Purba Champaran, Bihar
Recent activity
All 33 in the last 60 days- 21 Oct 2026 · FiledSubmittedProposed Sand Mining Project of Area 5.30 Ha at Sand Block Sattar Balu Ghat-01 on Gandak River of…
- 16 Oct 2026 · DecidedEnvironmental clearance grantedProposed Brick clay mining project at Mauja- Sarotar, Block- Keshariya, District- East Champaran (Bihar)…
- 16 Oct 2026 · DecidedEnvironmental clearance grantedProposed Brick Earth Mining for M/S SANI INT UDYOG - Bahadurpur Soil Brick Mining Project at…
- 16 Oct 2026 · DecidedEnvironmental clearance grantedBrick Earth Mining for M/S SABIR ENTERPRISES - Murtiya Soil Brick Mining Project at Mauza+Vill-Murtiya,…
- 16 Oct 2026 · DecidedEnvironmental clearance grantedBrick Earth Mining for M/S Parmanand Singh Int Udyog - Ahiraulia Soil Brick Mining Project at…
- 16 Oct 2026 · DecidedEnvironmental clearance grantedProposed Brick Earth Mining for M/S MATA INT UDYOG - Bherkhiya Soil Brick Mining Project at…
- 16 Oct 2026 · DecidedEnvironmental clearance grantedProposed Brick clay mining project at Village/Mauza- Madhubani, P.O- Madhubani, P.S- Motihari Mufassil,…
- 16 Oct 2026 · FiledSubmittedBrick Earth Mining Project of M/s Rana Brick
- 13 Oct 2026 · Details soughtAdditional details soughtBrick Earth Mining for M/S Gold Bricks – Kataha, Semra Soil Brick Mining Project at Village-Kataha, Semra,…
- 13 Oct 2026 · FiledSubmittedProposed Brick Earth Mining for M/S Safal Eit Udyog - Inarwa Soil Brick Mining Project at Village-Inarwa,…
- 13 Oct 2026 · FiledSubmittedBrick Earth Mining project of M/s Icon Bricks
- 12 Oct 2026 · FiledSubmittedBrick Earth Mining Project of M/s Vihar Brick
Dated by the portal's own appraisal history, converted to India Standard Time; a proposal with no recorded history appears on its register submission date.
Other clearances these proposals declare
- Forest land diversion declared
- 4
- Forest land sought for diversion
- 1 ha
- Wildlife board recommendation declared
- 0
- In or near a protected area
- 0
- In an eco-sensitive zone
- 0
These counts are taken from the application forms of the 49 of 49 proposals naming this district whose forms have been read for these questions. In 37 of those forms at least one question was left blank, and a blank answer is counted as unknown. The forest area is the area stated for forest clearance, with each forest proposal counted once, in the district where its project is primarily sited.
- Proposals naming this district
- 49
- Category A proposals
- 4
- Families declared displaced
- 52
- Families declared affected
- 92
Displacement figures are the proponents’ own declarations. A project sited across several districts declares one figure for the whole project, and that figure is counted once, in the district where the project is primarily sited. 2 of the proposals listed below declare displacement and are sited primarily in another district, so their figures are counted in that district’s total.
Fifth Schedule status
Not within a Fifth Schedule Scheduled Area
No Presidential Order under paragraph 6 of the Fifth Schedule declares any Scheduled Area in Bihar, so no part of this district is one and PESA does not apply.
OrderMinistry of Tribal Affairs, Scheduled Areas declared under paragraph 6 of the Fifth Schedule to the Constitution
What the record shows
Cultivators and agricultural labourers make up 81% of workers here, against 55% nationally, so at least three in four people who work here do so on the land.
Agricultural labourers, who work other people's land for wages, make up 61% of workers here. Compensation for acquired land is paid to those who hold title to it, so it does not reach them. They can still claim the rehabilitation and resettlement entitlements of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (RFCTLARR), because its section 3(c) counts a family whose livelihood depends on the land as an affected family, wherever that Act governs how the land is obtained.
Literacy was 55.8% in 2011 against 72.98% nationally, so notices and documents issued in writing during a consultation may reach fewer people here.
Applicants for projects sited mainly in this district have declared 52 families to be displaced. The figure comes from their applications, and we have not verified it.
Each of these observations appears when a fixed rule is met by the figures on this page, so the same figures always give the same sentences. None of them is a view on whether a project should go ahead.
Who lives there
Figures from Census 2011, each compared with the all-India value computed on the same definition.
- Total population
- 50,99,371
- Households
- 9,81,516
- Average household size
- 5.20
- 0.35 above India's 4.85India
- Scheduled Tribe share of population
- 0.2%
- 8.3 points below IndiaIndia
- Scheduled Caste share of population
- 12.7%
- 3.9 points below IndiaIndia
- Children aged 0-6
- 20.0%
- 6.4 points above IndiaIndia
- Literacy rate
- 55.8%
- 17.2 points below IndiaIndia
- Sex ratio
- 902
- 40.7 below India's 942.6India
What they live on
How the district's workers earn a living, from Census 2011. The land-dependent share counts cultivators and agricultural labourers as a share of all workers, and it is the group most directly affected when land is acquired.
- Total workers
- 17,37,539
- Work participation rate
- 34.1%
- 5.7 points below IndiaIndia
- Workers dependent on land
- 80.9%
- 26.4 points above IndiaIndia
- Cultivators
- 20.1%
- 4.5 points below IndiaIndia
- Agricultural labourers
- 60.9%
- 30.9 points above IndiaIndia
- Marginal workers
- 34.8%
- 10.1 points above IndiaIndia
- Household industry workers
- 2.7%
- 1.2 points below IndiaIndia
How households live
Land, income and work among rural households, from the Socio Economic and Caste Census 2011, which recorded these where the population census did not. Only the survey's rural part is used here, so urban households do not appear.
- Rural households owning land
- 28.9%
- 17.2 points below IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
- Rural households whose highest earner makes over ₹5,000 a month
- 26.7%
- 2.3 points above IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
- Rural households living mainly on manual casual labour
- 68.7%
- 17.0 points above IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
- Rural households with a salaried member
- 4.6%
- 3.7 points below IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
When these were filed
Each proposal is dated by the first step in its appraisal history, the dated record of steps the portal keeps for it.
The timeline counts 47 of the 49 proposals here. The first filing date comes from each proposal's appraisal history, and we have not yet read it for the other 2, so they are left out. Most of them are older proposals, so the early part of the timeline undercounts what was filed then. The register itself records a date for each of them; the gap is in our copy of the histories.
Hatched columns undercount, so they cannot be compared with solid ones. 2 of them cover periods for which we have read few filing dates so far, and they count only the proposals whose date we have. 2026-Q4 was still running when the register was read, so its column counts only the filings made up to that date.
What kind of projects these are
The proposals naming this district, grouped by the sector each was filed under.
- Non-Coal Mining 81.6%
- INFRA-1 8.2%
- Industrial Projects - 2 6.1%
- INFRA-2 4.1%
The four largest sectors are shown by name and the rest are grouped as Other.
What is proposed here
These are the proposals in the national environmental clearance register whose application names a site in this district, newest first. A project with sites in several districts appears under each of them.
- Category B1Proposal Accepted and Referred to SEAC2026-10-21
Proposed Sand Mining Project of Area 5.30 Ha at Sand Block Sattar Balu Ghat-01 on Gandak River of District- East Champaran(Motihari) of State-Bihar
RAJ SAGAR · Non-Coal Mining
- Category B2Under Verification2026-10-16
Brick Earth Mining Project of M/s Rana Brick
vijay prasad yadav · Non-Coal Mining
- Category B2Under Verification2026-10-13
Brick Earth Mining project of M/s Icon Bricks
nagnarayan tiwari · Non-Coal Mining
- Category B2Under Verification2026-10-13
Proposed Brick Earth Mining for M/S Safal Eit Udyog - Inarwa Soil Brick Mining Project at Village-Inarwa, P.O-Auraiya, P.S-Adapur, District-East Champaran (Bihar)
MERAJ AHMAD · Non-Coal Mining
- Category B2Under Verification2026-10-12
Brick Earth Mining Project of M/s Vihar Brick
vijay prasad yadav · Non-Coal Mining
- Category B2Under Verification2026-10-10
Brick Earth Mining Project of M/s Honda Int Udyog
om prakash sharan · Non-Coal Mining
- Category B2Under Verification2026-10-09
Brick Earth Mining Project of M/s Mahal Int Udyog
RAJU SAH · Non-Coal Mining
- Category B2Under Verification2026-10-09
Brick Earth Mining Project of M/s Tata Int Udyog
paspat sah · Non-Coal Mining
- Category B2EC Granted2026-10-01
Proposed Brick clay mining project at Mauja- Sarotar, Block- Keshariya, District- East Champaran (Bihar) By M/S BHARAT AND RAJA INT UDYOG
jamil akhtar · Non-Coal Mining
- Category B2ADS Raised2026-09-29
Brick Earth Mining for M/S Gold Bricks – Kataha, Semra Soil Brick Mining Project at Village-Kataha, Semra, P.O+P.S-Mothari, District-East Champaran-Motihari (Bihar)
GOLD BRICKS · Non-Coal Mining
- Category B1Forwarded to MS SPCB/PCC by MS2026-09-23
Proposed Sand Mining Project of Area 5.92 Ha at Sand Block Unit-2: Pipra Balu Ghat & Gobindganj Balu Ghat at Address- Gobindganj Balu District - East Champaran, Bihar
NITYANAND SINGH · Non-Coal Mining
- Category B2EC Granted2026-09-22
Proposed Brick Earth Mining for M/S SANI INT UDYOG - Bahadurpur Soil Brick Mining Project at Village+P.O-Bahadurpur, P.S-Govindganj, Distt-East Champaran Motihari (Bihar)
MAHAMMAD SANI · Non-Coal Mining
- Category B2EC Granted2026-09-17
Brick Earth Mining for M/S SABIR ENTERPRISES - Murtiya Soil Brick Mining Project at Mauza+Vill-Murtiya, P.O+P.S-Adapur, Distt-East Champaran (Bihar)
SABIR ALI · Non-Coal Mining
- Category B2EC Granted2026-09-16
Brick Earth Mining for M/S Parmanand Singh Int Udyog - Ahiraulia Soil Brick Mining Project at Village-Ahiraulia P.O-Mauje Ramgarhwa, P.S- Ramgarhwa, Distt-East Champaran Motihari (Bihar)
PARMANAND SINGH · Non-Coal Mining
- Category B1Forwarded to MS SPCB/PCC by MS2026-09-02
The proposed project is Sand Mining Project on Gandak River at Sand Block Sattar Balu Ghat-02 located at Thana no- 228, Khata no- 57, Khasra no-8428 & 8429, Mouza-Sundarpur, Block- Kesaria, District - East Champaran (Motihari) (Area- 5.30 Ha).
RAJ SAGAR · Non-Coal Mining
- Category B2Referred to SEAC2026-08-31
PROPOSED EARTH BRICK MINING PROJECT LOCATED AT MOUJA-DELHO, P. S+ANCHAL: MADHUBAN, MAUJA NO: 44, DIST-EAST CHAMPARAN, BIHAR OVER AN AREA OF 1.299 HA.
HIMANSHU RAJ · Non-Coal Mining
- Category B2EC Granted2026-07-30
Ordinary Earth Mining project of M/s Adyaraj Developers Pvt. Ltd., at Mauza- Mansingha, Block- Sugauli District- East Champaran, Bihar (Lease Area: 2.44 Ha.)
jitendra kumar roy · Non-Coal Mining
- Category B2EC Granted2026-07-23
Proposed Brick Earth Mining for M/S MATA INT UDYOG - Bherkhiya Soil Brick Mining Project at Mauza-Bherkhiya, Vill-Chakaniya, P.O-Damodarpur, P.S-Pipra, Distt-East Champaran (Bihar)
AJAY KUMAR GUPTA · Non-Coal Mining
- Category B1Forwarded to MS SPCB/PCC by MS2026-07-06
Proposed Sand Mining Project of Area 5.30 Ha at Sand Block Sattar Balu Ghat-01 on Gandak River of District- East Champaran(Motihari) of State-Bihar
RAJ SAGAR · Non-Coal Mining
- Category B2Referred to SEAC2026-07-03
Brick Earth Mining Project of M/s Janta Bricks
dhrishta dhuman kumar singh · Non-Coal Mining
- Category B2EC Granted2026-07-01
Proposed Brick clay mining project at Village/Mauza- Madhubani, P.O- Madhubani, P.S- Motihari Mufassil, Dist- East Champaran, Bihar. By M/S Maa Trading Co. & Ent Udyog
GUDIYA DEVI · Non-Coal Mining
- Category B2EC Granted2026-06-30
Proposed Brick clay mining project at Village/Mauza- Punar Murgai Chak (Pundar) P.O- Bajitpur, P.S- Madhuban, Dist- East Champaran, Bihar By M/S Maa Bricks Company
RAM NARESH CHAUDHARY · Non-Coal Mining
- Category B2EC Granted2026-06-30
Proposed Brick Earth mining project at M/S H.B CONSTRUCTION at Village/Mauza- Madhuchhapra, P.O- Damodarpur, P.S- Pipra, Dist- East Champaran, Bihar
SRIBABU PRASAD YADAV · Non-Coal Mining
- Category B2EC Granted2026-05-26
Proposed Brick Earth Mining for M/S S.B.F. Brick Udyog - Madhuban Bediban Soil Brick Mining Project at Vill-Madhuban Bediban, P.O-Damodarpur, P.S-Pipra, Distt-East Champaran (Bihar)
VIJAY KUMAR · Non-Coal Mining
- Category B2EC Granted2026-05-02
Brick Earth mining project of M/S Dev Star Bricks at Village/Mauza- Bahadurpur, P.O- Areraj, P.S- Govindganj, District-East Champaran, State- Bihar
RAJEEV RANJAN SINGH · Non-Coal Mining
- Category B2EC Granted2026-04-20
Brick Earth Mining Project of M/s. Fancy Bricks
md inam zafar · Non-Coal Mining
- Category B2EC Granted2026-04-05
Proposed Brick Earth Mining for M/S Kisan Int Udyog - Kothiya Hariram Soil Brick Mining Project at Vill-Kothiya Hariram, P.O+P.S-Mehsi, Distt–East Champaran (Bihar)
vijay krishna · Non-Coal Mining
- Category B2EC Granted2026-04-02
Proposed Brick Earth mining project Village/Mauza- Bahadurpur, P.O- Areraj, P.S- Govindganj, Dist- East Champaran, Bihar By M/s Maa Vaishnavi Bricks
RAJEEV RANJAN SINGH · Non-Coal Mining
- Category B2EC Granted2026-03-26
Brick Earth Mining for M/S R B C Int Udyog - Bairiya Soil Brick Mining Project at Village-Bairiya, P.O-Damodarpur, P.S-Pipra, Distt-East Champaran Motihari (Bihar)
SHILA DEVI · Non-Coal Mining
- Category B2EC Granted2026-03-09
Brick Earth Mining for M/S Maa Janki Int Udyog - Bairiya Soil Brick Mining Project at Village-Bairiya, P.O-Damodarpur, P.S-Pipra, Distt-East Champaran Motihari (Bihar)
sanjay kumar singh · Non-Coal Mining
- Category B2EC Granted2026-03-07
Proposed Brick Earth Mining for M/S Sai Brothers (Marka Rahul)- Rampurva Mehsi Soil Brick Mining Project at Village-Rampurva Mehsi, P.O+P.S-Mehsi, Distt-East Champaran Motihari
Ajit kumar gupta · Non-Coal Mining
- Category AProposal returned in present form2026-03-07
Development of Gorakhpur Siliguri High Speed Access Controlled Corridor, Bihar Section, starting from km 86.680 (near Gandak River) to km 175.750 (Interchange at NH-227F) in the State of Bihar. Total Design Length 89.070 km.
NATIONAL HIGHWAY AUTHORITY OF INDIA · INFRA-1
- Category B2EC Granted2026-02-24
Brick Earth Mining for M/S KUNTI BRICKS FIELD - Chakania Soil Brick Mining Project at Vill-Chakania, P.O-Damodarpur, P.S-Pipra, Distt–East Champaran (Bihar)
BHAGWAN PRASAD · Non-Coal Mining
- Category B2EC Granted2026-02-11
Brick Earth mining of M/s. Rai & Co.
santosh kumar · Non-Coal Mining
- Category B2EC Granted2026-02-11
Brick Earth Mining of M/s. J.M.S. Bricks
vijay kumar singh · Non-Coal Mining
- Category B1EC Granted2026-01-17
Greenfield Grain Based Distillery of 400 KLD Capacity (for Production of Ethanol as per EBP) alongwith 12 MW Power Cogeneration Project at Amodei, Block Ramgarhwa, Dist. East Champaran (Bihar) by M/s Ripuraj Gourmet Private Limited
RIPURAJ GOURMET PRIVATE LIMITED · Industrial Projects - 2
- Category B1EC Granted2026-01-09
Sand Mining Project Dumaria Balu Ghat at Mouza- Dumaria, Block- Sangrampur, District - East Champaran, Bihar (Area- 6.64 Ha).
KUMAR UDHAW GOSWAMI · Non-Coal Mining
- Category B2EC Granted2025-10-19
Proposed Brick Earth Mining project of M/S Chandan Bricks Industries at Mauza -Semra, P. O+P.S- Chakia, District- East Champaran, State-Bihar
CHANDAN SINGH · Non-Coal Mining
- Category AProposal pulled back (withdrawn)2025-09-05declares affected families
Development of 6 lane with PS Gorakhpur Siliguri High Speed Access Controlled corridor starting from Gorakhpur Bypass km 0.000 (near Madapur) to km 525.590 (on NH-327 near Bagdogra) at Deomani in the states of Uttar Pradesh, Bihar and West Bengal (Total Length = 525.590 km)
NATIONAL HIGHWAY AUTHORITY OF INDIA · INFRA-1
- Category B1ToR Granted2025-08-18
Greenfield Grain Based Distillery of 400 KLD Capacity (for Production of Ethanol as per EBP) alongwith 12 MW Power Cogeneration Project at Amodei, Block Ramgarhwa, Dist. East Champaran (Bihar) by M/s Ripuraj Gourmet Private Limited
RIPURAJ GOURMET PRIVATE LIMITED · Industrial Projects - 2
- Category B2EC Granted2025-06-25
PROPOSED BRICK EARTH MINING PROJECT LOCATED AT MAUJA-KUDARKAT, BLOCK: CHAWRADANO, THANA NO: 180, DIST- EAST CHAMPARAN, BIHAR OVER AN AREA OF 2.14 HA. HAVING A PRODUCTION CAPACITY OF 6000 Cum/Annum by S S Int Udhyog
s.s.eit udyog · Non-Coal Mining
- Category B1ToR Granted2025-05-09
Sand Mining Project Dumaria Balu Ghat at Mouza- Dumaria, Block- Sangrampur, District - East Champaran, Bihar (Area- 6.64 Ha).
KUMAR UDHAW GOSWAMI · Non-Coal Mining
- Category B2EC Granted2025-04-21
VIRAAT RAMAYAN INSTITUTE OF MEDICAL SCIENCE (Medical College and Hospital Project)
ARS FOUNDATION FOR HEALTH AND EDUCATION · INFRA-2
- Category AToR Granted2024-08-20declares affected families
Development of Four Lane highway from Manohar Chhapra village near Sahebganj (Ch. 44+650) to Charrahiya village near Areraj (Ch. 82+514) section of NH139W under Bharatmala Pariyojana in the state of Bihar
National Highways Authority of India · INFRA-1
- Category B2EC Granted2024-07-25
Amendment in Environment Clearance (EC) of Viraat Ramayana Mandir at Mauza: Bahuara Harbans, Kaithwalia, Siswa Narsingh, Block: Kesaria & Kalyanpur, District:-East Champaran, State: - Bihar
SRI MAHAVIR STHAN NYAS SAMITY · INFRA-2
- Category B2EC Granted2024-01-23
Establishment of Grain Based Ethanol Distillery capacity 100 KLPD with 2.5 MW co-generation power plant at Village – Nayagaon Kushahar, Khijirpura, Tehsil – Kesaria, District - East Champaran, Bihar, Pin -845424, India by M/s Tirhut Udhyog Pvt Ltd
TIRHUT UDHYOG PRIVATE LIMITED · Industrial Projects - 2
- Category B1EC Granted2023-10-02
Sand Mining Project of Area 18.63 Ha at East Champaran Unit-5 ( includes 4 sand blocks) on Burhi Gandak River of District- East Champaran of State-Bihar
VIKASH KUMAR · Non-Coal Mining
- Category B1TOR GRANTED2023-05-14
Sand Mining Project of Area 18.63 Ha at East Champaran Unit-5 ( includes 4 sand blocks) on Burhi Gandak River of District- East Champaran of State-Bihar
VIKASH KUMAR · Non-Coal Mining
- Category AToR Granted2023-03-17declares affected families
Construction of four lane highway from Areraj to Bettiah section of NH-139W (From km 0.000 to km 41.882) in the State of Bihar under Bharatmala Pariyojana.
National Highways Authority of India · INFRA-1
All 49 proposals that name this district, newest first.