  1. 9 Oct 2026 · DecidedEnvironmental clearance grantedMynkre Limestone Mine (Lease Area-15.27 Ha) by M/s TNE Cement Private Limited
  2. 9 Oct 2026 · DecidedTerms of Reference grantedLumshnong-2 Limestone Mine (4.546 ha)
  3. 9 Oct 2026 · DecidedTerms of Reference grantedLumshnong-1 Limestone Mine (3.927 ha)
  4. 8 Oct 2026 · DecidedTerms of Reference grantedWah Pynkon-2 Limestone Mine (4.518 ha)
  5. 8 Oct 2026 · DecidedTerms of Reference grantedWah Pynkon Limestone Mine (4.739 ha)
  6. 24 Sept 2026 · DecidedEnvironmental clearance grantedSaryngkham Coal Block B
  7. 22 Sept 2026 · DecidedEnvironmental clearance grantedProposed Moiong Thlushininang Limestone Mine (ML Area – 26.50 ha) with Limestone Production Capacity 1.007…
  8. 21 Sept 2026 · Details soughtAdditional details sought"Surve Larung Lumshnong Limestone Deposit (44.58 Ha.)'' with a proposed maximum excavation 1366475.2 TPA…
  9. 17 Sept 2026 · DecidedEnvironmental clearance grantedM/S Amsyndui Lime Stone Mine
  10. 17 Sept 2026 · DecidedEnvironmental clearance grantedUmtyra Limestone and Clay Deposit
  11. 16 Sept 2026 · DecidedEnvironmental clearance grantedM/s Limestone Mine
  12. 16 Sept 2026 · DecidedEnvironmental clearance grantedAmkapai Limestone Mine

Dated by the portal's own appraisal history, converted to India Standard Time; a proposal with no recorded history appears on its register submission date.

Other clearances these proposals declare

Forest land diversion declared
1
Forest land sought for diversion
52 ha
Wildlife board recommendation declared
0
In or near a protected area
1
In an eco-sensitive zone
8

These counts are taken from the application forms of the 102 of 102 proposals naming this district whose forms have been read for these questions. In 59 of those forms at least one question was left blank, and a blank answer is counted as unknown. The forest area is the area stated for forest clearance, with each forest proposal counted once, in the district where its project is primarily sited.

Proposals naming this district
102
Category A proposals
7
Families declared displaced
None declared
Families declared affected
None declared

Displacement figures are the proponents’ own declarations. A project sited across several districts declares one figure for the whole project, and that figure is counted once, in the district where the project is primarily sited.

Fifth Schedule status

Not within a Fifth Schedule Scheduled Area

Article 244(1) applies the Fifth Schedule in every State other than Assam, Meghalaya, Tripura and Mizoram, so no part of Meghalaya is a Fifth Schedule Scheduled Area and PESA does not apply here. A different protection does: this district lies within an Autonomous District Council, under the Sixth Schedule (Articles 244(2) and 275(1)), which has its own consent and land-transfer safeguards.

OrderConstitution of India, Article 244(1) · Article 244(1)

What the record shows

  • Half or more of the people counted here in 2011 were Scheduled Tribe: 95.3%, against 8.55% nationally.

Each of these observations appears when a fixed rule is met by the figures on this page, so the same figures always give the same sentences. None of them is a view on whether a project should go ahead.

Who lives there

Figures from Census 2011, each compared with the all-India value computed on the same definition.

Total population
2,60,878
Households
43,903
Average household size
5.94
1.09 above India's 4.85India
Scheduled Tribe share of population
95.3%
86.7 points above IndiaIndia
Scheduled Caste share of population
0.3%
16.3 points below IndiaIndia
Children aged 0-6
23.1%
9.5 points above IndiaIndia
Literacy rate
61.6%
11.4 points below IndiaIndia
Sex ratio
1,020
77.5 above India's 942.6India

What they live on

How the district's workers earn a living, from Census 2011. The land-dependent share counts cultivators and agricultural labourers as a share of all workers, and it is the group most directly affected when land is acquired.

Total workers
1,00,904
Work participation rate
38.7%
1.1 points below IndiaIndia
Workers dependent on land
56.2%
1.6 points above IndiaIndia
Cultivators
37.4%
12.7 points above IndiaIndia
Agricultural labourers
18.8%
11.1 points below IndiaIndia
Marginal workers
24.3%
0.4 points below IndiaIndia
Household industry workers
1.3%
2.5 points below IndiaIndia

How households live

Land, income and work among rural households, from the Socio Economic and Caste Census 2011, which recorded these where the population census did not. Only the survey's rural part is used here, so urban households do not appear.

Rural households owning land
11.8%
34.3 points below IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households whose highest earner makes over ₹5,000 a month
47.8%
23.4 points above IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households living mainly on manual casual labour
46.6%
5.2 points below IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households with a salaried member
6.1%
2.2 points below IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

When these were filed

Each proposal is dated by the first step in its appraisal history, the dated record of steps the portal keeps for it.

2023-Q32026-Q3

The timeline counts 92 of the 102 proposals here. The first filing date comes from each proposal's appraisal history, and we have not yet read it for the other 10, so they are left out. Most of them are older proposals, so the early part of the timeline undercounts what was filed then. The register itself records a date for each of them; the gap is in our copy of the histories.

Hatched columns undercount, so they cannot be compared with solid ones. One of them covers a period for which we have read few filing dates so far, and it counts only the proposals whose date we have.

What kind of projects these are

The proposals naming this district, grouped by the sector each was filed under.

  • Non-Coal Mining 79.4%
  • Industrial Projects - 1 8.8%
  • Coal Mining 5.9%
  • Thermal Projects 3.9%
  • Other (1) 2%

The four largest sectors are shown by name and the rest are grouped as Other.

What is proposed here

These are the proposals in the national environmental clearance register whose application names a site in this district, newest first. A project with sites in several districts appears under each of them.

  1. Category B1Referred to SEIAA2026-09-02

    Lum Syrman Limestone Block- A (ML Area: 217.394 ha.) with Limestone Production Capacity: 6.0 Million TPA, Shale Production: 1.25 Million TPA, Top Soil: 0.025 Million TPA, OB Soil (Waste): 0.0565 Million TPA (Total Material Handling: 7.33 Million TPA) along with installation of Primary Crusher: 1200 TPH (along with Wobbler & Screening) and Secondary Crusher: 400 TPH At Village: Lum Syrman, Elaka: Nongkhlieh, Block: Saipung C&RD, District: East Jaintia Hills, Meghalaya

    Shree Cement Limited · Non-Coal Mining

  2. Category B2ADS Raised2026-08-28

    Lum Sakhne Limestone Mine

    LESLY SHYLLA · Non-Coal Mining

  3. Category B1Proposal pulled back (withdrawn)2026-08-11

    Proposed Moiong Thlushininang Limestone Mine (ML Area – 26.50 ha) with Limestone Production Capacity 1.007 Million TPA at Village Chiehriphi, Taluka – Khliehriat, District- East Jaintia Hills, Meghalaya by M/s. Meghalaya Cements Ltd..

    MEGHALAYA CEMENTS LIMITED · Non-Coal Mining

  4. Category B1Under Processing with Authority2026-08-03

    "Surve Larung Lumshnong Limestone Deposit (44.58 Ha.)'' with a proposed maximum excavation 1366475.2 TPA (654577 TPA of limestone and 711898.2 TPA of waste including topsoil) by M/s. Green Valliey Industries Limited.

    GREEN VALLIEY INDUSTRIES LIMITED · Non-Coal Mining

  5. Category B1EC Granted2026-06-14

    M/s Limestone Mine

    alldrina nonglamin · Non-Coal Mining

  6. Category B1EC Granted2026-06-14

    Amkapai Limestone Mine

    suprita myrchiang · Non-Coal Mining

  7. Category B1EC Granted2026-06-14

    M/S Amsyndui Lime Stone Mine

    DUKANI TARIANG · Non-Coal Mining

  8. Category B1EC Granted2026-06-10

    Mynkre Limestone Mine (Lease Area-15.27 Ha) by M/s TNE Cement Private Limited

    TNe cement private limited · Non-Coal Mining

  9. Category B1EC Granted2026-05-13

    Saryngkham Coal Block B

    DAPMAIN SHYLLA · Coal Mining

  10. Category B1EC Granted2026-05-11

    Proposed Moiong Thlushininang Limestone Mine (ML Area – 26.50 ha) with Limestone Production Capacity 1.007 Million TPA at Village Chiehriphi, Taluka – Khliehriat, District- East Jaintia Hills, Meghalaya by M/s. Meghalaya Cements Ltd..

    MEGHALAYA CEMENTS LIMITED · Non-Coal Mining

  11. Category AEC Granted2026-04-30

    Khad-Moosiang Limestone Deposit over an area 4.75 Ha of M/s. Cement International Limited, located at Lumshnong Village, Khliehriat Tehsil, East Jaintia Hills District, Meghalaya State.

    LOVELY GYMPAD · Non-Coal Mining

  12. Category B1Forwarded to MS SPCB/PCC by MS2026-04-23

    Proposed Integrated Solid Waste Management Processing & Treatment Facility for Jowai Municipal Board at Khliehriat Umlamat, Chyrmang Wah West Jaintia Hills District, Meghalaya.

    JOWAI MUNICIPAL BOARD · INFRA-2

  13. Category B1Forwarded to MS SPCB/PCC by MS2026-04-21

    Lumshnong-1 Limestone Mine (3.927 ha)

    WORLIN LAMARE · Non-Coal Mining

  14. Category B2Proposal returned in present form2026-04-16

    Lumtyrthoo Sand Mine

    RIMIFUL SHYLLA · Non-Coal Mining

  15. Category B1Forwarded to MS SPCB/PCC by MS2026-04-15

    Wah Pynkon Limestone Mine (4.739 ha)

    LAMSHWA KYNDOH · Non-Coal Mining

  16. Category B1EC Granted2026-04-15

    Umtyra Limestone and Clay Deposit

    GOLDSTONE CEMENTS LTD · Non-Coal Mining

  17. Category B1Forwarded to MS SPCB/PCC by MS2026-04-15

    Wah Pynkon-2 Limestone Mine (4.518 ha)

    LAMSHWA KYNDOH · Non-Coal Mining

  18. Category B2Proposal returned in present form2026-04-14

    Khlieh Tyllu Sand Mine

    EBRIS PARIAT · Non-Coal Mining

  19. Category B1Forwarded to MS SPCB/PCC by MS2026-04-14

    Lumshnong-2 Limestone Mine (4.546 ha)

    WORLIN LAMARE · Non-Coal Mining

  20. Category AProposal returned in present form2026-04-14

    Establishment of Integrated Cement Plant with proposed production capacity: 2.0 Million TPA of clinker, 2.0 Million TPA of cement, 12 MW Waste Heat Recovery System (WHRS) and 25 MW thermal energy-based Captive Power Plant (CPP) at Village Mynkree, Tehsil Khliehriat, District East Jaintia Hills, Meghalaya

    TNe cement private limited · Industrial Projects - 1

  21. Category B1EC Granted2026-04-09

    Integrated Cement Plant with capacity of clinker: 0.95 million TPA, Cement: 0.99 million TPA (OPC, PPC, PSC, SRC, RHPC & Composite Cement) CPP: 15 MW, WHRS: 7 MW) and DG Sets 2500 KVA (1x2500 KVA or 2X1000 KVA & 1X500 KVA or 1x1000 KVA, 2x500 KVA & 2x250KVA) in Khara Siang Lum Pyrshin in Daistong village, Elaka: Nongkhlieh Dolloiship, District of East Jaintia Hills (Meghalaya) by Shree Cement Ltd.

    Shree Cement Limited · Industrial Projects - 1

  22. Category B2EC Granted2026-03-07

    Khlieh Tyllu Sand Mine

    EBRIS PARIAT · Non-Coal Mining

  23. Category B2EC Granted2026-03-07

    Lumtyrthoo Sand Mine

    RIMIFUL SHYLLA · Non-Coal Mining

  24. Category B1Forwarded to MS SPCB/PCC by MS2026-03-05

    Lum Syrman Limestone Block- A (ML Area: 217.394 ha.) with Limestone Production Capacity: 6.0 Million TPA, Shale Production: 1.25 Million TPA, Top Soil: 0.025 Million TPA, OB Soil (Waste): 0.0565 Million TPA (Total Material Handling: 7.33 Million TPA) along with installation of Primary Crusher: 1200 TPH (along with Wobbler & Screening) and Secondary Crusher: 400 TPH At Village: Lum Syrman, Elaka: Nongkhlieh, Block: Saipung C&RD, District: East Jaintia Hills, Meghalaya

    Shree Cement Limited · Non-Coal Mining

  25. Category B1EC Granted2026-02-27

    Proposed Moiong Thlushininang Limestone Mine (ML Area – 26.50 ha) with Limestone Production Capacity 1.007 Million TPA at Village Chiehriphi, Taluka – Khliehriat, District- East Jaintia Hills, Meghalaya by M/s. Meghalaya Cements Ltd..

    MEGHALAYA CEMENTS LIMITED · Non-Coal Mining

  26. Category B1Proposal pulled back (withdrawn)2026-02-23

    Integrated Cement Plant with capacity of clinker: 0.95 million TPA, Cement: 0.99 million TPA (OPC, PPC, PSC, SRC, RHPC & Composite Cement) CPP: 15 MW, WHRS: 7 MW) and DG Sets 2500 KVA (1x2500 KVA or 2X1000 KVA & 1X500 KVA or 1x1000 KVA, 2x500 KVA & 2x250KVA) in Khara Siang Lum Pyrshin in Daistong village, Elaka: Nongkhlieh Dolloiship, District of East Jaintia Hills (Meghalaya) by Shree Cement Ltd.

    Shree Cement Limited · Industrial Projects - 1

  27. Category B1EC Granted2026-02-23

    Integrated Cement Plant with capacity of clinker: 0.95 million TPA, Cement: 0.99 million TPA (OPC, PPC, PSC, SRC, RHPC & Composite Cement) CPP: 15 MW, WHRS: 7 MW) and DG Sets 2500 KVA (1x2500 KVA or 2X1000 KVA & 1X500 KVA or 1x1000 KVA, 2x500 KVA & 2x250KVA) in Khara Siang Lum Pyrshin in Daistong village, Elaka: Nongkhlieh Dolloiship, District of East Jaintia Hills (Meghalaya) by Shree Cement Ltd.

    Shree Cement Limited · Industrial Projects - 1

  28. Category B1Granted2025-12-27

    8 MW Thermal Power Plant at Lumshnong, East Jaintia Hills District, Meghalaya

    STAR CEMENT MEGHALAYA LIMITED · Thermal Projects

  29. Category B1Granted2025-12-26

    43 MW Thermal Power Plant at Lumshnong, East Jaintia Hills District, Meghalaya

    STAR CEMENT MEGHALAYA LIMITED · Thermal Projects

  30. Category AToR Granted2025-10-22

    Khad-Moosiang Limestone Deposit over an area 4.75 Ha of M/s. Cement International Limited, located at Lumshnong Village, Khliehriat Tehsil, East Jaintia Hills District, Meghalaya State.

    LOVELY GYMPAD · Non-Coal Mining

  31. Category B1ToR Granted2025-10-03

    Mynkre Limestone Mine (Lease Area-15.27 Ha) by M/s TNE Cement Private Limited

    TNe cement private limited · Non-Coal Mining

  32. Category B1ToR Granted2025-09-29

    Integrated Cement Plant with capacity of clinker: 0.95 million TPA, Cement: 0.99 million TPA (OPC, PPC, PSC, SRC, RHPC & Composite Cement) CPP: 15 MW, WHRS: 7 MW) and DG Sets 2500 KVA (1x2500 KVA or 2X1000 KVA & 1X500 KVA or 1x1000 KVA, 2x500 KVA & 2x250KVA) in Khara Siang Lum Pyrshin in Daistong village, Elaka: Nongkhlieh Dolloiship, District of East Jaintia Hills (Meghalaya) by Shree Cement Ltd.

    Shree Cement Limited · Industrial Projects - 1

  33. Category B1ToR Granted2025-09-29

    Saryngkham Coal Block B

    DAPMAIN SHYLLA · Coal Mining

  34. Category B1Proposal returned in present form2025-09-02

    Larung Limestone Mine over an area of 4.76 Ha of M/s. JUD Cements Limited, located at Wahiajer Village, Lumshnong Tehsil, East Jaintia Hills District, Meghalaya State

    J U D Cements PRIVATE LIMITED · Non-Coal Mining

  35. Category B2EC Granted2025-08-12

    KHLIEH POH LOOM BOULDER STONE MINE

    SOKI SIANGSHAI · Non-Coal Mining

  36. Category B2EC Granted2025-07-30

    Moodymmai Stone Quarry

    WANLANG PHAWA · Non-Coal Mining

  37. Category B2EC Granted2025-07-30

    M/s Eldi Dhar Limestone Mine

    ELDI DHAR · Non-Coal Mining

  38. Category B1Proposal pulled back (withdrawn)2025-07-24

    43 MW imported coal based Thermal Power Plant project at Lumshnong, East Jaintia Hills District, Meghalaya

    STAR CEMENT MEGHALAYA LIMITED · Thermal Projects

  39. Category B1Proposal pulled back (withdrawn)2025-07-23

    100% Coal-based 8 MW Thermal Power Plant project at Lumshnong, East Jaintia Hills District, Meghalaya

    STAR CEMENT MEGHALAYA LIMITED · Thermal Projects

  40. Category B2EC Granted2025-04-16

    Lumkya Boulder Stone Mine

    BAITLANG LAMURONG · Non-Coal Mining

  41. Category B1EC Granted2025-03-10

    Sutnga Limestone mine (ML area 230 ha) at Village Sutnga, Tehsil Khliehriat, District East Jaintia Hills, Meghalaya.

    COSMOS CEMENTS LIMITED · Non-Coal Mining

  42. Category B1EC Granted2025-03-06

    Madan Pyrda (Block-1) by M/s. Green Valliey Industries Limited

    GREEN VALLIEY INDUSTRIES LIMITED · Non-Coal Mining

  43. Category B1EC Granted2025-03-06

    Madan Pyrda (Block-1) by M/s. Green Valliey Industries Limited

    GREEN VALLIEY INDUSTRIES LIMITED · Non-Coal Mining

  44. Category B1EC Granted2025-02-08

    Umsangat Limestone Deposit - II of M/s. Goldstone Cements Limited.

    GOLDSTONE CEMENTS LTD · Non-Coal Mining

  45. Category B1EC Granted2025-02-07

    Umsangat Limestone Deposit - I of M/s. Goldstone Cements Limited.

    GOLDSTONE CEMENTS LTD · Non-Coal Mining

  46. Category B1EC Granted2025-01-17

    Thanghunai Limestone Quarry

    PLENTY PYNGROPE · Non-Coal Mining

  47. Category B1EC Granted2025-01-02

    Jaintia Stone Mine

    YOOKANI PASSAH · Non-Coal Mining

  48. Category B1EC Granted2025-01-01

    AMSYNDUI LIMESTONE MINE

    DOMINIC POHRMEN · Non-Coal Mining

  49. Category B2EC Granted2024-12-17

    LAKHON HILLS SAND MINE

    LAKHON PHAWA · Non-Coal Mining

  50. Category B2EC Granted2024-12-16

    M/S Amlari Amkhlew Limestone Mine

    SHEMPHANG lAKASHIANG · Non-Coal Mining

  51. Category AEC Granted2024-12-10

    Integrated Cement Plant of capacity 3.3 MTPA clinker, 2.8 MTPA cement and 16 MW Waste Heat Recovery System

    MEGHATOP CEMENT PRIVATE LIMITED · Industrial Projects - 1

  52. Category B1EC Granted2024-11-29

    Madan Pyrda (Block- 2) Limestone Deposit

    GREEN VALLIEY INDUSTRIES LIMITED · Non-Coal Mining

  53. Category B1EC Granted2024-11-13

    Saryngkham A Coal Mine

    DAPMAIN SHYLLA · Coal Mining

  54. Category B1EC Granted2024-11-13

    Nehlang Lyngdoh Coal Block

    LEBORLANG LYNGDOH · Coal Mining

  55. Category B1EC Granted2024-11-11

    "Brishyrnot Limestone Deposit-II'' with proposed maximum production capacity of 3.2 MTPA (3.0 MTPA limestone & 0.2 MTPA shale) by Star Cement Meghalaya Limited.

    STAR CEMENT MEGHALAYA LIMITED · Non-Coal Mining

  56. Category B1EC Granted2024-11-09

    "Daba Saitthad Limestone Deposit" having mining lease area of 25 Ha by Star Cement Limited.

    STAR CEMENT LIMITED · Non-Coal Mining

  57. Category B2EC Granted2024-09-19

    'WAH TANGPO' Boulderstone Mine

    NICKYSON DKHAR · Non-Coal Mining

  58. Category B1EC Granted2024-09-11

    Amsyndui Limestone Mine

    THIANGMON POHTAM · Non-Coal Mining

  59. Category B1ToR Granted2024-08-23

    Umsangat Limestone Deposit - II of M/s. Goldstone Cements Limited.

    GOLDSTONE CEMENTS LTD · Non-Coal Mining

  60. Category B1ToR Granted2024-08-22

    Umsangat Limestone Deposit - I of M/s. Goldstone Cements Limited.

    GOLDSTONE CEMENTS LTD · Non-Coal Mining

  61. Category B1ToR Granted2024-08-18

    M/s Limestone Mine

    alldrina nonglamin · Non-Coal Mining

  62. Category B1ToR Granted2024-08-18

    M/S Amsyndui Lime Stone Mine

    DUKANI TARIANG · Non-Coal Mining

  63. Category B1ToR Granted2024-08-18

    Amkapai Limestone Mine

    suprita myrchiang · Non-Coal Mining

  64. Category B1EC Granted2024-07-03

    Umsoo Mootang Limestone Mine (Block III) ML area 4.90 ha, limestone production 6.88 LakhsTPA at Umsoo Mootang area, Thangskai village, Narpuh Elaka,P.O. Limshong, East Jaintia Hills Dist., Meghalaya

    DALMIA CEMENT (BHARAT) LIMITED · Non-Coal Mining

  65. Category B1EC Granted2024-06-29

    Proposed Reketung Limestone Mine situated at village Reketung, Elaka Nongtalang, District- West Jaintia Hills (Meghalaya) by Shri Robert Dkhar

    ROBERT DKHAR · Non-Coal Mining

  66. Category B1EC Granted2024-06-24

    Proposed Mulieh Umlong Limestone Mine of Amrit Cement Limited (Mine Lease Area: 7.33 Ha,) for Limestone Production of 0.5 MTPA with Total Excavation of 0.671 MTPA (Limestone: 0.5 MTPA +Top Soil: 0.004 MTPA +Overburden: 0.167 MTPA).

    AMRIT CEMENT LIMITED · Non-Coal Mining

  67. Category B1EC Granted2024-06-23

    KREM SHRIEH LIMESTONE MINE

    IAID BAMON · Non-Coal Mining

  68. Category B1Withdrawal Request Accepted2024-06-10

    Meghatop Limestone mine with proposed maximum production capcity of 5 MTPA by M/s Meghatop Cement Pvt Limited

    MEGHATOP CEMENT PRIVATE LIMITED · Non-Coal Mining

  69. Category B2EC Granted2024-06-05

    "Pam Stiet" Hill Sand Mine

    ROBINA SWER · Non-Coal Mining

  70. Category B2EC Granted2024-06-01

    Tongseng Shale Deposit (4.99 Ha)

    STAR CEMENT LIMITED · Non-Coal Mining

  71. Category B1EC Granted2024-05-25

    Amendment in Environment Clearance for for project Lumshnong Limestone Mine of Star Cement Limited for reduction in mining lease area from 70 ha to 66.98 ha and permission for Limestone production from 15 Lakh TPA(ROM) to 25 lakh TPA (ROM) through road transportation with advance mitigation measures.

    STAR CEMENT LIMITED · Non-Coal Mining

  72. Category B2EC Granted2024-05-10

    Pohkremshrieh Limestone Mine

    VICTOR SUJA · Non-Coal Mining

  73. Category B1EC Granted2024-05-10

    GVIL Shale Mine

    GREEN VALLIEY INDUSTRIES LIMITED · Non-Coal Mining

  74. Category B2EC Granted2024-05-09

    Luti Nongkhlieh Boulder Stone

    HERLINGTON SHADAP · Non-Coal Mining

  75. Category B1ToR Granted2024-04-27

    Proposed Lum Padiar Shale Mine (Area 21.16 Ha) with Shale Production Capacity: 1,54,890 TPA at Village: Thangskai, P.O. & P.S. Lumshnong, Tehsil: Khliehriat, District: East Jaintia Hills, State: Meghalaya of M/s. Meghalaya Cements Limited.

    MEGHALAYA CEMENTS LIMITED · Non-Coal Mining

  76. Category AToR Granted2024-04-23

    Integrated Cement Plant of capacity 3.3 MTPA clinker, 2.8 MTPA cement and 16 MW Waste Heat Recovery System

    MEGHATOP CEMENT PRIVATE LIMITED · Industrial Projects - 1

  77. Category B1ToR Granted2024-04-16

    Larung Limestone Mine

    THYWILL DONG · Non-Coal Mining

  78. Category B1ToR Granted2024-04-16

    Proposed Moiong Thlushininang Limestone Mine (ML Area – 26.50 ha) with Limestone Production Capacity 1.007 Million TPA at Village Chiehriphi, Taluka – Khliehriat, District- East Jaintia Hills, Meghalaya by M/s. Meghalaya Cements Ltd..

    MEGHALAYA CEMENTS LIMITED · Non-Coal Mining

  79. Category B1ToR Granted2024-04-01

    "Surve Larung Lumshnong Limestone Deposit (44.58 Ha.)'' with a proposed maximum excavation 1366475.2 TPA (654577 TPA of limestone and 711898.2 TPA of waste including topsoil) by M/s. Green Valliey Industries Limited.

    GREEN VALLIEY INDUSTRIES LIMITED · Non-Coal Mining

  80. Category B1ToR Granted2024-03-07

    Nehlang Lyngdoh Coal Block

    LEBORLANG LYNGDOH · Coal Mining

  81. Category B1ToR Granted2024-03-07

    Saryngkham A Coal Mine

    DAPMAIN SHYLLA · Coal Mining

  82. Category B1ToR Granted2024-02-28

    Thanghunai Limestone Quarry

    PLENTY PYNGROPE · Non-Coal Mining

  83. Category B1EC Granted2024-02-25

    WAHRIANG LIMESTONE MINE

    BIGEN RUPSI · Non-Coal Mining

  84. Category B2Withdrawal Request Accepted2024-02-09

    Limestone Quarry of Thanghunai

    PLENTY PYNGROPE · Non-Coal Mining

  85. Category B1ToR Granted2024-02-07

    Amsyndui Limestone Mine

    THIANGMON POHTAM · Non-Coal Mining

  86. Category B2EC Granted2024-02-01

    Limestone Mine

    EFFICIENCY PYRNGAP · Non-Coal Mining

  87. Category AEC Granted2024-01-15

    Expansion of Cement & Clinkerization Plant from 2600 TPD (0.858 million TPA) to 4500 TPD (1.485 million TPA) with 10 MW CPP and 9.5 MW WHRS of Meghalaya Cements Ltd.

    MEGHALAYA CEMENTS LIMITED · Industrial Projects - 1

  88. Category B1EC Granted2024-01-10

    Umtyra Limestone and Clay Deposit

    GOLDSTONE CEMENTS LTD · Non-Coal Mining

  89. Category B1ToR Granted2023-12-30

    "Brishyrnot Limestone Deposit-II'' with proposed maximum production capacity of 3.2 MTPA (3.0 MTPA limestone & 0.2 MTPA shale) by Star Cement Meghalaya Limited.

    STAR CEMENT MEGHALAYA LIMITED · Non-Coal Mining

  90. Category B1EC Granted2023-12-28

    GVIL Shale Mine

    GREEN VALLIEY INDUSTRIES LIMITED · Non-Coal Mining

  91. Category AWithdrawal Request Accepted2023-11-25

    Expansion of Cement & Clinkerization Plant from 2600 TPD (0.858 million TPA) to 4500 TPD (1.485 million TPA) with 10 MW CPP and 9.5 MW WHRS of Meghalaya Cements Ltd.

    MEGHALAYA CEMENTS LIMITED · Industrial Projects - 1

  92. Category B1ToR Granted2023-10-19

    "Daba Saitthad Limestone Deposit" having mining lease area of 25 Ha by Star Cement Limited.

    STAR CEMENT LIMITED · Non-Coal Mining

  93. Category B1TOR GRANTED2023-09-18

    Proposed Integrated Solid Waste Management Facilities including a new sanitary landfill site for Jowai at Village Rakabah, District West Jaintia Hills, Meghalaya.

    Housing & Urban Development Corporation Limited · INFRA-2

  94. Category B2EC Granted2023-08-01

    Mookasnor Boulder Stone Mine

    PLEASUREFUL AHNAM · Non-Coal Mining

  95. Category B2EC Granted2023-07-13

    Amsyndui Low Grade Limestone Deposit

    DOLLY KHONGLAH · Non-Coal Mining

  96. Category B1TOR Granted2023-06-20

    Umtyra Limestone and Clay Deposit

    GOLDSTONE CEMENTS LTD · Non-Coal Mining

  97. Category B2EC Granted2023-06-16

    BANLUM STONE MINE

    BANLUMLANG THANGKHIEW · Non-Coal Mining

  98. Category B1TOR Granted2023-05-19

    Jaintia Stone Mine

    YOOKANI PASSAH · Non-Coal Mining

  99. Category B1EC Granted2023-04-21

    CHETAH LASHI LIMESTONE MINE

    LAMSHWA KYNDOH · Non-Coal Mining

  100. Category B1EC Granted2023-04-17

    Lumshnong Limestone Mine

    TESON DKHAR · Non-Coal Mining

Showing 100 of 102 proposals, newest first. The button below loads the rest.