← All districts

Sitamarhi, Bihar

Not a Scheduled AreaCensus 2011 district code 206
  1. 24 Oct 2026 · FiledSubmittedProposed Brick Earth Mining Project for M/S Saumya Int Udyog at Village/Mauza-Gorhari, P.O- Bakhri, P.S-…
  2. 16 Oct 2026 · Details soughtEssential details soughtOrdinary Earth Mining project of Rakesh Tiwari., at Mauza- Bhagwatipur, Block- Parihar, District-…
  3. 13 Oct 2026 · Details soughtAdditional details soughtProposed Brick Earth Mining Project for M/S Jay Hanuman Int Udyog at Village/Mauza- Belsand, Post-…
  4. 8 Oct 2026 · DecidedEnvironmental clearance grantedProposed Brick Earth Mining for M/S SHUSHIL INT UDYOG - Bachharpur Soil Brick Mining Project at…
  5. 8 Oct 2026 · DecidedEnvironmental clearance grantedBrick Earth Mining project of M/s Tohfa Int Udyog at Mauza- Bhagwatipur, Block- Parihar, District-…
  6. 2 Oct 2026 · FiledSubmittedOrdinary Earth Mining project of Rakesh Tiwari., at Mauza- Bhagwatipur, Block- Parihar, District-…
  7. 29 Sept 2026 · DecidedStandard Terms of Reference grantedExpansion of Sugar Mill from 6000 TCD to 10000 TCD, Cogeneration Power Plant from 13 MW to 50 MW,…
  8. 29 Sept 2026 · Details soughtAdditional details soughtBrick Earth Mining project of M/s Annpurna Eit Udyog at Mauza- Koiria Pipra, Block- Parihar, District-…
  9. 18 Sept 2026 · DecidedEnvironmental clearance grantedProposed Brick Earth Mining Project of M/S Shivam Int Udyog at Mauza-Banaul, P.O- Banaul, P.S- Nanpur,…
  10. 18 Sept 2026 · DecidedEnvironmental clearance grantedBrick Earth Mining Project of M/s Uma Int Udyog
  11. 18 Sept 2026 · DecidedEnvironmental clearance grantedBrick Earth Mining for M/S Lavkush Stone - Dharharwa Soil Brick Mining Project at Village+P.O-Dharharwa,…
  12. 18 Sept 2026 · DecidedEnvironmental clearance grantedBrick Earth Mining for M/S TRIMURTI INT UDYOG - Nocha Gamharia Soil Brick Mining Project at Mauza+Village-…

Dated by the portal's own appraisal history, converted to India Standard Time; a proposal with no recorded history appears on its register submission date.

Other clearances these proposals declare

Forest land diversion declared
2
Forest land sought for diversion
0 ha
Wildlife board recommendation declared
0
In or near a protected area
0
In an eco-sensitive zone
1

These counts are taken from the application forms of the 49 of 49 proposals naming this district whose forms have been read for these questions. In 40 of those forms at least one question was left blank, and a blank answer is counted as unknown. The forest area is the area stated for forest clearance, with each forest proposal counted once, in the district where its project is primarily sited.

Proposals naming this district
49
Category A proposals
4
Families declared displaced
None declared
Families declared affected
None declared

Displacement figures are the proponents’ own declarations. A project sited across several districts declares one figure for the whole project, and that figure is counted once, in the district where the project is primarily sited. 1 of the proposals listed below declare displacement and are sited primarily in another district, so their figures are counted in that district’s total.

Fifth Schedule status

Not within a Fifth Schedule Scheduled Area

No Presidential Order under paragraph 6 of the Fifth Schedule declares any Scheduled Area in Bihar, so no part of this district is one and PESA does not apply.

OrderMinistry of Tribal Affairs, Scheduled Areas declared under paragraph 6 of the Fifth Schedule to the Constitution

What the record shows

  • Cultivators and agricultural labourers make up 76% of workers here, against 55% nationally, so at least three in four people who work here do so on the land.

  • Agricultural labourers, who work other people's land for wages, make up 57% of workers here. Compensation for acquired land is paid to those who hold title to it, so it does not reach them. They can still claim the rehabilitation and resettlement entitlements of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (RFCTLARR), because its section 3(c) counts a family whose livelihood depends on the land as an affected family, wherever that Act governs how the land is obtained.

  • Literacy was 52.0% in 2011 against 72.98% nationally, so notices and documents issued in writing during a consultation may reach fewer people here.

Each of these observations appears when a fixed rule is met by the figures on this page, so the same figures always give the same sentences. None of them is a view on whether a project should go ahead.

Who lives there

Figures from Census 2011, each compared with the all-India value computed on the same definition.

Total population
34,23,574
Households
7,36,322
Average household size
4.65
0.20 below India's 4.85India
Scheduled Tribe share of population
0.1%
8.5 points below IndiaIndia
Scheduled Caste share of population
11.9%
4.8 points below IndiaIndia
Children aged 0-6
19.4%
5.8 points above IndiaIndia
Literacy rate
52.1%
20.9 points below IndiaIndia
Sex ratio
899
44.0 below India's 942.6India

What they live on

How the district's workers earn a living, from Census 2011. The land-dependent share counts cultivators and agricultural labourers as a share of all workers, and it is the group most directly affected when land is acquired.

Total workers
11,14,583
Work participation rate
32.6%
7.2 points below IndiaIndia
Workers dependent on land
76.4%
21.9 points above IndiaIndia
Cultivators
19.4%
5.3 points below IndiaIndia
Agricultural labourers
57.1%
27.1 points above IndiaIndia
Marginal workers
32.4%
7.7 points above IndiaIndia
Household industry workers
3.4%
0.4 points below IndiaIndia

How households live

Land, income and work among rural households, from the Socio Economic and Caste Census 2011, which recorded these where the population census did not. Only the survey's rural part is used here, so urban households do not appear.

Rural households owning land
33.6%
12.5 points below IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households whose highest earner makes over ₹5,000 a month
31.5%
7.2 points above IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households living mainly on manual casual labour
77.6%
25.9 points above IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households with a salaried member
4.1%
4.2 points below IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

When these were filed

Each proposal is dated by the first step in its appraisal history, the dated record of steps the portal keeps for it.

2024-Q42026-Q4

The timeline counts 47 of the 49 proposals here. The first filing date comes from each proposal's appraisal history, and we have not yet read it for the other 2, so they are left out. Most of them are older proposals, so the early part of the timeline undercounts what was filed then. The register itself records a date for each of them; the gap is in our copy of the histories.

Hatched columns undercount, so they cannot be compared with solid ones. 2026-Q4 was still running when the register was read, so its column counts only the filings made up to that date.

What kind of projects these are

The proposals naming this district, grouped by the sector each was filed under.

  • Non-Coal Mining 87.8%
  • INFRA-2 4.1%
  • INFRA-1 4.1%
  • Industrial Projects - 2 2%
  • Other (1) 2%

The four largest sectors are shown by name and the rest are grouped as Other.

What is proposed here

These are the proposals in the national environmental clearance register whose application names a site in this district, newest first. A project with sites in several districts appears under each of them.

  1. Category B2Under Verification2026-10-24

    Proposed Brick Earth Mining Project for M/S Saumya Int Udyog at Village/Mauza-Gorhari, P.O- Bakhri, P.S- Parihar, District-Sitamarhi, State-Bihar

    GOPal jee thakur · Non-Coal Mining

  2. Category B2Proposal Accepted and Referred to SEAC2026-10-22

    Ordinary Earth Mining project of Rakesh Tiwari., at Mauza- Bhagwatipur, Block- Parihar, District- Sitamarhi, Bihar., Bihar (Lease Area: 2.41 Ha.)

    RAKESH TIWARI · Non-Coal Mining

  3. Category B2Referred to SEAC2026-09-17

    Proposed Brick Earth Mining Project for M/S Jay Hanuman Int Udyog at Village/Mauza- Belsand, Post- Belsand, P.S- Belsand, District-Sitamarhi, State-Bihar- 843316

    sanjiv kumar · Non-Coal Mining

  4. Category B2EC Granted2026-09-12

    Brick Earth Mining project of M/s Tohfa Int Udyog at Mauza- Bhagwatipur, Block- Parihar, District- Sitamarhi, Bihar. (Lease Area: 1.86 Ha.)

    mohammad jumman · Non-Coal Mining

  5. Category B2Referred to SEAC2026-09-11

    Brick Earth Mining project of M/s Annpurna Eit Udyog at Mauza- Koiria Pipra, Block- Parihar, District- Sitamarhi, Bihar. (Lease Area: 1.60 Ha.)

    Arun kumar · Non-Coal Mining

  6. Category AForwarded to MS SPCB/PCC by MS2026-09-10

    Expansion of Sugar Mill from 6000 TCD to 10000 TCD, Cogeneration Power Plant from 13 MW to 50 MW, Distillery from 45 KLD to 500 KLD and Installation of 300 KLD Sustainable Aviation Fuel (SAF) Plant by RIGA SUGAR COMPANY LIMITED ( Subsidiary of Nirani Sugars Limited) at Dhanukagram, P.O.: Riga, District Sitamarhi, State Bihar

    NIRANI SUGARS LIMITED · Industrial Projects - 2

  7. Category B2EC Granted2026-09-04

    Proposed Brick Earth Mining for M/S SHUSHIL INT UDYOG - Bachharpur Soil Brick Mining Project at Mauza+Village+P.O-Bachharpur, P.S-Pupri, District-Sitamarhi (Bihar)

    SHIVSHANKAR SAH · Non-Coal Mining

  8. Category B2EC Granted2026-08-31

    Proposed Brick Earth Mining Project of M/S Shivam Int Udyog at Mauza-Banaul, P.O- Banaul, P.S- Nanpur, District- Sitamarhi, State- Bihar (Area - 1.62 ha.)

    NAVIN SARSWATI · Non-Coal Mining

  9. Category B2EC Granted2026-08-29

    Brick Earth Mining Project of M/s Uma Int Udyog

    UMASHANKAR SINGH · Non-Coal Mining

  10. Category B2EC Granted2026-08-26

    Brick Earth Mining for M/S Lavkush Stone - Dharharwa Soil Brick Mining Project at Village+P.O-Dharharwa, P.S-Parihar, District-Sitamarhi (Bihar)

    RAKESH TIWARI · Non-Coal Mining

  11. Category B2EC Granted2026-08-14

    Brick Earth Mining for M/S TRIMURTI INT UDYOG - Nocha Gamharia Soil Brick Mining Project at Mauza+Village- Nocha Gamharia, P.O- Bela Machhpakauni, P.S-Bela, District- Sitamarhi (Bihar)

    DINESH RAY · Non-Coal Mining

  12. Category B2EC Granted2026-08-11

    Brick Earth Mining for M/S SAHARA INT UDYOG - Gaadha Soil Brick Mining Project at Village-Gaadha, P.O-Gaadha, P.S-Pupri, District-Sitamarhi (Bihar)

    Devanti devi · Non-Coal Mining

  13. Category B2EC Granted2026-08-10

    Proposed Brick Earth Mining for M/S 5 STAR BRICKS UDYOG - Posua Patania Soil Brick Mining Project at Village+P.O-Posua Patania, P.S-Riga, District-Sitamarhi (Bihar)

    VIJENDRA KUMAR · Non-Coal Mining

  14. Category B2EC Granted2026-08-03

    Proposed Brick Earth Mining for M/S HIRAULI INT UDYOG LLP - Hirauli Soil Brick Mining Project at Mauza+Village- Hirauli, P.O- Chainpura, P.S - Pupri, District- Sitamarhi (Bihar)

    Md ashfaq alam · Non-Coal Mining

  15. Category B2EC Granted2026-07-18

    Proposed Brick clay mining project at Village/Mauza- Koyli, P.O- Koyli, P.S- Nanpur, Dist- Sitamarhi, Bihar By M/S Maa Kalika Int Udyog

    RISHI JHA · Non-Coal Mining

  16. Category B2EC Granted2026-07-14

    Brick Earth Mining Project of M/s Shree Ram Int Udyog

    SHATRUGHNA MISHRA · Non-Coal Mining

  17. Category B2EC Granted2026-07-13

    Proposed Nutan Rajeev Medical College and Hospital

    Rajeev Kumar · INFRA-2

  18. Category B2Referred to SEAC2026-07-03

    Brick Earth Mining Project of M/s Ravi Int Udyog

    RAVI KUMAR · Non-Coal Mining

  19. Category B2EC Granted2026-07-03

    Brick Earth Mining Project of M/s Maa Durga Int Udyog

    GANESH PRASAD SAH · Non-Coal Mining

  20. Category B2EC Granted2026-06-30

    Proposed Brick Earth Mining Project for M/S Bol Bum Int Udyog at Village/Mauza- Damabhi, P.O- Partapur, P.S- Belsand, District- Sitamarhi, State- Bihar.

    suresh gupta · Non-Coal Mining

  21. Category B2Proposal pulled back (withdrawn)2026-06-15

    Proposed Brick Earth Mining for M/S Shri Ram Janki INT Udyog Madhurapur Soil Brick Mining Project at Village - Madhurapur, Post: Madhurapur, P.S.: Bajpatti, District: Sitamarhi, State-Bihar

    pravin kumar · Non-Coal Mining

  22. Category B2EC Granted2026-06-09

    Proposed Brick Earth Mining for M/S MAA BHAWANI Int Udyog - Madanpur Vishwanath Soil Brick Mining Project at Village+P.O-Madanpur Vishwanath, P.S- Parsauni, District- Sitamarhi (Bihar)

    SAMIR KUMAR · Non-Coal Mining

  23. Category B2EC Granted2026-06-08

    Proposed Brick Earth Mining for M/S B R Int Udyog - Kumhara Bishanpur Soil Brick Mining Project at Village- Kumhara Bishanpur, P.O- Kumhara Bishanpur, P.S– Dumra, District- Sitamarhi (Bihar)

    SUJIT KUMAR · Non-Coal Mining

  24. Category B2EC Granted2026-06-06

    Brick Earth Mining for M/S Shankar Int Udyog - Madanpur Vishwanath Soil Brick Mining Project at Mauza Madanpur Vishwanath, Village+P.O- Madanpur Vishwanath, P.S- Parsauni, District- Sitamarhi (Bihar)

    RAMASHANKAR PRASAD SINGH · Non-Coal Mining

  25. Category B2EC Granted2026-05-14

    Brick Earth Mining for M/S GHUGHLA STAR INT UDHYOG LLP - Bhantabari Soil Brick Mining Project at Mauza+Village+P.O.- Bhantabari, P.S-Choraut, District- Sitamarhi (Bihar)

    UMESH MAHTO · Non-Coal Mining

  26. Category B2EC Granted2026-05-09

    Proposed Brick Earth Mining for M/S SRI DAS INT UDYOG - Raypur Jagarnath Soil Brick Mining Project at Mauza+Village-Raypur Jagarnath, P.O-Patdaura, P.S-Bajpatti, Distt–Sitamarhi (Bihar)

    RAKESH KUMAR · Non-Coal Mining

  27. Category B2EC Granted2026-05-09

    Proposed Brick Earth Mining for M/S RAJ INT UDYOG - Sardalpatti Soil Brick Mining Project at Mauza+Village+P.O.- Sardalpatti, P.S- Parihar, Distt–Sitamarhi (Bihar)

    ANURADHA DEVI · Non-Coal Mining

  28. Category B2EC Granted2026-05-07

    Brick Earth Mining for M/S Vikash Int Udyog - Bathuara Soil Brick Mining Project at Mauza – Bathuara, P.O- Bathuara, P.S - Bela, District- Sitamarhi (Bihar)

    RAM KAILASH SAH · Non-Coal Mining

  29. Category B2EC Granted2026-04-28

    Brick Earth Mining for M/S GS Eent Udyog - Rampur Parori Soil Brick Mining Project at Vill-Rampur Parori, P.O-Banchauri, P.S-Dumra, Distt–Sitamarhi (Bihar)

    SHYAM KUMAR · Non-Coal Mining

  30. Category B2EC Granted2026-03-16

    Proposed Brick Earth Mining Project for M/s Suraj Bricks Industries at Mauza- Raipur & Kauria, P.O- Raipur, P.S + Block- Nanpur, District- Sitamarhi, State- Bihar.

    Pawan kumar chaudhary · Non-Coal Mining

  31. Category B2EC Granted2026-03-13

    Brick Earth Mining Project of M/s Hariom Int Udyog

    vijay kumar · Non-Coal Mining

  32. Category AProposal returned in present form2026-03-09

    Development of Gorakhpur Siliguri High Speed Access Controlled Corridor, Bihar Section starting from km 175.750 (Interchange at NH-227F) to km 270.000 (Interchange at NH-527B) in the State of Bihar. Total Design Length. 94.250 km.

    NATIONAL HIGHWAY AUTHORITY OF INDIA · INFRA-1

  33. Category B2EC Granted2026-03-07

    Brick Earth Mining Project of M/s. Balaji Int Udyog.

    baban kumar singh · Non-Coal Mining

  34. Category B2EC Granted2026-03-07

    Brick Earth Mining Project of M/s. Shakti Int Nirman

    rabindra kumar shahi · Non-Coal Mining

  35. Category B2EC Granted2026-03-07

    Brick Earth Mining Project of M/s. Sona Int Udyog

    RAM PRAKASH MAHATO · Non-Coal Mining

  36. Category B2EC Granted2026-02-21

    Brick Earth Mining project of M/s. Mahamaya Int Udyog.

    nand kishor purbay · Non-Coal Mining

  37. Category B2EC Granted2026-02-14

    Brick Earth Mining Project of M/s. Shakti Int.

    sindhu kumari · Non-Coal Mining

  38. Category B2EC Granted2026-01-16

    Development of Punauradham, the birthplace of mother sita, situated in Sitamarhi District, Bihar in accordance with Shri Ram Janmabhoomi Tirtha Kshetra, Ayodhya.

    Bihar State tourism Deve-lopment Corporation Ltd · INFRA-2

  39. Category B1EC Granted2026-01-12

    Sand Mining Project Unit - 03 (Panrahi Sand Ghat) on Bagmati River at Mouza - Kansar, Block - Belsand, District - Sitamarhi, Bihar

    SUNITA DEVI · Non-Coal Mining

  40. Category B1EC Granted2025-11-03

    Sand Unit-1 (Jamla Ghat, Ghurghura Ghat & Sirisian ghat) on Bagmati & Adhwara Samuh River of District- Sitamarhi, Bihar

    pUNAM DEVI · Non-Coal Mining

  41. Category AProposal pulled back (withdrawn)2025-09-05declares affected families

    Development of 6 lane with PS Gorakhpur Siliguri High Speed Access Controlled corridor starting from Gorakhpur Bypass km 0.000 (near Madapur) to km 525.590 (on NH-327 near Bagdogra) at Deomani in the states of Uttar Pradesh, Bihar and West Bengal (Total Length = 525.590 km)

    NATIONAL HIGHWAY AUTHORITY OF INDIA · INFRA-1

  42. Category B2EC Granted2025-06-25

    Proposed brick earth mining project located at Mauza – Manpur Ratnawali, Block- Runni Saidpur, Dist. Sitamarhi, Bihar, covering a total area of 1.62 Ha. Having a production capacity of 5,000 Cum/Annum by M/s India Int Udyog

    Anjani kumar · Non-Coal Mining

  43. Category B1ToR Granted2025-06-03

    Sand Mining Project Unit - 03 (Panrahi Sand Ghat) on Bagmati River at Mouza - Kansar, Block - Belsand, District - Sitamarhi, Bihar

    SUNITA DEVI · Non-Coal Mining

  44. Category AToR Granted2025-04-17declares affected families

    ERM of Western Kosi Canal Project

    Water Resources Department, Govt of Bihar · River Valley and Hydroelectric Projects

  45. Category B2EC Granted2025-02-03

    Proposed Ordinary Earth Mining project of M/s Broadway Link Private Limited at Mauza: Ramnagra Rasalpur, Mauja No. 51, PS: Kathauli, Anchal: Sonbarsa District: Sitamarhi, Bihar over an area of 4.925 Ha. with production capacity of 59,839 Cum

    BROADway links Private limited · Non-Coal Mining

  46. Category B1ToR Granted2025-01-24

    Sand Unit-1 (Jamla Ghat, Ghurghura Ghat & Sirisian ghat) on Bagmati & Adhwara Samuh River of District- Sitamarhi, Bihar

    pUNAM DEVI · Non-Coal Mining

  47. Category B2Proposal returned in present form2024-12-25

    Proposed Soil Mining

    BROADway links Private limited · Non-Coal Mining

  48. Category B1EC Granted2023-11-25

    Sand Mining Project of Unit-2 (Parsauni Ghat) of Area 16.40 Ha at Bagmati River of District-Sitamarhi of State-Bihar.

    BALRAJ SINGH · Non-Coal Mining

  49. Category B1TOR GRANTED2023-06-26

    Sand Mining Project of Unit-2 (Parsauni Ghat) of Area 16.40 Ha at Bagmati River of District-Sitamarhi of State-Bihar.

    BALRAJ SINGH · Non-Coal Mining

All 49 proposals that name this district, newest first.