← All districts

Kanpur Nagar, Uttar Pradesh

Not a Scheduled AreaCensus 2011 district code 164
  1. 26 Oct 2026 · Details soughtEssential details soughtTaj Hotel, Ginger Hotel, Commercial, and Service Apartment Development
  2. 24 Oct 2026 · Details soughtAdditional details soughtProposed “Anand Saffron Residency"at Bairi Akbarpur kachar, Katri Kheora, Kanpur, Uttar Pradesh, Pin code:…
  3. 21 Oct 2026 · FiledSubmittedProposed Construction of 2030 Prisons Capacity New District Jail Kanpur Nagar at Village-Sarsaul, Hathi…
  4. 17 Oct 2026 · DecidedEnvironmental clearance grantedProposed Project of “Ordinary Sand Mine Category-1” Gata No. 12, Village – Katari Durgapur, Tehsil –…
  5. 5 Oct 2026 · Details soughtEssential details soughtKanpur Fertilizers & Chemicals Limited
  6. 28 Sept 2026 · DecidedEnvironmental clearance grantedProposed Project of “Ordinary Sand Mine Category-1” Gata No. 698क, 698ड़, 698च, 698छ, 699, 721, over an…
  7. 28 Sept 2026 · DecidedEnvironmental clearance granted“Morrum Mining” from Riverbed of Yamuna River at Village- Samuhi, Gata No.- 1598 Ch, Lease Area- 27.50…
  8. 28 Sept 2026 · DecidedEnvironmental clearance grantedOASIS SKYLINE-A GROUP HOUSING PROJECT
  9. 16 Sept 2026 · DecidedEnvironmental clearance grantedProposed “Anand Eco Green” at Arazi No. 177,178,193,195,174 KHA, 180,173,196KA, 197, 174KA, 176KA & 194,…
  10. 10 Sept 2026 · FiledSubmittedTaj Hotel, Ginger Hotel, Commercial, and Service Apartment Development
  11. 9 Sept 2026 · Details soughtAdditional details sought"Proposed Apex Trauma Centre (661 bedded) Hospital Building at Kanpur" by Lala Lajpat Rai Campus…

Dated by the portal's own appraisal history, converted to India Standard Time; a proposal with no recorded history appears on its register submission date.

Other clearances these proposals declare

Forest land diversion declared
2
Forest land sought for diversion
Area not stated
Wildlife board recommendation declared
0
In or near a protected area
0
In an eco-sensitive zone
0

These counts are taken from the application forms of the 38 of 38 proposals naming this district whose forms have been read for these questions. In 11 of those forms at least one question was left blank, and a blank answer is counted as unknown. The forest area is the area stated for forest clearance, with each forest proposal counted once, in the district where its project is primarily sited.

Proposals naming this district
38
Category A proposals
6
Families declared displaced
52
Families declared affected
317

Displacement figures are the proponents’ own declarations. A project sited across several districts declares one figure for the whole project, and that figure is counted once, in the district where the project is primarily sited.

Fifth Schedule status

Not within a Fifth Schedule Scheduled Area

No Presidential Order under paragraph 6 of the Fifth Schedule declares any Scheduled Area in Uttar Pradesh, so no part of this district is one and PESA does not apply.

OrderMinistry of Tribal Affairs, Scheduled Areas declared under paragraph 6 of the Fifth Schedule to the Constitution

What the record shows

  • Applicants for projects sited mainly in this district have declared 52 families to be displaced. The figure comes from their applications, and we have not verified it.

Each of these observations appears when a fixed rule is met by the figures on this page, so the same figures always give the same sentences. None of them is a view on whether a project should go ahead.

Who lives there

Figures from Census 2011, each compared with the all-India value computed on the same definition.

Total population
45,81,268
Households
8,63,338
Average household size
5.31
0.46 above India's 4.85India
Scheduled Tribe share of population
0.1%
8.5 points below IndiaIndia
Scheduled Caste share of population
17.8%
1.2 points above IndiaIndia
Children aged 0-6
11.1%
2.4 points below IndiaIndia
Literacy rate
79.7%
6.7 points above IndiaIndia
Sex ratio
863
80.1 below India's 942.6India

What they live on

How the district's workers earn a living, from Census 2011. The land-dependent share counts cultivators and agricultural labourers as a share of all workers, and it is the group most directly affected when land is acquired.

Total workers
15,72,232
Work participation rate
34.3%
5.5 points below IndiaIndia
Workers dependent on land
29.1%
25.5 points below IndiaIndia
Cultivators
12.6%
12.0 points below IndiaIndia
Agricultural labourers
16.5%
13.5 points below IndiaIndia
Marginal workers
21.8%
2.9 points below IndiaIndia
Household industry workers
4.4%
0.6 points above IndiaIndia

How households live

Land, income and work among rural households, from the Socio Economic and Caste Census 2011, which recorded these where the population census did not. Only the survey's rural part is used here, so urban households do not appear.

Rural households owning land
37.2%
8.9 points below IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households whose highest earner makes over ₹5,000 a month
19.0%
5.4 points below IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households living mainly on manual casual labour
41.2%
10.6 points below IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households with a salaried member
9.4%
1.2 points above IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

When these were filed

Each proposal is dated by the first step in its appraisal history, the dated record of steps the portal keeps for it.

2023-Q22026-Q4

The timeline counts 36 of the 38 proposals here. The first filing date comes from each proposal's appraisal history, and we have not yet read it for the other 2, so they are left out. Most of them are older proposals, so the early part of the timeline undercounts what was filed then. The register itself records a date for each of them; the gap is in our copy of the histories.

Hatched columns undercount, so they cannot be compared with solid ones. One of them covers a period for which we have read few filing dates so far, and it counts only the proposals whose date we have. 2026-Q4 was still running when the register was read, so its column counts only the filings made up to that date.

What kind of projects these are

The proposals naming this district, grouped by the sector each was filed under.

  • INFRA-2 57.9%
  • Non-Coal Mining 26.3%
  • INFRA-1 10.5%
  • Industrial Projects - 3 2.6%
  • Other (1) 2.6%

The four largest sectors are shown by name and the rest are grouped as Other.

What is proposed here

These are the proposals in the national environmental clearance register whose application names a site in this district, newest first. A project with sites in several districts appears under each of them.

  1. Category B2Forwarded to MS SPCB/PCC by MS2026-10-21

    Proposed Construction of 2030 Prisons Capacity New District Jail Kanpur Nagar at Village-Sarsaul, Hathi Gaon and Fufvar Sui Thok, Tehsil-Narwal, District-Kanpur Nagar, Uttar Pradesh by M/s Superintendent of District Jail, Kanpur Nagar

    ANIL KUMAR PANDEY · INFRA-2

  2. Category AUnder Processing with Authority2026-10-05

    Kanpur Fertilizers & Chemicals Limited

    KANPUR FERTILIZERS & CHEMICALS LIMITED · Industrial Projects - 3

  3. Category B2EDS raised2026-09-10

    Taj Hotel, Ginger Hotel, Commercial, and Service Apartment Development

    jk urbanscapes developers limited · INFRA-2

  4. Category B2Proposal Accepted and Referred to SEAC2026-08-20

    Amendment in the environmental clearance of Proposed Hospital Project “Regency Hospital” at Plot No. 3, Block - C, Sarvodaya Nagar, Kanpur, Uttar Pradesh by M/s Regency Hospital Limited

    M/S REGENCY HOSPITAL LIMITED · INFRA-2

  5. Category B2ADS Raised2026-08-10

    Proposed “Anand Saffron Residency"at Bairi Akbarpur kachar, Katri Kheora, Kanpur, Uttar Pradesh, Pin code: 208017

    DOLPHIN DWELLINGS PRIVATE LIMITED · INFRA-2

  6. Category B1EC Granted2026-08-04

    Proposed Project of “Ordinary Sand Mine Category-1” Gata No. 12, Village – Katari Durgapur, Tehsil – Bilhaur, District: Kanpur Nagar (U.P.)M/S Gauri Enterprises Prop. Ashok Kumar Singh,Proposed Project of “Ordinary Sand Mine Category-1” Gata No. 12, Total Lease Area – 12.0 Ha. Village – Katari Durgapur, Tehsil – Bilhaur, District: Kanpur Nagar (U.P.)Total Lease Area – 12.0 Ha.

    ASHOK KUMAR SINGH · Non-Coal Mining

  7. Category B2Proposal Accepted and Referred to SEAC2026-07-24

    Proposed Group Housing “The Forty2 Cawnpore” at Plot No.: Part of H. No. 10/504, Khalasi line Nazool Plot no. 24 (Part) BLK-10, Civil lines, Kanpur Nagar U.P by M/s BALAJI SMART HOMES LLP

    BALAJI SMART HOMES LLP · INFRA-2

  8. Category B1EC Granted2026-06-23

    Proposed Project of “Ordinary Sand Mine Category-1” Gata No. 698क, 698ड़, 698च, 698छ, 699, 721, over an area of 21.58 Hectares situated in Village –Ludhwa Khera, Tehsil – Sadar, District: Kanpur Nagar (U.P.), Prop. Abhishek Yadav

    ABHISHEK YADAV · Non-Coal Mining

  9. Category B2Under Verification2026-06-22

    Proposed “Anand Resort” At Arazi No. 560,379,578,577,573,572,570,602,603,609,612,613 Hindupur, 433, 434, 435 Pratappur Hari, 386,387,388,394(P),395(P),389(KA),390,391,392,393,396(P), 397,398(KA),399(KA),380,381 Sambharpur, Kanpur, Uttar Pradesh, Pincode:208017

    aishwarya awas private limited · INFRA-2

  10. Category B1EC Granted2026-05-14

    “Morrum Mining” from Riverbed of Yamuna River at Village- Samuhi, Gata No.- 1598 Ch, Lease Area- 27.50 ha., Tehsil- Ghatampur, District- Kanpur Nagar, Uttar Pradesh, Project Proponent- M/s A. R. Construction (Prop. - Anita Sharma)

    ANITA SHARMA · Non-Coal Mining

  11. Category B2Referred to SEAC2026-05-07

    "Proposed Apex Trauma Centre (661 bedded) Hospital Building at Kanpur" by Lala Lajpat Rai Campus affiliated to Government Medical College

    DR SANJAY KALA · INFRA-2

  12. Category B1EC Granted2026-05-01

    Proposed Project of “Sand/Morrum Mine” Gata No. 2104च over an area of 18.00 Hectares Village – Samuhi, Tehsil– Ghatampur, District- Kanpur Nagar (U.P.), Prop.- Shri Shashank Shekhar Shukla

    SHASHANK SHUKLA · Non-Coal Mining

  13. Category AStage-I FC Awaited2026-03-19

    “Development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana LOT-4/Package-2 (Kanpur Kabrai Project).

    NATIONAL HIGHWAYS AUTHORITY OF INDIA PIU KANPUR · INFRA-1

  14. Category B2EC Granted2026-01-30

    EMARALD ORCHIDS- A GROUP HOUSING PROJECT

    RHL ORCHID OZONE LIMITED LIABILITY PARTNERSHIP · INFRA-2

  15. Category B2EC Granted2026-01-15

    OASIS SKYLINE-A GROUP HOUSING PROJECT

    MAHADEV DEVELOPERS · INFRA-2

  16. Category B2EC Granted2025-12-26

    Proposed “Anand Eco Green” at Arazi No. 177,178,193,195,174 KHA, 180,173,196KA, 197, 174KA, 176KA & 194, village Sambharpur ,Kanpur, Uttar Pradesh, Pincode:208017

    DOLPHIN DWELLINGS PRIVATE LIMITED · INFRA-2

  17. Category B2EC Granted2025-12-20

    PALOMA:THE GRANDEUR

    PALOMA REALTY LLP · INFRA-2

  18. Category B2EC Granted2025-11-04

    Proposed “Anand Saffron Residency"at Bairi Akbarpur kachar, Katri Kheora, Kanpur, Uttar Pradesh, Pin code: 208017

    DOLPHIN DWELLINGS PRIVATE LIMITED · INFRA-2

  19. Category B2Proposal returned in present form2025-10-25

    “Expansion of Rama Medical College, Hospital and Research Centre from 720 to 1220 Bedded”. Total Plot Area is 147450 Sq.m & Total Build Up Area is 62966 Sq. m located at GT Road, Mandhana, Kanpur, Uttar Pradesh.

    JYOTI PRAKASH MAURYA · INFRA-2

  20. Category AToR Granted2025-10-01

    “Development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana LOT-4/Package-2 (Kanpur Kabrai Project).

    NATIONAL HIGHWAYS AUTHORITY OF INDIA PIU KANPUR · INFRA-1

  21. Category B1ToR Granted2025-09-26

    Proposed Project of “Sand/Morrum Mine” Gata No. 2104च over an area of 18.00 Hectares Village – Samuhi, Tehsil– Ghatampur, District- Kanpur Nagar (U.P.), Prop.- Shri Shashank Shekhar Shukla

    SHASHANK SHUKLA · Non-Coal Mining

  22. Category B1ToR Granted2025-09-26

    Proposed Project of “Ordinary Sand Mine Category-1” Gata No. 698क, 698ड़, 698च, 698छ, 699, 721, over an area of 21.58 Hectares situated in Village –Ludhwa Khera, Tehsil – Sadar, District: Kanpur Nagar (U.P.), Prop. Abhishek Yadav

    ABHISHEK YADAV · Non-Coal Mining

  23. Category B1ToR Granted2025-09-25

    Expansion of Indian Institute of Technology Kanpur Campus located at Kalyanpur ,Kanpur, Uttar Pradesh by Institute Works Department, IIT Kanpur

    INDIAN INSTITUTE OF TECHNOLOGY KANPUR · INFRA-2

  24. Category B1ToR Granted2025-09-16

    “Morrum Mining” from Riverbed of Yamuna River at Village- Samuhi, Gata No.- 1598 Ch, Lease Area- 27.50 ha., Tehsil- Ghatampur, District- Kanpur Nagar, Uttar Pradesh, Project Proponent- M/s A. R. Construction (Prop. - Anita Sharma)

    ANITA SHARMA · Non-Coal Mining

  25. Category B1ToR Granted2025-09-06

    Proposed Project of “Ordinary Sand Mine Category-1” Gata No. 12, Village – Katari Durgapur, Tehsil – Bilhaur, District: Kanpur Nagar (U.P.)M/S Gauri Enterprises Prop. Ashok Kumar Singh,Proposed Project of “Ordinary Sand Mine Category-1” Gata No. 12, Total Lease Area – 12.0 Ha. Village – Katari Durgapur, Tehsil – Bilhaur, District: Kanpur Nagar (U.P.)Total Lease Area – 12.0 Ha.

    ASHOK KUMAR SINGH · Non-Coal Mining

  26. Category B2EC Granted2025-05-15

    "Constraction of Pratyaksha Kar Bhawan along with residential complex (consisting of Type-II, III & IV Quarters) and MSTU setup. "Plot No.1part, Bock D/1,Kheora Bangar, Knpur Nagar,District-Kanpur Nagar, Uttar Pradesh

    Ministry of Finance Department of Financial Services · INFRA-2

  27. Category B1EC Granted2025-01-01

    “Ordinary Sand Mine” from Riverbed of Yamuna River at Village- Rampur, Gata No. 735, 1616, 1617, 1610, 1620, 1619, 1618, 737, Area- 10.00 ha., Tehsil- Ghatampur, District- Kanpur Nagar, Uttar Pradesh, Project Proponent- M/s Shri Sai Builders (Prop. - Smt. Pratima Katiyar)

    PRATIMA KATIYAR · Non-Coal Mining

  28. Category B2EC Granted2024-07-26

    Proposed Group Housing Project on Plot No: GH-02, Vinayak Shree NRI City, Katri Kheora, Kanpur, Uttar Pradesh

    VINAYAK SHREE REAL ESTATE PRIVATE LIMITED · INFRA-2

  29. Category B1EC Granted2024-06-28

    Proposed Township Vinayak Shree “NRI City” Mainawati Marg, in Village Katri Khyora, Kanpur, U.P. by M/S Vinayak Shree Real Estate Pvt. Ltd.

    VINAYAK SHREE REAL ESTATE PRIVATE LIMITED · INFRA-2

  30. Category B2EC Granted2024-02-22

    “GROUP HOUSING PROJECT “

    J P REALTOR P LTD · INFRA-2

  31. Category B1ToR Granted2024-02-02

    Proposed Township Vinayak Shree “NRI City” Mainawati Marg, in Village Katri Khyora, Kanpur, U.P. by M/S Vinayak Shree Real Estate Pvt. Ltd.

    VINAYAK SHREE REAL ESTATE PRIVATE LIMITED · INFRA-2

  32. Category B1Standard ToR Granted2024-01-28

    Terms of Reference application for integrated township “Mantora Green City” at village –Singhpur Kachhar, Hindpur & Sambharpur Tehsil and district Kanpur Nagar, Uttar Pradesh of M/s Assam Entrade limited

    NISHANT GUPTA · INFRA-2

  33. Category B1ToR Granted2024-01-04

    “Ordinary Sand Mine” from Riverbed of Yamuna River at Village- Rampur, Gata No. 735, 1616, 1617, 1610, 1620, 1619, 1618, 737, Area- 10.00 ha., Tehsil- Ghatampur, District- Kanpur Nagar, Uttar Pradesh, Project Proponent- M/s Shri Sai Builders (Prop. - Smt. Pratima Katiyar)

    PRATIMA KATIYAR · Non-Coal Mining

  34. Category AProposal returned in present form2023-10-04

    (3x660 MW) Neyveli Uttar Pradesh Power Limited, Ghatampur Thermal Power Project

    NEYVELI UTTAR PRADESH POWER LIMITED · Thermal Projects

  35. Category AEC Granted2023-08-14declares affected families

    Development of 6 Lane Kanpur Ring Road starting from NH-19 (Existing Ch. 506+820) near Sachendi village and ends at same point i.e. NH-19 (Existing Ch. 506+820) near Sachendi village in Kanpur Nagar district under NHDP Phase-VII in the state of Uttar Pradesh(Total length 93.209km) by M/s National Highways Authority of India

    National Highways Authority of India · INFRA-1

  36. Category B2EDS raised2023-08-08

    Proposed Group Housing Project “RUDRA GARDENIA (PHASE-1)” at Arazi No. 353 & 356, Village: Singhpur Kachhar, Tehsil: Kanpur Sadar, District: Kanpur Nagar, State: Uttar Pradesh

    PREM AGARWAL · INFRA-2

  37. Category AToR Granted2023-06-23

    “Development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana LOT-4/Package-2 (Kanpur Kabrai Project).

    NATIONAL HIGHWAYS AUTHORITY OF INDIA PIU KANPUR · INFRA-1

  38. Category B2EC Granted2022-11-29

    RESIDENTIAL GROUP HOUSING PROJECT “PALOMA GRANDEUR”

    PALOMA REALTY LLP · INFRA-2

All 38 proposals that name this district, newest first.