  1. 27 Oct 2026 · Details soughtAdditional details soughtGreenfield Steel Project-Nawapara Unit-I/O Pellets(1.2MTPA)+PGP(30000NM3/Hr),Sponge…
  2. 27 Oct 2026 · Details soughtAdditional details soughtProposed Expansion of existing steel plant by increasing of existing Sponge Iron Plant capacity from…
  3. 27 Oct 2026 · Details soughtEssential details soughtKanchanpur Ordinary Sand Quarry, Area- 2.00 Ha.,Village – Kanchanpur, Project Proponent - Shri Jayawant Tirkey
  4. 27 Oct 2026 · FiledSubmittedProposed 3x 800 MW (2400 MW) Coal based Ultra-Supercritical Thermal Power Plant coming up at Village…
  5. 26 Oct 2026 · FiledSubmittedM/s Mahavir Coal Washery Private Limited, Village & Post - Chandrasekharpur, Tehsil - Dharamjaigarh,…
  6. 26 Oct 2026 · FiledSubmittedProposed 2x800 MW Ultra Super Critical Coal Fired Thermal Power Project By M/s Torrent Power Limited at…
  7. 23 Oct 2026 · Details soughtAdditional details soughtExpansion of existing integrated steel plant from 3.6 MTPA to 12.6 MTPA Crude steel at Raigarh, Chhattisgarh
  8. 21 Oct 2026 · Details soughtAdditional details soughtM/s Vinayak Minerals , Karta - Anand Kumar Agrawal HUF
  9. 20 Oct 2026 · ClosedPulled back by the applicantCHHAL OPENCAST COAL MINE PROJECT
  10. 20 Oct 2026 · FiledSubmittedCHHAL OPENCAST COAL MINE PROJECT
  11. 16 Oct 2026 · Details soughtAdditional details soughtProposed Expansion of existing steel plant by increasing of existing Sponge Iron Plant capacity from…
  12. 16 Oct 2026 · Details soughtAdditional details soughtSplitting of EC facilities issued to M/s. Shree Rupanadham Steel Pvt. Ltd. between M/s. Shree Rupanadham…

Dated by the portal's own appraisal history, converted to India Standard Time; a proposal with no recorded history appears on its register submission date.

Other clearances these proposals declare

Forest land diversion declared
21
Forest land sought for diversion
1,226 ha
Wildlife board recommendation declared
1
In or near a protected area
0
In an eco-sensitive zone
1

These counts are taken from the application forms of the 252 of 252 proposals naming this district whose forms have been read for these questions. In 147 of those forms at least one question was left blank, and a blank answer is counted as unknown. The forest area is the area stated for forest clearance, with each forest proposal counted once, in the district where its project is primarily sited.

Proposals naming this district
252
Category A proposals
117
Families declared displaced
30,275
Families declared affected
49,917

Displacement figures are the proponents’ own declarations. A project sited across several districts declares one figure for the whole project, and that figure is counted once, in the district where the project is primarily sited. 2 of the proposals listed below declare displacement and are sited primarily in another district, so their figures are counted in that district’s total.

Fifth Schedule status

Partly within a Fifth Schedule Scheduled Area

The Order fixes the area by reference to territorial divisions as existing at 20 February 2003. It names only part of this district, so district-level status cannot settle whether a particular site is inside it.

OrderThe Scheduled Areas (States of Chhattisgarh, Jharkhand and Madhya Pradesh) Order, 2003 · C.O. 192, notified 2003-02-20

What the record shows

  • The Scheduled Tribe share here, 33.8%, is at least double the national figure of 8.55%.

  • Cultivators and agricultural labourers make up 77% of workers here, against 55% nationally, so at least three in four people who work here do so on the land.

  • Agricultural labourers, who work other people's land for wages, make up 47% of workers here. Compensation for acquired land is paid to those who hold title to it, so it does not reach them. They can still claim the rehabilitation and resettlement entitlements of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (RFCTLARR), because its section 3(c) counts a family whose livelihood depends on the land as an affected family, wherever that Act governs how the land is obtained.

  • Part of this district is a Fifth Schedule Scheduled Area. Acquiring land for a project sited in that part needs the Gram Sabha's prior consent under section 41(3) of RFCTLARR, and the district-level record cannot settle whether a particular site lies there.

  • Applicants for projects sited mainly in this district have declared 30,275 families to be displaced. The figure comes from their applications, and we have not verified it.

Each of these observations appears when a fixed rule is met by the figures on this page, so the same figures always give the same sentences. None of them is a view on whether a project should go ahead.

Who lives there

Figures from Census 2011, each compared with the all-India value computed on the same definition.

Total population
14,93,984
Households
3,67,962
Average household size
4.06
0.79 below India's 4.85India
Scheduled Tribe share of population
33.8%
25.3 points above IndiaIndia
Scheduled Caste share of population
15.1%
1.6 points below IndiaIndia
Children aged 0-6
13.1%
0.5 points below IndiaIndia
Literacy rate
73.3%
0.3 points above IndiaIndia
Sex ratio
991
48.6 above India's 942.6India

What they live on

How the district's workers earn a living, from Census 2011. The land-dependent share counts cultivators and agricultural labourers as a share of all workers, and it is the group most directly affected when land is acquired.

Total workers
6,90,167
Work participation rate
46.2%
6.4 points above IndiaIndia
Workers dependent on land
77.1%
22.5 points above IndiaIndia
Cultivators
30.2%
5.6 points above IndiaIndia
Agricultural labourers
46.9%
17.0 points above IndiaIndia
Marginal workers
29.8%
5.0 points above IndiaIndia
Household industry workers
1.4%
2.4 points below IndiaIndia

How households live

Land, income and work among rural households, from the Socio Economic and Caste Census 2011, which recorded these where the population census did not. Only the survey's rural part is used here, so urban households do not appear.

Rural households owning land
45.2%
0.9 points below IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households whose highest earner makes over ₹5,000 a month
9.5%
14.9 points below IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households living mainly on manual casual labour
55.4%
3.6 points above IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households with a salaried member
6.5%
1.8 points below IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

When these were filed

Each proposal is dated by the first step in its appraisal history, the dated record of steps the portal keeps for it.

2023-Q12026-Q4

The timeline counts 227 of the 252 proposals here. The first filing date comes from each proposal's appraisal history, and we have not yet read it for the other 25, so they are left out. Most of them are older proposals, so the early part of the timeline undercounts what was filed then. The register itself records a date for each of them; the gap is in our copy of the histories.

Hatched columns undercount, so they cannot be compared with solid ones. 4 of them cover periods for which we have read few filing dates so far, and they count only the proposals whose date we have. 2026-Q4 was still running when the register was read, so its column counts only the filings made up to that date.

What kind of projects these are

The proposals naming this district, grouped by the sector each was filed under.

  • Non-Coal Mining 41.3%
  • Industrial Projects - 1 30.6%
  • Coal Mining 17.1%
  • Thermal Projects 7.9%
  • Other (3) 3.2%

The four largest sectors are shown by name and the rest are grouped as Other.

What is proposed here

These are the proposals in the national environmental clearance register whose application names a site in this district, newest first. A project with sites in several districts appears under each of them.

  1. Category B2Under Verification2026-10-27

    Kanchanpur Ordinary Sand Quarry, Area- 2.00 Ha.,Village – Kanchanpur, Project Proponent - Shri Jayawant Tirkey

    JAYAWANT TIRKEY · Non-Coal Mining

  2. Category AUnder Examination2026-10-27

    Proposed 3x 800 MW (2400 MW) Coal based Ultra-Supercritical Thermal Power Plant coming up at Village Dolesara, Tehsil Tamnar, District Raigarh, Chhattisgarh promoted by M/s Jindal Power Limited (JPL)

    JINDAL POWER LIMITED · Thermal Projects

  3. Category AUnder Examination2026-10-26

    Proposed 2x800 MW Ultra Super Critical Coal Fired Thermal Power Project By M/s Torrent Power Limited at Deori & Dumarpali village in Raigarh District of Chhattisgarh

    TORRENT POWER LIMITED · Thermal Projects

  4. Category B1Under Verification2026-10-26

    M/s Mahavir Coal Washery Private Limited, Village & Post - Chandrasekharpur, Tehsil - Dharamjaigarh, District - Raigarh, Chhattisgarh.

    SANDEEP VERMA · Coal Mining

  5. Category AProposal pulled back (withdrawn)2026-10-20declares affected families

    CHHAL OPENCAST COAL MINE PROJECT

    South Eastern Coalfields Limited · Coal Mining

  6. Category AProposal Accepted and Referred to EAC2026-10-16declares affected families

    Baroud Opencast Expansion Coal Mine

    South Eastern Coalfields Limited · Coal Mining

  7. Category AForwarded to MS SPCB/PCC by MS2026-10-15declares affected families

    Gare Palma Sector-I Coal Mine in Mand Raigarh Coalfield (Block Area: 3020.00 ha) with combined Coal Production Capacity: 15.00 Million TPA by Opencast and Underground Mining method at Tehsil: Tamnar, District: Raigarh, Chhattisgarh by M/s. Jindal Power Limited (JPL).

    JINDAL POWER LIMITED · Coal Mining

  8. Category AADS Raised2026-10-13

    Greenfield Steel Project-Nawapara Unit-I/O Pellets(1.2MTPA)+PGP(30000NM3/Hr),Sponge Iron(858000TPA),Billets(IF)(792000TPA),Billets(EAF)(330000TPA),Rolled Prod (RM)(792000TPA)+PGP(40000 NM3/Hr),Coal Washery(2.25MTPA),SEAF(FeSi-85000TPA/FeMn-240000TPA/SiMn-160000TPA/FeCr-180000TPA/Pig Iron-280000TPA),Briquettes(1000Kg/hr),Jigging(10000TPA),Sinter(132000TPA),AOD 198000TPA(MC FeMn/LC FeMn/MC FeCr/LC FeCr),Argon(19.8Mm3),Oxygen(99Mm3),Nitrogen(297Mm3),Slag Crusher(50TPH),WHRB(100 MW)&CFBC(100MW)

    B.S.SPONGE PRIVATE LTD · Industrial Projects - 1

  9. Category AProposal Accepted and Referred to EAC2026-10-13declares affected families

    Proposed installation of 1 × 800 MW Supercritical (SC) Thermal Power Unit at village Badadarha, District Sakti, Chhattisgarh by DB Power Infra Limited.

    DB Power INfra limited · Thermal Projects

  10. Category B2Under Verification2026-10-13

    Proposal for corrigendum in DSR Stone Bargarh (Rectification of wrongly mentioned khata no. and Plot no. in Approved DSR Stone Bargarh)

    Deputy Director of Mines · Non-Coal Mining

  11. Category B2EDS raised2026-10-10

    M/S Shri Balaji Crusher Udyog Prop Smt. Renu Agrawal (Area 0.994 Ha)

    RENU KEJARIWAL · Non-Coal Mining

  12. Category AProposal Accepted and Referred to EAC2026-10-05

    Request for issue of Amendments to the Environmental Clearance (EC) issued to M/s. Salasar Steel and Power Limited. for Expansion of steel plant at Gerwani Village , Raigarh Tehsil, & District, Chhattisgarh

    SALASAR STEEL AND POWER LIMITED · Industrial Projects - 1

  13. Category B1Proposal Accepted and Referred to SEAC2026-10-05declares affected families

    Gare Palma IV/6 coal mine (4 MTPA) and coal washery (4 MTPA) in an ML area of 381.42 ha located at Raigarh, Chhattisgarh

    Jindal Steel Limited · Coal Mining

  14. Category AEDS Raised2026-10-04declares affected families

    Banai & Bhalumunda Opencast Coal Mine project of M/s Jindal Power Limited located at Villages Auraimuda, Banai, Barkaspali, Bhalumuda, Chirramuda, Charbhantha, Chitwahi, Dholnara, Dolesara, Kasaiya, Kerakhol, Kognara, Kolam, Muskura, Noondarha & Rodopali, Tehsil Tamnar & Gharghoda, District Raigarh, State Chhattisgarh

    JINDAL POWER LIMITED · Coal Mining

  15. Category B1Proposal Accepted and Referred to SEAC2026-10-03declares affected families

    DURGAPUR OPENCAST PROJECT

    South Eastern Coalfields Limited · Coal Mining

  16. Category AUnder Processing with Authority2026-09-30

    Splitting of EC facilities issued to M/s. Shree Rupanadham Steel Pvt. Ltd. between M/s. Shree Rupanadham Steel Pvt. Ltd. & M/s. Shree Banke Bihari Ispat Pvt. Ltd. at Saraipali Village, Tamnar Tehsil, Raigarh District, Chhattisgarh

    SHREE RUPANADHAM STEEL PVT LTD · Industrial Projects - 1

  17. Category AProposal Accepted and Referred to EAC2026-09-28declares affected families

    Expansion of Lara Super Thermal Power Project from 3200 MW [Stage-I (2x800 MW) & Stage-II (2x800 MW)] to 4800 MW by adding two units of 800 MW under Lara Super Thermal Power Project, Stage-III (2x800 MW) at Villages Armuda, Chhapora, Bodajhariya, Mahloi, Riyapalli, Kandagarh. Devalpura, Ghutkupali, Thengapali, Lara in Tehsil Pussore, District Raigarh and Village Saradih in Tehsil Dabhara, District Sakti, Chhattisgarh.

    NTPC LIMITED · Thermal Projects

  18. Category B1Proposal Accepted and Referred to SEAC2026-09-25declares affected families

    Proposed Laladhurwa-Jognipali Limestone Block (Lease Area 200.902 ha) with Limestone production capacity 3654413.97 TPA, OB/Waste 554058.50 TPA; (Total Handling: 4208472.47 TPA, excluding top soil 116224.80 m3 per annum); along with installation of 700 TPH Crusher at Village- Laladhurwa,Jognipali,Kapisda,Sarsara & Dhaura Bhatha, Tehsil- Sarangarh, District- Sarangarh-Bilaigarh (Earlier Raigarh), State- Chhattisgarh, by Green Sustainable Manufacturing Pvt. Ltd

    GREEN SUSTAINABLE MANUFACTURING PRIVATE LIMITED · Non-Coal Mining

  19. Category AProposal Accepted and Referred to EAC2026-09-24declares affected families

    Pelma Open Cast Project (15.0 MTY)

    South Eastern Coalfields Limited · Coal Mining

  20. Category AADS Raised2026-09-23

    Proposed Expansion of existing steel plant by increasing of existing Sponge Iron Plant capacity from 90,000 TPA to 1,56,000 TPA, Coal washery capacity from 0.3 MTPA to 1.8 MTPA, Steel Making capacity from 79,200 TPA to 2,64,000 TPA, Rolling Mill Capacity from 1,35,000 TPA to 3,85,000 TPA, Captive Power Generation capacity from 11 MW (WHRB - 6 MW + AFBC - 5 MW) to 65 MW (WHRB - 10 MW + CFBC/AFBC - 55 MW) and by installation of 2X9 MVA Ferro- Alloys Plant

    NAV DURGA FUEL PRIVATE LIMITED · Industrial Projects - 1

  21. Category AProposal Accepted and Referred to EAC2026-09-13

    Expansion of pellet plant capacity from EC approved Capacity of 12,50,000 TPA to 17,50,000 TPA @ 20% in 2 Phases under Para 7 (ii) of EIA Notification, 2006 as per OM F. No. IA3-22/10/2022-IA.III [E 177258] dtd. 11th April, 2022

    MSP STEEL AND POWER LIMITED · Industrial Projects - 1

  22. Category AProposal Accepted and Referred to EAC2026-09-01declares affected families

    Expansion by up to 20% of the Existing Capacity of the Talaipalli Coal Mining Project with a rated capacity of 25 MTPA, due to modifications in the Mining Plan with respect to OB Generation, Dumping, Rehandling, etc. within a lease area of 2119.4 Ha located in the villages of Talaipalli, Bichhinara, Nayarampur, Kudhurmoha, Raikera, Chotiguda, Ajijgarh and Salehpali, Tehsil- Gharghoda, District Raigarh, Chhattisgarh by NTPC Mining Limited.

    NTPC MINING LIMITED · Coal Mining

  23. Category AEC Granted2026-08-31

    Expansion of existing Power Plant Phase I 1x600MW, Operational and Phase II 2x800MW Ultra Super Critical under construction by adding Phase III 2x800MW, Ultra Super Critical TPP at Villages Chhote & Bade Bhandar, Barpali, Kotma and Sarwani, Tehsil Pussore, District Raigarh, Chhattisgarh by Adani Power Limited, Raigarh

    Adani Power Limited · Thermal Projects

  24. Category B1Referred to SEIAA2026-08-25

    Shubh Minerals Private Limited, Director Pratish Kumar Goyal

    SHUBH MINERALS PRIVATE LIMITED · Non-Coal Mining

  25. Category B1Referred to SEAC2026-08-25

    Balaji Mines & Minerals Partner - Ankur Kumar Agrawal

    balaji mines & minerals · Non-Coal Mining

  26. Category AUnder Processing with Authority2026-08-20declares affected families

    Expansion of existing integrated steel plant from 3.6 MTPA to 12.6 MTPA Crude steel at Raigarh, Chhattisgarh

    Jindal Steel Limited · Industrial Projects - 1

  27. Category AForwarded to MS SPCB/PCC by MS2026-08-19

    Expansion of Existing Thermal Power Plant from 600 MW (2x300 MW) to 1200 MW (4x300 MW) by installation of remaining 2x300 MW Sub Critical Thermal Power Units [EC dtd 05.10.2010] as per MoEFCC Notification dated 18.03.2021 at Village Binjkot & Darramuda, Tehsil- Kharsia, District- Raigarh, Chhattisgarh by M/s Sarda Energy & Minerals Limited

    SARDA ENERGY & MINERALS LIMITED · Thermal Projects

  28. Category B2ADS Raised2026-08-05

    Amendment in Environmental Clearance for 100 KLPD Grain Based Ethanol Plant along with 3 MW Co-generation Power Plant By M/s Nav Durga Fuel Pvt. Ltd.

    NAV DURGA FUEL PRIVATE LIMITED · Industrial Projects - 2

  29. Category B1ADS Raised2026-07-29

    M/s Vinayak Minerals , Karta - Anand Kumar Agrawal HUF

    ANAND KUMAR AGRAWAL HUF · Non-Coal Mining

  30. Category B1ADS Raised2026-07-29

    Shri Mangal Metal Partner- Pratish Kumar Goyal

    SHRI MANGAL MATELS · Non-Coal Mining

  31. Category AProposal returned in present form2026-07-22

    Proposed Expansion of existing steel plant by increasing of existing Sponge Iron Plant capacity from 90,000 TPA to 1,56,000 TPA, Coal washery capacity from 0.3 MTPA to 2.5 MTPA, Steel Making capacity from 79,200 TPA to 2,64,000 TPA, Rolling Mill Capacity from 1,35,000 TPA to 3,85,000 TPA, Captive Power Generation capacity from 11 MW (WHRB - 6 MW + AFBC - 5 MW) to 51 MW (WHRB - 10 MW + AFBC - 41 MW) and by installation of 2X9 MVA Ferro-Alloys Plant.

    NAV DURGA FUEL PRIVATE LIMITED · Industrial Projects - 1

  32. Category AStandard ToR Granted2026-07-20

    Greenfield Steel plant along with Railway siding for transportation of material located at Village-Kushwabahari, Tehsil- Raigarh, District- Raigarh-496005, Chhattisgarh by M/s Shubh Metallics Private Limited

    SHUBH METALICS PRIVATE LIMITED · Industrial Projects - 1

  33. Category B1ADS Raised2026-07-15

    M/S Harsh Minerals(Proprietor: Shri Sushil Mittal) , Area - 4.992 Hec.

    SUSHIL MITTAL · Non-Coal Mining

  34. Category B1Referred to SEIAA2026-07-10

    M/s Chiraipani Quartzite Quarry

    Rhi magnesita india refractories limited · Non-Coal Mining

  35. Category AProposal returned in present form2026-07-09

    Proposed 3x 800 MW (2400 MW) Coal based Ultra-Supercritical Thermal Power Plant coming up at Village Dolesara, Tehsil Tamnar, District Raigarh, Chhattisgarh promoted by M/s Jindal Power Limited (JPL)

    JINDAL POWER LIMITED · Thermal Projects

  36. Category AToR Granted2026-06-22

    Proposed 2x800 MW Ultra Super Critical Coal Fired Thermal Power Project By M/s Torrent Power Limited at Deori & Dumarpali village in Raigarh District of Chhattisgarh

    TORRENT POWER LIMITED · Thermal Projects

  37. Category B1ToR Granted2026-06-10

    Proposed setting up of Coal Tar Distillation plant to manufacture 18,000 TPA Coal tar Pitch and its by - products at Vill. - Sambalpuri, Tehsil - Raigarh, Dist. - Raigarh, Chhattisgarh, India.

    CHOUDHARY HYDRO CARBON PRIVATE LIMITED · Industrial Projects - 2

  38. Category AUnder Processing with Authority2026-06-04

    Transfer of Environmental Clearance granted for Integrated Steel plant (3.6 MTPA) and Captive Power Plant at Raigarh, Chhattisgarh

    Jindal Steel Limited · Industrial Projects - 1

  39. Category AEC Granted2026-05-26

    1x600 MW Super Critical and 2x800 MW Ultra-Super Critical Thermal Power Plant by M/s. Adani Power Limited, Raigarh located at Villages Chhote Bhandar, Bade Bhandar, Sarvani & Amli Bhanuna, Tehsil Pussore, District Raigarh, Chhattisgarh. Reg. - Request for Amendment in Specific Condition No. xxvi of Environmental Clearance (EC)

    Adani Power Limited · Thermal Projects

  40. Category B2EC Granted2026-05-24

    Rakesh Ratre

    RAKESH RATRE · Non-Coal Mining

  41. Category B1Referred to SEIAA2026-05-23declares affected families

    PORDA CHIMTAPANI OPENCAST COAL MINE PROJECT

    South Eastern Coalfields Limited · Coal Mining

  42. Category AProposal pulled back (withdrawn)2026-05-16

    PROPOSED 4x660 (2640) MW COAL BASED SUPER CRITICAL THERMAL POWER PLANT AT VILLAGE DOLESARA, TEHSIL TAMNAR, DISTRICT RAIGARH, CHHATTISGARH BY JINDAL POWER LIMITED (JPL)

    JINDAL POWER LIMITED · Thermal Projects

  43. Category AGranted2026-05-08

    Integrated Cement Plant: Clinker – 2.5 MTPA, Cement: 2.5 MTPA, WHRS: 12 MW and DG set: 500 KVA at Villages: Kosampali, Barmuda, Dhanagar and Saraipali, Tehsil & District: Raigarh, Chhattisgarh

    JINDAL CEMENT INDUSTRIES PRIVATE LIMITED · Industrial Projects - 1

  44. Category AToR Granted2026-05-06

    Greenfield Steel Project-Nawapara Unit-I/O Pellets(1.2MTPA)+PGP(30000NM3/Hr),Sponge Iron(858000TPA),Billets(IF)(792000TPA),Billets(EAF)(330000TPA),Rolled Prod (RM)(792000TPA)+PGP(40000 NM3/Hr),Coal Washery(2.25MTPA),SEAF(FeSi-85000TPA/FeMn-240000TPA/SiMn-160000TPA/FeCr-180000TPA/Pig Iron-280000TPA),Briquettes(1000Kg/hr),Jigging(10000TPA),Sinter(132000TPA),AOD 198000TPA(MC FeMn/LC FeMn/MC FeCr/LC FeCr),Argon(19.8Mm3),Oxygen(99Mm3),Nitrogen(297Mm3),Slag Crusher(50TPH),WHRB(100 MW)&CFBC(100MW)

    B.S.SPONGE PRIVATE LTD · Industrial Projects - 1

  45. Category B2EC Granted2026-05-05

    Vishal Singh Kshatri

    vishal singh kshatri · Non-Coal Mining

  46. Category B2EC Granted2026-05-05

    Durgesh Singh

    durgesh singh · Non-Coal Mining

  47. Category B2EC Granted2026-04-25

    Deepak Tripathi

    DEEPAK TRIPATHI · Non-Coal Mining

  48. Category AToR Granted2026-04-25

    Establishment of Submerged Electric Arc Furnaces -2x 9 MVA (Fesi-14,000TPA / FeMn-40,000 TPA / SiMn-28,000TPA / FeCr-30,000 TPA / PigIron-48,000TPA.) &Briquetting Plant - 200Kg/Hr.

    SIMN FERRO PRIVATE LIMITED · Industrial Projects - 1

  49. Category B1Forwarded to MS SPCB/PCC by MS2026-04-22

    Dumarpali Sand Mine on Mand River

    KRISHNA KUMAR PATEL · Non-Coal Mining

  50. Category B2EC Granted2026-04-18

    Anjay Joshi

    ANJAY JOSHI · Non-Coal Mining

  51. Category B2EC Granted2026-04-17

    Santosh Kumar Dewangan

    SANTOSH KUMAR DEWANGAN · Non-Coal Mining

  52. Category AUnder Processing with Authority2026-04-09

    Gare Palma IV/2 & IV/3 Opencast and Underground Coal mining project of a combined production of 6.25 MTPA in an ML area of 964.65ha and Coal washery of 4.75 MTPA (800 TPH) at Tamnar Tehsil, Raigarh District, Chhattisgarh

    JINDAL POWER LIMITED · Coal Mining

  53. Category AStandard ToR Granted2026-04-08declares affected families

    CHHAL OPENCAST COAL MINE PROJECT

    South Eastern Coalfields Limited · Coal Mining

  54. Category B1EC Granted2026-03-23

    Transfer of Environmental Clearance granted for Cement Plant at Raigarh, Chhattisgarh

    Jindal Steel Limited · Industrial Projects - 1

  55. Category B2EC Granted2026-03-16

    Hemant Jatwar

    HEMANT JATWAR · Non-Coal Mining

  56. Category B2EC Granted2026-03-16

    Ramanand Jatwar

    RAMANAND JATWAR · Non-Coal Mining

  57. Category B2EC Granted2026-03-16

    Shraddha Pandey

    SHRADDHA PANDEY · Non-Coal Mining

  58. Category B2EC Granted2026-03-13

    Deepesh Agrawal

    DEEPESH AGRAWAL · Non-Coal Mining

  59. Category B2EC Granted2026-03-12

    Ravi Kant Dubey

    RAVI KANT DUBEY · Non-Coal Mining

  60. Category B2EC Granted2026-03-12

    Siddharth Pandey

    SIDDHARTH PANDEY · Non-Coal Mining

  61. Category B1Forwarded to MS SPCB/PCC by MS2026-03-10

    Pankaj Pandey

    PANKAJ PANDEY · Non-Coal Mining

  62. Category B1Forwarded to MS SPCB/PCC by MS2026-03-10

    Anand Tiwari

    ANAND TIWARI · Non-Coal Mining

  63. Category B1ADS Raised2026-02-03

    M/s. Vimla Infrastructure (I) Private Limited

    VIMLA INFRASTRUCTURE (INDIA) PVT. LTD. · Industrial Projects - 1

  64. Category AProposal returned in present form2026-02-03

    Greenfield Steel plant of 2x350TPD&2x200TPD DRI Kilns to produce Sponge-Fe 385000TPA IF-3x20Ton&3x15Ton LRF-20Ton with CCM for Hot/M.S Billets 360150TPA RM for Rolled products (TMT bars/Angles/Channels) 349344TPA by hot charging&RHF 10TPH Ferro Alloy plant-2No SAF-9MVA for 36000TPA Si-Mn/19000TPA Fe-Si/45000TPA Fe-Mn/72000TPA Pig-Iron Ductile Fe Pipe 70000TPA&Coal Washery2.52MTPA Power with WHRB 36MW&AFBC 14MW& Fly Ash Brick Plant of 32500 Bricks/Day with Railway siding for transportation

    SHUBH METALICS PRIVATE LIMITED · Industrial Projects - 1

  65. Category AToR Granted2026-01-29declares affected families

    Baroud Opencast Expansion Coal Mine

    South Eastern Coalfields Limited · Coal Mining

  66. Category AEC Granted2026-01-21

    Proposed expansion by Installation of Production Facilities for: Sponge Iron (From 29700 TPA to 211200 TPA) With Addition of New Facilities Induction Furnace with CCM 165000 TPA (Hot Charging); Rolling Mill (Automated) 160000 TPA; Ferro Alloys 9 MVA × 2 Nos. (SiMn – 30000 TPA, FeMn- 30000 TPA & FeSi– 14500 TPA); and Captive Power 30 MW (From 0.5 MW to 18 MW Through WHRB and 12 MW through AFBC) by M/s. Sunil Sponge Private Limited located at Village: Saraipali, RNM Tamnar, District: Raigarh, CG.

    SUNIL SPONGE PRIVATE LIMITED · Industrial Projects - 1

  67. Category AEC Granted2026-01-20

    Expansion of the existing integrated steel plant

    SCANIA STEELS & POWERS LIMITED · Industrial Projects - 1

  68. Category B1EC Rejected2025-12-19

    Proposed Kandraja Bauxite Block over an area of 135.223 Ha; Maximum production of Bauxite ROM (80700 TPA) at Village-Kandraja, Tehsil-Mainpat, District-Surguja, State- Chhattisgarh, by M/s MAA Kudargarhi Steels Pvt Ltd

    MAA KUDARGARHI STEELS PRIVATE LIMITED · Non-Coal Mining

  69. Category B2EC Granted2025-12-03

    Transfer of Environmental Clearance (EC) of M/s. Calcar Products Pvt Ltd. to M/s. Vimla Infrastructure (India) Pvt. Ltd.

    VIMLA INFRASTRUCTURE (INDIA) PVT. LTD. · Industrial Projects - 1

  70. Category B1EC Rejected2025-11-30declares affected families

    Proposed Laladhurwa-Jognipali Limestone Block (Lease Area 200.902 ha) with Limestone production capacity 3654413.97 TPA, OB/Waste 554058.50 TPA; (Total Handling: 4208472.47 TPA, excluding top soil 116224.80 m3 per annum); along with installation of 700 TPH Crusher at Village- Laladhurwa,Jognipali,Kapisda,Sarsara & Dhaura Bhatha, Tehsil- Sarangarh, District- Sarangarh-Bilaigarh (Earlier Raigarh), State- Chhattisgarh, by Green Sustainable Manufacturing Pvt. Ltd

    GREEN SUSTAINABLE MANUFACTURING PRIVATE LIMITED · Non-Coal Mining

  71. Category AEC Granted2025-11-19

    2x800 MW (Expansion, Stage-II) Coal Based Lara Super Thermal Power Project at villages Armuda, Chhapora, Bodajharia, Devalpura, Mahloi, Riyapalli, Lara, Jhilgitar and Kandagarh, in Taluk Pussore, in District Raigarh, in Chhattisgarh by M/s NTPC Ltd

    NTPC LIMITED · Thermal Projects

  72. Category AToR Granted2025-11-04

    Expansion of existing Power Plant Phase I 1x600MW, Operational and Phase II 2x800MW Ultra Super Critical under construction by adding Phase III 2x800MW, Ultra Super Critical TPP at Villages Chhote & Bade Bhandar, Barpali, Kotma and Sarwani, Tehsil Pussore, District Raigarh, Chhattisgarh by Adani Power Limited, Raigarh

    Adani Power Limited · Thermal Projects

  73. Category AEC Granted2025-10-31declares affected families

    TALAIPALLI COAL MINING PROJECTS

    NTPC MINING LIMITED · Coal Mining

  74. Category AProposal pulled back (withdrawn)2025-10-24

    Expansion of pellet plant capacity from EC approved Capacity of 12,50,000 TPA to 17,50,000 TPA @ 20% in 2 Phases under Para 7 (ii) of EIA Notification, 2006 as per OM F.No. IA3-22/10/2022-IA.III [E 177258] dtd. 11th April, 2022)

    MSP STEEL AND POWER LIMITED · Industrial Projects - 1

  75. Category AEC Granted2025-10-20

    Establishment of proposed Steel plant consisting of 4x250TPD DRI Kilns to produce Sponge Iron(330000TPA) IF(4x15T) LRF(15T) &RHF(10TPH) with CCM to produce Hot Billets/M.S Billets of 194040TPA RM to Produce Rolled products (TMT bars/Angles/Channels) 186766TPA through hot charging& RHF Coal based PGP 4000Nm3/hr Ferro Alloy plant(2X9MVA SAF) to produce 34000TPA Si-Mn/19000TPA Fe-Si/43000TPA Fe-Mn/68000TPA Pig Iron Power gen. through WHRB#24 MW & FBC#8 MW and Fly Ash Brick Plant of 54900 Bricks/day

    kelo steel & power private limited · Industrial Projects - 1

  76. Category AEC Granted2025-10-18

    Expansion of Steel Plant – DRI Kilns (Sponge Iron from 1,20,000 TPA to 6,48,000 TPA), Induction Furnaces along with CCM & LRF (Hot Billets / Billets / Ingots from 1,23,500 TPA to 4,53,000TPA), Rolling Mills (TMT bars / Structural Steel / Wire Rod Mill with HB Wire cooled Roll & Strip Mill with Pipe Mill)(85 % Hot charging with Hot Billets and remaining 15% through RHF with LDO as fuel from 94,800 TPA to 5,30,400 TPA), WHRB based Power Plant from 8 MW to 44 MW, FBC based Power Plant from 4 MW to

    SHREE RUPANADHAM STEEL PVT LTD · Industrial Projects - 1

  77. Category AProposal returned in present form2025-10-18declares affected families

    Amendment in “Environmental Clearance transfer letter no. J-11015/81/2008-IA.II(M) dated 28.10.2021 of Gare Palma IV/1 Opencast Project (Expn. of ML area from 705.555 ha to 978.654 ha at 6 MTPA production capacity) and Expn of Coal Washery from 2.4 ΜΤΡΑ to 3.2 MTPA)

    JINDAL POWER LIMITED · Coal Mining

  78. Category AGranted2025-10-09

    4x150 MW coal based Thermal Power Plant located at Dongamahua, Tehsil-Tamnar, District- Raigarh, Chhattisgarh

    Jindal Steel Limited · Thermal Projects

  79. Category AStandard ToR Granted2025-10-04

    Expansion of Ferro Alloy Plant (0.03 MTPA) to Integrated Steel Plant (0.224 MTPA crude steel) in villages Garhumariya & Darramuda, P.O. Garhumaria, Jharsuguda-Raigarh Road, Tehsil Pusour, District Raigarh, Chhattisgarh of M/s Rungta Sons Private Limited.

    RUNGTA SONS PRIVATE LIMITED · Industrial Projects - 1

  80. Category AEC Granted2025-10-04

    Request for Amendments to Environmental Clearance (EC) comprising of change in CFBC based Power Plant from 2 x 250 MW to 2 x 125 MW (Phase # 1) & 1 x 250 MW (Phase # 2) and request for permission for utilisation of Harvested rain water from existing natural ponds & water reservoirs within the site for Phase-1 operations & remaining phases will be through Kelo river, for NR Iron and Power Private Limited located at Shivpuri Village, Raigarh Tehsil & District, Chhattisgarh

    NR IRON AND POWER PRIVATE LIMITED · Industrial Projects - 1

  81. Category B2EC Granted2025-09-26

    District Survey Report(DSR) of Morrum minor mineral of Jharsuguda District

    CHUDAMANI BISWAL · Non-Coal Mining

  82. Category B2EC Granted2025-09-26

    District Survey Report(DSR) of River Sand minor mineral of Jharsuguda District.

    CHUDAMANI BISWAL · Non-Coal Mining

  83. Category B2EC Granted2025-09-26

    District Survey Report(DSR) of Road metal/ Building stone minor mineral of Jharsuguda District.

    CHUDAMANI BISWAL · Non-Coal Mining

  84. Category B1EC Granted2025-09-19declares affected families

    Gare Palma IV/6 coal mine (4 MTPA) and coal washery (4 MTPA) in an ML area of 381.42 ha located at Raigarh, Chhattisgarh

    Jindal Steel Limited · Coal Mining

  85. Category B2EC Granted2025-09-18

    Installation Of 15 MT x 2 Nos of induction furnace along with CCMs to produce 105,600 TPA MS Ingot/ Billet along with Rolling Mill with Direct Hot Charging facility to produce 101,418 TPA Rerolled Steel Products; mainly in the form of TMT.

    mk tmt and steels private limited · Industrial Projects - 1

  86. Category AEC Granted2025-09-16

    Expansion of Sponge Iron from 120000 TPA to 144000 TPA and Billet from 100000 TPA to 120000 TPA, Rolled products from 95000 TPA to 114000 TPA, Captive Power Plant from 20 MW to 24 MW (WHRB-8 to 10 MW, AFBC-12 to 14 MW) and Ferro Alloy- 30,000 TPA Max(No increase in ferro alloys capacity) under 7(ii)(a) for 20% increase in first phase at Village: Temtema, Tehsil: Kharasia, District: Raigarh, Chhattisgarh by Sky Alloys & Power Limited

    SKY ALLOYS AND POWER LIMITED · Industrial Projects - 1

  87. Category B1Referred to SEIAA2025-09-08

    Capacity Expansion of Manufacturing Facilities to Produce Mild Steel Billet 57330 TPA to 246,960 TPA; Rerolled Steel Products 234,612TPA Through Hot Charging from 55610 TPA to 160,512 TPA and Through Reheating Furnace 74,100 TPA and MS Pipe 122,600 TPA along with existing 20000 TPA Steel fabrication unit by M/s Om Shree Rupesh Steel Pvt. Ltd. at Village: Chiraipani, near Gerwani, Tehsil and District: Raigarh, (C.G)

    OM SHREE RUPESH STEEL PRIVATE LIMITED · Industrial Projects - 1

  88. Category AProposal pulled back (withdrawn)2025-09-01

    Expansion of existing Sponge Iron from 120000TPA to 168000TPA, Billet from 100000TPA to 140000TPA, Rolled products from 95000TPA to 133000TPA, Captive Power Plant from 20MW to 28MW (WHRB-8 to 12MW, FBC-12 to 16MW) and Ferro Alloys 30000TPA Max.(No increase in Ferro Alloys Capacity) under 7(ii)(a) for 20% increase in Phase-I & 20% increase in Phase-II(Total increase of 40% capacity than sanctioned in existing EC) by Sky Alloys & Power Ltd at Vil. Temtema Tehsil Kharsia Dist. Raigarh Chhattisgarh

    SKY ALLOYS AND POWER LIMITED · Industrial Projects - 1

  89. Category B1ToR Granted2025-08-25

    Proposed setting up of Coal Tar Distillation plant to manufacture 18,000 TPA Coal tar Pitch and its by - products at Vill. - Sambalpuri, Tehsil - Raigarh, Dist. - Raigarh, Chhattisgarh, India.

    CHOUDHARY HYDRO CARBON PRIVATE LIMITED · Industrial Projects - 2

  90. Category AProposal returned in present form2025-08-11declares affected families

    Talaipalli Coal Mining Project

    NTPC MINING LIMITED · Coal Mining

  91. Category AStandard ToR Granted2025-08-11

    Purunga Coal Mine

    Ambuja Cements Limited · Coal Mining

  92. Category AEC Granted2025-07-24declares affected families

    Baroud Opencast Expansion Project

    South Eastern Coalfields Limited · Coal Mining

  93. Category AToR Granted2025-07-18declares affected families

    Expansion of Lara Super Thermal Power Project from 3200 MW [Stage-I (2x800 MW) & Stage-II (2x800 MW)] to 4800 MW by adding two units of 800 MW under Lara Super Thermal Power Project, Stage-III (2x800 MW) at Villages Armuda, Chhapora, Bodajhariya, Mahloi, Riyapalli, Kandagarh. Devalpura, Ghutkupali, Thengapali, Lara in Tehsil Pussore, District Raigarh and Village Saradih in Tehsil Dabhara, District Sakti, Chhattisgarh.

    NTPC LIMITED · Thermal Projects

  94. Category AProposal pulled back (withdrawn)2025-07-18declares affected families

    TALAIPALLI COAL MINING PROJECTS

    NTPC MINING LIMITED · Coal Mining

  95. Category AStandard ToR Granted2025-07-05

    Greenfield steel plant by B.S.Sponge Pvt.Ltd. (Badgaon Unit)-Sponge Iron-1320000TPA, Hot Billets/Ingots through IF-1155000 TPA&EAF-330000 TPA, Rolling Mill with RHF (TMT/Wire/Strip/Plate/Structural Steel) -1386000 TPA,MS Pipe Mill-198000 TPA,Coal Washery-2250000 TPA, SEAFs-6x16.5MVA (FeSi-77000 TPA/FeMn-220000 TPA/SiMn-154000 TPA/FeCr-165300 TPA/Pig Iron-264000TPA),WHRB–150MW,FBC–100MW &Oxygen/Nitrogen/Organ Plant-198 Mm3/594 Mm3/19.8 Mm3,Slag Crusher-25 TPH, Fly Ash Brick unit 100000 Bricks/Day

    B.S.SPONGE PRIVATE LTD · Industrial Projects - 1

  96. Category AEC Granted2025-07-01

    Amendment in Environment Clearance for Reduction in Plant area from proposed 30.35 ha (75 acres) to of existing 17.67 ha.(43.66 acres) and the Capacity as existing and implemented by M/s Sky Alloys & Power Limited at Village: Temtema, Tehsil: Kharasia, District: Raigarh, Chhattisgarh

    SKY ALLOYS AND POWER LIMITED · Industrial Projects - 1

  97. Category AToR Granted2025-06-26

    Application for amendment to TOR letter issued to M/s. Singhal Steel Pvt. Ltd. pertaining to change in FBC based Power Plant capacity from 20 MW to 80 MW and Installation of New EOF unit (1 x 50 T) and New Vacuum Degassing unit (1 x 50 T) in the plant configuration for the proposed steel plant at Patarapali, Kotarliya & Siyarpali Villages, Raigarh Tehsil & District, Chhattisgarh

    SINGHAL STEEL PRIVATE LIMITED · Industrial Projects - 1

  98. Category B2EC Granted2025-06-25

    District Survey Report(DSR) of Road metal/Building Stone/Black Stone (minor mineral) of Sundargarh District.

    Deputy Director of Mines, Rourkela · Non-Coal Mining

  99. Category B2EC Granted2025-06-25

    District Survey Report(DSR) of Sandstone of Sundargarh District.

    Deputy Director of Mines, Rourkela · Non-Coal Mining

  100. Category B2EC Granted2025-06-25

    District Survey Report(DSR) of Ordinary Earth/Brick Earth (minor mineral) of Sundargarh District.

    Deputy Director of Mines, Rourkela · Non-Coal Mining

Showing 100 of 252 proposals, newest first. The button below loads the rest.