Buxar, Bihar
Recent activity
All 11 in the last 60 days- 21 Oct 2026 · FiledSubmittedPROPOSED BRICK EARTH MINING PROJECT FOR M/S TATA INT UDYOG AT MAUZA-ARAILA (THANA No.192), P.O-AMSARI, P.S…
- 13 Oct 2026 · Details soughtAdditional details soughtProposed ‘Nawanagar Industrial Area’, located at Nawanagar Block, Buxar District, Bihar, covering an…
- 13 Oct 2026 · FiledSubmittedPROPOSED BRICK EARTH MINING PROJECT FOR M/S TATA INT UDYOG AT MAUZA-ARAILA (THANA No.192), P.O-AMSARI, P.S…
- 30 Sept 2026 · Details soughtAdditional details soughtProposed ‘Nawanagar Industrial Area’, located at Nawanagar Block, Buxar District, Bihar, covering an…
- 18 Sept 2026 · DecidedEnvironmental clearance grantedBrick Earth Mining for M/S NEW BHARAT ENT UDYOG - Chhatanwar Soil Brick Mining Project at…
- 18 Sept 2026 · DecidedEnvironmental clearance grantedProposed Brick Earth Mining for M/S BHARTI BRICKS – Bhojpur Jadid Soil Brick Mining Project at…
- 18 Sept 2026 · DecidedEnvironmental clearance grantedBrick Earth Mining Project of Khandhara Soil Brick Mine by M/s Guru Kripa Innt Udyog
- 15 Sept 2026 · Details soughtAdditional details soughtBrick Earth Mining Project of Khandhara Soil Brick Mine by M/s Guru Kripa Innt Udyog
- 9 Sept 2026 · DecidedEnvironmental clearance grantedBrick Earth Mining for M/S Sun Bricks - Churamanpur Soil Brick Mining Project at Mauza+Village+P.O-…
- 9 Sept 2026 · DecidedEnvironmental clearance grantedProposed Brick Earth Mining for M/S Anil Int Udyog - Ramubariya+Kharanti Soil Brick Mining Project at…
- 1 Sept 2026 · FiledSubmittedBrick Earth Mining for M/S NEW BHARAT ENT UDYOG - Chhatanwar Soil Brick Mining Project at…
Dated by the portal's own appraisal history, converted to India Standard Time; a proposal with no recorded history appears on its register submission date.
Other clearances these proposals declare
- Forest land diversion declared
- 0
- Forest land sought for diversion
- None declared
- Wildlife board recommendation declared
- 0
- In or near a protected area
- 0
- In an eco-sensitive zone
- 0
These counts are taken from the application forms of the 49 of 49 proposals naming this district whose forms have been read for these questions. In 43 of those forms at least one question was left blank, and a blank answer is counted as unknown. The forest area is the area stated for forest clearance, with each forest proposal counted once, in the district where its project is primarily sited.
- Proposals naming this district
- 49
- Category A proposals
- 2
- Families declared displaced
- None declared
- Families declared affected
- None declared
Displacement figures are the proponents’ own declarations. A project sited across several districts declares one figure for the whole project, and that figure is counted once, in the district where the project is primarily sited.
Fifth Schedule status
Not within a Fifth Schedule Scheduled Area
No Presidential Order under paragraph 6 of the Fifth Schedule declares any Scheduled Area in Bihar, so no part of this district is one and PESA does not apply.
OrderMinistry of Tribal Affairs, Scheduled Areas declared under paragraph 6 of the Fifth Schedule to the Constitution
What the record shows
Agricultural labourers, who work other people's land for wages, make up 47% of workers here. Compensation for acquired land is paid to those who hold title to it, so it does not reach them. They can still claim the rehabilitation and resettlement entitlements of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (RFCTLARR), because its section 3(c) counts a family whose livelihood depends on the land as an affected family, wherever that Act governs how the land is obtained.
Each of these observations appears when a fixed rule is met by the figures on this page, so the same figures always give the same sentences. None of them is a view on whether a project should go ahead.
Who lives there
Figures from Census 2011, each compared with the all-India value computed on the same definition.
- Total population
- 17,06,352
- Households
- 2,61,660
- Average household size
- 6.52
- 1.67 above India's 4.85India
- Scheduled Tribe share of population
- 1.6%
- 7.0 points below IndiaIndia
- Scheduled Caste share of population
- 14.8%
- 1.9 points below IndiaIndia
- Children aged 0-6
- 17.3%
- 3.7 points above IndiaIndia
- Literacy rate
- 70.1%
- 2.8 points below IndiaIndia
- Sex ratio
- 922
- 21.0 below India's 942.6India
What they live on
How the district's workers earn a living, from Census 2011. The land-dependent share counts cultivators and agricultural labourers as a share of all workers, and it is the group most directly affected when land is acquired.
- Total workers
- 5,38,322
- Work participation rate
- 31.6%
- 8.2 points below IndiaIndia
- Workers dependent on land
- 71.4%
- 16.8 points above IndiaIndia
- Cultivators
- 24.6%
- level with IndiaIndia
- Agricultural labourers
- 46.8%
- 16.9 points above IndiaIndia
- Marginal workers
- 39.0%
- 14.2 points above IndiaIndia
- Household industry workers
- 4.9%
- 1.0 points above IndiaIndia
How households live
Land, income and work among rural households, from the Socio Economic and Caste Census 2011, which recorded these where the population census did not. Only the survey's rural part is used here, so urban households do not appear.
- Rural households owning land
- 30.1%
- 16.0 points below IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
- Rural households whose highest earner makes over ₹5,000 a month
- 40.8%
- 16.4 points above IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
- Rural households living mainly on manual casual labour
- 57.7%
- 6.0 points above IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
- Rural households with a salaried member
- 11.3%
- 3.0 points above IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
When these were filed
Each proposal is dated by the first step in its appraisal history, the dated record of steps the portal keeps for it.
The timeline counts 48 of the 49 proposals here. The first filing date comes from each proposal's appraisal history, and we have not yet read it for the other 1, so they are left out. Most of them are older proposals, so the early part of the timeline undercounts what was filed then. The register itself records a date for each of them; the gap is in our copy of the histories.
Hatched columns undercount, so they cannot be compared with solid ones. 2026-Q4 was still running when the register was read, so its column counts only the filings made up to that date.
What kind of projects these are
The proposals naming this district, grouped by the sector each was filed under.
- Non-Coal Mining 83.7%
- INFRA-1 4.1%
- Industrial Projects - 1 4.1%
- Thermal Projects 4.1%
- Other (1) 4.1%
The four largest sectors are shown by name and the rest are grouped as Other.
What is proposed here
These are the proposals in the national environmental clearance register whose application names a site in this district, newest first. A project with sites in several districts appears under each of them.
- Category B2Under Verification2026-10-21
PROPOSED BRICK EARTH MINING PROJECT FOR M/S TATA INT UDYOG AT MAUZA-ARAILA (THANA No.192), P.O-AMSARI, P.S + Circle-DUMRAON, DISTRICT-BUXAR, STATE- BIHAR-802126
SAROJ KUMAR RAY · Non-Coal Mining
- Category B2EC Granted2026-09-01
Brick Earth Mining for M/S NEW BHARAT ENT UDYOG - Chhatanwar Soil Brick Mining Project at Mauza-Chhatanwar, Vill-Akalupur, P.O-Dumraon(HF), P.S–Krishna Brahm, District-Buxar (Bihar)
dhanjee singh · Non-Coal Mining
- Category B2EC Granted2026-08-24
Proposed Brick Earth Mining for M/S BHARTI BRICKS – Bhojpur Jadid Soil Brick Mining Project at Mauza+Village-Bhojpur Jadid, P.O-Naya Bhojpur, P.S-Dumraon, District-Buxar (Bihar)
BIPUL BHARTI · Non-Coal Mining
- Category B2EC Granted2026-08-20
Brick Earth Mining Project of Khandhara Soil Brick Mine by M/s Guru Kripa Innt Udyog
Raj Kumar Dubey · Non-Coal Mining
- Category B2Proposal pulled back (withdrawn)2026-08-17
Brick Earth Mining Project of Khandhara Soil Brick Mine
Raj Kumar Dubey · Non-Coal Mining
- Category B2Proposal pulled back (withdrawn)2026-08-14
Brick Earth Mining Project of Khandhara Soli Brick Mine
Raj Kumar Dubey · Non-Coal Mining
- Category B2EC Granted2026-07-27
Brick Earth Mining for M/S Sun Bricks - Churamanpur Soil Brick Mining Project at Mauza+Village+P.O- Churamanpur, P.S- Industrial Area Buxar, District-Buxar (Bihar)
SARJIT ROY · Non-Coal Mining
- Category B2EC Granted2026-07-27
Proposed Brick Earth Mining for M/S Anil Int Udyog - Ramubariya+Kharanti Soil Brick Mining Project at Mauza-Ramubariya+Kharanti, P.O- Majhariya, P.S-Industrial Area Buxar, District-Buxar (Bihar)
ANIL KUMAR SINGH · Non-Coal Mining
- Category B2EC Granted2026-07-24
Proposed Brick Earth Mining for M/S GYANTI INT UDYOG – Dhudhani Soil Brick Mining Project at Mauza+Village-Dhudhani, P.O-Pawani, P.S-Muffasil Buxar, District-Buxar (Bihar)
VIKASH KUMAR RAI · Non-Coal Mining
- Category B2EC Granted2026-07-23
Proposed Brick Earth Mining for M/S D.K BRICKS – Parari Soil Brick Mining Project at Mauza+Village-Parari, P.O-Churamanpur, P.S-Industrial Area Buxar, District-Buxar (Bihar)
HARENDRA SINGH · Non-Coal Mining
- Category B1Referred to SEAC2026-07-21
Proposed ‘Nawanagar Industrial Area’, located at Nawanagar Block, Buxar District, Bihar, covering an extent of 404.68 Acre area (163.76Ha.), of Bihar Industrial Area Development Authority (BIADA)
BIHAR INDUSTRIAL AREA DEVELOPMENT AUTHORITY · INFRA-1
- Category B2EC Granted2026-06-29
Proposed Brick Earth Mining for M/S SAMRAT ENT UDYOG - Sonpa Soil Brick Mining Project at Mauza+Village+P.O-Sonpa, P.S-Rajpur, District-Buxar (Bihar)
RAGHAWJEE RAI · Non-Coal Mining
- Category B2EC Granted2026-06-27
Brick Earth Mining for M/S YASH DEEP BRICKS - Nainijor Soil Brick Mining Project at Mauza-Nainijor, Village+P.O-Barki Nainijor, P.S-Nainijor, District-Buxar (Bihar)
VINOD KUMAR TIWARI · Non-Coal Mining
- Category B2EC Granted2026-06-26
Proposed Brick Earth Mining for M/S R B S Int Udyog - Balihar Soil Brick Mining Project at Mauza+Village-Balihar, P.O-Dullahpur, P.S-Simri, District-Buxar (Bihar)
PREEM SINGH · Non-Coal Mining
- Category B2EC Granted2026-06-24
Brick Earth Mining Project of M/s Pratap Int Udyog
rambadan singh · Non-Coal Mining
- Category B2EC Granted2026-06-17
Proposed Brick Earth Mining for M/S Satyam Int Udyog – Nagpura Soil Brick Mining Project at Mauza+Vill+P.O-Nagpura, P.S-Simri, District-Buxar (Bihar)
SANTOSH KUMAR SINGH · Non-Coal Mining
- Category B2EC Granted2026-06-15
Proposed Brick Earth Mining for M/S Muskan Ett Udyog – Bhatauli Soil Brick Mining Project at Mauza+Village+P.O- Bhatauli, P.S- Nawanagar, District- Buxar (Bihar)
birendra sah · Non-Coal Mining
- Category B2EC Granted2026-06-09
Proposed Brick Earth Mining for M/S Sagar Bricks – Lakhrawan Soil Brick Mining Project at Mauza-Lakhrawan, Village+P.O-Dhakhich, P.S-Krishana Braham, District-Buxar (Bihar)
SANJAY KUMAR · Non-Coal Mining
- Category B2EC Granted2026-05-22
Brick Earth Mining of M/s Bhaibhav ITE Udyog
abhay ray · Non-Coal Mining
- Category B2EC Granted2026-04-28
Proposed Brick Earth Mining for M/S Pradhan Bricks – Shivpur Janubi Soil Brick Mining Project at Mauza-Shivpur Janubi, P.O+P.S-Chakki, District-Buxar (Bihar)
RAMJEE RAI · Non-Coal Mining
- Category B2EC Granted2026-04-10
Proposed Brick Earth Mining for M/S Pradhan Int Bhatta Udyog - Chhatanwar Soil Brick Mining Project at Village+P.O-Chhatanwar, P.S-Krishna Braham, District-Buxar (Bihar)
PRADUMAN RAI · Non-Coal Mining
- Category B2EC Granted2026-04-08
Proposed Brick Earth Mining for M/S Pradhan Int Bhatta Udyog - Ariyaon Soil Brick Mining Project at Mauza+ Village+P.O-Ariyaon, P.S-Krishna Barham, District- Buxar (Bihar)
RAHUL KUMAR PRADHAN · Non-Coal Mining
- Category B2EC Granted2026-04-06
Brick Earth Mining Project of M/s. Janta Int Udyog
jay prakash yadav · Non-Coal Mining
- Category B2EC Granted2026-03-17
Proposed Brick Earth Mining Project for M/S Shiv Int Udyog at Mauza/Vill- Panditpur, P.O- Nadaon, P.S- Buxar Muffashil, Block- Buxar, District- Buxar, State- Bihar, Area- 5.70 Acer or 2.31 Ha.
PAVAN KUMAR CHAUHAN · Non-Coal Mining
- Category B2EC Granted2026-03-07
Brick Earth Mining Project of M/s Bhushan Bricks
chandra shekhar singh · Non-Coal Mining
- Category B2EC Granted2026-02-25
Brick Earth Mining Project of M/s Prayag Int Udyog
manoj kumar singh · Non-Coal Mining
- Category B2EC Granted2026-02-11
Brick Earth mining of M/s. R.K Products
ram krishna pandey · Non-Coal Mining
- Category B2EC Granted2026-02-07
Proposed Brick Earth Mining for M/S VIP Int Udyog- Bhadar Soil Brick Mining Project at Village - Bhadar ,P.O-Bhadar, P.S-Sikrauli Lakh, District-Buxar (Bihar)
RAJENDRA SINGH YADAV · Non-Coal Mining
- Category B2EC Granted2026-02-05
Proposed Brick Earth Mining for M/S NEW VIP Int Udyog- Bhadar Soil Brick Mining Project at Vill-Bhadar P.O-Bhadar, P.S-Sikrauli Lakh, District-Buxar (Bihar)
RAJESH KUMAR YADAV · Non-Coal Mining
- Category B2EC Granted2026-01-29
Proposed Brick Earth Mining for M/S Sun Ent Udyog- Nadaon Soil Brick Mining Project at Vill- Nadaon , P.O-Nadaon, P.S-Buxar, Distt–Buxar (Bihar)
SUN ENT UDYOG · Non-Coal Mining
- Category B2EC Granted2026-01-29
M/s. Pratap Enterprises
manohar kumar · Non-Coal Mining
- Category B2EC Granted2025-12-24
PROPOSED BRICK EARTH MINING PROJECT LOCATED AT MAUZA –CHATANWAR , ANCHAL-DUMRAON, DISTRICT-BUXAR, BIHAR OVER AN AREA OF 2.35 HA HAVING A PRODUCTION CAPACITY OF 7973 CUM/ANNUM By M/s Om Int Udyog
kanhaiya yadav · Non-Coal Mining
- Category B2EC Granted2025-12-08
Brick Earth Mining for M/S Dhiraj Ent Udyog- Paramdihari Soil Brick Mining Project at Village/Mauza- Paramdihari, P.O- Rupsagar, P.S- Surajpura, District- Buxar (Bihar)
BARUN KUMAR SINGH · Non-Coal Mining
- Category B2Under Verification2025-11-07
PROPOSED ORDINARY SOIL MINING PROJECT LOCATED AT MAUZA – USARVALIYA , P.O.- KORANSARAI, THANA- KORANSARAI, DISTRICT-BUXAR, BIHAR OVER AN AREA OF 1.63 HA HAVING A PRODUCTION CAPACITY OF 26406 CUM by Kanchan Enterprises
kanchan devi · Non-Coal Mining
- Category B2EC Granted2025-10-16
Brick Earth Mining for M/S Badal Ent Udyog-Mungaow Soil Brick Mining Project at Mauza+Village- Mungaow, P.O. – Mungaow, P.S- Koran Sarai, Anchal- Dumraon, District- Buxar (Bihar)
ARUN KUMAR SINGH · Non-Coal Mining
- Category B2EC Granted2025-10-14
Brick Earth Mining for M/S Vivek Int Udyog- Usarwalia Soil Brick Mining Project at Mauza-Usarwalia, Block/Anchal- Dumraon, District- Buxar (Bihar)
vinod kumar singh · Non-Coal Mining
- Category B2EC Granted2025-08-16
Brick Earth Mining for M/S Sri Om Int Udyog- Saphi Naubarar Soil Brick Mining Project at Mauza- Saphi Naubarar, Village- Jawahi, P.O- Balua, P.S– Brahampur, District- Buxar (Bihar)
hiralal yadav · Non-Coal Mining
- Category B2EC Granted2025-03-29
Brick Earth Mining for M/S Hira Eat Udyog- Turaopatti Soil Brick Mining Project at Mauza- Turaopatti,Village –Rupsagar, P.O +P.S –Nawanagar, Anchal- Nawanagar, District- Buxar, (Bihar)
PARSHURAM SINGH · Non-Coal Mining
- Category B2EC Granted2025-03-19
Proposed Brick Earth Mining for M/S Sone Bricks - Dubauli Soil brick Mining project at Village-Dubauli, P.O.-Simri, P.S -Simri, District- Buxar (Bihar)
shambhu nath singh · Non-Coal Mining
- Category B2EC Granted2025-03-18
Gunjadihri Soil Brick Mine at Village- Gunjadihri, P.O- Rupsagar, P.S & Anchal- Nawanagar, District- Buxar (Bihar)
rajesh kumar singh · Non-Coal Mining
- Category B2EC Granted2025-01-14
Basudhar Soil Brick Mining Project at Village+P.O- Basudhar, P.S+Anchal- Itarhi, District- Buxar (Bihar)
DILIP SINGH · Non-Coal Mining
- Category B1EC Granted2024-12-04
Proposed Standalone Clinker Grinding Unit with Cement Production Capacity of 4.0 Million TPA along with installation of D.G. Set of Capacity 1 MW by JK Cement Works, Buxar (A unit of JK Cement Limited) at Khasra Nos. 04,05,12 & others, Villages: Menhmarara & Kant, Tehsil-Dumraon, District -Buxar, Bihar
J K CEMENT LIMITED · Industrial Projects - 1
- Category AToR Granted2024-11-11
Proposed Expansion from 1320 MW to 1980 MW Buxar Thermal Power Project by installing 1x660 MW plant unit Near Chausa, district Buxar, Bihar
SJVN THERMAL PVT LTD · Thermal Projects
- Category B1ToR Granted2024-09-23
Proposed ‘Nawanagar Industrial Area’, located at Nawanagar Block, Buxar District, Bihar, covering an extent of 404.68 Acre area (163.76Ha.), of Bihar Industrial Area Development Authority (BIADA)
BIHAR INDUSTRIAL AREA DEVELOPMENT AUTHORITY · INFRA-1
- Category B2EC Granted2024-07-25
Soil mining project for Brick Earth M/S MAHAL INT UDYOG of District- Buxar, State- Bihar
MUKESH SINGH · Non-Coal Mining
- Category B1ToR Granted2024-07-23
Proposed Standalone Clinker Grinding Unit with Cement Production Capacity of 4.0 Million TPA along with installation of D.G. Set of Capacity 1 MW by JK Cement Works, Buxar (A unit of JK Cement Limited) at Khasra Nos. 04,05,12 & others, Villages: Menhmarara & Kant, Tehsil-Dumraon, District -Buxar, Bihar
J K CEMENT LIMITED · Industrial Projects - 1
- Category B2EC Granted2024-07-17
Exploratory drilling of Two wells in OALP-VI BLOCK, GV-ONHP-2021/2
OIL AND NATURAL GAS CORPORATION LIMITED · Industrial Projects - 2
- Category AToR Granted2023-10-10
Proposed Expansion from 1320 MW to 1980 MW Buxar Thermal Power Project by installing 1x660 MW plant unit Near Chausa, district Buxar, Bihar
SJVN THERMAL PRIVATE LIMITED · Thermal Projects
- Category B2EC Granted2023-03-24
Greenfield Project of 150 Grain Based Distillery Plant along with Co-Generation Power Plant of 4.5 MW at Plot No. NS G-7, Industrial Area Nawanagar, District- Buxar, Bihar by M/s Swadeshi Fuels LLP.
SWADESHI FUELS LLP · Industrial Projects - 2
All 49 proposals that name this district, newest first.