All 2 in the last 60 days- 12 Oct 2026 · DecidedTerms of Reference grantedProposed Development of IIT Jammu- Phase B at village -Jagti, Tehsil- Nagrota, District - Jammu, Jammu &…
- 14 Sept 2026 · DecidedTerms of Reference grantedManufacturing of lead ingots, pig ingots and battery plates through mechanised process in favour of M/s M…
Dated by the portal's own appraisal history, converted to India Standard Time; a proposal with no recorded history appears on its register submission date.
Other clearances these proposals declare
- Forest land diversion declared
- 0
- Forest land sought for diversion
- None declared
- Wildlife board recommendation declared
- 0
- In or near a protected area
- 0
- In an eco-sensitive zone
- 1
These counts are taken from the application forms of the 80 of 80 proposals naming this district whose forms have been read for these questions. In 64 of those forms at least one question was left blank, and a blank answer is counted as unknown. The forest area is the area stated for forest clearance, with each forest proposal counted once, in the district where its project is primarily sited.
- Proposals naming this district
- 80
- Category A proposals
- 3
- Families declared displaced
- None declared
- Families declared affected
- None declared
Displacement figures are the proponents’ own declarations. A project sited across several districts declares one figure for the whole project, and that figure is counted once, in the district where the project is primarily sited.
Fifth Schedule status
Not within a Fifth Schedule Scheduled Area
No Presidential Order under paragraph 6 of the Fifth Schedule declares any Scheduled Area in Jammu & Kashmir, so no part of this district is one and PESA does not apply. A different protection does apply here: State land and forest-rights law; no Presidential Order under the Fifth Schedule extends here.
OrderMinistry of Tribal Affairs, Scheduled Areas declared under paragraph 6 of the Fifth Schedule to the Constitution
Who lives there
Figures from Census 2011, each compared with the all-India value computed on the same definition.
- Total population
- 15,29,958
- Households
- 3,14,199
- Average household size
- 4.87
- level with IndiaIndia
- Scheduled Tribe share of population
- 4.5%
- 4.0 points below IndiaIndia
- Scheduled Caste share of population
- 24.7%
- 8.1 points above IndiaIndia
- Children aged 0-6
- 10.9%
- 2.6 points below IndiaIndia
- Literacy rate
- 83.5%
- 10.5 points above IndiaIndia
- Sex ratio
- 880
- 62.6 below India's 942.6India
What they live on
How the district's workers earn a living, from Census 2011. The land-dependent share counts cultivators and agricultural labourers as a share of all workers, and it is the group most directly affected when land is acquired.
- Total workers
- 5,08,622
- Work participation rate
- 33.2%
- 6.5 points below IndiaIndia
- Workers dependent on land
- 20.7%
- 33.8 points below IndiaIndia
- Cultivators
- 13.5%
- 11.1 points below IndiaIndia
- Agricultural labourers
- 7.3%
- 22.7 points below IndiaIndia
- Marginal workers
- 19.3%
- 5.4 points below IndiaIndia
- Household industry workers
- 2.1%
- 1.7 points below IndiaIndia
How households live
Land, income and work among rural households, from the Socio Economic and Caste Census 2011, which recorded these where the population census did not. Only the survey's rural part is used here, so urban households do not appear.
- Rural households owning land
- 61.8%
- 15.7 points above IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
- Rural households whose highest earner makes over ₹5,000 a month
- 46.7%
- 22.3 points above IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
- Rural households living mainly on manual casual labour
- 38.0%
- 13.8 points below IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
- Rural households with a salaried member
- 31.6%
- 23.3 points above IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
When these were filed
Each proposal is dated by the first step in its appraisal history, the dated record of steps the portal keeps for it.
The timeline counts 78 of the 80 proposals here. The first filing date comes from each proposal's appraisal history, and we have not yet read it for the other 2, so they are left out. Most of them are older proposals, so the early part of the timeline undercounts what was filed then. The register itself records a date for each of them; the gap is in our copy of the histories.
Hatched columns undercount, so they cannot be compared with solid ones.
What kind of projects these are
The proposals naming this district, grouped by the sector each was filed under.
- Non-Coal Mining 71.3%
- INFRA-2 13.8%
- Industrial Projects - 1 12.5%
- Industrial Projects - 3 2.5%
The four largest sectors are shown by name and the rest are grouped as Other.
What is proposed here
These are the proposals in the national environmental clearance register whose application names a site in this district, newest first. A project with sites in several districts appears under each of them.
- Category B1Forwarded to MS SPCB/PCC by MS2026-09-07
Proposed Development of IIT Jammu- Phase B at village -Jagti, Tehsil- Nagrota, District - Jammu, Jammu & Kashmir by Indian Institute of Technology, Jammu
INDIAN INSTITUTE OF TECHNOLOGY JAMMU · INFRA-2
- Category B1Forwarded to MS SPCB/PCC by MS2026-07-20
Manufacturing of lead ingots, pig ingots and battery plates through mechanised process in favour of M/s M V Alloys sidco industrial complex, bari brahmna , sambaj&K
M V ALLOYS · Industrial Projects - 1
- Category B1EC Granted2026-05-21
Expansion of Production Capacity
UFLEX LIMITED · Industrial Projects - 3
- Category B1EC Granted2026-05-11
Integrated Solid Waste Management at Bhalwal village Jammu district, Jammu & Kashmir
CEF JAMMU ENERGY PRIVATE LIMITED · INFRA-2
- Category B1EC Granted2026-04-06
River Bed Mining Block no 24, District Reasi, Jammu & Kashmir.
M/S UMESH KUMAR · Non-Coal Mining
- Category B1Forwarded to MS SPCB/PCC by MS2026-02-06
M/s RR Aliance Bio Health Care LLP, Common Bio Medical Waste Treatment Facility (CBWTF)
RR ALIANCE BIO HEALTH CARE LLP · INFRA-2
- Category B1EC Granted2026-01-14
River Bed mining Projectat block no 1/5 Jammu
KARANVIR SINGH · Non-Coal Mining
- Category B1EC Granted2025-07-18
Minor Mineral (River Bed Material) Mining Project Block-23, Area of 7.43 ha at Chenab River, Village- Pandhal and Jeri area, Tehsil & District Reasi, J&K U.T in favor of Shri Rattan Lal Jalla, S/O Shri Satlal Jalla R/O Roop Nagar, Jammu, J&K U.T.
RATTAN LAL JALLA · Non-Coal Mining
- Category B1EC Granted2025-07-18
Minor Mineral (River Bed Material) Mining Project Block-22, Area of 7.51 ha At Chenab River, Village- Pandhal and Jeri area, Tehsil & District Reasi, J&K U.T in favor of Shri Jugesh Aggarwal, S/O Shri Ram Chand R/O Anandpur, Pathankot, Punjab
JUGESH AGGARWAL · Non-Coal Mining
- Category B1EC Granted2025-07-18
Minor Mineral (River Bed Material) Mining Project Block-2, Area of 7.91 ha at Tanda, Seri Khad, Village-Tanda, District-Reasi (J&K) U.T. in favor of M/S Sai Mines R/O Logate, Kathua, J&K U.T.
SAI MINES · Non-Coal Mining
- Category B1EC Granted2025-07-18
Minor Mineral (River Bed Material) Mining Project Block-26, Area of 5.0 ha At River Chenab,Downstream Baradari Bridge (Kans Khosan Area) , Tehsil & District Reasi, J&K U.T. in favor of Shri Karanvir Singh S/O Shri Surinder Singh
KARANVIR SINGH · Non-Coal Mining
- Category B1ToR Granted2025-07-14
Real Estate Development of Reclaimed Land of Tawi Riverfront, Jammu
JAMMU SMART CITY LIMITED · INFRA-2
- Category B2EC Granted2025-04-28
Proposed Minor Mineral (Nallah Muck) Block-4/J Mining ProjectBlock-4/J, an area of 4.90; , At Tawi River, Village - Malhori Jagir, District- Jammu, J&K
CHOUDHARY POWER PROJECTS PRIVATE LIMITED · Non-Coal Mining
- Category B1EC Granted2025-03-19
Proposal for obtaining Extension of Environmental Clearance of the area for Minor Mineral Block (River Bed Material) Block No. 31, Resized Area:- 3.52ha., at Anji Khad Downstream Sula Park Bridge, District-Reasi, J&K U.T in favor of Shri Parshotam Singh S/O Shri Baljit Singh
M/S PARSHOTAM SINGH · Non-Coal Mining
- Category B1ToR Granted2025-03-04
Expansion of Production Capacity
UFLEX LIMITED · Industrial Projects - 3
- Category B2EC Granted2025-02-19
Minor Mineral Block No. 33, Phare Khad (Kanjali) at Village-Phare, District-Reasi, State-Jammu & Kashmir.
SHIVA MINERALS PUNJAB · Non-Coal Mining
- Category B2EC Granted2025-02-18
River Bed Material Block No.21, Tawi Khad Downstream Matnani Bridge, Village- Nar Block Pouni, Tehsil & District-Reasi, State-Jammu & Kashmir.
RANBIR SINGH S/O GULWANT SINGH · Non-Coal Mining
- Category B2EC Granted2025-01-20
Development of Inter Modal Station (IMS) at Katra
NATIONAL HIGHWAYS LOGISTICS MANAGEMENT LIMITED · INFRA-2
- Category B2Proposal Withdrawal Request Accepted2025-01-09
Minor Mineral (Nallah Muck) Mining Project, Block -19/J, Area 4.63 ha. Nikki Tawi River Near Village-Badyal Brhamna, District-Jammu J&K (U.T.)
SANDEEP SINGH · Non-Coal Mining
- Category B2Proposal Withdrawal Request Accepted2025-01-09
Minor Mineral (Nallah Muck) Mining Project, Block -13/J, Area-4.40 Ha. At Nikki Tawi River, Village- Surya Chack, District- Jammu, J&K. U.T.
CHOUDHARY POWER PROJECTS PRIVATE LIMITED · Non-Coal Mining
- Category B2Proposal Withdrawal Request Accepted2025-01-09
Minor Mineral (Nallah Muck) Mining Project, Block -12/J, Area-4.50 Ha. At Nikki Tawai River at Village Chack Ganeshu, District- Jammu, J&K. U.T.
CHOUDHARY POWER PROJECTS PRIVATE LIMITED · Non-Coal Mining
- Category B2Proposal Withdrawal Request Accepted2025-01-09
Minor Mineral (Nallah Muck) Mining Project, Block -29/J, At Sardan Nallah at Upstream Railway Bridge Pargolta area, District- Jammu, J&K. U.T.
CHOUDHARY POWER PROJECTS PRIVATE LIMITED · Non-Coal Mining
- Category B1EC Granted2024-12-21
Minor Mineral (River Bed Material) Mining Project, Block-5/22, Area of 8.65 ha.
HARPAL SINGH · Non-Coal Mining
- Category B2EC Rejected2024-12-14
Proposal for obtaining Environmental Clearance of the area for Nallah Muck Block-28/J, Sardan Nallah at Upstream Railway Bridge Pargolta area, District- Jammu, J&K
MOHIT SINGH · Non-Coal Mining
- Category B2EC Granted2024-12-10
Minor Mineral (Nallah Muck) Mining Project, Block -32/J, Area-3.20 Ha. At Jhajjar Nallah at Village Sarmal, District- Jammu, J&K (U.T.).
BHARAT BHUSHAN · Non-Coal Mining
- Category B1Withdrawal Request Accepted2024-11-19
Minor Mineral (River Bed Mineral) Mining for area 9.82 hectare, Block no. 1/4 Tawi River Downstream, Railway Bridge, Kishanpur Manwal, Village Kishanpur, Teshil & District Jammu, J&K U.T
CHOUDHARY POWER PROJECTS PRIVATE LIMITED · Non-Coal Mining
- Category B1EC Granted2024-09-24
Extension Of Validity Of Environmental Clearance Minor mineral Lease for Sand , Stone and Bajri project Located at Khasra No. 1245/1, situated at Mauza/Mohal Danoon, Tehsil Salooni, District Chamba, Himachal Pradesh, Area 16.1898 Hectares (200-01 Bigha)
AMIT SHARMA · Non-Coal Mining
- Category B1EC Granted2024-09-21
River Bed Mining Project at Block no 5/32 Khourwali Khad Upstream Khour Bridge ,Jammu
MAHAVIR MINING · Non-Coal Mining
- Category B1EC Granted2024-09-21
River Bed Mining Project at Block no 5/30,Khour wali khad upstream,District Jammu
M/S SINGH MINERALS PATHANKOT · Non-Coal Mining
- Category B1EC Granted2024-09-21
River bed Mining Project at Block no 5/23,Jad Khad Downstream Jourian Bridge,District Jammu
KESARI NANDAN · Non-Coal Mining
- Category B1EC Granted2024-09-21
River Bed Mining Block 1/7,Tawi River Downstream Railway Bridge, Kishanpur Manwal,Jammu
M/S PARSHOTAM SINGH · Non-Coal Mining
- Category B1ToR Granted2024-09-21
Integrated Solid Waste Management at Bhalwal village Jammu district, Jammu & Kashmir
CEF JAMMU ENERGY PRIVATE LIMITED · INFRA-2
- Category B1EC Granted2024-09-20
River Bed Mining Project at Block 1/1 ,Tawi River Upstream Dhar-Udhampur Road Bridge ,Kishanpur Manwal,Jammu
PAVAN SHARMA · Non-Coal Mining
- Category B2EC Granted2024-09-20
Minor Mineral (RBM) Block No. 27/J, at Sardan Nalah Downstream Railway Bridge Village: Pargolta, Tehsil & District- Jammu, Jammu & Kashmir UT (Area 2.55ha).
NARESH SINGH · Non-Coal Mining
- Category B1EC Granted2024-09-19
River Bed Mining Project at Block No.-5/26,Jad Khad Upstream Jourian Bridge,Jammu
M/S PARSHOTAM SINGH · Non-Coal Mining
- Category B1EC Granted2024-09-19
River Bed Mining Project at Block 1/3,Tawi River Downstream, Railway Bridge, Kishanpur Manwal,Jammu
SAI MINES · Non-Coal Mining
- Category B1EC Granted2024-09-19
River Bed Mining Project at Block 5/24 ,Jad Khad upstream Jourian bridge
KARANVIR SINGH · Non-Coal Mining
- Category B1EC Granted2024-09-14
Minor Mineral (River Bed Material) Mining Project, Block No. 5/12, at Khatharwali Khad Downstream Manoh Khathar Bridge,Village- Kathar Tehsil- Akhnoor, District- Jammu
RAHIL CHOUDHARY S/O RAKESH KUMAR CHOUDHARY · Non-Coal Mining
- Category B1EC Granted2024-09-13
Minor Mineral (River Bed Material) Mining Project, Block-38 (5/13), Area of 8.69 ha.
SUSHIL KUMAR · Non-Coal Mining
- Category B1EC Granted2024-09-13
Minor Mineral (River Bed Mineral) Mining Project Block-5/3, Area of 9.94 ha At Chenab River Downstream, Old Bridge Akhnoor, Village-Malpur, Tehsil-Bhalwal, District- Jammu, J&K (U.T.)
VIPAN KUMAR · Non-Coal Mining
- Category B2EC Granted2024-09-12
Minor Mineral (Nallah Muck) Block-19/J Mining Project, proposal for obtaining Environmental Clearance of the area for Nallah Muck Block -19/J, an area of 4.63 ha at Nikki Tawi River Near Village-Badyal Brhamna, District-Jammu J&K (U.T.)
SANDEEP SINGH · Non-Coal Mining
- Category B2EC Granted2024-09-11
proposed Minor Mineral (Nallah Muck), Block -29/J (3.00 hectare), Sardan Nallah at Upstream Railway Bridge Pargolta area, District- Jammu, J&K
CHOUDHARY POWER PROJECTS PRIVATE LIMITED · Non-Coal Mining
- Category B2EC Granted2024-09-10
proposed Minor Mineral (Nallah Muck) mining project Block-13/J (4.40 Ha.) at Nikki Tawi River, Village- Surya Chack, District- Jammu, J&K.
CHOUDHARY POWER PROJECTS PRIVATE LIMITED · Non-Coal Mining
- Category B1EC Granted2024-09-10
Minor Mineral (River Bed Mineral) Mining Project, Block-5/2 At Chenab River Downstream, Old Bridge Akhnoor, Village-Malpur, Tehsil-Bhalwal, District- Jammu, J&K (U.T.)
CHOUDHARY ZAHEER · Non-Coal Mining
- Category B2EC Granted2024-09-10
River bed mining project Nallah Muck Block-12/J, an area of 4.50 ha; , Nikki Tawi River at Village Chack Ganeshu, District- Jammu, J&K
CHOUDHARY POWER PROJECTS PRIVATE LIMITED · Non-Coal Mining
- Category B1EC Granted2024-09-09
Minor Mineral (River Bed Mineral) Mining Project, Block-5/4, Area of 9.32 haAt Chenab River Downstream, Old Chenab Bridge Akhnoor, Village-Malpur, Tehsil-Bhalwal, District- Jammu, J&K (U.T.)
RAMESHWAR SINGH · Non-Coal Mining
- Category B1EC Granted2024-09-05
Minor Mineral (River Bed Material) Mining Project, Block No. 1/8, at Tawi River Downstream Railway Bridge, Kishanpur, Manwal, Village- Kishanpur, Tehsil- Jammu Dist.-Jammu (J&K)
SUSHIL KUMAR · Non-Coal Mining
- Category B1EC Granted2024-09-05
Minor Mineral (River Bed Material) Mining Project, Block No. 5/36 over an Area- 5.28 ha. at Chauki Chaura Downstream, Chagial Bridge, Village-Gangal, Tehsil-Chauki Chaura District-Jammu (J&K)
RAHIL CHOUDHARY S/O RAKESH KUMAR CHOUDHARY · Non-Coal Mining
- Category B1EC Granted2024-08-30
Minor Mineral (River Bed Material) Mining Project, Block No. 5/33 over an Area- 9.66 ha. at Khourwali Khad Downstream Khour Bridge, Village-Narayana, Tehsil-Khour, District- Jammu, J&K (U.T.).
RAHIL CHOUDHARY S/O RAKESH KUMAR CHOUDHARY · Non-Coal Mining
- Category B1EC Granted2024-08-30
Minor Mineral (River Bed Material) Mining Project, Block-5/21, Area of 9.35 ha.
KULDEEP SINGH · Non-Coal Mining
- Category B1EC Granted2024-08-30
Minor Mineral (River Bed Material) Mining Project, Block No. 1/4 (Area-9.82 ha.), Tawi River Downstream, Railway Bridge, Kishanpur Manwal, Village- Kishanpur, Tehsil & District-Jammu (J&K)
SANCHIT GAUTAM S/O SH. RAVI GAUTAM · Non-Coal Mining
- Category B1EC Granted2024-08-30
Minor Mineral (River Bed Material) Mining Project, Block-54(5/29), Area of 9.89 ha
KIMAT LAL S/O KOHLA RAM · Non-Coal Mining
- Category B2EC Granted2024-08-29
Minor Mineral (River Bed Mineral) Mining Project, Block No. 44 (Area-1.23 ha.), Chibbewali Khad at Village Pungali, Tehsil Nagrota, District- Jammu (J&K)
SAHIL CHOUDHARY · Non-Coal Mining
- Category B1EC Granted2024-08-05
Proposal for Extension of Environment Clearance in favour of Shri Sahil Arora, S/o Sh. Sunil Arora, Minor Mineral (River Bed Material) Project at Block No. 2 (1/2) (Area- 9.21 ha.), Tawi River Downstream, Railway Bridge, Kishanpur Manwal Village- Kishanpur, Tehsil & District- Jammu, J&K
SAHIL ARORA · Non-Coal Mining
- Category B1EC Granted2024-08-05
Minor Mineral (River Bed Mineral) Mining Project, proposal for Block-5/31, Area of 6.62 ha; Located Khourwali Khad Downstream, Village Narayana, Tehsil Khour, Jammu J&K U.T
SHRI MANGAL SINGH S/O SHRI OM PRAKASH · Non-Coal Mining
- Category B1EC Granted2024-08-05
Minor Mineral (River Bed Material) Mining Project, Block No. 1/6 (Area-9.74 ha.), Tawi River Downstream, Railway Bridge, Kishanpur Manwal, Village- Kishanpur, Tehsil & District-Jammu (J&K)
ADITYA MAHAJAN · Non-Coal Mining
- Category B1EC Granted2024-08-05
Minor Mineral (River Bed Material) Mining Project, Block No. 5/11 over an Area-8.59 ha. at Khatharwalli Khad Downstream Manoh Khathar Bridge, District- Jammu, J&K. U.T. in favor of Aditiya Mahajan
ADITYA MAHAJAN · Non-Coal Mining
- Category B1EC Granted2024-08-05
Proposal for Extension of Environment Clearance in favour of Shri Sanchit Gautam S/o Shri Ravi Gautam Minor Mineral (River Bed Material) Project at Block No. 5/9, (Area- 9.52 ha.), Khatharwalli Khad Downstream Manoh Khathar Bridge, Village- Khathar, Tehsil- Akhnoor, District- Jammu, J&K.
SANCHIT GAUTAM S/O SH. RAVI GAUTAM · Non-Coal Mining
- Category B1EC Granted2024-08-05
Minor Mineral (River Bed Material) Mining Project, Block-5/25, Area of 9.43 ha.
BRINDER SINGH S/O SHRE KEEMAT LAL · Non-Coal Mining
- Category B1EC Granted2024-08-05
PROPOSED PERMANENT CAMPUS OF IIT JAMMU [PHASE A- STAGE 1C] BY INDIAN INSTITUTE OF TECHNOLOGY JAMMU
INDIAN INSTITUTE OF TECHNOLOGY JAMMU · INFRA-2
- Category B2EC Granted2024-07-29
Minor Mineral (Nallah Muck) Mining Project for Block-6/J, Area of 4.00 ha At Tawi River, Village Chak Ralewakan, District Jammu, J&K
CHOUDHARY POWER PROJECTS PRIVATE LIMITED · Non-Coal Mining
- Category B2EC Granted2024-07-29
Proposed Minor Mineral (Nallah Muck) Mining Project, Block-18/J, Area of 4.10 ha.
CHOUDHARY POWER PROJECTS PRIVATE LIMITED · Non-Coal Mining
- Category B1EC Granted2024-07-12
Expansion of the existing unit by installing 01 no. Induction furnace of 25 TPH capacity and one Continuous Casting Machine at SIDCO Industrial Estate, Bari Brahmana, Samba Jammu & Kashmir by M/s Kashmir Ispat for production of 1,19,000 TPA of Steel Ingots/Billets and to enhance the capacity of rolling mill to increase the production of Round, Angle, Channel, TMT Bars and Flats from 85,876 TPA to 1,13,050 TPA.
KASHMIR ISPAT · Industrial Projects - 1
- Category B1ToR Rejected2024-04-08
M/s Shakti Tools India Ltd. Manufacturing of TMT, Angles, Channels, MS Patti, Flats and Billets.
SHAKTI TOOLS INDIA LIMITED · Industrial Projects - 1
- Category B1ToR Rejected2024-04-06
Expansion of existing Steel Manufacturing Unit namely M/s Vijay Steel Industries (Unit-II) located at Phase-II, SIDCO Industrial Complex, Bari Brahmana, Jammu for increasing the production capacity from 10,000 TPA to 99,000 TPA.
VIJAY STEEL INDUSTRIES · Industrial Projects - 1
- Category B1Standard ToR Granted2024-02-23
M/s Shakti Tools India Ltd. Manufacturing of TMT, Angles, Channels, MS Patti, Flats and Billets.
SHAKTI TOOLS INDIA LIMITED · Industrial Projects - 1
- Category B1EC Granted2024-02-15
Minor Mineral (River Bed material) Project at Block-1, (Area-8.42 ha.), Tanda Seri Khad, near Village Tanda (Plan-I) District-Reasi, J& K of Shri Sahil Arora
SAHIL ARORA · Non-Coal Mining
- Category B1EC Granted2024-02-15
Minor Mineral (River Bed material) Project at Block -7, (Area-9.60 ha.), at Anji Khad, Downstream Sula Park bridge (Plan No.VII), District-Reasi, JK UT of Shri Sumit Gupta.
SHRI SUMIT GUPTA S/O SHRI ASHOK KUMAR GUPTA · Non-Coal Mining
- Category B2EC Granted2024-02-15
Minor Minerals Block-08, (Area- 4.30 ha.), Birma Nallah Upstream National highway Bridge, Village-Batal Ballian, District- Udhampur
SHRI MANGAL SINGH S/O SHRI OM PRAKASH · Non-Coal Mining
- Category B1EC Granted2024-02-15
Minor Mineral (River Bed material) Project at Block -34 Area-8.49ha. at Tanda, Seri Khad, Village-T anda, District-Reasi, J&K U.T of Shri Mangal Singh
SHRI MANGAL SINGH S/O SHRI OM PRAKASH · Non-Coal Mining
- Category B2EC Granted2024-01-20
River Bed Mining Project in Minor Mineral Block -32, Pei Khad, At village -Dhabbar ,Tehsil & District - Reasi, J&K
ANJU BALA SHARMA · Non-Coal Mining
- Category B1ToR Granted2023-12-14
Expansion of existing Steel Manufacturing Unit namely M/s Quality Casting Industries located at SIDCO Industrial Complex, Bari Brahmana, Jammu for increase in production capacity from 18,754 TPA to 1,32,600 TPA for manufacturing of Pencil Ingots
QUALITY CASTING INDUSTRIES · Industrial Projects - 1
- Category B1Withdrawal Request Accepted2023-12-02
Existing Steel Manufacturing unit "M/s Quality Casting Industries"
QUALITY CASTING INDUSTRIES · Industrial Projects - 1
- Category AEC Granted2023-11-08
Expansion of Civil Enclave at Jammu Airport with an area of 40000 m2 proposed by Airports Authority of India
AIRPORTS AUTHORITY OF INDIA · INFRA-2
- Category B1Standard ToR Granted2023-10-30
M/s KASHMIR ISPAT located at SIDCO Industrial Complex, Bari Brahmana, Samba Jammu.
KASHMIR ISPAT · Industrial Projects - 1
- Category B1ToR Granted2023-10-05
PROPOSED PERMANENT CAMPUS OF IIT JAMMU [PHASE A- STAGE 1C] BY INDIAN INSTITUTE OF TECHNOLOGY JAMMU
INDIAN INSTITUTE OF TECHNOLOGY JAMMU · INFRA-2
- Category AWithdrawal Request Accepted2023-09-30
M/s KASHMIR ISPAT located at SIDCO Industrial Complex, Bari Brahmana, Samba Jammu
RAHUL BANSAL · Industrial Projects - 1
- Category AProposal returned in present form2023-09-01
Expansion of Civil Enclave at Jammu Airport with an area of 40000 m2 proposed by Airports Authority of India
AIRPORTS AUTHORITY OF INDIA · INFRA-2
- Category B1Under Examination2023-06-14
Expansion of Civil Enclave at Jammu Airport with an area of 40000 m2 proposed by Airports Authority of India
AIRPORTS AUTHORITY OF INDIA · INFRA-2
- Category B1EDS RAISED2023-05-10
Existing Steel Manufacturing unit "M/s Quality Casting Industries"
QUALITY CASTING INDUSTRIES · Industrial Projects - 1