← All districts

Chandauli, Uttar Pradesh

Not a Scheduled AreaCensus 2011 district code 196
  1. 14 Oct 2026 · Details soughtAdditional details soughtOrdinary Sand Mining” having lease area – 12.50 ha along riverbed of Ganga river at Araji No/Gata No. 2g,…
  2. 12 Oct 2026 · DecidedTerms of Reference grantedDevelopment of Vindhya-Purvanchal Spur Link Expressway
  3. 8 Oct 2026 · DecidedTerms of Reference grantedProposed “Ordinary Sand Mining” having lease area – 8.09 ha along riverbed of Ganga river at Gata (Plot)…
  4. 8 Oct 2026 · DecidedEnvironmental clearance grantedExpansion of Hotel Building at Arazi No.-880/2, 883,882/2,Mauza–Aktha,Ward-Sarnath Pargana - Shivpur…
  5. 28 Sept 2026 · ClosedReturned in its present formDevelopment of Vindhya-Purvanchal Spur Link Expressway
  6. 8 Sept 2026 · Details soughtAdditional details soughtOrdinary Sand Mining” having lease area – 12.50 ha along riverbed of Ganga river at Araji No/Gata No. 2g,…
  7. 3 Sept 2026 · FiledSubmittedDevelopment of Vindhya-Purvanchal Spur Link Expressway

Dated by the portal's own appraisal history, converted to India Standard Time; a proposal with no recorded history appears on its register submission date.

Other clearances these proposals declare

Forest land diversion declared
4
Forest land sought for diversion
247 ha
Wildlife board recommendation declared
1
In or near a protected area
0
In an eco-sensitive zone
0

These counts are taken from the application forms of the 29 of 29 proposals naming this district whose forms have been read for these questions. In 6 of those forms at least one question was left blank, and a blank answer is counted as unknown. The forest area is the area stated for forest clearance, with each forest proposal counted once, in the district where its project is primarily sited.

Proposals naming this district
29
Category A proposals
7
Families declared displaced
400
Families declared affected
1,860

Displacement figures are the proponents’ own declarations. A project sited across several districts declares one figure for the whole project, and that figure is counted once, in the district where the project is primarily sited.

Fifth Schedule status

Not within a Fifth Schedule Scheduled Area

No Presidential Order under paragraph 6 of the Fifth Schedule declares any Scheduled Area in Uttar Pradesh, so no part of this district is one and PESA does not apply.

OrderMinistry of Tribal Affairs, Scheduled Areas declared under paragraph 6 of the Fifth Schedule to the Constitution

What the record shows

  • Applicants for projects sited mainly in this district have declared 400 families to be displaced. The figure comes from their applications, and we have not verified it.

Each of these observations appears when a fixed rule is met by the figures on this page, so the same figures always give the same sentences. None of them is a view on whether a project should go ahead.

Who lives there

Figures from Census 2011, each compared with the all-India value computed on the same definition.

Total population
19,52,756
Households
2,96,804
Average household size
6.58
1.73 above India's 4.85India
Scheduled Tribe share of population
2.1%
6.4 points below IndiaIndia
Scheduled Caste share of population
22.9%
6.2 points above IndiaIndia
Children aged 0-6
15.9%
2.3 points above IndiaIndia
Literacy rate
71.5%
1.5 points below IndiaIndia
Sex ratio
918
24.2 below India's 942.6India

What they live on

How the district's workers earn a living, from Census 2011. The land-dependent share counts cultivators and agricultural labourers as a share of all workers, and it is the group most directly affected when land is acquired.

Total workers
6,52,543
Work participation rate
33.4%
6.4 points below IndiaIndia
Workers dependent on land
57.4%
2.8 points above IndiaIndia
Cultivators
19.3%
5.3 points below IndiaIndia
Agricultural labourers
38.1%
8.2 points above IndiaIndia
Marginal workers
47.6%
22.9 points above IndiaIndia
Household industry workers
9.0%
5.2 points above IndiaIndia

How households live

Land, income and work among rural households, from the Socio Economic and Caste Census 2011, which recorded these where the population census did not. Only the survey's rural part is used here, so urban households do not appear.

Rural households owning land
38.2%
7.9 points below IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households whose highest earner makes over ₹5,000 a month
25.7%
1.3 points above IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households living mainly on manual casual labour
63.9%
12.1 points above IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households with a salaried member
7.9%
0.4 points below IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

When these were filed

Each proposal is dated by the first step in its appraisal history, the dated record of steps the portal keeps for it.

2023-Q32026-Q3

The timeline counts 24 of the 29 proposals here. The first filing date comes from each proposal's appraisal history, and we have not yet read it for the other 5, so they are left out. Most of them are older proposals, so the early part of the timeline undercounts what was filed then. The register itself records a date for each of them; the gap is in our copy of the histories.

Hatched columns undercount, so they cannot be compared with solid ones. 2 of them cover periods for which we have read few filing dates so far, and they count only the proposals whose date we have.

What kind of projects these are

The proposals naming this district, grouped by the sector each was filed under.

  • Non-Coal Mining 37.9%
  • INFRA-2 34.5%
  • INFRA-1 13.8%
  • River Valley and Hydroelectric Projects 13.8%

The four largest sectors are shown by name and the rest are grouped as Other.

What is proposed here

These are the proposals in the national environmental clearance register whose application names a site in this district, newest first. A project with sites in several districts appears under each of them.

  1. Category AForwarded to MS SPCB/PCC by MS2026-09-03declares affected families

    Development of Vindhya-Purvanchal Spur Link Expressway

    UTTAR PRADESH EXPRESSWAYS INDUSTRIAL DEVELOPMENT AUTHORITY (UPEIDA) · INFRA-1

  2. Category B1Proposal returned in present form2026-07-20declares affected families

    Development of Vindhya-Purvanchal Spur Link Expressway

    UTTAR PRADESH EXPRESSWAYS INDUSTRIAL DEVELOPMENT AUTHORITY (UPEIDA) · INFRA-1

  3. Category B1Forwarded to MS SPCB/PCC by MS2026-07-17

    Proposed “Ordinary Sand Mining” having lease area – 8.09 ha along riverbed of Ganga river at Gata (Plot) No. 07 Kh, Khand No. 02, Village –Badagaon, Tehsil -Sakaldiha, District- Chandauli, Uttar Pradesh of M/s Geeta Construction of Smt. Geeta Rai

    Geeta Rai · Non-Coal Mining

  4. Category AForwarded to MS SPCB/PCC by MS2026-06-29

    Development of Link / Connector Corridor between National Highway-19 (NH-19) and Varanasi Ring Road with Riverbank Connectivity along River Ganga for Decongestion of Varanasi City from Km 0+000 to Km 18+560 (Total Length is 46.039 Km including MCW/FOB/loop/ramps/service road) in the state of Uttar Pradesh on HAM.

    NATIONAL HIGHWAY AUTHORITY OF INDIA · INFRA-1

  5. Category B1ADS Raised2026-04-10

    Ordinary Sand Mining” having lease area – 12.50 ha along riverbed of Ganga river at Araji No/Gata No. 2g, Khand-01, Village- Puravijayee , Tehsil -Sakaldiha, District- Chandauli, Uttar Pradesh of Shri Ravindra Kumar Mishra.

    RAVINDRA MISHRA · Non-Coal Mining

  6. Category AToR Granted2026-01-09declares affected families

    Development of Greenfield 4-lane highway Ghazipur-Zamania-Saiyad Raja-Manikpur (Ch: 0+000 to Ch: 51+850) Section of NH-24 (old NH-97) in the State of Uttar Pradesh

    NATIONAL HIGHWAY AUTHORITY OF INDIA · INFRA-1

  7. Category B2EC Granted2025-12-24

    Expansion of Hotel Building at Arazi No.-880/2, 883,882/2,Mauza–Aktha,Ward-Sarnath Pargana - Shivpur Dist.-Varanasi, Uttar Pradesh

    RAJ COMPLEX · INFRA-2

  8. Category B2Proposal pulled back (withdrawn)2025-12-10

    Proposed “Twin Tower” Group Housing at Arazi No. 45/1, 47/1, 47/2, 47/3 ,Mauza Semara & Pargana Ralhupur & Arazi No.- 18/1, 18/2, 150mi/1, 150/1d At Mauza Katesar & Pargana Ralhupur, District- Chandauli

    Jeet Homes ananta · INFRA-2

  9. Category B2EC Granted2025-09-23

    Ordinary Soil Excavation

    Dharmendra Kumar Gautam · Non-Coal Mining

  10. Category B2EC Granted2025-09-17

    Proposed “Twin Tower” Group Housing at Arazi No. 45/1, 47/1, 47/2, 47/3 ,Mauza Semara & Pargana Ralhupur & Arazi No.- 18/1, 18/2, 150mi/1, 150/1d At Mauza Katesar & Pargana Ralhupur, District- Chandauli

    Jeet Homes ananta · INFRA-2

  11. Category B2EC Granted2025-08-04

    Expansion of Proposed Group Housing project located at SM plot no. MI 155/1, MI 169/1, MI 171/1, Mauza- Katesar, Pargana- Ralhupur, Tehsil- Mughalsarai, District- Chandulli, Uttar Pradesh.

    Ganpati Infratech · INFRA-2

  12. Category B2EC Granted2025-05-25

    Proposed project of Ordinary Soil Mining project at Arazi No.- 97 G, 144, 145, 152 Area- 1.441 ha, Village- Paduhar, Tehsil- Chakia, District- Chandauli (U.P.) by M/s DRS Industrial Park LLP, Partner- Dev Battacharya

    dev bhattacharya · Non-Coal Mining

  13. Category B2Referred to SEAC2025-05-15

    Development of Multi-Modal Logistics Park (MMLP) in the Varanasi and Chandauli district of Uttar Pradesh

    POOJA MISHRA · INFRA-2

  14. Category B1Proposal returned in present form2025-03-18

    Development of Multi-Modal Logistics Park (MMLP) in the Varanasi district of Uttar Pradesh

    POOJA MISHRA · INFRA-2

  15. Category B2EC Granted2025-01-29

    “Ordinary Soil Mining” Project at Gata No.- 127, Village-Gurera, Tehsil- Sakaldiha, District-Chandauli, U.P. (Area – 0.3000 ha). Shri Dharmendra Kumar Gautam Authorsied Person M/s VARANASI INFRADEVELOPERS PRIVATE LIMITED

    DHARMENDRA KUMAR GAUTAM · Non-Coal Mining

  16. Category B2EC Granted2025-01-14

    “Ordinary Earth Mining” Project at Gata No.- 797क, 746, 796, 723ख, 794, Village-Kaithi, Tehsil- Sakaldiha, District-Chandauli, U.P. (Area – 1.4290 ha). M/s APCO INFRATECH PVT. LTD., Authorized Person: -Shri Chandra Prakash Singh S/o Shri Yashveer Singh, C/o SUPERINTENDING ENGINEER, P.W.D (VARANASI-CIRCLE)

    CHANDRA PRAKASH SINGH · Non-Coal Mining

  17. Category B2EC Granted2024-12-24

    Construction of 37 Nos. Court Rooms for Integrated Court Complex at District-Chandauli, Uttar Pradesh by M/s District Judge, Chandauli

    VIRENDRA KUMAR · INFRA-2

  18. Category AToR Granted2024-11-26

    Musakhand Pumped Storage Hydro Project

    ACME URJA TWO PRIVATE LIMITED · River Valley and Hydroelectric Projects

  19. Category AToR Granted2024-10-28declares affected families

    Musakhand Pumped Storage Project (600 MW)

    ACME CLEANTECH SOLUTIONS PRIVATE LIMITED · River Valley and Hydroelectric Projects

  20. Category B2EC Granted2024-09-25

    Proposed Hotel Building at Arazi No.-880/2, 883,882/2,Mauza–Aktha,Ward-Sarnath Pargana - Shivpur Dist.-Varanasi, Uttar Pradesh

    RAJ COMPLEX · INFRA-2

  21. Category AWithdrawal Request Accepted2024-07-23declares affected families

    Musakhand Pumped Storage Project (600 MW)

    ACME CLEANTECH SOLUTIONS PRIVATE LIMITED · River Valley and Hydroelectric Projects

  22. Category B1EC Granted2024-03-07

    Ordinary Sand Mining” having lease area – 20.0 ha along riverbed of Ganga river at Khand No. 01,Araji No. 791 & 437, Village – Jamalpur, Tehsil -Sakaldiha, District- Chandauli, Uttar Pradesh of M/s Rajesh Prasad Yadav and Sons

    RAJESH PRASAD · Non-Coal Mining

  23. Category B2EC Granted2024-02-21

    Police Line (Residential & Non-Residential) Project at Village- Bhojapur, Tehsil- Sadar, District- Chandauli, State- Uttar Pradesh by M/s Superintendent of Police, Chandauli

    RAM YADAV · INFRA-2

  24. Category B2EC Granted2023-12-04

    Environment Clearance of the Proposed group housing project at Arazi no. 538 MI, 542 MI, 547, 546, Mauja – Godhana, Pargana – Dhoos, Tehsil – P.D.D.U. Nagar (Mughalsarai), District – Chandauli, Uttar Pradesh, developed by M/s Subh Sanket Traders Pvt. Ltd.

    SUBH SANKET TRADERS PRIVATE LIMITED · INFRA-2

  25. Category B1EC Granted2023-10-11

    Ordinary Sand Mining” having lease area – 8.09 ha along riverbed of Ganga river at Araji No/Gata No. 7kh, Khand-2, Village – Badagaon, Tehsil -Sakaldiha, District- Chandauli, Uttar Pradesh of M/s Rajesh Prasad Yadav and Sons.

    RAJESH PRASAD · Non-Coal Mining

  26. Category B1TOR Granted2023-08-12

    Ordinary Sand Mining” having lease area – 12.50 ha along riverbed of Ganga river at Araji No/Gata No. 2g, Khand-01, Village- Puravijayee , Tehsil -Sakaldiha, District- Chandauli, Uttar Pradesh of Shri Ravindra Kumar Mishra.

    RAVINDRA MISHRA · Non-Coal Mining

  27. Category B1TOR Granted2023-08-11

    Ordinary Sand Mining” having lease area – 20.0 ha along riverbed of Ganga river at Khand No. 01,Araji No. 791 & 437, Village – Jamalpur, Tehsil -Sakaldiha, District- Chandauli, Uttar Pradesh of M/s Rajesh Prasad Yadav and Sons

    RAJESH PRASAD · Non-Coal Mining

  28. Category AToR Granted2023-08-01declares affected families

    Musakhand Pumped Storage Project (600 MW)

    ACME CLEANTECH SOLUTIONS PRIVATE LIMITED · River Valley and Hydroelectric Projects

  29. Category B1TOR Granted2023-06-05

    Ordinary Sand Mining” having lease area – 8.09 ha along riverbed of Ganga river at Araji No/Gata No. 7kh, Khand-2, Village – Badagaon, Tehsil -Sakaldiha, District- Chandauli, Uttar Pradesh of M/s Rajesh Prasad Yadav and Sons.

    RAJESH PRASAD · Non-Coal Mining

All 29 proposals that name this district, newest first.