradesh. Sanctioned Lease Area – 1.0810 ha.
AJAY SINGH · Non-Coal Mining
- Category B2EC Granted2024-01-29
Proposed Ordinary Soil Mining Project of Prop. Shri Udai Bhan Chaudhari located at Khasra / Gata No. Gata(s) no. 11,13mi, 272mi, 281, Village – Nak Phulha, Tehsil- Rae Bareli, District- Rae Bareli, Uttar Pradesh. Sanctioned Lease Area – 1.6760 ha.
UDAI CHAUDHARI · Non-Coal Mining
- Category B1EC Granted2024-01-24
proposed expansion from Steel Billets/Ingot - 23100 TPA to 69300 TPA, TMT/Round/Bars/Sections & Long Products - 82500 TPA to 99000 TPA at Plot No - D - 19, D - 20, D - 21, D - 32, D - 33 & D – 34, UPSIDC, Industrial Area Phase II, Amawan Road, Raebareli (U.P.).
HOIN MAL SONS ENTERPRISES PRIVATE LIMITED · Industrial Projects - 1
- Category B2EC Granted2024-01-04
Proposed Ordinary Earth Mining Project of Shri Rakesh Kumar Pandey S/o Shri Shiv Sagar Pandey located at Khasra / Gata No. 330, 337, 348, Village – Khanuva, Tehsil- Rae Bareli, District- Rae Bareli , Uttar Pradesh. Sanctioned Lease Area – 2.3410 ha.
RAKESH PANDEY · Non-Coal Mining
- Category B1TOR GRANTED2023-11-23
proposed expansion from Steel Billets/Ingot - 23100 TPA to 69300 TPA, TMT/Round/Bars/Sections & Long Products - 82500 TPA to 99000 TPA at Plot No - D - 19, D - 20, D - 21, D - 32, D - 33 & D – 34, UPSIDC, Industrial Area Phase II, Amawan Road, Raebareli (U.P.).
HOIN MAL SONS ENTERPRISES PRIVATE LIMITED · Industrial Projects - 1
- Category B1EC Granted2023-10-19
Proposed Clinker Grinding unit capacity 3,60,000 TPA (1000 TPD) at Plot No: UD -1, Industrial Area, Sultanpur Road, Tehsil & Distt: Raebareli (U.P.) by M/s Unicem Cement Private Limited
UNICEM CEMENT PRIVATE LIMITED · Industrial Projects - 1
- Category B1EC Granted2023-06-19
Manufacturing of API/Bulk Drugs/Pharmaceutical products at Plot No A3, Industrial Area Raebareli Site-2, District- Raebareli - 229316, Uttar Pradesh by Raspa Pharma Private Limited
RASPA PHARMA PRIVATE LIMITED · Industrial Projects - 3
- Category B1EC Granted2023-06-18
FERROSANG ENVIRO SOLUTIONS PRIVATE LIMITED
FERROSANG ENVIRO SOLUTIONS PRIVATE LIMITED · INFRA-2
- Category B1EC Granted2023-05-28
Proposed Clinker Grinding Unit of 2,00,000 TPA Cement (OPC, PPC) at Plot No C-19,20 UPSIDA-II, Industrial Area, Raebareli, Uttar Pradesh by M/s Elephant Cements Private Limited.
ELEPHANT CEMENTS PRIVATE LIMITED · Industrial Projects - 1
- Category B1TOR GRANTED2023-03-30
Manufacturing of API/Bulk Drugs/Pharmaceutical products at Plot No A3, Industrial Area Raebareli Site-2, District- Raebareli - 229316, Uttar Pradesh by Raspa Pharma Private Limited
RASPA PHARMA PRIVATE LIMITED · Industrial Projects - 3
- Category B1TOR GRANTED2023-02-13
FERROSANG ENVIRO SOLUTIONS PRIVATE LIMITED
FERROSANG ENVIRO SOLUTIONS PRIVATE LIMITED · INFRA-2
- Category B1TOR GRANTED2023-02-02
Proposed Clinker Grinding Unit of 2,00,000 TPA Cement (OPC, PPC) at Plot No C-19,20 UPSIDA-II, Industrial Area, Raebareli, Uttar Pradesh by M/s Elephant Cements Private Limited.
ELEPHANT CEMENTS PRIVATE LIMITED · Industrial Projects - 1
All 35 proposals that name this district, newest first.