← All districts

Saraikela-Kharsawan, Jharkhand

Scheduled AreaCensus 2011 district code 369
  1. 22 Oct 2026 · DecidedEnvironmental clearance grantedExpansion of existing steel plant by enhancement of Pig iron production from 155,250 TPA to 414,000 TPA,…
  2. 9 Oct 2026 · DecidedEnvironmental clearance grantedTintidih Stone Deposit (2.340 Ha or 5.784 Acres)
  3. 9 Oct 2026 · DecidedEnvironmental clearance grantedSosomuli Stone Mine
  4. 9 Oct 2026 · DecidedEnvironmental clearance grantedTentoposi Stone Deposit (2.50 acre or 1.011 ha)
  5. 9 Oct 2026 · DecidedEnvironmental clearance grantedTentoposi Stone Deposit (area 1.821 Ha or 4.50 Acres)
  6. 9 Oct 2026 · DecidedEnvironmental clearance grantedTintidih Stone Deposit (2.95 Ha or 7.29Acres)
  7. 9 Oct 2026 · DecidedTerms of Reference grantedProposal for 0.5 MTPA Electrical Steel Complex at village - Dugdha, Gamharia, Dist: Saraikela Kharsawan,…
  8. 8 Oct 2026 · Details soughtAdditional details soughtEnvironment Clearance for Mini Blast Furnace (3x40m3) for the production of 99000 TPA Pig Iron, LD…
  9. 24 Sept 2026 · FiledSubmittedSurrender of Environment Clearance “Modernization Cum Expansion of Straight Bar & Wire Mill” (EC file no…
  10. 3 Sept 2026 · Details soughtAdditional details soughtExpansion of existing steel plant by enhancement of Pig iron production from 155,250 TPA to 414,000 TPA,…
  11. 1 Sept 2026 · FiledSubmittedTintidih Stone Mine

Dated by the portal's own appraisal history, converted to India Standard Time; a proposal with no recorded history appears on its register submission date.

Other clearances these proposals declare

Forest land diversion declared
0
Forest land sought for diversion
None declared
Wildlife board recommendation declared
0
In or near a protected area
0
In an eco-sensitive zone
3

These counts are taken from the application forms of the 85 of 85 proposals naming this district whose forms have been read for these questions. In 44 of those forms at least one question was left blank, and a blank answer is counted as unknown. The forest area is the area stated for forest clearance, with each forest proposal counted once, in the district where its project is primarily sited.

Proposals naming this district
85
Category A proposals
21
Families declared displaced
10
Families declared affected
30

Displacement figures are the proponents’ own declarations. A project sited across several districts declares one figure for the whole project, and that figure is counted once, in the district where the project is primarily sited.

Fifth Schedule status

Within a Fifth Schedule Scheduled Area

The Order fixes the area by reference to territorial divisions as existing at 11 April 2007. It names this district as a whole.

OrderThe Scheduled Areas (State of Jharkhand) Order, 2007 · C.O. 229, notified 2007-04-11

What the record shows

  • The Scheduled Tribe share here, 35.2%, is at least double the national figure of 8.55%.

  • This district is a Fifth Schedule Scheduled Area. Under section 41(3) of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (RFCTLARR), land here can be acquired only with the prior consent of the Gram Sabha, and the requirement holds even when an acquisition is urgent.

  • Applicants for projects sited mainly in this district have declared 10 families to be displaced. The figure comes from their applications, and we have not verified it.

Each of these observations appears when a fixed rule is met by the figures on this page, so the same figures always give the same sentences. None of them is a view on whether a project should go ahead.

Who lives there

Figures from Census 2011, each compared with the all-India value computed on the same definition.

Total population
10,65,056
Households
2,21,232
Average household size
4.81
level with IndiaIndia
Scheduled Tribe share of population
35.2%
26.6 points above IndiaIndia
Scheduled Caste share of population
5.3%
11.4 points below IndiaIndia
Children aged 0-6
15.0%
1.4 points above IndiaIndia
Literacy rate
67.7%
5.3 points below IndiaIndia
Sex ratio
956
13.7 above India's 942.6India

What they live on

How the district's workers earn a living, from Census 2011. The land-dependent share counts cultivators and agricultural labourers as a share of all workers, and it is the group most directly affected when land is acquired.

Total workers
4,30,051
Work participation rate
40.4%
0.6 points above IndiaIndia
Workers dependent on land
60.4%
5.8 points above IndiaIndia
Cultivators
27.1%
2.5 points above IndiaIndia
Agricultural labourers
33.2%
3.3 points above IndiaIndia
Marginal workers
46.8%
22.1 points above IndiaIndia
Household industry workers
2.4%
1.4 points below IndiaIndia

How households live

Land, income and work among rural households, from the Socio Economic and Caste Census 2011, which recorded these where the population census did not. Only the survey's rural part is used here, so urban households do not appear.

Rural households owning land
47.4%
1.3 points above IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households whose highest earner makes over ₹5,000 a month
33.4%
9.1 points above IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households living mainly on manual casual labour
39.8%
12.0 points below IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households with a salaried member
11.4%
3.1 points above IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

When these were filed

Each proposal is dated by the first step in its appraisal history, the dated record of steps the portal keeps for it.

2023-Q12026-Q3

The timeline counts 65 of the 85 proposals here. The first filing date comes from each proposal's appraisal history, and we have not yet read it for the other 20, so they are left out. Most of them are older proposals, so the early part of the timeline undercounts what was filed then. The register itself records a date for each of them; the gap is in our copy of the histories.

Hatched columns undercount, so they cannot be compared with solid ones. 4 of them cover periods for which we have read few filing dates so far, and they count only the proposals whose date we have.

What kind of projects these are

The proposals naming this district, grouped by the sector each was filed under.

  • Non-Coal Mining 41.2%
  • Industrial Projects - 1 36.5%
  • INFRA-2 20%
  • Industrial Projects - 2 2.4%

The four largest sectors are shown by name and the rest are grouped as Other.

What is proposed here

These are the proposals in the national environmental clearance register whose application names a site in this district, newest first. A project with sites in several districts appears under each of them.

  1. Category B1Proposal Accepted and Referred to SEAC2026-09-24

    Surrender of Environment Clearance “Modernization Cum Expansion of Straight Bar & Wire Mill” (EC file no EC/SEIAA/2015-16/872/2015) of Tata Steel Limited, Gamharia granted by SEIAA, Jharkhand

    Tata Steel Limited · Industrial Projects - 1

  2. Category B2Proposal Accepted and Referred to SEAC2026-09-01

    Tintidih Stone Mine

    VISHNU UPADHAYAY · Non-Coal Mining

  3. Category B2EC Granted2026-08-14

    Tintidih Stone Deposit (2.340 Ha or 5.784 Acres)

    anand dodrajka · Non-Coal Mining

  4. Category B2EC Granted2026-08-12

    Sosomuli Stone Mine

    jai prakash singh · Non-Coal Mining

  5. Category B2EC Granted2026-07-29

    Tintidih Stone Deposit (2.95 Ha or 7.29Acres)

    Ravindra Mining private Limited · Non-Coal Mining

  6. Category B1Forwarded to MS SPCB/PCC by MS2026-07-22

    Proposal for 0.5 MTPA Electrical Steel Complex at village - Dugdha, Gamharia, Dist: Saraikela Kharsawan, Jharkhand - 832108

    Tata Steel Limited · Industrial Projects - 1

  7. Category B2EC Granted2026-07-15

    Soro (Jorgodih) Sand Ghat

    Rajesh Kumar Sharma · Non-Coal Mining

  8. Category AStandard ToR Granted2026-07-03

    Expansion of 0.35 MTPA DRI & 60 MW CPP in 37.313 ha into “Seraikela-Kharsawan Steel Plant” of 1.431 MTPA crude steel with 255 MW Captive Power Plant (WHRB 90 MW & AFBC 165 MW) in 80.64 ha in Village Totatalwadi & Kolburudih, Block Seraikela, District Seraikela-Kharswan, Jharkhand of M/s Rungta Sons Private Limited

    RUNGTA SONS PRIVATE LIMITED · Industrial Projects - 1

  9. Category B1Proposal pulled back (withdrawn)2026-07-01

    Tintidih Stone Deposit (2.340 Ha or 5.784 Acres)

    anand dodrajka · Non-Coal Mining

  10. Category B2EC Granted2026-06-30

    Bhadudih Stone Deposit (0.708 Ha)

    Devraj Mahato · Non-Coal Mining

  11. Category B2Proposal pulled back (withdrawn)2026-06-30

    Tintidih Stone Deposit (2.340 Ha or 5.784 Acres)

    anand dodrajka · Non-Coal Mining

  12. Category B2EC Granted2026-06-30

    Tentoposi Stone Deposit (area 1.821 Ha or 4.50 Acres)

    manish Agarwal · Non-Coal Mining

  13. Category B2EC Granted2026-06-30

    Tentoposi Stone Deposit (2.50 acre or 1.011 ha)

    manish Agarwal · Non-Coal Mining

  14. Category AEC Granted2026-06-25

    Expansion of existing steel plant by enhancement of Pig iron production from 155,250 TPA to 414,000 TPA, enhancement of Sinter production capacity from 207,000 TPA to 483,000 TPA, enhancement of Captive power from 4MW to 9MW through BF Gas WHRB, Installation of 300,000 TPA Ductile Iron Pipe Plant and installation of 1200 nm3/hr Oxygen Plant by M/s Narsingh Ispat Ltd. at Village: Khunti, Kandra Road, PO: Chandil, Dist.- Saraikela-Kharsawan, Jharkhand.

    NARSINGH ISPAT LTD · Industrial Projects - 1

  15. Category B2EC Granted2026-06-08

    Murumdih Pot Stone Mine

    SMRITI ANAND · Non-Coal Mining

  16. Category B2EC Granted2026-05-05

    Chhotakhiri Stone Deposit 2.833 Ha or 7.00 Acres

    Varun Ahuja · Non-Coal Mining

  17. Category B1ToR Granted2026-03-10

    Expansion of Existing plant for Manufacturing of Grey, SG, CI and ADI Iron Casting Component by electric furnaces from 23,520 TPA to 50,000 TPA by increasing the capacity of Casting Line at Village: Bholadih, P.O: Kolabira, P.S: Saraikela, Dist.: Saraikela Kharswan, Jharkhand by M/s Ramkrishna Forgings Limited (Plant-VIII).

    RAMKRISHNA FORGINGS LIMITED · Industrial Projects - 1

  18. Category AEC Granted2026-02-12

    Proposed Integrated Steel Plant with Sponge Iron (DRI) 2,31,000 TPA, Steel Billets (MS Billets) 1,98,000 TPA, Rolling Mill (MS Bars & Structural Steel) 1,92,233 TPA and 30 MW Captive Power Plant by M/S Krishna Sponge Iron & Power Pvt. Ltd.

    Krishna sponge iron and power private limited · Industrial Projects - 1

  19. Category B1ToR Granted2026-02-11

    Proposed expansion of existing non-recovery type coke oven plant capacity from 24,000 TPA to 1,35,000 TPA along with 10 MW capacity Waste Heat Recovery Boiler (WHRB) based Captive Power Plant at Plot Nos. NS-5(P), NS-31, V-1(P), Adityapur Industrial Area, 5th Phase, Mouza - Gamharia, P.S. Adityapur, District Seraikela-Kharsawan, Jamshedpur, Jharkhand, PIN-832108.

    ANJANEYA ISPAT LIMITED · Industrial Projects - 1

  20. Category AEC Granted2026-02-01declares affected families

    EIA for setting up of 1.2 MTPA greenfield Integrated Steel Plant at Saraikela Kharsawan, Jharkhand

    S M STEELS AND POWVER LIMITED · Industrial Projects - 1

  21. Category B2Proposal pulled back (withdrawn)2026-01-31

    Soro (Jorgodih) Sand Ghat

    Rajesh Kumar Sharma · Non-Coal Mining

  22. Category B1EC Granted2026-01-06

    Amendment in Existing 1.2 MTPA Pellet Plant with Installation of PGP (Producer Gas Plant) for Predominant Substitution of Existing Fuel - Furnace Oil by Producer Gas at Village Kandra, Kandra-Chowka Road, District Saraikela Kharsawan, Jharkhand

    AMALGAM STEEL PRIVATE LIMITED · Industrial Projects - 1

  23. Category B2EC Granted2025-12-11

    Proposed Expansion of 650 Bedded Hospital along with Oxygen Plant for M/s Netaji Subhas Medical College and Hospital a unit of Sitwanto Devi Mahila Kalyan Sansthan at Village-Bhatia & Hatiadih, Thana No. 127 & 60, Thana: Saraikela, Near Phase-7, Adityapur Industrial Area, Dist.-Seraikela-Kharsawan (Jharkhand)

    MADAN SINGH · INFRA-2

  24. Category AGranted2025-11-10

    Integrated Steel Plant (2.5 MTPA) along with Captive Power Plant (280 MW; WHRB 140 MW & AFBC 140 MW)

    RUNGTA SONS PRIVATE LIMITED · Industrial Projects - 1

  25. Category B2EC Granted2025-10-06

    Proposed Ryan Institute of Techno Science (RITS) [managed by Raj Bharati Siksha Niketan] located at Industrial Plot No.- IC-1, 2 & 3, (Survey Plot No.: 45(P), 41(P), 42(P)) Near 7th Phase Adityapur Industrial area, Dist.-Saraikela-Kharsawan, Jharkhand.

    RAJ BHARATI SIKSHA NIKETAN · INFRA-2

  26. Category B2EC Granted2025-09-05

    RANJAR STONE DEPOSIT

    Hemwant Kumar Singh · Non-Coal Mining

  27. Category B2EC Granted2025-09-03

    Haribhanja Brick Soil Mining

    naba kishore singhdeo · Non-Coal Mining

  28. Category B2EC Granted2025-09-03

    Jamdah Brick Soil Mining

    Madan Munda · Non-Coal Mining

  29. Category AToR Granted2025-06-27declares affected families

    EIA for setting up of 1.2 MTPA greenfield Integrated Steel Plant at Saraikela Kharsawan, Jharkhand

    S M STEELS AND POWVER LIMITED · Industrial Projects - 1

  30. Category B2EC Granted2025-06-18

    The Skyline

    DHATRE UDYOG LIMITED · INFRA-2

  31. Category B1EC Granted2025-06-04

    Grain based Distillery to produce Ethanol with installed capacity 40 KLPD under 100% EBP program by M/s Maheshwari Carbons Private Limited at Mouza–Nawadih, P.S.- Sariakella, Thana No-292, Halka No - 8, Khata No-43, Plot No.-402 (P), Jharkhand – 833 219.

    maheshwari carbons private limited · Industrial Projects - 2

  32. Category AProposal returned in present form2025-05-17

    Expansion in existing Steel Plant at vill- Maslewa, Kolabira, Saraikela-Kharsawan (JHK)

    D.D. STEEL & POWER LIMITED · Industrial Projects - 1

  33. Category AToR Granted2025-05-03

    Expansion of existing steel plant by enhancement of Pig iron production from 155,250 TPA to 414,000 TPA, enhancement of Sinter production capacity from 207,000 TPA to 483,000 TPA, enhancement of Captive power from 4MW to 9MW through BF Gas WHRB, Installation of 300,000 TPA Ductile Iron Pipe Plant and installation of 1200 nm3/hr Oxygen Plant by M/s Narsingh Ispat Ltd. at Village: Khunti, Kandra Road, PO: Chandil, Dist.- Saraikela-Kharsawan, Jharkhand.

    NARSINGH ISPAT LTD · Industrial Projects - 1

  34. Category B2EC Granted2025-05-02

    Tangarjora Stone Deposit , Mauza- Tangarjora, P.S.- Rajnagar, Thana No.-75, District- Saraikela Kharsawan, State- Jharkhand ,Area of 4.109 Acre / 1.662 Ha.

    SUKHCHAIN INDUSTRIES PRIVATE LIMITED · Non-Coal Mining

  35. Category B2EC Granted2025-05-02

    Baliasai Stone Mine

    anand dodrajka · Non-Coal Mining

  36. Category B2EC Granted2025-05-01

    BHANDARI SAI QUARTZITE STONE MINE

    MANISH KUMAR AGARWAL · Non-Coal Mining

  37. Category AStandard ToR Granted2025-04-22

    EXPANSION OF SRIJAN STEEL AND POWER INDUSTRIES PRIVATE LIMITED BY PRODUCTION OF 0.2 MTPA OF ROLLED PRODUCTS

    SRIJAN STEEL AND POWER INDUSTRIES PRIVATE LIMITED · Industrial Projects - 1

  38. Category B2EC Granted2025-03-21

    Raidih Stone Deposit

    jai prakash singh · Non-Coal Mining

  39. Category B2EC Granted2025-03-21

    Ugma Stone Mine

    Hare Lal Construction Company Private Limited · Non-Coal Mining

  40. Category B2EC Granted2025-03-21

    Chota Tangrani Stone Mine

    Tarun Kumar Dey · Non-Coal Mining

  41. Category B2EC Granted2025-03-04

    Chhota Tangrani Stone Deposit, Mauza- Chhota Tangrani, P.S.- Saraikela, Thana No.-321, District- Saraikela Kharsawan, State- Jharkhand, Area of 3.06 Acre / 1.238 Ha.

    BHAGWATI STONE CRUSHER · Non-Coal Mining

  42. Category AToR Granted2025-03-01

    Proposed Integrated Steel Plant with Sponge Iron (DRI) 2,31,000 TPA, Steel Billets (MS Billets) 1,98,000 TPA, Rolling Mill (MS Bars & Structural Steel) 1,92,233 TPA and 30 MW Captive Power Plant by M/S Krishna Sponge Iron & Power Pvt. Ltd.

    Krishna sponge iron and power private limited · Industrial Projects - 1

  43. Category AStandard ToR Granted2025-02-04

    Expansion of the existing project land from 2.6365 ha to 6.7177 ha for installation of Sponge Iron (DRI) 2,00,200 TPA and Ferro alloy (Si-Mn) 30,000 TPA Plant along with the existing Captive Power Plant of 20 MW” by M/s Divine Vidyut Ltd.

    DIVINE VIDYUT LIMITED · Industrial Projects - 1

  44. Category AProposal returned in present form2025-01-22

    Expansion in existing Steel Plant at vill- Maslewa, Kolabira, Saraikela-Kharsawan (JHK)

    D.D. STEEL & POWER LIMITED · Industrial Projects - 1

  45. Category B2EC Granted2025-01-17

    Joddiha Stone Mine

    Mohamad Mustafa Ansari · Non-Coal Mining

  46. Category B2EC Granted2025-01-17

    Proposed Residential project “Ashiana Amaya"

    ASHIANA HOUSING LIMITED · INFRA-2

  47. Category AProposal Withdrawal Request Accepted2024-12-26

    “Expansion at existing site by new installation of Ferro alloy (Si-Mn) 30,000 TPA & Sponge Iron (DRI) 1,20,000 TPA along with WHRB facility, having an existing Captive Power Plant of 20 MW” by M/s Divine Vidyut Ltd.” located at Raidih-Palgam, Kaushalgarh, Chowka- Kandra Road, P.S. – Chandil, Dist. Saraikela , Jharkhand.

    DIVINE VIDYUT LIMITED · Industrial Projects - 1

  48. Category B2EC Granted2024-12-12

    M/S PKS Bricks

    PREM KUMAR SINGH · Non-Coal Mining

  49. Category B1ToR Granted2024-12-11

    Grain based Distillery to produce Ethanol with installed capacity 40 KLPD under 100% EBP program by M/s Maheshwari Carbons Private Limited at Mouza–Nawadih, P.S.- Sariakella, Thana No-292, Halka No - 8, Khata No-43, Plot No.-402 (P), Jharkhand – 833 219.

    maheshwari carbons private limited · Industrial Projects - 2

  50. Category AEC Granted2024-11-08

    Proposed Integrated steel plant with Captive Power Plant (50 MW) at village Khunti, Kandra Road, P.O. Chandil, District - Saraikela Kharswan, Jharkhand by Narsingh Ispat Ltd

    NARSINGH ISPAT LIMITED · Industrial Projects - 1

  51. Category B2EC Granted2024-10-22

    Rudia stone mine

    KAMAL PRASAD · Non-Coal Mining

  52. Category AGranted2024-09-24

    EC transfer of Expansion of existing iron and steel plant by installation of Coke Oven Plant (0.5 MTPA), Iron Ore Washing (2.7 MTPA) and Pelletization Plant (1.2 MTPA)

    Tata Steel Limited · Industrial Projects - 1

  53. Category B1Under Examination2024-08-16

    Proposed Expansion of Common Hazardous Waste Treatment Storage and Disposal Facility

    ADITYAPUR WASTE MANAGEMENT PRIVATE LIMITED · INFRA-2

  54. Category AUnder Examination2024-08-16

    Proposed Expansion of Common Hazardous waste Treatment Storage and Disposal Facility.

    ADITYAPUR WASTE MANAGEMENT PRIVATE LIMITED · INFRA-2

  55. Category B2EC Granted2024-07-22

    Ulidihi Stone Deposit

    tarun kanti ghosh · Non-Coal Mining

  56. Category B2EC Granted2024-07-13

    Vinayak Avenue

    VIDHI DEVELOPERS PRIVATE LIMITED · INFRA-2

  57. Category B1EC Granted2024-05-30

    Transfer of EC granted by SEIAA Jharkhand vide letter no. EC/SEIAA/2015-16/872/2015/262 from Tata Steel Long Product limited to Tata Steel Limited, Gamharia

    Tata Steel Limited · Industrial Projects - 1

  58. Category B1ToR Granted2024-05-27

    Regularization of Existing Rolling mill, Multi blanking line (CTL), Reheating furnace (11 TPH) for production of 28160 TPA Round Bars, Flat Bars & Sections and 20 million/year M.S. Blanks-Disc along with Modernization of existing Coal Gasifier by M/s Steel Strips Wheel Limited at Village- Muria, P.O. Kolabira, Dist.- Saraikela Kharsawan, Jharkhand

    STEEL STRIPS WHEELS LTD · Industrial Projects - 1

  59. Category B2EC Granted2024-04-25

    Proposed Expansion of 650 Bedded Hospital along with Oxygen Plant for M/s Netaji Subhas Medical College and Hospital a unit of Sitwanto Devi Mahila Kalyan Sansthan at Village-Bhatia & Hatiadih, Thana No. 127 & 60, Thana: Saraikela, Near Phase-7, Adityapur Industrial Area, Dist.-Seraikela-Kharsawan (Jharkhand)

    MADAN SINGH · INFRA-2

  60. Category AToR Granted2024-04-10

    Regularization of existing plant having Cold Rolled Mill (6Hi) unit for production of 200,000TPA Cold Rolled Coil and Continuous Galvanizing Line for production of 150,000 TPA Galvanized Plain Coil by M/s BMW Industries Limited at M-1, Large Sector Mauza- Adityapur Industrial Area, PO- Gamharia, Dist- Saraikela Kharsawan, Jamshedpur, Jharkhand

    BMW INDUSTRIES LIMITED · Industrial Projects - 1

  61. Category B1Withdrawal Request Accepted2024-02-28

    Expansion-cum-Modernization of capacity of existing Bar Mill from 105 MT/day to 425 MT/day

    TATA STEEL LIMITED · Industrial Projects - 1

  62. Category B1EC Granted2023-11-16

    Expansion of Standalone Clinker Grinding Unit for manufacturing of Cement (OPC, PPC, PSC & Composite Cement) from 2.5 Million TPA to 3.0 Million TPA by internal modification of VRM main gear box and process optimization at Village: Hansda, PO: Burudih, Block: Kharsawan, District: Saraikela - Kharsawan (Jharkhand) by Shree Jharkhand Cement Plant (A Unit of Shree Cement Ltd.)

    Shree Cement Ltd. · Industrial Projects - 1

  63. Category B2EC Granted2023-10-16

    Tirildih Stone Deposit (Area - 0.97 ha.)

    BALBINDER SINGH · Non-Coal Mining

  64. Category B1EC Granted2023-10-13

    Expansion of Forging Unit of M/s Ramkrishna Forgings Limited (Unit – VII) from 18,600 to 100,000TPA and Fabrication & Assembly capacity 13,130TPA at Plot No. 1988, Industrial Area, Village- Dugni, Block- Seraikela, District- Seraikela Kharsawan, State- Jharkhand

    RAMKRISHNA FORGINGS LIMITED · Industrial Projects - 1

  65. Category B2EC Granted2023-10-08

    Residential Project "The Watermark"

    KAMINI KAUSHAL CONSTRUCTION · INFRA-2

  66. Category B1EC Granted2023-09-18

    Environmental Clearance for Mining of Soapstone minor mineral from Brahmandungri SoapStone mine Proposed by M/s Ganga Engineering

    GANGA ENGINEERING · Non-Coal Mining

  67. Category B1EC Granted2023-09-18

    Sonapose & Databera Stone Block (7.40 ha.)

    NAVEEN SINGH · Non-Coal Mining

  68. Category AUnder Processing with Authority2023-08-17

    Proposed expansion of existing steel plant to Integrated Steel Plant through installation of 1800 TPD (3x600 TPD) DRI kilns along with Beneficiation Plant for Iron ore (1X0.6 MTPA), Pellet Plant (1x0.6 MTPA), Steel Melting Shop (2x25 T + 4x15 T Induction Furnaces) with matching LRF & CCM, Rolling Mill (0.35 MTPA), Ferro alloy Plant (4x16.5 MVA),Briquette plant for Chrome Ore (1x30 TPH), Oxygen plant (100 TPD) and 82 MW (57 MW WHRB based + 25 MW AFBC based) Captive Power Plant

    NILACHAL IRON AND POWER LTD · Industrial Projects - 1

  69. Category AUnder Processing with Authority2023-07-24

    Environment Clearance for Mini Blast Furnace (3x40m3) for the production of 99000 TPA Pig Iron, LD Convertor for production of 99000 TPA steel along with Billet Caster for production of 95000 TPA Billets, Hot Briquette Plant for Production capacity of 150000 TPA Briquettes and Gas recovery type Power Plant of 1.5 MW by M/s Anjaneya Ispat Ltd. located at B-6 to 10, Adityapur Industrial Area, Tehsil-Gamharia, District- Seraikela-Kharsawan, Jamshedpur, Jharkhand

    ANJANEYA ISPAT LIMITED · Industrial Projects - 1

  70. Category AWithdrawal Request Accepted2023-07-06

    Environment Clearance for Mini Blast Furnace (3x40m3) for the production of 99000 TPA Pig Iron, LD Convertor for production of 99000 TPA steel along with Billet Caster for production of 95000 TPA Billets, Hot Briquette Plant for Production capacity of 150000 TPA Briquettes and Gas recovery type Power Plant of 1.5 MW by M/s Anjaneya Ispat Limited at B6 to 10, 5th Phase, Adityapur Industrial Area, Gamharia, District-Seraikela Kharsawan, Jamshedpur-Jharkhand

    ANJANEYA ISPAT LIMITED · Industrial Projects - 1

  71. Category B1EC Granted2023-06-13

    Vinayak Square

    VIDHI DEVELOPERS PRIVATE LIMITED · INFRA-2

  72. Category AToR Granted2023-05-29

    Proposed expansion of existing steel plant to Integrated Steel Plant through installation of 1800 TPD (3x600 TPD) DRI kilns along with Beneficiation Plant for Iron ore (1X0.6 MTPA), Pellet Plant (1x0.6 MTPA), Steel Melting Shop (2x25 T + 4x15 T Induction Furnaces) with matching LRF & CCM, Rolling Mill (0.35 MTPA), Ferro alloy Plant (4x16.5 MVA),Briquette plant for Chrome Ore (1x30 TPH), Oxygen plant (100 TPD) and 82 MW (57 MW WHRB based + 25 MW AFBC based) Captive Power Plant

    NILACHAL IRON AND POWER LTD · Industrial Projects - 1

  73. Category B1TOR Granted2023-04-24

    Expansion of Forging Unit of M/s Ramkrishna Forgings Limited (Unit – VII) from 18,600 to 100,000TPA and Fabrication & Assembly capacity 13,130TPA at Plot No. 1988, Industrial Area, Village- Dugni, Block- Seraikela, District- Seraikela Kharsawan, State- Jharkhand

    RAMKRISHNA FORGINGS LIMITED · Industrial Projects - 1

  74. Category B2EC Granted2023-04-12

    Medki Stone Mine (2.024 ha.)

    MANOJ KUMAR · Non-Coal Mining

  75. Category B2EC Granted2023-04-12

    Medki Stone Mine (1.651 ha.)

    MANOJ KUMAR · Non-Coal Mining

  76. Category B2EC Granted2023-04-12

    Proposed 350 bedded Hospital for M/s Netaji Subhas Medical College and Hospital a unit of Sitwanto Devi Mahila Kalyan Sansthan Total Plot Area: 19243.20 Sqm. Built-up Area: 52184.06 Sqm.

    MADAN SINGH · INFRA-2

  77. Category B2EC Granted2023-03-06

    Proposed Multistoried Residential Project [B+G+12 multi storied Residential apartment with Retail Area and public utility] over Revenue Plot No. (CS) 957, Khata no. (MSP) 957 & Holding No. 145 at Village DOBO, P.O. Mango, PS Chandil, District – Saraikela Kharsawan-831012, Jharkhand

    CREATIVE HOMES · INFRA-2

  78. Category B2EC Granted2023-02-22

    Tangarjora Stone Deposit

    CHIRANJEEVI KUCHI · Non-Coal Mining

  79. Category B2TOR Granted2023-02-21

    Proposed 350 bedded Hospital for M/s Netaji Subhas Medical College and Hospital a unit of Sitwanto Devi Mahila Kalyan Sansthan Total Plot Area: 19243.20 Sqm. Built-up Area: 52184.06 Sqm.

    MADAN SINGH · INFRA-2

  80. Category B1TOR Granted2023-02-20

    Sonapose & Databera Stone Block (7.40 ha.)

    NAVEEN SINGH · Non-Coal Mining

  81. Category B1TOR Granted2023-02-15

    Vinayak Square

    VIDHI DEVELOPERS PRIVATE LIMITED · INFRA-2

  82. Category B1TOR Granted2023-02-07

    Environmental Clearance for Mining of Soapstone minor mineral from Brahmandungri SoapStone mine Proposed by M/s Ganga Engineering

    GANGA ENGINEERING · Non-Coal Mining

  83. Category B2EC Granted2022-11-22

    Proposed Residential Building

    SHREE TRIVENI REALTORS LLP · INFRA-2

  84. Category B2EC Granted2022-10-14

    Shrachi Greens Project

    SHRACHI REALTY PRIVATE LIMITED · INFRA-2

  85. Category B2EC Granted2022-10-12