Dumka, Jharkhand
Recent activity
All 6 in the last 60 days- 14 Oct 2026 · FiledSubmittedChitragaria Stone Mine
- 13 Oct 2026 · FiledSubmittedLawapara Stone mines
- 9 Oct 2026 · DecidedEnvironmental clearance grantedJamirtala & Chandipur Stone Deposit (2.86 Ha. or 7.06Acres)
- 9 Oct 2026 · DecidedEnvironmental clearance grantedAMCHUA STONE DEPOSIT
- 9 Oct 2026 · DecidedEnvironmental clearance grantedKurunda Stone Mine (2.42 Ha.) Re-submission
- 9 Oct 2026 · DecidedEnvironmental clearance grantedKURUNDA STONE MINE (2.48 Ha.)
Dated by the portal's own appraisal history, converted to India Standard Time; a proposal with no recorded history appears on its register submission date.
Other clearances these proposals declare
- Forest land diversion declared
- 0
- Forest land sought for diversion
- None declared
- Wildlife board recommendation declared
- 0
- In or near a protected area
- 0
- In an eco-sensitive zone
- 0
These counts are taken from the application forms of the 166 of 166 proposals naming this district whose forms have been read for these questions. In 107 of those forms at least one question was left blank, and a blank answer is counted as unknown. The forest area is the area stated for forest clearance, with each forest proposal counted once, in the district where its project is primarily sited.
- Proposals naming this district
- 166
- Category A proposals
- 1
- Families declared displaced
- 541
- Families declared affected
- 541
Displacement figures are the proponents’ own declarations. A project sited across several districts declares one figure for the whole project, and that figure is counted once, in the district where the project is primarily sited.
Fifth Schedule status
Within a Fifth Schedule Scheduled Area
The Order fixes the area by reference to territorial divisions as existing at 11 April 2007. It names this district as a whole.
OrderThe Scheduled Areas (State of Jharkhand) Order, 2007 · C.O. 229, notified 2007-04-11
What the record shows
The Scheduled Tribe share here, 43.2%, is at least double the national figure of 8.55%.
Cultivators and agricultural labourers make up 79% of workers here, against 55% nationally, so at least three in four people who work here do so on the land.
Agricultural labourers, who work other people's land for wages, make up 49% of workers here. Compensation for acquired land is paid to those who hold title to it, so it does not reach them. They can still claim the rehabilitation and resettlement entitlements of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (RFCTLARR), because its section 3(c) counts a family whose livelihood depends on the land as an affected family, wherever that Act governs how the land is obtained.
This district is a Fifth Schedule Scheduled Area. Under section 41(3) of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (RFCTLARR), land here can be acquired only with the prior consent of the Gram Sabha, and the requirement holds even when an acquisition is urgent.
Applicants for projects sited mainly in this district have declared 541 families to be displaced. The figure comes from their applications, and we have not verified it.
Each of these observations appears when a fixed rule is met by the figures on this page, so the same figures always give the same sentences. None of them is a view on whether a project should go ahead.
Who lives there
Figures from Census 2011, each compared with the all-India value computed on the same definition.
- Total population
- 13,21,442
- Households
- 2,75,019
- Average household size
- 4.80
- level with IndiaIndia
- Scheduled Tribe share of population
- 43.2%
- 34.7 points above IndiaIndia
- Scheduled Caste share of population
- 6.0%
- 10.6 points below IndiaIndia
- Children aged 0-6
- 16.6%
- 3.0 points above IndiaIndia
- Literacy rate
- 61.0%
- 12.0 points below IndiaIndia
- Sex ratio
- 977
- 34.1 above India's 942.6India
What they live on
How the district's workers earn a living, from Census 2011. The land-dependent share counts cultivators and agricultural labourers as a share of all workers, and it is the group most directly affected when land is acquired.
- Total workers
- 6,24,779
- Work participation rate
- 47.3%
- 7.5 points above IndiaIndia
- Workers dependent on land
- 79.5%
- 24.9 points above IndiaIndia
- Cultivators
- 31.0%
- 6.3 points above IndiaIndia
- Agricultural labourers
- 48.5%
- 18.6 points above IndiaIndia
- Marginal workers
- 62.0%
- 37.3 points above IndiaIndia
- Household industry workers
- 3.7%
- 0.1 points below IndiaIndia
How households live
Land, income and work among rural households, from the Socio Economic and Caste Census 2011, which recorded these where the population census did not. Only the survey's rural part is used here, so urban households do not appear.
- Rural households owning land
- 77.6%
- 31.5 points above IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
- Rural households whose highest earner makes over ₹5,000 a month
- 10.6%
- 13.7 points below IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
- Rural households living mainly on manual casual labour
- 51.8%
- level with IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
- Rural households with a salaried member
- 4.8%
- 3.5 points below IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
When these were filed
Each proposal is dated by the first step in its appraisal history, the dated record of steps the portal keeps for it.
The timeline counts 157 of the 166 proposals here. The first filing date comes from each proposal's appraisal history, and we have not yet read it for the other 9, so they are left out. Most of them are older proposals, so the early part of the timeline undercounts what was filed then. The register itself records a date for each of them; the gap is in our copy of the histories.
Hatched columns undercount, so they cannot be compared with solid ones. 2026-Q4 was still running when the register was read, so its column counts only the filings made up to that date.
What kind of projects these are
The proposals naming this district, grouped by the sector each was filed under.
- Non-Coal Mining 99.4%
- Coal Mining 0.6%
The four largest sectors are shown by name and the rest are grouped as Other.
What is proposed here
These are the proposals in the national environmental clearance register whose application names a site in this district, newest first. A project with sites in several districts appears under each of them.
- Category B1Forwarded to MS SPCB/PCC by MS2026-10-14
Chitragaria Stone Mine
sasti pad mandal · Non-Coal Mining
- Category B1Forwarded to MS SPCB/PCC by MS2026-10-13
Lawapara Stone mines
fadar ansari · Non-Coal Mining
- Category B1Referred to SEIAA2026-08-03
JAMIRTALA STONE DEPOSIT
KSHITIJ RAJ · Non-Coal Mining
- Category B1EC Granted2026-07-31
Jamirtala & Chandipur Stone Deposit (2.86 Ha. or 7.06Acres)
sanjay sinha · Non-Coal Mining
- Category B1Referred to SEIAA2026-07-16
SAHARPUR STONE DEPOSIT
AJEET KUMAR · Non-Coal Mining
- Category B1Under Verification2026-06-18
AMCHUA STONE MINE (2.695 Ha.)
MANOJ KUMAR YADAV · Non-Coal Mining
- Category B1EC Granted2026-06-18
AMCHUA STONE DEPOSIT
HANS RAJ · Non-Coal Mining
- Category B1EC Granted2026-06-17
KURUNDA STONE MINE (2.48 Ha.)
RAVI KUMAR · Non-Coal Mining
- Category B1EC Granted2026-06-17
Kurunda Stone Mine (2.42 Ha.) Re-submission
RAVI KUMAR · Non-Coal Mining
- Category B1Referred to SEIAA2026-06-06
GOSAINPAHARI STONE MINE
manik chand maheshwari · Non-Coal Mining
- Category B1EC Granted2026-03-25
Salbonapahar Stone Mine New B1 (2.808)
surjeet kumar · Non-Coal Mining
- Category B1Under Verification2026-03-18
SALBONAPAHAR STONE MINE
MD ALAM ANSARI · Non-Coal Mining
- Category AEC Granted2026-02-27declares affected families
Amendment of certain specific conditions of Environmental Clearance accorded to Pachwara South Coal Mine over 714.8553ha. located in Rajmahal Coal Field, Dist.- Dumka, Jharkhand
NEYVELI UTTAR PRADESH POWER LIMITED · Coal Mining
- Category B1EC Granted2026-02-24
SIYALPAHARI STONE DEPOSIT
Atmanand Upadhyay · Non-Coal Mining
- Category B1Forwarded to MS SPCB/PCC by MS2026-02-16
POKHARIA STONE MINE
OM PRAKASH SHARMA · Non-Coal Mining
- Category B1Forwarded to MS SPCB/PCC by MS2026-02-16
CHITRAGARIA STONE DEPOSIT
MD Ansar · Non-Coal Mining
- Category B2EC Granted2026-02-05
HARIPUR SAND DEPOSIT
Rajesh Kumar Sharma · Non-Coal Mining
- Category B2EC Granted2026-02-05
Simra Sand Ghat
Rajesh Kumar Sharma · Non-Coal Mining
- Category B2EC Granted2026-02-03
CHHOTAKAMTI SAND GHAT
ASBOLUS GLOBAL PRIVATE LIMITED · Non-Coal Mining
- Category B2EC Granted2026-02-03
KATANAI SAND DEPOSIT
ANKOOR TRADEVISTA PRIVATE LIMITED · Non-Coal Mining
- Category B2EC Granted2026-02-03
HARIPUR SAND DEPOSIT
ASBOLUS GLOBAL PRIVATE LIMITED · Non-Coal Mining
- Category B1EC Granted2026-01-14
Barmasia Stone mines
patras tudu · Non-Coal Mining
- Category B1EC Granted2026-01-14
Aamchuwan Stone Mine
mihir kumar mondal · Non-Coal Mining
- Category B1EC Granted2026-01-14
Siyalpahari Stone mine
SANDHYA RANI · Non-Coal Mining
- Category B1EC Granted2026-01-14
SAHARPUR STONE MINE
kalim ansari · Non-Coal Mining
- Category B1Referred to SEIAA2026-01-13
Lowapara Stone Deposit
Ajay kumar modi · Non-Coal Mining
- Category B1EC Granted2026-01-13
MANJHLADIH STONE MINE
SANJAY PRASAD SINGH · Non-Coal Mining
- Category B1ToR Granted2025-12-15
AMCHUA STONE MINE
rajendra prasad agarwala · Non-Coal Mining
- Category B1EC Granted2025-12-13
CHANDIPUR STONE MINE
RAVI KUMAR · Non-Coal Mining
- Category B1EC Granted2025-10-31
Salbonapahar Stone Mine with Crusher
ranjit kumar · Non-Coal Mining
- Category B2EC Granted2025-09-18
Rambani Stone Mine
shivam kumar · Non-Coal Mining
- Category B2EC Granted2025-09-06
BANDARJORI STONE DEPOSIT
RAVI KUMAR · Non-Coal Mining
- Category B1ToR Granted2025-09-05
JAMIRTALA STONE DEPOSIT
KSHITIJ RAJ · Non-Coal Mining
- Category B1ToR Granted2025-07-19
Manjhladih Stone Deposit, Area 1.70 ha or 4.20 Acre.
Tarun Sahu · Non-Coal Mining
- Category B1ToR Granted2025-07-18
Jamirtala & Chandipur Stone Deposit (2.86 Ha. or 7.06Acres)
sanjay sinha · Non-Coal Mining
- Category B1ToR Granted2025-07-18
AMCHUA STONE MINE (2.695 Ha.)
MANOJ KUMAR YADAV · Non-Coal Mining
- Category B1ToR Granted2025-07-18
SAHARPUR STONE DEPOSIT
AJEET KUMAR · Non-Coal Mining
- Category B1ToR Granted2025-06-19
SIYALPAHARI STONE DEPOSIT
Atmanand Upadhyay · Non-Coal Mining
- Category B2EC Granted2025-06-19
Dimadaha Stone Mine
fadar ansari · Non-Coal Mining
- Category B1ToR Granted2025-06-19
KURUNDA STONE MINE (2.48 Ha.)
RAVI KUMAR · Non-Coal Mining
- Category B1ToR Granted2025-06-19
AMCHUA STONE MINE
RAVI KUMAR · Non-Coal Mining
- Category B2EC Granted2025-06-19
CHORMURIA STONE DEPOSIT
RAVI KUMAR · Non-Coal Mining
- Category B1ToR Granted2025-06-19
SIALPAHARI STONE MINE
saral kumar · Non-Coal Mining
- Category B1ToR Granted2025-06-19
Kurunda Stone Mine (2.42 Ha.) Re-submission
RAVI KUMAR · Non-Coal Mining
- Category B2EC Granted2025-06-19
Amba Stone Mine
sanjay kumar sah · Non-Coal Mining
- Category B2EC Granted2025-06-19
BANDARJORI STONE DEPOSIT
RAVI KUMAR · Non-Coal Mining
- Category B1ToR Granted2025-06-03
CHANDANGARIA STONE DEPOSIT
swastik mining agency · Non-Coal Mining
- Category B2EC Granted2025-05-23
Labapara Stone Mines Area 1.62ha or 4.00Acre.
Mayank Kumar Jha · Non-Coal Mining
- Category B1ToR Granted2025-05-03
Salbonapahar Stone Mine New B1 (2.808)
surjeet kumar · Non-Coal Mining
- Category B2EC Granted2025-05-02
BARAMASIA STONE MINE
MD ABDUSSALAM ANSARI · Non-Coal Mining
- Category B2EC Granted2025-05-02
MANJHLADIH STONE MINE
saradindu mal · Non-Coal Mining
- Category B2EC Granted2025-05-02
Chormuria Stone Deposit(Area 0.970)
SUKDEB PANDIT · Non-Coal Mining
- Category B2EC Granted2025-05-01
KULKULIDANGAL STONE MINE (2.638)
sanjiv kumar roy · Non-Coal Mining
- Category B2EC Granted2025-05-01
Haripur Stone Mine
gour chandra mandal · Non-Coal Mining
- Category B1ToR Granted2025-05-01
Lawapara Stone mines
fadar ansari · Non-Coal Mining
- Category B1ToR Granted2025-05-01
GOSAINPAHARI STONE MINE
manik chand maheshwari · Non-Coal Mining
- Category B1ToR Granted2025-05-01
Sialpahari Stone Mine (1.78 Ha)
saral kumar · Non-Coal Mining
- Category B2EC Granted2025-05-01
Dhawadangal Stone Mine (1.893)
md asad ali · Non-Coal Mining
- Category B1ToR Granted2025-05-01
Chitragaria Stone Mine
sasti pad mandal · Non-Coal Mining
- Category B1ToR Granted2025-05-01
RAMBANI STONE MINE
vidit kumar mittal · Non-Coal Mining
- Category B1ToR Granted2025-05-01
SALBONAPAHAR STONE MINE
surjeet kumar · Non-Coal Mining
- Category B1ToR Granted2025-04-17
Salbonapahar Stone Mine with Crusher
ranjit kumar · Non-Coal Mining
- Category B1Pending at MS for Proposal Withdraw2025-04-16
SALBONAPAHAR STONE MINE
surjeet kumar · Non-Coal Mining
- Category B1Pending at MS for Proposal Withdraw2025-03-28
Salbonapahar Stone Mine (2.808)
surjeet kumar · Non-Coal Mining
- Category B1Pending at MS for Proposal Withdraw2025-03-28
Salbonapahar Stone Mine (1.62 Ha)
surjeet kumar · Non-Coal Mining
- Category B2Pending at MS for Proposal Withdraw2025-03-21
Sialpahari Stone Mine
saral kumar · Non-Coal Mining
- Category B2Pending at MS for Proposal Withdraw2025-03-21
GOSAINPAHARI STONE MINE
manik chand maheshwari · Non-Coal Mining
- Category B2EC Granted2025-03-21
SIULIBANA STONE MINE
manik chand maheshwari · Non-Coal Mining
- Category B1ToR Granted2025-03-21
Benagaria Stone Deposit (Area 2.395 ha.)
ATMANAND UPADHYAY · Non-Coal Mining
- Category B2Pending at MS for Proposal Withdraw2025-03-20
Kulkulidangal Stone Mine for Black Stone production of 27,577 Cum/ 74,457 Tons (Max.) per year at Dumka (Area- 2.638 Ha.)
sanjiv kumar roy · Non-Coal Mining
- Category B2Pending at MS for Proposal Withdraw2025-03-20
Dhawadangal Stone Mine
md asad ali · Non-Coal Mining
- Category B2EC Granted2025-03-03
CHITRAGARIA STONE MINE (1.49 Ha )
golenur bibi · Non-Coal Mining
- Category B2EC Granted2025-03-03
BENAGARIA STONE MINE
MANOJ KUMAR YADAV · Non-Coal Mining
- Category B1ToR Granted2025-03-03
SAHARPUR STONE MINE
kalim ansari · Non-Coal Mining
- Category B1ToR Granted2025-03-03
SALBONAPAHAR STONE MINE
SANJAY PRASAD SINGH · Non-Coal Mining
- Category B2EC Granted2025-01-17
MANJHLADIH STONE MINE
saradindu mal · Non-Coal Mining
- Category B2EC Granted2025-01-17
CHHATARCHUA STONE MINE
hari nandan choudhary · Non-Coal Mining
- Category B2EC Granted2025-01-17
Chandipur Stone Deposit
Harish Mandal · Non-Coal Mining
- Category B2EC Granted2025-01-17
Benagaria Stone Deposit
DIGVIJAY SINGH · Non-Coal Mining
- Category B2EC Granted2025-01-16
SUGGAPAHARI STONE MINE
sudeep kumar · Non-Coal Mining
- Category B1ToR Granted2025-01-16
SALBONAPAHAR STONE MINE
Sanjay kumar verma · Non-Coal Mining
- Category B2EC Granted2025-01-16
Hathbari Stone Deposit
avinash kumar · Non-Coal Mining
- Category B1ToR Granted2025-01-15
MANJHLADIH STONE MINE
SANJAY PRASAD SINGH · Non-Coal Mining
- Category B2EC Granted2024-12-16
CHANDANGARIA STONE MINE
SANJAY KUMAR YADAV · Non-Coal Mining
- Category B2EC Granted2024-12-13
HARIPUR STONE MINE
Daniyal tudu · Non-Coal Mining
- Category B1ToR Granted2024-12-13
AMCHUA STONE DEPOSIT
HANS RAJ · Non-Coal Mining
- Category B2EC Granted2024-12-13
Saharpur Stone Bock
BINOD KUMAR SINGHANIA · Non-Coal Mining
- Category B2EC Granted2024-12-13
PINDARGARIA STONE MINE
ritesh kumar · Non-Coal Mining
- Category B2EC Granted2024-12-13
SAHARPUR STONE MINE
md asad ali · Non-Coal Mining
- Category B2EC Granted2024-12-13
LABAPARA STONE MINE
pratyush dhar jha · Non-Coal Mining
- Category B2EC Granted2024-12-13
RAMBANI STONE MINE
DEPESH KUMAR · Non-Coal Mining
- Category B1ToR Granted2024-12-13
Siyalpahari Stone mine
SANDHYA RANI · Non-Coal Mining
- Category B1ToR Granted2024-12-13
CHANDIPUR STONE MINE
RAVI KUMAR · Non-Coal Mining
- Category B2EC Granted2024-12-13
CHITRAGARIA STONE MINE
mahesh yadav · Non-Coal Mining
- Category B2EC Granted2024-12-13
CHANDANGARIA STONE MINE
ranarakesh pratap singh · Non-Coal Mining
- Category B1ToR Granted2024-12-13
Aamchuwan Stone Mine
mihir kumar mondal · Non-Coal Mining
- Category B2EC Granted2024-12-13
SALBONAPAHAR STONE MINE
islam miyan · Non-Coal Mining
- Category B2EC Granted2024-12-13
CHANDIPUR STONE MINE
RAMBANI STONE MINE OF M/S TRIDEV ENGICON PVT. LTD. · Non-Coal Mining
- Category B2EC Granted2024-12-13
SIULIBANA STONE MINE
manik chand maheshwari · Non-Coal Mining
- Category B1ToR Granted2024-12-13
SALBONAPAHAR STONE MINE
MD ALAM ANSARI · Non-Coal Mining
Showing 100 of 166 proposals, newest first. The button below loads the rest.