  1. 21 Oct 2026 · DecidedStandard Terms of Reference grantedExpansion of existing Environmental Clearance granted for Integrated Cement Plant from Clinker (0.95…
  2. 12 Oct 2026 · FiledSubmittedExpansion of existing Environmental Clearance granted for Integrated Cement Plant from Clinker (0.95…
  3. 3 Oct 2026 · Details soughtEssential details soughtNew Umrangso Limestone Block (Area: 200 ha) with Limestone Production Capacity: 0.681 Million TPA, Top…
  4. 2 Oct 2026 · FiledSubmittedNew Umrangso Limestone Block (Area: 200 ha) with Limestone Production Capacity: 0.681 Million TPA, Top…
  5. 29 Sept 2026 · DecidedStandard Terms of Reference grantedNew Umrangso Limestone Block (Area: 31 ha) with Limestone Production Capacity: 0.891 Million TPA, Topsoil:…
  6. 29 Sept 2026 · DecidedStandard Terms of Reference grantedNew Umrangso Limestone Block (Area: 30 ha) with Limestone Production Capacity: 0.948 Million TPA, Topsoil:…
  7. 28 Sept 2026 · Details soughtEssential details soughtNew Umrangso Limestone Block (Area: 31 ha) with Limestone Production Capacity: 0.891 Million TPA, Topsoil:…
  8. 28 Sept 2026 · Details soughtEssential details soughtNew Umrangso Limestone Block (Area: 30 ha) with Limestone Production Capacity: 0.948 Million TPA, Topsoil:…
  9. 25 Sept 2026 · DecidedEnvironmental clearance refusedDIYUNG RIVER SAND GRAVEL & BOULDER MINING PERMIT AREA A DOKHONGMA
  10. 25 Sept 2026 · DecidedEnvironmental clearance refusedSAND GRAVEL AND BOULDER MINING PERMIT AREA AT DIKRENGMA AREA OF DIYUNG RIVER
  11. 23 Sept 2026 · FiledSubmittedNew Umrangso Limestone Block (Area: 31 ha) with Limestone Production Capacity: 0.891 Million TPA, Topsoil:…
  12. 23 Sept 2026 · FiledSubmittedNew Umrangso Limestone Block (Area: 30 ha) with Limestone Production Capacity: 0.948 Million TPA, Topsoil:…

Dated by the portal's own appraisal history, converted to India Standard Time; a proposal with no recorded history appears on its register submission date.

Other clearances these proposals declare

Forest land diversion declared
1
Forest land sought for diversion
Area not stated
Wildlife board recommendation declared
0
In or near a protected area
0
In an eco-sensitive zone
0

These counts are taken from the application forms of the 79 of 79 proposals naming this district whose forms have been read for these questions. In 23 of those forms at least one question was left blank, and a blank answer is counted as unknown. The forest area is the area stated for forest clearance, with each forest proposal counted once, in the district where its project is primarily sited.

Proposals naming this district
79
Category A proposals
13
Families declared displaced
38
Families declared affected
1,237

Displacement figures are the proponents’ own declarations. A project sited across several districts declares one figure for the whole project, and that figure is counted once, in the district where the project is primarily sited.

Fifth Schedule status

Not within a Fifth Schedule Scheduled Area

Article 244(1) applies the Fifth Schedule in every State other than Assam, Meghalaya, Tripura and Mizoram, so no part of Assam is a Fifth Schedule Scheduled Area and PESA does not apply here. A different protection does: this district lies within the North Cachar Hills Autonomous Council, under the Sixth Schedule (Articles 244(2) and 275(1)), which has its own consent and land-transfer safeguards.

OrderConstitution of India, Article 244(1) · Article 244(1)

What the record shows

  • Half or more of the people counted here in 2011 were Scheduled Tribe: 70.9%, against 8.55% nationally.

  • Applicants for projects sited mainly in this district have declared 38 families to be displaced. The figure comes from their applications, and we have not verified it.

Each of these observations appears when a fixed rule is met by the figures on this page, so the same figures always give the same sentences. None of them is a view on whether a project should go ahead.

Who lives there

Figures from Census 2011, each compared with the all-India value computed on the same definition.

Total population
2,14,102
Households
42,252
Average household size
5.07
0.22 above India's 4.85India
Scheduled Tribe share of population
70.9%
62.4 points above IndiaIndia
Scheduled Caste share of population
2.0%
14.6 points below IndiaIndia
Children aged 0-6
15.1%
1.6 points above IndiaIndia
Literacy rate
77.5%
4.6 points above IndiaIndia
Sex ratio
932
10.3 below India's 942.6India

What they live on

How the district's workers earn a living, from Census 2011. The land-dependent share counts cultivators and agricultural labourers as a share of all workers, and it is the group most directly affected when land is acquired.

Total workers
85,028
Work participation rate
39.7%
0.1 points below IndiaIndia
Workers dependent on land
58.0%
3.4 points above IndiaIndia
Cultivators
52.3%
27.7 points above IndiaIndia
Agricultural labourers
5.7%
24.3 points below IndiaIndia
Marginal workers
19.7%
5.1 points below IndiaIndia
Household industry workers
1.8%
2.1 points below IndiaIndia

How households live

Land, income and work among rural households, from the Socio Economic and Caste Census 2011, which recorded these where the population census did not. Only the survey's rural part is used here, so urban households do not appear.

Rural households owning land
31.3%
14.8 points below IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households whose highest earner makes over ₹5,000 a month
22.3%
2.1 points below IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households living mainly on manual casual labour
9.6%
42.2 points below IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households with a salaried member
16.6%
8.4 points above IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

When these were filed

Each proposal is dated by the first step in its appraisal history, the dated record of steps the portal keeps for it.

2023-Q22026-Q4

The timeline counts 75 of the 79 proposals here. The first filing date comes from each proposal's appraisal history, and we have not yet read it for the other 4, so they are left out. Most of them are older proposals, so the early part of the timeline undercounts what was filed then. The register itself records a date for each of them; the gap is in our copy of the histories.

Hatched columns undercount, so they cannot be compared with solid ones. One of them covers a period for which we have read few filing dates so far, and it counts only the proposals whose date we have. 2026-Q4 was still running when the register was read, so its column counts only the filings made up to that date.

What kind of projects these are

The proposals naming this district, grouped by the sector each was filed under.

  • Non-Coal Mining 79.7%
  • Industrial Projects - 1 15.2%
  • River Valley and Hydroelectric Projects 2.5%
  • Industrial Projects - 2 1.3%
  • Other (1) 1.3%

The four largest sectors are shown by name and the rest are grouped as Other.

What is proposed here

These are the proposals in the national environmental clearance register whose application names a site in this district, newest first. A project with sites in several districts appears under each of them.

  1. Category AForwarded to MS SPCB/PCC by MS2026-10-12

    Expansion of existing Environmental Clearance granted for Integrated Cement Plant from Clinker (0.95 Million TPA to 4.5 Million TPA), Cement (0.95 Million TPA to 4.0 Million TPA - OPC, PPC, PSC, Composite Cement, PLC & LC3), WHRS (6 MW to 30 MW), D.G. Sets. (2 x 500 KVA to 2 x 750 KVA) at Village Umrangso 19 Kilo, P.O.: Umrangso, District: Dima Hasao, State: Assam by M/s. JK Lakshmi Cement Limited

    JK LAKSHMI CEMENT LIMITED · Industrial Projects - 1

  2. Category B1Referred to SEIAA2026-10-09declares affected families

    New Umrangso Limestone Block (Area: 200 ha) with Limestone Production Capacity: 0.681 Million TPA, Top Soil: 0.020 Million TPA, Waste/OB: 0.303 Million TPA and Mineral Reject: 0.120 Million TPA (Total Excavation: 1.124 Million TPA) by M/s. JK Lakshmi Cement Limited located at Village: Umrangso 18 Kilo, Tehsil: Umrangso, District: Dima Hasao, Assam.

    JK LAKSHMI CEMENT LIMITED · Non-Coal Mining

  3. Category B1Forwarded to MS SPCB/PCC by MS2026-09-28

    New Umrangso Limestone Block (Area: 31 ha) with Limestone Production Capacity: 0.891 Million TPA, Topsoil: 0.021 Million TPA and Waste/OB: 0.475 Million TPA (Total Excavation: 1.387 Million TPA) by Assam Mineral Development Corporation Limited located at Village: Umrangso (Umrangso 19 Km), Tehsil: Umrangso, District: Dima Hasao, Assam.

    ASSAM MINERAL DEVELOPMENT CORPORATION LIMITED · Non-Coal Mining

  4. Category B1Forwarded to MS SPCB/PCC by MS2026-09-28

    New Umrangso Limestone Block (Area: 30 ha) with Limestone Production Capacity: 0.948 Million TPA, Topsoil: 0.017 Million TPA and Waste/OB: 0.208 Million TPA (Total Excavation: 1.173 Million TPA) by Assam Mineral Development Corporation Limited located at Village: Umrangso (Umrangso 19 Km), Tehsil: Umrangso, District: Dima Hasao, Assam.

    ASSAM MINERAL DEVELOPMENT CORPORATION LIMITED · Non-Coal Mining

  5. Category B1EC Granted2026-08-21

    Proposed North Boro Hundong Limestone Block (Part – A), Auctioned Block Area: 188.498 ha with Limestone Production Capacity 6.0 Million TPA, Waste (OB/IB): 2.8 Million TPA & Top Soil: 0.076 Million TPA (Total Excavation: 8.876 Million TPA) located at Village: Boro Lakhindong, Tehsil: Umrangso, District: Dima Hasao, Assam by Star Cement Limited.

    STAR CEMENT LIMITED · Non-Coal Mining

  6. Category B1Standard ToR Granted2026-07-31declares affected families

    New Umrangso Limestone Block (Area: 200 ha) with Limestone Production Capacity: 0.681 Million TPA, Top Soil: 0.020 Million TPA, Waste/OB: 0.303 Million TPA and Mineral Reject: 0.120 Million TPA (Total Excavation: 1.124 Million TPA) by M/s. JK Lakshmi Cement Limited located at Village: Umrangso 18 Kilo, Tehsil: Umrangso, District: Dima Hasao, Assam.

    JK LAKSHMI CEMENT LIMITED · Non-Coal Mining

  7. Category AEC Granted2026-07-25

    Proposed Integrated Cement Plant with production capacity of Clinker: 8.0 Million TPA (2 x 4.0 Million TPA), Cement: 3.0 Million TPA, WHRS: 42 MW (2 x 21 MW), CPP: 50 MW (2 x 25 MW) in phased manner at Village: Choto Lokhindong, Tehsil: Umrangso, District: Dima Hasao, Assam by M/s. Ambuja Concrete North Private Limited

    AMBUJA CONCRETE NORTH PRIVATE LIMITED · Industrial Projects - 1

  8. Category B2Forwarded to MS SPCB/PCC by MS2026-07-22

    ROBIBRA BLOCK-II BOULDER AND GRAVEL MINING PERMIT AREA ON DIYUNG RIVER BED

    AMUN DAULAGUPU · Non-Coal Mining

  9. Category B2EC Granted2026-07-09

    Proposed Onshore Oil & Gas Exploration in OALP-III Block AA-ONHP-2018/3 for drilling of Loc. ODHB in District-Dima Hasao, Assam

    OIL INDIA LIMITED · Industrial Projects - 2

  10. Category B1Standard ToR Granted2026-07-08

    Proposed South Boro Hundong Limestone Block (Part - A) Auctioned Block Area: 103 ha with Limestone Production Capacity 3.0 Million TPA with Crusher 1000 TPH located at Villages: Tharvelongso and Boro Lakhindong, Tehsil: Umrangsho, District: Dima Hasao, Assam by M/s. Ambuja Cements Limited.

    Ambuja Cements Limited · Non-Coal Mining

  11. Category B1Standard ToR Granted2026-07-07

    Proposed South Boro Hundong Limestone Block (Part - B) Auctioned Block Area: 131 ha with Limestone Production Capacity 3.0 Million TPA with Crusher 1000 TPH located at Villages: Tharvelongso and Boro Lakhindong, Tehsil: Umrangsho, District: Dima Hasao, Assam by M/s. Ambuja Cements Limited.

    Ambuja Cements Limited · Non-Coal Mining

  12. Category B1EC Granted2026-04-14

    Jamunanagar Limestone Mine (Mine Lease area – 35 Ha & Limestone Production Capacity of 1.5 Million TPA) located near Jamunanagar, New Umrangso village, Tehsil – Umrangshu, District – Dima Hasao (North Cachar Hills), Assam

    DALMIA CEMENT (NORTH EAST) LIMITED · Non-Coal Mining

  13. Category B2EC Granted2026-04-04

    DUDUKI RIVER BOULDER MINING PERMIT AREA

    botendra purasa · Non-Coal Mining

  14. Category B2EC Granted2026-04-04

    MAHUR RIVER STONE BOULDER MINING PERMIT AREA (DAUTHUHAJA)

    vikramjit phonglo · Non-Coal Mining

  15. Category B1Standard ToR Granted2026-03-18

    Proposed North Boro Hundong Limestone Block (Part – A), Auctioned Block Area: 188.498 ha with Limestone Production Capacity 6.0 Million TPA, Waste (OB/IB): 2.8 Million TPA & Top Soil: 0.076 Million TPA (Total Excavation: 8.876 Million TPA) located at Village: Boro Lakhindong, Tehsil: Umrangso, District: Dima Hasao, Assam by Star Cement Limited.

    STAR CEMENT LIMITED · Non-Coal Mining

  16. Category B2EC Granted2026-03-05

    SEMKHOR-I RIVER BOULDER AND SAND GRAVEL MINING PERMIT AREA

    khanenjit bathari · Non-Coal Mining

  17. Category AProposal returned in present form2026-02-13

    Integrated Cement Plant with production capacity of Clinker - 8.0 Million TPA (2 x 4.0 Million TPA), Cement (OPC, PPC, PSC, CC, PLC and LC3) - 2.0 Million TPA, WHRS - 36 MW (2 x 18 MW), CPP - 25 MW & D.G. Sets- 4000 kVA (2 x 2000 kVA or 2 x 1000 kVA and 4 x 500 kVA or 2 x 1000 kVA and 2 x 500 kVA and 4 x 250 kVA) in phased manner at Village: Boro Lakhindong, Tehsil: Umrangso, District: Dima Hasao, Assam by Star Cement Limited

    STAR CEMENT LIMITED · Industrial Projects - 1

  18. Category AToR Granted2026-01-06declares affected families

    Assam/PSP04

    ASSAM POWER DISTRIBUTION COMPANY LIMITED · River Valley and Hydroelectric Projects

  19. Category B1EC Granted2026-01-03

    Integrated Cement Plant with production capacity of Clinker (0.95 Million TPA), Cement (0.95 Million TPA - OPC, PPC, PSC, Composite Cement, PLC and LC3), WHRS (6 MW) and D.G. Set (2 x 500 KVA) at Village: New Umrangso (19 kilo), Tehsil: Umrangso, District: Dima Hasao, State: Assam by M/s. JK Lakshmi Cement Ltd.

    JK LAKSHMI CEMENT LIMITED · Industrial Projects - 1

  20. Category AToR Granted2025-11-17

    Proposed Integrated Cement Plant with production capacity of Clinker: 8.0 Million TPA (2 x 4.0 Million TPA), Cement: 3.0 Million TPA, WHRS: 42 MW (2 x 21 MW), CPP: 50 MW (2 x 25 MW) in phased manner at Village: Choto Lokhindong, Tehsil: Umrangso, District: Dima Hasao, Assam by M/s. Ambuja Concrete North Private Limited

    AMBUJA CONCRETE NORTH PRIVATE LIMITED · Industrial Projects - 1

  21. Category B1Standard ToR Granted2025-11-08

    Integrated Cement Plant with production capacity of Clinker (0.95 Million TPA), Cement (0.95 Million TPA - OPC, PPC, PSC, Composite Cement, PLC and LC3), WHRS (6 MW) and D.G. Set (2 x 500 KVA) at Village: New Umrangso (19 kilo), Tehsil: Umrangso, District: Dima Hasao, State: Assam by M/s. JK Lakshmi Cement Ltd.

    JK LAKSHMI CEMENT LIMITED · Industrial Projects - 1

  22. Category B1EC Granted2025-11-06

    North Boro Hundong (Part-B) Limestone Block (Non-Forest 199.977 ha) at village Boro Lakhindong, Tehsil/Taluka Umrangsho, Dima Hasao District, Assam of Dalmia Bharat Green Vision Ltd.

    DALMIA BHARAT GREEN VISION LIMITED · Non-Coal Mining

  23. Category B1EC Granted2025-11-01

    Proposed South Boro Hundong Limestone Block (Part – C) Auctioned Block Area: 183.0 ha with Limestone Production Capacity 6.0 Million TPA located at Villages: Boro Lakhingdong and Tharbelongso, Tehsil: Umrangsho, District: Dima Hasao, Assam by M/s. Ambuja Cements Limited.

    Ambuja Cements Limited · Non-Coal Mining

  24. Category B2EC Granted2025-10-08

    DIYUNG RIVER BLOCK 3 RIVER BOULDER AND SAND GRAVEL MINING PERMIT AREA

    RAJKUMAR NAIDING · Non-Coal Mining

  25. Category B2EC Granted2025-10-08

    DIYUNG RIVER BLOCK 2 BOULDER AND SAND GRAVEL MINING PERMIT AREA

    SOLJIT HASAM · Non-Coal Mining

  26. Category B2EC Granted2025-10-08

    DIYUNG RIVER BLOCK 1 RIVER BOULDER AND SAND GRAVEL MINING PERMIT AREA

    RAJKUMAR NAIDING · Non-Coal Mining

  27. Category B2EC Granted2025-10-07

    JINAM RIVER UPPER BLOCK-1 BOULDER AND SAND GRAVEL MINING PERMIT AREA

    laltuorpui hmar · Non-Coal Mining

  28. Category AProposal returned in present form2025-09-23

    Integrated Cement Plant with production capacity of Clinker: 8.0 Milllion TPA (2 x 4.0 Million TPA), Cement: 3.0 Million TPA, WHRS: 42 MW (2 x 21 MW), CPP: 50 MW (2 x 25 MW) in phased manner at Village: Choto Lokhindong, Tehsil: Umrangso, District: Dima Hasao, Assam by M/s. Ambuja Concrete North Private Limited

    AMBUJA CONCRETE NORTH PRIVATE LIMITED · Industrial Projects - 1

  29. Category AGranted2025-09-15

    New Umrangshu Limestone Mine (Mine Lease area – 417.50 Ha & Limestone Production Capacity of 7.77 MTPA) at Village- New Umrangshu, Tehsil – Umrangshu, District – DimaHasao (North Cachar Hills), Assam

    DALMIA CEMENT (NORTH EAST) LIMITED · Non-Coal Mining

  30. Category B2EC Granted2025-09-09

    CHIRI RIVER BLOCK-2 BOULDER AND SAND GRAVEL MINING PERMIT AREA

    laltuorpui hmar · Non-Coal Mining

  31. Category B2EC Granted2025-09-09

    JINAM RIVER UPPER JINAM BLOCK-2 BOULDER AND SAND GRAVEL MINING PERMIT AREA

    laltuorpui hmar · Non-Coal Mining

  32. Category B1Standard ToR Granted2025-09-03

    Proposed South Boro Hundong Limestone Block (Part – C) Auctioned Block Area: 183.0 ha with Limestone Production Capacity 6.0 Million TPA located at Villages: Boro Lakhingdong and Tharbelongso, Tehsil: Umrangsho, District: Dima Hasao, Assam by M/s. Ambuja Cements Limited.

    Ambuja Cements Limited · Non-Coal Mining

  33. Category B2EC Granted2025-08-16

    CHIRI RIVER BLOCK-1 BOULDER AND SAND GRAVEL MINING PERMIT AREA

    laltuorpui hmar · Non-Coal Mining

  34. Category B1Standard ToR Granted2025-08-14

    North Boro Hundong (Part-B) Limestone Block (Non-Forest 199.977 ha) at village Boro Lakhindong, Tehsil/Taluka Umrangsho, Dima Hasao District, Assam of Dalmia Bharat Green Vision Ltd.

    DALMIA BHARAT GREEN VISION LIMITED · Non-Coal Mining

  35. Category B2EC Granted2025-07-21

    JINAM RIVER BOULDER AND SAND GRAVEL MINING PERMIT AREA

    laltuorpui hmar · Non-Coal Mining

  36. Category B2EC Granted2025-07-12

    Jatinga River (Kapurcherra) Sand, Gravel & Boulder Mining Permit Area

    brijesh langthasa · Non-Coal Mining

  37. Category B2EC Granted2025-07-10

    Jatinga River (Lampu) Sand, Gravel & Boulder Mining Permit Area

    sajish bathari · Non-Coal Mining

  38. Category B2EC Granted2025-07-10

    Jatinga River (Dolaichunga) Sand, Gravel & Boulder Mining Permit Area

    sajish bathari · Non-Coal Mining

  39. Category B2EC Granted2025-05-20

    Sopro Nala Stone Mining Permit Area

    HEMONJOY JIDUNG · Non-Coal Mining

  40. Category B2EC Granted2025-05-10

    Pangmul Village Stone Mining Permit Area

    RAJIB DAS · Non-Coal Mining

  41. Category AStandard ToR Granted2025-05-07

    Integrated Cement Plant - Clinker (2 x 2.5 Million TPA), Cement (4.0 Million TPA - OPC, PPC, PSC, Composite Cement, PLC & LC3), Captive Power Plant (25 MW), WHRS (30 MW) and D.G. Set (2x 750 KVA), AFR Pre-Processing and Co-Processing along with Railway Siding, Wagon Tippler at Village: Umrangso, Tehsil: Umrangso, District: Dima Hasao, Assam by M/s. Mahabal Cement Private Limited

    MAHABAL CEMENT PRIVATE LIMITED · Industrial Projects - 1

  42. Category AProposal Withdrawal Request Accepted2025-05-06

    Integrated Cement Plant - Clinker (2x2.5 Million TPA), Cement (4.0 Million TPA - OPC, PPC, PSC, Composite Cement, PLC & LC3), Captive Power Plant (25 MW), WHRS (30 MW) and D.G. Set (2x 750 KVA), AFR Pre-Processing and Co-Processing along with Railway Siding, Wagon Tippler and Residential Colony (Build-up area - 72000 square meter) at Village: Umrangso, Tehsil: Umrangso, District: Dima Hasao, Assam by M/s. Mahabal Cement Pvt. Ltd.

    MAHABAL CEMENT PRIVATE LIMITED · Industrial Projects - 1

  43. Category B2EC Rejected2025-03-06

    DIYUNG RIVER SAND GRAVEL & BOULDER MINING PERMIT AREA A DOKHONGMA

    dima hasao forest division(west) · Non-Coal Mining

  44. Category B2ADS Raised2025-03-06

    SAND GRAVEL AND BOULDER MINING PERMIT AREA AT MAHURBRA AREA OF MAHUR RIVER

    dima hasao forest division(west) · Non-Coal Mining

  45. Category B2EC Rejected2025-02-26

    SAND GRAVEL AND BOULDER MINING PERMIT AREA AT DIKRENGMA AREA OF DIYUNG RIVER

    dima hasao forest division(west) · Non-Coal Mining

  46. Category B2EC Granted2025-02-20

    RADAODISA TO NEAR LONGDING PHONGLO SAND MINING PERMIT AREA

    vikramjit phonglo · Non-Coal Mining

  47. Category B2EC Granted2025-02-18

    KIMKRIDISA/P.DIHAJENG RIVER BOULDER AND SAND GRAVEL MINING PERMIT AREA

    biprojit langthasa · Non-Coal Mining

  48. Category B2EC Granted2025-02-05

    JINAM RIVER BOULDER AND SAND GRAVEL MINING PERMIT AREA

    dima hasao forest division(west) · Non-Coal Mining

  49. Category B2EC Granted2025-02-03

    DIYUNG RIVER BLOCK 3 RIVER BOULDER AND SAND GRAVEL MINING PERMIT AREA

    dima hasao forest division(west) · Non-Coal Mining

  50. Category B2EC Granted2025-02-03

    DIYUNG RIVER BLOCK 2 BOULDER AND SAND GRAVEL MINING PERMIT AREA

    dima hasao forest division(west) · Non-Coal Mining

  51. Category B2EC Granted2025-02-03

    DIYUNG RIVER BLOCK 1 RIVER BOULDER AND SAND GRAVEL MINING PERMIT AREA

    dima hasao forest division(west) · Non-Coal Mining

  52. Category B2EC Granted2024-11-22

    MAHUR RIVER STONE BOULDER MINING PERMIT AREA AT DAUTHUHAJA

    dima hasao forest division(west) · Non-Coal Mining

  53. Category B2EC Granted2024-11-14

    EXTRACTION OF BOULDER FROM ASALU AREA OF CHIKU RIVER (BLOCK 17) MINING PERMIT AREA

    dima hasao forest division(west) · Non-Coal Mining

  54. Category B2EC Granted2024-11-07

    MOTIBRA I, RIVER BOULDER AND SAND GRAVEL MINING PERMIT AREA 2

    pronif haflongbar · Non-Coal Mining

  55. Category B2EC Granted2024-10-10

    Diyung River (Tereh Village) Sand, Gravel & Boulder Mining Permit Area

    dima hasao forest division(west) · Non-Coal Mining

  56. Category B2EC Granted2024-09-28

    BOROWAPU VILLAGE PATTA LAND STONE BOULDER MINING PERMIT AREA

    david naiding · Non-Coal Mining

  57. Category B2EC Granted2024-09-23

    EXTRACTION OF BOULDER FROM BRASANG RIVER (BLOCK - 14) MINING PERMIT AREA

    dima hasao forest division(west) · Non-Coal Mining

  58. Category B2EC Granted2024-09-20

    Langku Nala Sand Mining Permit Area

    dima hasao forest division(west) · Non-Coal Mining

  59. Category B2EC Granted2024-09-19

    Karpani Nala Stone Mining Permit Area

    dima hasao forest division(west) · Non-Coal Mining

  60. Category B2EC Granted2024-08-31

    DIYUNG RIVER STONE BOULDER MINING PERMIT AREA

    dima hasao forest division(west) · Non-Coal Mining

  61. Category AGranted2024-07-05

    Name Change in Environmental Clearance of Clinekrisation Plant of 1.52 MTPA along with Installation of Waste Heat Recovery System (8 MW) at 16 kilo Langcherui (Jamunanagar), Tehsil-Umrangso, District-Dima Hasao (Earlier North Cachar Hills), Assam

    DALMIA CEMENT (NORTH EAST) LIMITED · Industrial Projects - 1

  62. Category B2EC Granted2024-07-02

    Jatinga River (Lampu) Sand, Gravel & Boulder Mining Permit Area

    dima hasao forest division(west) · Non-Coal Mining

  63. Category B2EC Granted2024-06-25

    Jatinga River (Muyungkro) Sand, Gravel & Boulder Mining Permit Area

    dima hasao forest division(west) · Non-Coal Mining

  64. Category B2EC Granted2024-06-25

    Jatinga River (Kapurcherra) Sand, Gravel & Boulder Mining Permit Area

    dima hasao forest division(west) · Non-Coal Mining

  65. Category B2EC Granted2024-06-24

    Jatinga River ( Muyungkro 1) Sand, Gravel & Boulder Mining Permit Area

    dima hasao forest division(west) · Non-Coal Mining

  66. Category B2EC Granted2024-06-24

    Jatinga River (Dolaichunga) Sand, Gravel & Boulder Mining Permit Area

    dima hasao forest division(west) · Non-Coal Mining

  67. Category B2EC Granted2024-06-15

    Jatinga River (Moulkoi Area 1) Sand, Gravel & Boulder Mining Permit Area

    dima hasao forest division(west) · Non-Coal Mining

  68. Category B2EC Granted2024-06-15

    Jatinga River (Moulkoi Area) Sand, Gravel & Boulder Mining Permit Area

    dima hasao forest division(west) · Non-Coal Mining

  69. Category B2EC Granted2024-06-15

    Jatinga River (Dittokcherra 1) Sand, Gravel & Boulder Mining Permit Area

    dima hasao forest division(west) · Non-Coal Mining

  70. Category B2EC Granted2024-05-21

    Dehangi Diyung River (Dehangi Tiniali) Sand, Gravel & Boulder Mining Permit Area

    dima hasao forest division(west) · Non-Coal Mining

  71. Category B2EC Granted2024-05-21

    Mahur River (Amlangbra Village) Sand, Gravel & Boulder Mining Permit Area

    dima hasao forest division(west) · Non-Coal Mining

  72. Category B1ToR Granted2024-04-22

    Garampani Coal Mine

    ASSAM MINERAL DEVELOPMENT CORPORATION LIMITED · Coal Mining

  73. Category AGranted2024-04-15

    Proposed Greenfield Clinekrisation Plant of 3.63 Million TPA capacity along with WHRS of 16 MW & DG Set of 750 kVA at village 19 Kilo Umrangso, Tehsil: Umrangso, District: Dima Hasao (earlier N.C. Hills), Assam by M/s. Calcom Cement India Ltd. [A subsidiary of Dalmia Cement (Bharat) Ltd.]

    DALMIA CEMENT (NORTH EAST) LIMITED · Industrial Projects - 1

  74. Category B1EC Granted2023-11-16

    M/s ASSAM MINERAL DEVELOPMENT CORPORATION LTD, NEW UMRANGSHU LIMESTONE MINE, AREA– 200.00 HECT.

    M/s Assam Mineral Development Corporation Ltd · Non-Coal Mining

  75. Category B1EC Granted2023-11-16

    M/s NECEM CEMENTS LTD., NEW UMRANGSHU LIMESTONE MINE

    MS NECEM CEMENT LTD · Non-Coal Mining

  76. Category AEC Granted2023-10-23declares affected families

    Lower Kopili HEP (120MW) in Karbi Anglong & Dima Hasao, Assam, by M/s Assam Power Generation Corporation Ltd.

    APGCL · River Valley and Hydroelectric Projects

  77. Category AEC Granted2023-04-24

    Proposed Greenfield Clinekrisation Plant of 3.63 Million TPA capacity along with WHRS of 16 MW & DG Set of 750 kVA at village 19 Kilo Umrangso, Tehsil: Umrangso, District: Dima Hasao (earlier N.C. Hills), Assam by M/s. Calcom Cement India Ltd. [A subsidiary of Dalmia Cement (Bharat) Ltd.]

    DALMIA CEMENT (NORTH EAST) LIMITED · Industrial Projects - 1

  78. Category B1EC Granted2023-03-09

    M/s ASSAM MINERAL DEVELOPMENT CORPORATION LTD, NEW UMRANGSHU LIMESTONE MINE, AREA– 200.00 HECT. (Amalgamation)

    M/s Assam Mineral Development Corporation Ltd · Non-Coal Mining

  79. Category B1TOR Granted2023-01-26

    M/s ASSAM MINERAL DEVELOPMENT CORPORATION LTD, NEW UMRANGSHU LIMESTONE MINE, AREA– 200.00 HECT. (Amalgamation)

    M/s Assam Mineral Development Corporation Ltd · Non-Coal Mining