← All districts

Hoshiarpur, Punjab

Not a Scheduled AreaCensus 2011 district code 38
  1. 15 Oct 2026 · FiledSubmittedExtraction of sand, stone, and bajri, located at Khasra No. 145/5, measuring an area of 02-74-12 hectares…
  2. 5 Oct 2026 · DecidedEnvironmental clearance grantedProposed establishment of Resin Manufacturing Unit Within the Existing Ply-board manufacturing (including…

Dated by the portal's own appraisal history, converted to India Standard Time; a proposal with no recorded history appears on its register submission date.

Other clearances these proposals declare

Forest land diversion declared
0
Forest land sought for diversion
None declared
Wildlife board recommendation declared
0
In or near a protected area
0
In an eco-sensitive zone
0

These counts are taken from the application forms of the 49 of 49 proposals naming this district whose forms have been read for these questions. In 23 of those forms at least one question was left blank, and a blank answer is counted as unknown. The forest area is the area stated for forest clearance, with each forest proposal counted once, in the district where its project is primarily sited.

Proposals naming this district
49
Category A proposals
5
Families declared displaced
None declared
Families declared affected
None declared

Displacement figures are the proponents’ own declarations. A project sited across several districts declares one figure for the whole project, and that figure is counted once, in the district where the project is primarily sited.

Fifth Schedule status

Not within a Fifth Schedule Scheduled Area

No Presidential Order under paragraph 6 of the Fifth Schedule declares any Scheduled Area in Punjab, so no part of this district is one and PESA does not apply.

OrderMinistry of Tribal Affairs, Scheduled Areas declared under paragraph 6 of the Fifth Schedule to the Constitution

Who lives there

Figures from Census 2011, each compared with the all-India value computed on the same definition.

Total population
15,86,625
Households
3,36,994
Average household size
4.71
0.14 below India's 4.85India
Scheduled Tribe share of population
0.0%
8.6 points below IndiaIndia
Scheduled Caste share of population
35.1%
18.5 points above IndiaIndia
Children aged 0-6
10.6%
3.0 points below IndiaIndia
Literacy rate
84.6%
11.6 points above IndiaIndia
Sex ratio
961
18.5 above India's 942.6India

What they live on

How the district's workers earn a living, from Census 2011. The land-dependent share counts cultivators and agricultural labourers as a share of all workers, and it is the group most directly affected when land is acquired.

Total workers
4,99,822
Work participation rate
31.5%
8.3 points below IndiaIndia
Workers dependent on land
32.8%
21.7 points below IndiaIndia
Cultivators
18.0%
6.7 points below IndiaIndia
Agricultural labourers
14.9%
15.0 points below IndiaIndia
Marginal workers
17.8%
7.0 points below IndiaIndia
Household industry workers
3.2%
0.6 points below IndiaIndia

How households live

Land, income and work among rural households, from the Socio Economic and Caste Census 2011, which recorded these where the population census did not. Only the survey's rural part is used here, so urban households do not appear.

Rural households owning land
31.4%
14.7 points below IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households whose highest earner makes over ₹5,000 a month
48.2%
23.8 points above IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households living mainly on manual casual labour
45.0%
6.8 points below IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households with a salaried member
17.6%
9.4 points above IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

When these were filed

Each proposal is dated by the first step in its appraisal history, the dated record of steps the portal keeps for it.

2024-Q12026-Q4

The timeline counts 33 of the 49 proposals here. The first filing date comes from each proposal's appraisal history, and we have not yet read it for the other 16, so they are left out. Most of them are older proposals, so the early part of the timeline undercounts what was filed then. The register itself records a date for each of them; the gap is in our copy of the histories.

Hatched columns undercount, so they cannot be compared with solid ones. 2026-Q4 was still running when the register was read, so its column counts only the filings made up to that date.

What kind of projects these are

The proposals naming this district, grouped by the sector each was filed under.

  • Non-Coal Mining 65.3%
  • Industrial Projects - 3 18.4%
  • Industrial Projects - 1 8.2%
  • INFRA-2 6.1%
  • Other (1) 2%

The four largest sectors are shown by name and the rest are grouped as Other.

What is proposed here

These are the proposals in the national environmental clearance register whose application names a site in this district, newest first. A project with sites in several districts appears under each of them.

  1. Category B1Under Examination2026-10-15

    Extraction of sand, stone, and bajri, located at Khasra No. 145/5, measuring an area of 02-74-12 hectares (private land, riverbed) in Mohal Kuthera, Mauza Jandor, Tehsil Rakkar/Jaswan, District Kangra, Himachal Pradesh: Proposed by Smt. Ambika Singh, R/o L-9, South Extension Part-2, Andrewsganj, South Delhi

    ambika singh · Non-Coal Mining

  2. Category B2Referred to SEIAA2026-08-25

    Expansion of an existing unit namely, ‘Sonalika Industries’ by M/s International Cars & Motors Limited located in the revenue estate of Village Chak Gujran, Jalandhar Road, District Hoshiarpur, Punjab

    INTERNATIONAL CARS AND MOTORS LIMITED · INFRA-2

  3. Category B2Pending at MS SEIAA2026-07-31

    Extraction of sand, stone and bajri from Khasra No.4083/1460, measuring 02-75-53 Hectares (Govt Land, River Bed) falling in Mohal Singa Alias Surkalan, Tehsil Haroli, District Una, Himachal Pradesh, proposed by: Sh. Yogesh Aery S/o sh. Ashok Kumar, & Ashok Kumar S/o Sh. Hussan Lal, Partners M/s Jagdambay Stone Crusher & Screening Plant,

    jagdambey stone crusher & Screening plant · Non-Coal Mining

  4. Category B2EC Granted2026-06-03

    Proposed establishment of Resin Manufacturing Unit Within the Existing Ply-board manufacturing (including Veneer and laminate) Unit located at Village: Khakli, Bua Bai Road, PO: Baghpur, District: Hoshiarpur, State: Punjab, by Jai Mata Plywood

    JAI MATA PLYWOOD · Industrial Projects - 3

  5. Category B2EC Granted2026-05-23

    Minor Mineral (Gravel) Mining Project for obtaining Environmental Clearance of mine located near village Sandhwal, Tehsil Mukerian(Hajipur), District-Hoshiarpur, Punjab (CRMS Site 153) with Hadbast No. 356 and a lease area of 1.77 ha in favor of Mr. Romy Bajaj owner of Maeco Infra Stone Crushing Co.

    SANDEEP KUMAR · Non-Coal Mining

  6. Category B2EC Granted2026-05-19

    Minor Mineral (Gravel) Mining Project for obtaining Environmental Clearance of mine located near village Sandhwal, Tehsil Mukerian(Hajipur), District-Hoshiarpur, Punjab (CRMS Site 61) with Hadbast No. 354 and a lease area of 2.66 ha in favor of Mr. Jatinder Kumar (M/s Jai Shankar Stone Crusher)

    JATINDER KUMAR · Non-Coal Mining

  7. Category B2EC Granted2026-05-19

    Minor Mineral (Gravel) Mining Project for obtaining Environmental Clearance of mine located near village Naushera Simbli, Tehsil Mukerian(Hajipur), District-Hoshiarpur, Punjab (CRMS Site 38) with Hadbast No. 354 and a lease area of 1.15 ha in favor of M/s Baba Farid Stone Crusher

    BABA FARID STONE CRUSHER · Non-Coal Mining

  8. Category B2EC Granted2026-05-14

    International Tractors Limited Unit-II located at opp. ITL Plant, Village Chak Gujran, P.O. Piplanwala, Jalandhar Road, District Hoshiarpur, Punjab.

    INTERNATIONAL TRACTORS LIMITED · INFRA-2

  9. Category B2EC Granted2026-05-14

    Extraction of sand, stone and bajri from Khasra No.4083/1460, measuring 02-75-53 Hectares (Govt Land, River Bed) falling in Mohal Singa Alias Surkalan, Tehsil Haroli, District Una, Himachal Pradesh, proposed by: Sh. Yogesh Aery S/o sh. Ashok Kumar, & Ashok Kumar S/o Sh. Hussan Lal, Partners M/s Jagdambay Stone Crusher & Screening Plant,

    jagdambey stone crusher & Screening plant · Non-Coal Mining

  10. Category B1Proposal returned in present form2026-01-27

    Wudchem Industries

    WUDCHEM INDUSTRIES · Industrial Projects - 3

  11. Category B2EC Granted2026-01-27

    Extraction of sand, stone & bajri from Khasra No. 145/4, measuring an area 02-77-50 Hectares (Private Land, River Bed) falling in Mohal Kuthera, Mauza Jandor, Tehsil Rakkar/Jaswan, District Kangra, Himachal Pradesh, proposed by Smt. Ambika Singh

    ambika singh · Non-Coal Mining

  12. Category B2EC Granted2026-01-07

    Minor Mineral (Sand) Mining Project for obtaining Environmental Clearance, located near Village - Bathulla , District Hoshiarpur, Punjab with a lease area of 2.50 ha in favor of M/s GDP Infratech

    M/s Gdp infratech · Non-Coal Mining

  13. Category B2EC Granted2025-10-27

    Proposed project involves mining of Ordinary earth in Village- Chandpur, Tehsil & District Hoshiarpur, Punjab. area of 3.44 Ha, Khasra no. 13//21 (8-0), 13//22 (7-12), 21//5 (8-0), 21//6/1 (3-16), 22//1 (8-0), 22//2 (7-12), 22//9/1 (3-16), 22//10/1 (4-0), 22//9/2 (3-8), 22//10/2/1 (1-19), 22//11/2 (4-8), 22//12 (7-12)Hadbast No-190

    Manjit Singh janda · Non-Coal Mining

  14. Category B2EC Granted2025-10-24

    Proposed establishment of Resin Manufacturing Unit Within the Existing Plyboard Manufacturing plant by M/s Wintek Boards Private Limited

    wintek boards private limited · Industrial Projects - 3

  15. Category B2EC Granted2025-10-16

    Proposed establishment of Resin Manufacturing Unit Within the Existing Ply-board manufacturing (including Recon Veneer and laminate) at Plot No. 4-5-6-7, Industrial Wood Park, Village: Bassi Kaso, Kantian Road, Near Canal Bridge, District: Hoshiarpur, State: Punjab by Wudmaster Veneers India Pvt. Ltd

    WUDMASTER VENEERS INDIA PRIVATE LIMITED · Industrial Projects - 3

  16. Category B2EC Granted2025-09-16

    Dhirowal Ordinary Earth Mining project at Village Dhirowal,Tehsil & District Hoshiarpur,Punjab

    DHARMINDER SINGH · Non-Coal Mining

  17. Category AEC Granted2025-08-14

    Proposed 20% expansion in the agro pulp and hard wood pulp production along with associated facilities in the existing paper mill at Village: Saila Khurd, Tehsil: Garhshankar, District: Hoshiarpur, Punjab by Kuantum Papers Limited

    KUANTUM PAPERS LIMITED · Industrial Projects - 1

  18. Category B2EC Granted2025-08-06

    Proposed Veneer and Plywood manufacturing unit by M/s Century Plyboards (India) Limited in the revenue estate of Village Ghasipur, Tehsil & District Hoshiarpur, Punjab

    CENTURY PLYBOARDS (INDIA) LIMITED · INFRA-2

  19. Category B2EC Granted2025-04-04

    Mining of mineral Naushehra Simbli Gravel Mining Project, (Agriculture Site: SR 01), Area0.81 ha.

    MANDEEP SINGH · Non-Coal Mining

  20. Category B2EC Granted2025-04-04

    Mining of mineral Sandhwal Gravel Mining Project, (Agriculture Site: SR 02) Area2.63 ha.

    MANDEEP SINGH · Non-Coal Mining

  21. Category AStandard ToR Granted2024-12-09

    Proposed Formaldehyde and Resin Manufacturing Unit

    CENTURY PLYBOARDS (INDIA) LIMITED · Industrial Projects - 3

  22. Category B1EC Granted2024-12-06

    Extraction/Collection of Sand, Stone & Bajri by Smt. Rama Sharma, Prop:- M/s Sidhi Vinayak stone Crusher

    HARISH SHARMA · Non-Coal Mining

  23. Category B1EC Granted2024-07-31

    The proposed project involves mining of minor mineral i.e. RBM from agricultural land in village- Nangal Kalmot (Part-1), Tehsil- Nangal, District- Rupnagar, State Punjab from an area 68.79 Ha, with avg. production capacity 430507 TPA proposed by Executive Engineer/ Rupnagar, Drainage cum Mines and Geology, WRD, Punjab.

    Department of Irrigation · Non-Coal Mining

  24. Category AStandard ToR Granted2024-07-30

    Proposed Greenfield Formaldehyde (72000 MTPA) and Resin (82,8000 MTPA) Manufacturing Unit

    CENTURY PLYBOARDS (INDIA) LIMITED · Industrial Projects - 3

  25. Category B1EC Granted2024-07-11

    Proposed sand mining project (Boulder, gravel, sand) as per DSR NO. SEIAA/MS/2023/399 with production capacity of 38118 TPA over an area of 6.07 Ha from agricultural/patta land located at village- Saidpur, Tehsil- Garhshankar, District- Hoshiarpur, Punjab through XEN/DMO District Hoshiarpur, Government of Punjab.

    EXECUTIVE ENGINEER, HOSHIARPUR DRAINAGE DIVISION, HOSHIARPUR · Non-Coal Mining

  26. Category B2EC Granted2024-06-28

    Proposed Ordinary Earth Mining Project at Village Chandpur District Hoshiarpur

    Manjit singh janda · Non-Coal Mining

  27. Category B1EC Granted2024-05-12

    The proposed project involves mining of minor mineral i.e. sand from Ephemerals Streams (Nasrala Choe) (NS07,08) in village-Badial, District- Hoshiarpur, State Punjab with avg. production capacity 18265 tonnes per annum through Executive Engineer/Hoshiarpur, Drainage cum Mines and Geology WRD Punjab

    EXECUTIVE ENGINEER, HOSHIARPUR DRAINAGE DIVISION, HOSHIARPUR · Non-Coal Mining

  28. Category B1EC Granted2024-04-23

    "Proposed Hoshiarpur Cement Grinding Unit for Ordinary Portland Cement (OPC) / Portland Pozzolana Cement (PPC) / Portland Slag Cement (PSC) / Portland Composite Cement (PCC)/ Other cement to the tune of 2 x 3.0 MMTPA (6 MMTPA)” at Village- Raniala & Sadullapur Badhwan, Tehsil- Garhshankar, District- Hoshiarpur, State- Punjab by Ambuja Cements Limited.

    Ambuja Cement Limited · Industrial Projects - 1

  29. Category B1EC Granted2024-04-19

    Proposed sand mining project (Boulder, gravel, sand) as per DSR NO. SEIAA/MS/2023/399 with production capacity of 38118 TPA over an area of 6.07 Ha from agricultural/patta land located at village- Saidpur, Tehsil- Garhshankar, District- Hoshiarpur, Punjab through XEN/DMO District Hoshiarpur, Government of Punjab.

    EXECUTIVE ENGINEER, HOSHIARPUR DRAINAGE DIVISION, HOSHIARPUR · Non-Coal Mining

  30. Category AStandard ToR Granted2024-04-09

    Proposed Greenfield Formaldehyde (72000 MTPA) and Resin (82,8000 MTPA) Manufacturing Unit

    PURBANCHAL TIMBER INDUSTRIES · Industrial Projects - 3

  31. Category B1EC Granted2024-03-23

    The proposed project involves mining of minor mineral i.e. sand from Ephemerals Streams (Nasrala Choe) (NS07,08) in village-Badial, District- Hoshiarpur, State Punjab with avg. production capacity 18265 tonnes per annum through Executive Engineer/Hoshiarpur, Drainage cum Mines and Geology WRD Punjab

    EXECUTIVE ENGINEER, HOSHIARPUR DRAINAGE DIVISION, HOSHIARPUR · Non-Coal Mining

  32. Category B1EC Granted2024-03-23

    Proposed sand mining project (Boulder, gravel, sand) as per DSR NO. SEIAA/MS/2023/399 with production capacity of 164428 TPA over an area of 28.0 Ha from Ephemerals Streams (Choe) (NS01) located at village- Bassi Gulam Husssain and Sherpur Batia, Tehsil- Hoshiarpur, District- Hoshiarpur, Punjab through XEN/DMO District Hoshiarpur, Government of Punjab.

    EXECUTIVE ENGINEER, HOSHIARPUR DRAINAGE DIVISION, HOSHIARPUR · Non-Coal Mining

  33. Category B1EC Granted2024-03-16

    The proposed project involves mining of minor mineral i.e. RBM from agricultural land in village- Nangal Kalmot (Part-1), Tehsil- Nangal, District- Rupnagar, State Punjab from an area 68.79 Ha, with avg. production capacity 430507 TPA proposed by Executive Engineer/ Rupnagar, Drainage cum Mines and Geology, WRD, Punjab.

    Department of Irrigation · Non-Coal Mining

  34. Category B1TOR GRANTED2023-09-05

    Proposed sand mining project (Boulder, gravel, sand) as per DSR NO. SEIAA/MS/2023/399 with production capacity of 164428 TPA over an area of 28.0 Ha from Ephemerals Streams (Choe) (NS01) located at village- Bassi Gulam Husssain and Sherpur Batia, Tehsil- Hoshiarpur, District- Hoshiarpur, Punjab through XEN/DMO District Hoshiarpur, Government of Punjab.

    EXECUTIVE ENGINEER, HOSHIARPUR DRAINAGE DIVISION, HOSHIARPUR · Non-Coal Mining

  35. Category B1TOR GRANTED2023-08-22

    The proposed project involves mining of minor mineral i.e. sand from Ephemerals Streams (Nasrala Choe) (NS07,08) in village-Badial, District- Hoshiarpur, State Punjab with avg. production capacity 18265 tonnes per annum through Executive Engineer/Hoshiarpur, Drainage cum Mines and Geology WRD Punjab

    EXECUTIVE ENGINEER, HOSHIARPUR DRAINAGE DIVISION, HOSHIARPUR · Non-Coal Mining

  36. Category B1TOR GRANTED2023-08-10

    Extraction/Collection of Sand, Stone & Bajri by Smt. Rama Sharma, Prop:- M/s Sidhi Vinayak stone Crusher

    HARISH SHARMA · Non-Coal Mining

  37. Category B1TOR GRANTED2023-07-27

    The proposed project involves mining of minor mineral i.e. sand from Ephemerals Strems (Mengarwal Choe) (MG03) in village- Chak Gujran, District- Hoshiarpur, State Punjab from an auctioned area of 11.51, with avg. production capacity 58241.5 (60873 peak production) proposed by Hoshiarpur, Drainage cum Mines and Geology, WRD, Punjab.

    EXECUTIVE ENGINEER, HOSHIARPUR DRAINAGE DIVISION, HOSHIARPUR · Non-Coal Mining

  38. Category B1TOR GRANTED2023-07-24

    The proposed project involves mining of minor mineral i.e. RBM from agricultural land in village- Nangal Kalmot (Part-1), Tehsil- Nangal, District- Rupnagar, State Punjab from an area 68.79 Ha, with avg. production capacity 430507 TPA proposed by Executive Engineer/ Rupnagar, Drainage cum Mines and Geology, WRD, Punjab.

    Department of Irrigation · Non-Coal Mining

  39. Category B2EC Granted2023-07-14

    Dagana Kalan Sand Mine (Choe Bed, Lease Code: NS 05)

    EXECUTIVE ENGINEER, HOSHIARPUR DRAINAGE DIVISION, HOSHIARPUR · Non-Coal Mining

  40. Category B1TOR GRANTED2023-07-12

    Proposed sand mining project (Boulder, gravel, sand) as per DSR NO. SEIAA/MS/2023/399 with production capacity of 38118 TPA over an area of 6.07 Ha from agricultural/patta land located at village- Saidpur, Tehsil- Garhshankar, District- Hoshiarpur, Punjab through XEN/DMO District Hoshiarpur, Government of Punjab.

    EXECUTIVE ENGINEER, HOSHIARPUR DRAINAGE DIVISION, HOSHIARPUR · Non-Coal Mining

  41. Category B1TOR GRANTED2023-06-29

    "Proposed Hoshiarpur Cement Grinding Unit for Ordinary Portland Cement (OPC) / Portland Pozzolana Cement (PPC) / Portland Slag Cement (PSC) / Portland Composite Cement (PCC)/ Other cement to the tune of 2 x 3.0 MMTPA (6 MMTPA)” at Village- Raniala & Sadullapur Badhwan, Tehsil- Garhshankar, District- Hoshiarpur, State- Punjab by Ambuja Cements Limited.

    Ambuja Cement Limited · Industrial Projects - 1

  42. Category AINTIMATED2023-05-23

    Proposed change in product mix for manufacturing of Pulp and Paper Industry by M/s. Kauntam Papers Limited

    KUANTUM PAPERS LIMITED · Industrial Projects - 1

  43. Category B2EC Granted2023-05-13

    Mehlanwali Sand Mine (Choe Bed-Lease code: ML 01)

    EXECUTIVE ENGINEER, HOSHIARPUR DRAINAGE DIVISION, HOSHIARPUR · Non-Coal Mining

  44. Category B2EC Granted2023-05-13

    Naushehra Simbli Gravel Mine, (Agriculture Site: SR 01)

    EXECUTIVE ENGINEER, HOSHIARPUR DRAINAGE DIVISION, HOSHIARPUR · Non-Coal Mining

  45. Category B2EC Granted2023-05-13

    Ghukarewal Sand Mine, (Choe Bed-Lease Code: RD 01)

    EXECUTIVE ENGINEER, HOSHIARPUR DRAINAGE DIVISION, HOSHIARPUR · Non-Coal Mining

  46. Category B2EC Granted2023-04-21

    Sandhwal Gravel Mine, (Agriculture Site: SR 02)

    EXECUTIVE ENGINEER, HOSHIARPUR DRAINAGE DIVISION, HOSHIARPUR · Non-Coal Mining

  47. Category B1EC Granted2023-03-07

    New Chemical Manufacturing unit M/s Ativeer Polychem at Plot no.- 12,13,14,15,16,18,19,20,21,22,23, Industrial Focal Point (Mini Growth Centre), Tanda, District- Hoshiarpur, Punjab

    ATIVEER POLYCHEM · Industrial Projects - 3

  48. Category B1TOR GRANTED2023-02-01

    Wudchem Industries

    WUDCHEM INDUSTRIES · Industrial Projects - 3

  49. Category B2EC Granted2022-10-03

    Greenfield project of 120 KLPD Grain Based Ethanol Plant along with 2.5 MW Co-generation Power Plant at Village- Jahan Kela and Bassi Mustafa, Tehsil- Hoshiyarpur, District-Hoshiyarpur, Punjab by M/s Sutlej Organics and Chemicals Private Limited

    SUTLEJ ORGANICS & CHEMICALS PRIVATE LIMITED · Industrial Projects - 2

All 49 proposals that name this district, newest first.