Pakur, Jharkhand
Recent activity
All 2 in the last 60 days- 14 Oct 2026 · DecidedEnvironmental clearance grantedBhuska Stone Mine
- 14 Oct 2026 · DecidedEnvironmental clearance grantedBhuska Stone Mines
Dated by the portal's own appraisal history, converted to India Standard Time; a proposal with no recorded history appears on its register submission date.
Other clearances these proposals declare
- Forest land diversion declared
- 0
- Forest land sought for diversion
- None declared
- Wildlife board recommendation declared
- 0
- In or near a protected area
- 0
- In an eco-sensitive zone
- 0
These counts are taken from the application forms of the 202 of 202 proposals naming this district whose forms have been read for these questions. In 93 of those forms at least one question was left blank, and a blank answer is counted as unknown. The forest area is the area stated for forest clearance, with each forest proposal counted once, in the district where its project is primarily sited.
- Proposals naming this district
- 202
- Category A proposals
- 2
- Families declared displaced
- 795
- Families declared affected
- 978
Displacement figures are the proponents’ own declarations. A project sited across several districts declares one figure for the whole project, and that figure is counted once, in the district where the project is primarily sited. 1 of the proposals listed below declare displacement and are sited primarily in another district, so their figures are counted in that district’s total.
Fifth Schedule status
Within a Fifth Schedule Scheduled Area
The Order fixes the area by reference to territorial divisions as existing at 11 April 2007. It names this district as a whole.
OrderThe Scheduled Areas (State of Jharkhand) Order, 2007 · C.O. 229, notified 2007-04-11
What the record shows
The Scheduled Tribe share here, 42.1%, is at least double the national figure of 8.55%.
Literacy was 48.8% in 2011 against 72.98% nationally, so notices and documents issued in writing during a consultation may reach fewer people here.
This district is a Fifth Schedule Scheduled Area. Under section 41(3) of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (RFCTLARR), land here can be acquired only with the prior consent of the Gram Sabha, and the requirement holds even when an acquisition is urgent.
Applicants for projects sited mainly in this district have declared 795 families to be displaced. The figure comes from their applications, and we have not verified it.
Each of these observations appears when a fixed rule is met by the figures on this page, so the same figures always give the same sentences. None of them is a view on whether a project should go ahead.
Who lives there
Figures from Census 2011, each compared with the all-India value computed on the same definition.
- Total population
- 9,00,422
- Households
- 1,82,317
- Average household size
- 4.94
- 0.09 above India's 4.85India
- Scheduled Tribe share of population
- 42.1%
- 33.6 points above IndiaIndia
- Scheduled Caste share of population
- 3.2%
- 13.5 points below IndiaIndia
- Children aged 0-6
- 19.7%
- 6.2 points above IndiaIndia
- Literacy rate
- 48.8%
- 24.2 points below IndiaIndia
- Sex ratio
- 989
- 46.6 above India's 942.6India
What they live on
How the district's workers earn a living, from Census 2011. The land-dependent share counts cultivators and agricultural labourers as a share of all workers, and it is the group most directly affected when land is acquired.
- Total workers
- 4,04,584
- Work participation rate
- 44.9%
- 5.1 points above IndiaIndia
- Workers dependent on land
- 63.1%
- 8.6 points above IndiaIndia
- Cultivators
- 26.0%
- 1.4 points above IndiaIndia
- Agricultural labourers
- 37.1%
- 7.2 points above IndiaIndia
- Marginal workers
- 37.7%
- 13.0 points above IndiaIndia
- Household industry workers
- 4.8%
- 1.0 points above IndiaIndia
How households live
Land, income and work among rural households, from the Socio Economic and Caste Census 2011, which recorded these where the population census did not. Only the survey's rural part is used here, so urban households do not appear.
- Rural households owning land
- 48.7%
- 2.6 points above IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
- Rural households whose highest earner makes over ₹5,000 a month
- 8.8%
- 15.5 points below IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
- Rural households living mainly on manual casual labour
- 56.2%
- 4.4 points above IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
- Rural households with a salaried member
- 2.5%
- 5.8 points below IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
When these were filed
Each proposal is dated by the first step in its appraisal history, the dated record of steps the portal keeps for it.
The timeline counts 145 of the 202 proposals here. The first filing date comes from each proposal's appraisal history, and we have not yet read it for the other 57, so they are left out. Most of them are older proposals, so the early part of the timeline undercounts what was filed then. The register itself records a date for each of them; the gap is in our copy of the histories.
Hatched columns undercount, so they cannot be compared with solid ones.
What kind of projects these are
The proposals naming this district, grouped by the sector each was filed under.
- Non-Coal Mining 98.5%
- Coal Mining 1%
- INFRA-2 0.5%
The four largest sectors are shown by name and the rest are grouped as Other.
What is proposed here
These are the proposals in the national environmental clearance register whose application names a site in this district, newest first. A project with sites in several districts appears under each of them.
- Category B2Referred to SEIAA2026-07-31
Ordinary Soil Mining of M/S Kisan Bricks Field- Shri Sabbir Ahmad & Abdul Wahid (0.709 Ha.)
ATARUDIN SHEKH · Non-Coal Mining
- Category B1Referred to SEIAA2026-04-13
Bhimpur Stone Deposit
Biswakarma Mardi · Non-Coal Mining
- Category AEC Granted2026-02-27declares affected families
Amendment of certain specific conditions of Environmental Clearance accorded to Pachwara South Coal Mine over 714.8553ha. located in Rajmahal Coal Field, Dist.- Dumka, Jharkhand
NEYVELI UTTAR PRADESH POWER LIMITED · Coal Mining
- Category B1EC Granted2025-12-15
Bhuska stone mines
SHRI DINESH TANWANI · Non-Coal Mining
- Category B1EC Granted2025-11-22
Shyampur Stone Deposit
M/S SRI SURESH KUMAR TANWANI · Non-Coal Mining
- Category AEC Granted2025-11-18declares affected families
Expansion of Pachhwara (North) Coal Mine from 15 MTPA to 22.5 MTPA
THE WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED · Coal Mining
- Category B1EC Granted2025-11-13
JIYAPANI STONE MINE
AVINASH KUMAR BHAKAT · Non-Coal Mining
- Category B1EC Granted2025-11-11
STONE DEPOSIT OF GOLPUR NO. – 85 & KHAKSA NO. - 84
RAMBANI STONE MINE OF M/S TRIDEV ENGICON PVT. LTD. · Non-Coal Mining
- Category B1EC Granted2025-11-03
TANGIDAHA STONE MINE
GURU STONE PRODUCTS · Non-Coal Mining
- Category B1EC Granted2025-11-01
NARAYANDIH STONE MINE
GURU STONE PRODUCTS · Non-Coal Mining
- Category B1EC Granted2025-10-24
Bhuska Stone Mine
SHRI DINESH TANWANI · Non-Coal Mining
- Category B1EC Granted2025-10-24
Bhuska Stone Mines
SHRI DINESH TANWANI · Non-Coal Mining
- Category B1Proposal pulled back (withdrawn)2025-10-07
Bhuska Stone Mine
SHRI DINESH TANWANI · Non-Coal Mining
- Category B1Proposal pulled back (withdrawn)2025-10-07
Bhuska Stone Mines
SHRI DINESH TANWANI · Non-Coal Mining
- Category B1EC Granted2025-09-05
Khaprajola Stone Deposit (Area- 2.79 ha. or 6.8975 Acres)
mohit mandhyan · Non-Coal Mining
- Category B1EC Granted2025-09-05
Bastadih Stone Deposit
Santosh Kumar Bhagat · Non-Coal Mining
- Category B1EC Granted2025-09-05
Ramnathpur Stone Deposit
ANIL TANWANI · Non-Coal Mining
- Category B1EC Granted2025-09-05
Tongi Stone Deposit
Usman Shekh · Non-Coal Mining
- Category B1EC Granted2025-07-18
RAMNATHPUR STONE MINE
suresh kumar tanwani · Non-Coal Mining
- Category B1EC Granted2025-07-18
Talpahari Stone Mine
jaidul shaikh · Non-Coal Mining
- Category B1EC Granted2025-07-18
PIPARJORIA STONE DEPOSIT (AREA-2.75 HA. OR 6.80 ACRE)
Ramlakshman Yadav · Non-Coal Mining
- Category B1EC Granted2025-07-18
Dhowadangal Stone Mine
iyasin shekh · Non-Coal Mining
- Category B1EC Granted2025-07-18
MANSINGHPUR STONE MINE
LSG Mining Private Limited · Non-Coal Mining
- Category B1EC Granted2025-07-18
SURAIDIH STONE MINE
SAMID ANSARI · Non-Coal Mining
- Category B1EC Granted2025-07-18
ANGUTHIYA STONE MINE
rajoo sheikh · Non-Coal Mining
- Category B1EC Granted2025-07-18
SHYAMPUR STONE MINE
suresh kumar tanwani · Non-Coal Mining
- Category B1EC Granted2025-07-18
Siulidanga Stone Deposit
Safikul Islam · Non-Coal Mining
- Category B1EC Granted2025-07-18
DHARSURI STONE DEPOSIT
lutfal stone and granites · Non-Coal Mining
- Category B1EC Granted2025-07-18
Suraidih Stone Mine
mukatar momin · Non-Coal Mining
- Category B1EC Granted2025-07-18
BHUSKA STONE MINE
pratik agarwala · Non-Coal Mining
- Category B1EC Granted2025-07-18
SURAIDIH STONE MINE
krs shakti mining and construction private limited · Non-Coal Mining
- Category B1EC Granted2025-06-19
"Golpur Stone Deposit” Project (Area 6.12 ACRES / 2.477 HA.) at Mauza- Golpur, Thana No.-85, Anchal- Pakuria, District- Pakur, Jharkhand
majestic stone works · Non-Coal Mining
- Category B1EC Granted2025-01-17
Kalupara Stone Deposit
h l aggregates · Non-Coal Mining
- Category B1EC Granted2025-01-17
Kalupara Stone Deposit (6.0 Acres/2.428 Ha.)
hilltop Stone works · Non-Coal Mining
- Category B1ToR Granted2024-12-11
Jagatpur Stone Deposit
Amar Mandal · Non-Coal Mining
- Category B1ToR Granted2024-10-22
Bhuska stone mines
SHRI DINESH TANWANI · Non-Coal Mining
- Category B1ToR Granted2024-10-21
SURAIDIH STONE MINE
krs shakti mining and construction private limited · Non-Coal Mining
- Category B1ToR Granted2024-10-21
PIPARJORIA STONE DEPOSIT (AREA-2.75 HA. OR 6.80 ACRE)
Ramlakshman Yadav · Non-Coal Mining
- Category B2EC Granted2024-10-21
PIPARJORIA STONE DEPOSIT (Area- 2.16 ha or 5.33 acres)
Ramlakshman Yadav · Non-Coal Mining
- Category B1EC Granted2024-10-21
Pratappur Stone Deposit
belal shaikh · Non-Coal Mining
- Category B2EC Granted2024-10-21
Kalajhor Stone Mine
kabatulla Shekh · Non-Coal Mining
- Category B1ToR Granted2024-10-21
STONE DEPOSIT OF GOLPUR NO. – 85 & KHAKSA NO. - 84
RAMBANI STONE MINE OF M/S TRIDEV ENGICON PVT. LTD. · Non-Coal Mining
- Category B2EC Granted2024-10-21
Taldih Stone Deposit
M/S PURUSHOTTAM SHARAN PRASHANT · Non-Coal Mining
- Category B2EC Granted2024-10-21
Maheshgaria Stone Mine
kailash kumar chitlangi · Non-Coal Mining
- Category B2EC Granted2024-10-21
Mansinghpur Stone Mine
Ansar ali · Non-Coal Mining
- Category B1EC Granted2024-10-21
TANGIDAHA STONE MINE
gol mohammad shekh · Non-Coal Mining
- Category B2EC Granted2024-10-21
M/S RAR STONE WORKS OF SHRI RAHUL KUMAR AND PARTNERS
RAHUL KUMAR · Non-Coal Mining
- Category B2EC Granted2024-10-21
Gamaheriya Stone Deposit
PRADIP KUMAR GUPTA · Non-Coal Mining
- Category B2EC Granted2024-10-21
BALIAPATRA STONE DEPOSIT
ABHISHEK KUMAR BHAGAT · Non-Coal Mining
- Category B2EC Granted2024-10-21
Khaprajola Stone Deposit (Area- 2.79 ha. or 6.8975 Acres)
mohit mandhyan · Non-Coal Mining
- Category B1EC Granted2024-10-21
TANGIDAHA STONE MINE
nabiut shekh · Non-Coal Mining
- Category B1ToR Granted2024-10-21
MANSINGHPUR STONE MINE
LSG Mining Private Limited · Non-Coal Mining
- Category B1ToR Granted2024-10-21
Siulidanga Stone Deposit
Safikul Islam · Non-Coal Mining
- Category B2EC Granted2024-10-21
Barhabad Stone Deposit (Area- 0.97 HA / 2.40 ACRE)
ABHIK SAHA · Non-Coal Mining
- Category B1ToR Granted2024-10-21
ANGUTHIYA STONE MINE
rajoo sheikh · Non-Coal Mining
- Category B1ToR Granted2024-10-21
Bastadih Stone Deposit
Santosh Kumar Bhagat · Non-Coal Mining
- Category B1EC Granted2024-10-21
ASANJOLA STONE MINE
Anil Kumar · Non-Coal Mining
- Category B2EC Granted2024-10-21
Taldih Stone Deposit
viraaj engicon private limited · Non-Coal Mining
- Category B1ToR Granted2024-10-21
Bhuska Stone Mines
SHRI DINESH TANWANI · Non-Coal Mining
- Category B2EC Granted2024-10-21
PADERKOLA STONE MINE WITH CRUSHER
LSG Mining Private Limited · Non-Coal Mining
- Category B1ToR Granted2024-10-21
Tongi Stone Deposit
Usman Shekh · Non-Coal Mining
- Category B1ToR Granted2024-10-21
DHARSURI STONE DEPOSIT
lutfal stone and granites · Non-Coal Mining
- Category B1ToR Granted2024-10-21
Bhimpur Stone Deposit
Biswakarma Mardi · Non-Coal Mining
- Category B2EC Granted2024-10-21
DUMARGHATI STONE MINE
SAMID ANSARI · Non-Coal Mining
- Category B1ToR Granted2024-10-21
RAMNATHPUR STONE MINE
suresh kumar tanwani · Non-Coal Mining
- Category B2EC Granted2024-10-21
STONE DEPOSIT OF KHAKSA - 84
RAMBANI STONE MINE OF M/S TRIDEV ENGICON PVT. LTD. · Non-Coal Mining
- Category B2EC Granted2024-10-21
Manglapara Stone Deposit
PRABHAKAR KUMAR SINHA · Non-Coal Mining
- Category B1ToR Granted2024-10-21
Talpahari Stone Mine
jaidul shaikh · Non-Coal Mining
- Category B1ToR Granted2024-10-21
Basmata Stone Mine (Area- 1.66 ha. or 4.094 Acres)
Seema Mandhyan · Non-Coal Mining
- Category B1EC Granted2024-10-21
Manjhladih Stone Mine
SAMID ANSARI · Non-Coal Mining
- Category B1ToR Granted2024-10-21
SHYAMPUR STONE MINE
suresh kumar tanwani · Non-Coal Mining
- Category B2EC Granted2024-10-21
Piparjoriya Stone Deposit
satish kumar lakhmani · Non-Coal Mining
- Category B2EC Granted2024-10-21
JITALPUR STONE MINE
MD MANIRUZZAMAN · Non-Coal Mining
- Category B2EC Granted2024-10-21
ARJUNDAHA STONE MINE
gobinda mondal · Non-Coal Mining
- Category B1ToR Granted2024-10-21
Bhuska Stone Mine
SHRI DINESH TANWANI · Non-Coal Mining
- Category B2EC Granted2024-10-21
SRIRAMGARIA STONE MINE
amirul islam · Non-Coal Mining
- Category B2EC Granted2024-10-20
CHILGAON STONE MINE
isob Shekh · Non-Coal Mining
- Category B1ToR Granted2024-10-20
BHUSKA STONE MINE
pratik agarwala · Non-Coal Mining
- Category B1Pending at MS for Proposal Withdraw2024-10-20
DHARSURI STONE DEPOSIT (1.857 Ha.)
LSG Mining Private Limited · Non-Coal Mining
- Category B1Pending at MS for Proposal Withdraw2024-10-19
MAHESHGARIA STONE MINE
kailash kumar chitlangi · Non-Coal Mining
- Category B1Pending at MS for Proposal Withdraw2024-10-19
ARJUNDAHA STONE MINE
gobinda mondal · Non-Coal Mining
- Category B1ToR Granted2024-10-18
"Golpur Stone Deposit” Project (Area 6.12 ACRES / 2.477 HA.) at Mauza- Golpur, Thana No.-85, Anchal- Pakuria, District- Pakur, Jharkhand
majestic stone works · Non-Coal Mining
- Category B2EC Granted2024-09-26
Barhabad Stone Deposit
krs shakti mining and construction private limited · Non-Coal Mining
- Category B2EC Granted2024-09-26
ARAJI KHAPRAJOLA STONE MINE
m/s new mahadev stone works · Non-Coal Mining
- Category B1EC Granted2024-09-26
Pratappur Stone Mine with Crusher
LUTFAL HAQUE · Non-Coal Mining
- Category B1ToR Granted2024-09-26
Sundarpahari Stone Deposit (Area 2.387 ha. or 5.90 Acre)
CHIRANJIT PRASAD · Non-Coal Mining
- Category B1ToR Granted2024-09-26
Suraidih Stone Mine
mukatar momin · Non-Coal Mining
- Category B2EC Granted2024-09-26
SAMLAPUR STONE MINE
sundaram pandey · Non-Coal Mining
- Category B1ToR Granted2024-09-26
Dhowadangal Stone Mine
iyasin shekh · Non-Coal Mining
- Category B2EC Granted2024-09-26
BARHABAD STONE DEPOSIT
abhishek ranjan · Non-Coal Mining
- Category B1ToR Granted2024-09-25
Hathigarh Stone Mine
UDAY SINGH · Non-Coal Mining
- Category B1ToR Granted2024-09-25
Ramnathpur Stone Deposit
ANIL TANWANI · Non-Coal Mining
- Category B1EC Granted2024-09-25
Talpahari Stone Deposit
MOHAMMAD SHEKH · Non-Coal Mining
- Category B1EC Granted2024-09-25
Jiyajori & Belpahari Stone Mine
AZHAR ISLAM · Non-Coal Mining
- Category B1EC Granted2024-09-25
Belpahari Stone Mine
AJAY TEBRIWAL · Non-Coal Mining
- Category B2EC Granted2024-09-19
Ramnathpur Stone Deposit
RAJESH KUMAR KALWAR · Non-Coal Mining
- Category B1ToR Granted2024-09-13
SURAIDIH STONE MINE
SAMID ANSARI · Non-Coal Mining
- Category B2EC Granted2024-09-13
SAMLAPUR STONE MINE
abhishek ranjan · Non-Coal Mining
- Category B1ToR Granted2024-08-22
Salboni Stone Deposit
SABIRUDDIN SHEKH · Non-Coal Mining
- Category B1ToR Granted2024-08-22
Shyampur Stone Deposit
M/S SRI SURESH KUMAR TANWANI · Non-Coal Mining
Showing 100 of 202 proposals, newest first. The button below loads the rest.