All 34 in the last 60 days- 26 Oct 2026 · Details soughtEssential details soughtDarri Limestone Quarry Shri Vishnu Prasad Agrawal (M/s Jindal Enterprises)
- 26 Oct 2026 · Details soughtAdditional details soughtEstablishment of Greenfield steel plant for production of 1,81,500 TPA Sponge Iron, 2,32,850 TPA MS…
- 23 Oct 2026 · Details soughtEssential details soughtJAIRAMNAGAR, LOW GRADE LIMESTONE QUARRY
- 21 Oct 2026 · ClosedDelisted automaticallyEstablishment of Greenfield steel plant for production of 1,81,500 TPA Sponge Iron, 2,32,850 TPA MS…
- 21 Oct 2026 · Details soughtAdditional details soughtBANSAJHAL LIMESTONE QUARRY, VILLAGE BANSAJHAL, AREA 2.279 HA SHRI HITESH SAPARIYA
- 21 Oct 2026 · FiledSubmittedJAIRAMNAGAR, LOW GRADE LIMESTONE QUARRY
- 17 Oct 2026 · FiledSubmittedVarun Jain
- 16 Oct 2026 · Details soughtEssential details soughtM/s Jindal Enterprises ( Darri Limestone Quarry )
- 16 Oct 2026 · Details soughtAdditional details soughtEstablishment of Greenfield steel plant for production of 1,81,500 TPA Sponge Iron, 2,32,850 TPA MS…
- 14 Oct 2026 · Details soughtEssential details soughtChange in Name in Environment Clearance of “New Captive Limestone Mine (ML Area 1236.479 ha) with…
- 12 Oct 2026 · FiledSubmittedM/s Jindal Enterprises ( Darri Limestone Quarry )
- 3 Oct 2026 · FiledSubmittedVikas Singh
Dated by the portal's own appraisal history, converted to India Standard Time; a proposal with no recorded history appears on its register submission date.
Other clearances these proposals declare
- Forest land diversion declared
- 3
- Forest land sought for diversion
- Area not stated
- Wildlife board recommendation declared
- 0
- In or near a protected area
- 0
- In an eco-sensitive zone
- 0
These counts are taken from the application forms of the 182 of 182 proposals naming this district whose forms have been read for these questions. In 87 of those forms at least one question was left blank, and a blank answer is counted as unknown. The forest area is the area stated for forest clearance, with each forest proposal counted once, in the district where its project is primarily sited.
- Proposals naming this district
- 182
- Category A proposals
- 56
- Families declared displaced
- None declared
- Families declared affected
- None declared
Displacement figures are the proponents’ own declarations. A project sited across several districts declares one figure for the whole project, and that figure is counted once, in the district where the project is primarily sited.
Fifth Schedule status
Partly within a Fifth Schedule Scheduled Area
The Order fixes the area by reference to territorial divisions as existing at 20 February 2003. It names only part of this district, so district-level status cannot settle whether a particular site is inside it.
OrderThe Scheduled Areas (States of Chhattisgarh, Jharkhand and Madhya Pradesh) Order, 2003 · C.O. 192, notified 2003-02-20
What the record shows
The Scheduled Tribe share here, 17.8%, is at least double the national figure of 8.55%.
Agricultural labourers, who work other people's land for wages, make up 45% of workers here. Compensation for acquired land is paid to those who hold title to it, so it does not reach them. They can still claim the rehabilitation and resettlement entitlements of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (RFCTLARR), because its section 3(c) counts a family whose livelihood depends on the land as an affected family, wherever that Act governs how the land is obtained.
Part of this district is a Fifth Schedule Scheduled Area. Acquiring land for a project sited in that part needs the Gram Sabha's prior consent under section 41(3) of RFCTLARR, and the district-level record cannot settle whether a particular site lies there.
Each of these observations appears when a fixed rule is met by the figures on this page, so the same figures always give the same sentences. None of them is a view on whether a project should go ahead.
Who lives there
Figures from Census 2011, each compared with the all-India value computed on the same definition.
- Total population
- 20,71,480
- Households
- 4,65,125
- Average household size
- 4.45
- 0.40 below India's 4.85India
- Scheduled Tribe share of population
- 17.8%
- 9.3 points above IndiaIndia
- Scheduled Caste share of population
- 20.0%
- 3.4 points above IndiaIndia
- Children aged 0-6
- 15.2%
- 1.6 points above IndiaIndia
- Literacy rate
- 72.0%
- 1.0 points below IndiaIndia
- Sex ratio
- 966
- 23.6 above India's 942.6India
What they live on
How the district's workers earn a living, from Census 2011. The land-dependent share counts cultivators and agricultural labourers as a share of all workers, and it is the group most directly affected when land is acquired.
- Total workers
- 9,15,982
- Work participation rate
- 44.2%
- 4.4 points above IndiaIndia
- Workers dependent on land
- 65.4%
- 10.9 points above IndiaIndia
- Cultivators
- 20.7%
- 3.9 points below IndiaIndia
- Agricultural labourers
- 44.7%
- 14.8 points above IndiaIndia
- Marginal workers
- 28.2%
- 3.4 points above IndiaIndia
- Household industry workers
- 2.0%
- 1.8 points below IndiaIndia
How households live
Land, income and work among rural households, from the Socio Economic and Caste Census 2011, which recorded these where the population census did not. Only the survey's rural part is used here, so urban households do not appear.
- Rural households owning land
- 18.1%
- 28.0 points below IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
- Rural households whose highest earner makes over ₹5,000 a month
- 1.8%
- 22.6 points below IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
- Rural households living mainly on manual casual labour
- 93.6%
- 41.8 points above IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
- Rural households with a salaried member
- 0.7%
- 7.6 points below IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
When these were filed
Each proposal is dated by the first step in its appraisal history, the dated record of steps the portal keeps for it.
The timeline counts 144 of the 182 proposals here. The first filing date comes from each proposal's appraisal history, and we have not yet read it for the other 38, so they are left out. Most of them are older proposals, so the early part of the timeline undercounts what was filed then. The register itself records a date for each of them; the gap is in our copy of the histories.
Hatched columns undercount, so they cannot be compared with solid ones. 5 of them cover periods for which we have read few filing dates so far, and they count only the proposals whose date we have. 2026-Q4 was still running when the register was read, so its column counts only the filings made up to that date.
What kind of projects these are
The proposals naming this district, grouped by the sector each was filed under.
- Non-Coal Mining 59.9%
- Industrial Projects - 1 21.4%
- Coal Mining 13.7%
- River Valley and Hydroelectric Projects 2.2%
- Other (2) 2.7%
The four largest sectors are shown by name and the rest are grouped as Other.
What is proposed here
These are the proposals in the national environmental clearance register whose application names a site in this district, newest first. A project with sites in several districts appears under each of them.
- Category B2EDS raised2026-10-21
JAIRAMNAGAR, LOW GRADE LIMESTONE QUARRY
tularam sharma · Non-Coal Mining
- Category B1Under Examination2026-10-17
Varun Jain
VARUN JAIN · Non-Coal Mining
- Category AUnder Examination2026-10-16
Change in Name in Environment Clearance of “New Captive Limestone Mine (ML Area 1236.479 ha) with production capacity 4.0 MTPA Limestone near village: Chilhati, Tehsil: Pachpedi (earlier known as Masturi), District: Bilaspur, Chhattisgarh” from M/s. Lafarge India Ltd. to M/s. Nuvoco Vistas Corporation Limited.
NUVOCO VISTAS CORPORAtion limited · Non-Coal Mining
- Category B1EDS raised2026-10-12
M/s Jindal Enterprises ( Darri Limestone Quarry )
VISHNU AGRAWAL · Non-Coal Mining
- Category B1Proposal Accepted and Referred to SEAC2026-10-03
Vikas Singh
VIKAS SINGH · Non-Coal Mining
- Category B1Proposal Accepted and Referred to SEAC2026-10-02
Vinod Kumar Agrawal
VINOD AGRAWAL · Non-Coal Mining
- Category B2Referred to SEIAA2026-09-27
Harish Madhukar
HARISH MADHUKAR · Non-Coal Mining
- Category AProposal Accepted and Referred to EAC2026-09-14
Greenfield Wet Type Coal Washery Project Based on Heavy Media Cyclone Technology of 2.6 MTPA located at Village-Amli, Tehsil- Kota, District-Bilaspur, Chhattisgarh
VEERAJ EARRTHFUSION PRIVATE LIMITED · Coal Mining
- Category AProposal Accepted and Referred to EAC2026-09-09
Expansion of Wet Type Coal washery project based on heavy media cyclone technology from 5 MTPA to 6 MTPA located at Village-Ghutku, Tehsil-Takhtpur, District-Bilaspur, Chhattisgarh by M/s Phil Coal Beneficiation Pvt Ltd - 1st Stage expansion as per OM dated 11.04.2022 i.e 20% of existing capacity.
Phil coal benefication private limited · Coal Mining
- Category B1Proposal Accepted and Referred to SEAC2026-09-07
Aayush Agrawal
AAYUSH AGRAWAL · Non-Coal Mining
- Category AUnder Processing with Authority2026-08-20
Application for amendment in Environmental Clearance for reduction in project land area of M/s Shree Balaji Steel and Metal Private Limited, located at Village Dagori, Ameri Akbari, Satighat, Tehsil Bilha, District Bilaspur, Chhattisgarh
SHREE BALAJI STEEL AND METAL PRIVATE LIMITED · Industrial Projects - 1
- Category B2EC Granted2026-08-11
M/S Eagle Mining (Mr. Ankur Agrawal)
ankur agrawal · Non-Coal Mining
- Category B2Referred to SEIAA2026-08-11
DOLOMITE QUARRY, VILLAGE BODSARA, AREA 4.04 HA. PROJECT PROPONENT SHRI RAGHUVEER SINGH CHAWLA,
SHRI RAGHUVEER SINGH CHAWLA · Non-Coal Mining
- Category B2Under Verification2026-08-10
Neha Shivdasani
NEHA SHIVDASANI · Non-Coal Mining
- Category AForwarded to MS SPCB/PCC by MS2026-08-06
Integrated Steel Plant Comprising of DRI Plant - 0.6 MTPA, SMS - 0.55 MTPA, Rolling Mill - 0.50 MTPA, Captive Power Plant - 140MW, Oxygen Plant - 50 TPD, Coke Oven - 1.0 MTPA, Slag Crushing Unit - 0.1 MTPA & Fly Ash Bricks Making Plant – 0.1 MTPA (25000-27000 Nos.) by M/s Jayaswal Neco Industries Limited
JAYASWAL NECO INDUSTRIES LIMITED · Industrial Projects - 1
- Category AEC Granted2026-08-03
Expansion of Wet type Coal washery from 1.92 MTPA (2x0.96 MTPA) to 5.00 MTPA (2x2.5 MTPA)
CLEAN COAL ENTERPRISES PRIVATE LIMITED · Coal Mining
- Category AForwarded to MS SPCB/PCC by MS2026-07-31
Greenfield Steel plant of 2x350TPD DRI Kilns to produce 231000TPA Sponge Iron, SMS with 5x15T IF, 20T LRF & CCM to produce 247500 TPA Hot Billets/MS Billets, Rolling Mill to Produce 231000TPA Rolled products (Wire Rod, TMT bar, Structure Steel etc.), Ferro Alloy plant (2x9 MVA SAF) to produce 23760TPA of Si-Mn 14850TPA Fe-Si or 36960TPA Fe-Mn 36300TPA Pig Iron, 45MW Captive Power Plant (WHRB#20 MW+AFBC#25 MW) & Fly Ash Brick Plant (385 TPD) by M/s Metnext Private Limited
METNEXT PRIVATE LIMITED · Industrial Projects - 1
- Category AToR Granted2026-07-20
Bilaspur Pumped Storage Project (1000 MW)
JINDAL GREEN PSP 1 PRIVATE LIMITED · River Valley and Hydroelectric Projects
- Category AEC Granted2026-06-27
Expansion of Wet Type Coal Washery Project based on Heavy Median Cyclone from 0.96 MTPA to 2.5 MTPA located at Village - Ghutku, Tehsil - Takhatpur, District - Bilaspur, Chhattisgarh by M/s Paras Power & Coal Beneficiation Limited
M/S PARAS POWER & COAL BENEFICIATION LIMITED · Coal Mining
- Category B1EDS Raised2026-06-25
Darri Limestone Quarry Shri Vishnu Prasad Agrawal (M/s Jindal Enterprises)
VISHNU AGRAWAL · Non-Coal Mining
- Category B2ADS Raised2026-06-20
Shri Sai Stone Crusher, Partner Kapil Khanuja
SHRI SAI STONE CRUSHER · Non-Coal Mining
- Category B1Forwarded to MS SPCB/PCC by MS2026-06-19
Aarti Relwani
AARTI RELWANI · Non-Coal Mining
- Category B2ADS Raised2026-06-10
BANSAJHAL LIMESTONE QUARRY, VILLAGE BANSAJHAL, AREA 2.279 HA SHRI HITESH SAPARIYA
HITESH SAPARIYA · Non-Coal Mining
- Category AProposal returned in present form2026-06-09
Expansion cum modification of Integrated Steel plant comprising Sponge Iron Plant of 0.60MTPA with 3x600TPD DRI Kiln, Coke Oven plant of 1.0MTPA with 20battery & 11Ovens, Rolling Mill of 0.50MTPA for rolled steel products, SMS of 0.55MTPA for production of MS Billets with 6x30tons IF, 60tons LRF & Caster, Captive Power Plant of 125MW(3x15MW WHRB+20MW AFBC & 6x10MW Coke Oven Gas based), Oxygen Plant of 50TPD, Slag crushing unit of 0.1MTPA & Fly ash bricks plant of 300 TPD
JAYASWAL NECO INDUSTRIES LIMITED · Industrial Projects - 1
- Category B2ADS Raised2026-06-01
Sarita Pandey
SARITA PANDEY · Non-Coal Mining
- Category B2EC Granted2026-05-31
M/s Mahamaya Minerals. Part- Mahesh Sharma and Vimal Agrawal
MAHESH SHARMA · Non-Coal Mining
- Category AToR Granted2026-05-22
Proposed expansion of existing sponge iron plant capacity from 30,000 TPA to 96,000 TPA, installation of new WHRB 7 MW (1x2;1x5 MW) and new AFBC/CFBC power plant -7 MW at khasra no. 657/2 (part) Village- Hardikala, Silpahari Industrial Area, District- Bilaspur, Chhattisgarh by M/s. Geetanjali Ispat & Powers Private Limited
Geetanjali Ispat and Powers Private Limited · Industrial Projects - 1
- Category AEC Granted2026-05-19
Request for amendment to the Environmental Clearance (EC) of Bilaspur Mining (India) Pvt. Ltd, EC Granted for at Kharkena Village in Sakri Tehsil and Dhourbhatta Village in Bilha Tehsil, Bilaspur District, Chhattisgarh.
BILASPUR MINING INDIA PRIVATE LIMITED · Industrial Projects - 1
- Category AProposal pulled back (withdrawn)2026-05-12
0.50 MTPA Integrated Steel Plant of M/s Jayaswal Neco Industries Limited located at Village- Dagori, Ameri-Akberi and Udgaon Tehsil- Bilha and District- Bilaspur Chhattisgarh, comprising of Sponge Iron 0.60 MTPA, Coke Oven Plant 1.00 MTPA , Steel Melting Shop - 0.50 MTPA, TMT Mill - 0.50 MTPA, Oxygen plant – 50 TPD, Slag Crushing unit – 0.10 MTPA, Fly Ash Brick Plant - 300 TPD and Power Plant - 125MW (3x 15MW through DRI WHRB; 20 MW AFBC and 60 MW through Coke Oven Gas based).
JAYASWAL NECO INDUSTRIES LIMITED · Industrial Projects - 1
- Category B1ToR Granted2026-05-12
Proposed 2.48 MTPA throughput coal washery at Lokhandi village, Takhatpur Tehsil, Bilaspur district, Chhattisgarh by Aries Clean Coal Pvt. Ltd.
aries clean coal private limited · Coal Mining
- Category AEC Granted2026-04-27
Expansion of Coal Washery Project from 2.5 MTPA to 5.0 MTPA” Located at Village-Gatora, Tehsil-Masturi, District-Bilaspur, Chhattisgarh by Clean Coal Enterprises Pvt. Ltd. (CCEPL).
CLEAN COAL ENTERPRISES PRIVATE LIMITED · Coal Mining
- Category AEC Granted2026-04-25
Amendment in Environment Clearance pertaining to exemption of "wagon loading though silo" for our 5.0 MTPA (Wet type) Coal Washery at Village Ghutku, Tehsil Takhatpur, District Bilaspur, Chhattisgarh
Phil coal benefication private limited · Coal Mining
- Category B1EC Granted2026-04-21
Ankit Kumar Mishra
ANKIT MISHRA · Non-Coal Mining
- Category B2ADS Raised2026-04-07
BRICK EARTH QUARRY, VILLAGE-SONPURI
jagdish chakradhari · Non-Coal Mining
- Category AUnder Processing with Authority2026-03-26
Establishment of Greenfield steel plant for production of 1,81,500 TPA Sponge Iron, 2,32,850 TPA MS Billets, 2,25,860 TPA Rerolled Steel products, 34,000 TPA (max) Ferro Alloys, Captive Power Plant for 24 MW (WHRB-12 MW and AFBC-12 MW) power generation, Installation of 1,200,000 TPA Coal Washery and 37,500 TPA Fly Ash Bricks/Blocks Plant by M/s HD India Iron and Coal Power Pvt. Ltd at Village: Ameriakbari, Tehsil: Bilha, District: Bilaspur, State: Chhattisgarh.
hd india iron and coal power private limited · Industrial Projects - 1
- Category B1ToR Granted2026-03-24
M/s JRC Associates Prop Shri Jasbir Singh Chawla
JASBIR SINGH CHAWLA · Non-Coal Mining
- Category B2EC Granted2026-03-18
Amit Yadav
AMIT YADAV · Non-Coal Mining
- Category AProposal returned in present form2026-03-14
Establishment of Greenfield steel plant comprising of DRI Kiln 1 x 350 TPD – 1,15,500 TPA, WHRB based Power Plant – 1 x 10 MW, FBC based Power Plant – 1 x 5 MW & Brick Manufacturing unit – 50,00,000 Bricks/Annum
IMAEC Steel and Power Limited · Industrial Projects - 1
- Category AStandard ToR Granted2026-03-10
Expansion of Wet type Coal washery from 1.92 MTPA (2x0.96 MTPA) to 5.00 MTPA (2x2.5 MTPA)
CLEAN COAL ENTERPRISES PRIVATE LIMITED · Coal Mining
- Category B1ToR Rejected2026-03-06
Ravi Kumar Madhukar
Ravi kumar madhukar · Non-Coal Mining
- Category B2EC Granted2026-02-25
Malti
MALTI · Non-Coal Mining
- Category B1EC Granted2026-02-23
Proposed 1.25 MTPA Coal Washery (Wet Process) of M/s Bhatia Energy and Coal Beneficiation Pvt. Ltd. in Village Lokhandi, Tehsil Takhatpur, District Bilaspur (Chhattisgarh)
BHATIA ENERGY COAL BENEFICATION PVT LTD · Coal Mining
- Category B2EC Rejected2026-02-19
Mohtara Limestone Quarry , Area - 1.821 ha. , Lessee - Arun Kumar Jaiswal
ARUN KUMAR JAISWAL · Non-Coal Mining
- Category B2ADS Raised2026-02-09
Harikripa Minerals Partner's Nidhi Rajpal & Kunal Rajpal
HARI KRIPA MINERALS · Non-Coal Mining
- Category B1EC Granted2026-01-24
M/s Tiwarta Coal Beneficiation Limited
ashok kumar dhulyani · Coal Mining
- Category AEC Granted2026-01-08
Proposed Cane Juice/Grain Based Distillery for production of 600 KLPD Rectified Spirit (RS)/Extra Neutral Alcohol (ENA)/Ethanol along with 12.0 MW Co-generation Power Plant by M/s RSLD Biofuels Private Limited in the revenue estate Village Kaith Nawagaon, Tehsil Mungeli, District Mungeli, Chhattisgarh
RSLD BIOFUELS PRIVATE LIMITED · Industrial Projects - 2
- Category AStandard ToR Granted2026-01-06
Proposed expansion of existing sponge iron plant capacity from 30,000 TPA to 96,000 TPA, installation of new WHRB 7 MW (1x2;1x5 MW) and new AFBC/CFBC power plant -7 MW at khasra no. 657/2 (part) Village- Hardikala, Silpahari Industrial Area, District- Bilaspur, Chhattisgarh by M/s. Geetanjali Ispat & Powers Private Limited
Geetanjali Ispat and Powers Private Limited · Industrial Projects - 1
- Category AEC Granted2025-12-12
Establishment of Greenfield steel plant comprising of DRI Kilns – 2 x 250 TPD (Sponge Iron - 1,65,000 TPA), Ferro Alloy Unit - 3 x 9 MVA (FeSi – 21,000 TPA/ FeMn – 60,000 TPA/ SiMn – 42,000 TPA/FeCr – 45,000 TPA/ Pig Iron - 72,000 TPA), Briquetting Plant (300 Kg/Hr.), WHRB based Power Plant – 2 x 7 MW, FBC based Power Plant – 1 x 12 MW & Brick Manufacturing unit (16,000 Bricks / Day)]
BILASPUR MINING INDIA PRIVATE LIMITED · Industrial Projects - 1
- Category B1EC Granted2025-12-09
M/s. Inspire Industries Private Limited
SANDEEP VERMA · Coal Mining
- Category B1Forwarded to MS SPCB/PCC by MS2025-12-09
Coal Washery Project of MANIKARNIKA LOGISTICS PRIVATE LIMITED
ManikARNIKA LOGISTICS private limited · Coal Mining
- Category B1Proposal pulled back (withdrawn)2025-11-23
M/s. Inspire Industries Private Limited
SANDEEP VERMA · Coal Mining
- Category AGranted2025-11-20
Transfer of Environment clearance due to change in ownership
SHREE BALAJI STEEL AND METAL PRIVATE LIMITED · Industrial Projects - 1
- Category AEC Granted2025-11-06
EC Amendment for Reconfiguration of Plant Facilities including Induction Furnace Capacity reconfiguration, Stack Re-arrangement, Groundwater Use, Coal Deshaler Installation to reduce GHG emission and CAAQMS Rationalization by M/s Kalindi Ispat Pvt. Ltd. at Village - Belpan, Tahsil- Masturi, District - Bilaspur, Chhattisgarh
KALINDI ISPAT PRIVATE LIMITED · Industrial Projects - 1
- Category AEC Granted2025-11-03
Expansion of Coal Washery Project from 2.5 MTPA to 5.0 MTPA” Located at Village-Gatora, Tehsil-Masturi, District-Bilaspur, Chhattisgarh by Clean Coal Enterprises Pvt. Ltd. (CCEPL).
CLEAN COAL ENTERPRISES PRIVATE LIMITED · Coal Mining
- Category B2EC Granted2025-10-25
Associated Mining Company Proprietor- N S Saigal
NARENDRA SAIGAL · Non-Coal Mining
- Category B2EC Granted2025-09-26
M/s. Bahubali Construction Company Partner - Suresh Chand Jain & Aayush Agrawal
M/S BAHUBALI CONSTRUCTION COMPANY · Non-Coal Mining
- Category B1EC Granted2025-09-09
Godadih Mahal No. 2 Limestone mine with production capacity: 1.54 MTPA at Village Godadih, District- Bilaspur, Chhattisgarh
Jindal Steel Limited · Non-Coal Mining
- Category B1ToR Granted2025-08-14
Coal Washery Project of M/s. SPRN MINERALS PRIVATE LIMITED.
SPRN MINERALS PRIVATE LIMITED · Coal Mining
- Category B1ToR Rejected2025-07-18
M/s Jindal Enterprises
VISHNU AGRAWAL · Non-Coal Mining
- Category B2EC Rejected2025-07-18
Purushottam Yadav
PURUSHOTTAM YADAV · Non-Coal Mining
- Category B2EC Rejected2025-07-18
Bhupendra Singh Thakur
BHUPENDRA THAKUR · Non-Coal Mining
- Category AStandard ToR Granted2025-06-24
Expansion-cum-Amendment of existing project of M/s NACHIKETA POWER & STEEL PVT. LTD. for 0.6 MTPA Pellet Plant
KUNAL S SARAF · Industrial Projects - 1
- Category B1EC Granted2025-06-17
Request for surrendering of Environmental Clearance granted for establishment of Grain based Bio Ethanol 335000 KLA (100 KLD); Animal feed grade protein 28000 TPA,Bio CNG 3000 TPA, CO2-17500 TPA and 3 MW Co-generation Power Plant by M/s.Kusum Smelters Pvt. Ltd. at Village – Dhamni, Tehsil - Patharia, District – Mungeli, State – Chhattisgarh
KUSUM SMELTERS PRIVATE LIMITED · Industrial Projects - 2
- Category B2EC Rejected2025-06-06
Kosamtara Limestone Quarry
SANDEEP PANDEY · Non-Coal Mining
- Category AToR Granted2025-06-04
Establishment of Greenfield steel plant comprising of DRI Kiln 1 x 350 TPD – 1,15,500 TPA, WHRB based Power Plant – 1 x 10 MW, FBC based Power Plant – 1 x 5 MW & Brick Manufacturing unit – 50,00,000 Bricks/Annum
IMAEC Steel and Power Limited · Industrial Projects - 1
- Category B2EC Granted2025-05-29
Matiyaari Bricks Earth clay Quarry
KAVITA BANSAL · Non-Coal Mining
- Category B2EC Rejected2025-05-10
M/s J.R.C. Associates (Prop- Shri. Jasbir Singh Chawla)
JASBIR SINGH CHAWLA · Non-Coal Mining
- Category B1EC Rejected2025-05-09
Godadih Mahal No. 2 Limestone Mine of M/s Jindal Steel & Power Ltd. located at Village Godadih, District-Bilaspur, Chhattisgarh
Jindal Steel & Power Ltd. · Non-Coal Mining
- Category B2EC Rejected2025-04-23
JAIRAMNAGAR LIMESTONE QUARRY, LESSEE - SHRI TULARAM SHARMA, AREA- 0.6394HA. KHASRA - 722/3, 724/2, 4, 5, 6, 7 VILLAGE - JAIRAMNAGAR TEHSIL - MASTURI, DISTRICT - BILASPUR (CG)
tularam sharma · Non-Coal Mining
- Category AToR Granted2025-04-21
Greenfield Wet Type Coal Washery Project Based on Heavy Media Cyclone Technology of 2.6 MTPA located at Village-Amli, Tehsil- Kota, District-Bilaspur, Chhattisgarh
VEERAJ EARRTHFUSION PRIVATE LIMITED · Coal Mining
- Category AToR Granted2025-04-17
Bilaspur Pumped Storage Project (1000 MW)
JINDAL RENEWABLE POWER PRIVATE LIMITED · River Valley and Hydroelectric Projects
- Category AStandard ToR Granted2025-04-03
Proposed Cane Juice/Grain Based Distillery for production of 600 KLPD Rectified Spirit (RS)/Extra Neutral Alcohol (ENA)/Ethanol along with 12.0 MW Co-generation Power Plant by M/s RSLD Biofuels Private Limited in the revenue estate Village Kaith Nawagaon, Tehsil Mungeli, District Mungeli, Chhattisgarh
RSLD BIOFUELS PRIVATE LIMITED · Industrial Projects - 2
- Category AToR Granted2025-04-02declares affected families
Parsapani Pumped Storage Project
HINDUJA RENEWABLES ENERGY PRIVATE LIMITED · River Valley and Hydroelectric Projects
- Category AEC Granted2025-03-27
Expansion of existing plant through establishment of DRI Kilns (Sponge Iron 4,29,000 TPA), Induction Furnace with LRF & CCM (Billets / Ingots) (3,96,000 TPA), WHRB based Power Plant -2 x 15 MW, CFBC based Power Plant– 1 x 10 MW, Fly Ash Bricks -346 TPD in the existing 7.5 MW Biomass based Power Plant and 1x9 MVA Ferro Alloys plant (Si-Mn 14,400 TPA or Fe-Mn 25,200 TPA or Ferro Chrome 15,000 TPA or Fe-Si 7,000 TPA or Pig Iron 25,200 TPA) at Vill -Khamhardih,Tehsil- Pathariya,District-Mungeli, C.G
SEETA ENERGEN PRIVATE LIMITED · Industrial Projects - 1
- Category AEC Granted2025-03-05
Proposed Integrated Cement Project - Clinker (3.3 Million TPA), Cement (1.0 Million TPA), CPP (30 MW), WHRS (17 MW) and D.G. Set (2 x 2000 KVA & 1 x 500 KVA) at Villages: Godadih, Bohardih and Loharsi, Tehsil: Pachapedi (Earlier Masturi), District: Bilaspur (Chhattisgarh) by M/s. ACC Limited
ACC LIMITED · Industrial Projects - 1
- Category B2EC Granted2025-02-06
M/s. Murarilal Kedarmal Prop. Parvati Bai Agrawal
PARVATI AGRAWAL · Non-Coal Mining
- Category B2EC Granted2025-01-18
M/s Singh Stone Mines
SINGH STONE MINES · Non-Coal Mining
- Category AToR Granted2025-01-06
Greenfield Wet Type Coal Washery Project Based on Heavy Media Cyclone Technology of 2.6 MTPA located at Village-Amli, Tehsil- Kota, District-Bilaspur, Chhattisgarh
VEERAJ EARRTHFUSION PRIVATE LIMITED · Coal Mining
- Category B2EC Granted2024-12-21
Raj Kumar Ratre
RAJ RATRE · Non-Coal Mining
- Category B2EC Granted2024-12-20
Nutan Chandra
nutan chandra · Non-Coal Mining
- Category B2EC Rejected2024-12-16
Sai Construction Partner - Atul Kumar Shukla
SAI CONSTRUCTION · Non-Coal Mining
- Category B1ToR Granted2024-12-14
BHADHA DOLOMITE (BENEFICIABLE GRADE) QUARRY, AREA - 3.80 HA., LESSEE- SHRI GAURAV BANDHI
GAURAV BANDHI · Non-Coal Mining
- Category B2EC Rejected2024-12-05
Jairamnagar Limestone Quarry , Area - 0.639 ha. Lessee - shri Tula ram Shrama
tularam sharma · Non-Coal Mining
- Category B2EC Granted2024-12-02
Sai Construction Partner - Atul Kumar Shukla
SAI CONSTRUCTION · Non-Coal Mining
- Category B2EC Granted2024-12-02
Satish Kumar Shah Proprietor of M/s Rajeshwari Minerals and Chemicals
SATISH SHAH · Non-Coal Mining
- Category AToR Granted2024-12-02
Expansion & Modernization in existing Steel Plant located at Village-Paraghat, Tehsil-Masturi, District-Bilaspur, Chhattisgarh by M/s Rashi Steel and Power Limited
RASHI STEEL AND POWER LIMITED · Industrial Projects - 1
- Category B2EC Granted2024-12-01
MASTURI LIMESTONE QUARRY, LESSEE - SHRI KAUSHAL SINGH PARMAR AREA - 1.011 HA. KHASRA - 586/1 VILLAGE - MASTURI TEHSIL - MASTURI DISTRICT - BILASPUR (CG)
KAUSHAL · Non-Coal Mining
- Category B1ToR Granted2024-11-15
M/s. Murarilal Kedarmal, Prop. Parvati Bai Agrawal
PARVATI AGRAWAL · Non-Coal Mining
- Category B1ToR Rejected2024-11-15
M/s. Murarilal Kedarmal Prop. Parvati Bai Agrawal
PARVATI AGRAWAL · Non-Coal Mining
- Category AEC Granted2024-11-12
Amendment in Clearance Condition issued to M/s. Airan Steel and Power Pvt.Ltd
AIRAN STEEL AND POWER PRIVATE LIMITED · Industrial Projects - 1
- Category B2EC Granted2024-10-23
JAIRAMNAGAR LIMESTONE QUARRY, LESSEE - SMT. VIMLA SINGH THAKUR AREA - 0.849 HA. KHASRA - 252/3 VILLAGE - JAIRAMNAGAR TEHSIL - MASTURI DIST - BILASPUR (CG)
VIMLA THAKUR · Non-Coal Mining
- Category B2EC Granted2024-10-21
Vinod Kumar Agrawal
VINOD AGRAWAL · Non-Coal Mining
- Category B2EC Granted2024-10-21
Harish Kumar Shah
HARISH SHAH · Non-Coal Mining
- Category B1Proposal Withdrawal Request Accepted2024-09-26
M/S MAA DEVSAR, PARTNER - SHRI NIKHIL BANSAL AREA- 1.214 HA. KHASRA - 572/1 VILLAGE - MASTURI TEHSIL -MASTURI DIST - BILASPUR
maa devsar stone · Non-Coal Mining
- Category B2Referred to SEIAA2024-09-19
Amali Ordinary Stone Mine
RAYALASEEMA CONCRETE SLEEPERS PRIVATE LIMITED · Non-Coal Mining
- Category B2EC Rejected2024-09-14
Landmark Engineer, Proprietor - Nishant Jain
NISHANT JAIN · Non-Coal Mining
- Category B1EC Granted2024-08-29
Application for Amendment to Environmental Clearance (EC) issued to M/s Mangal Sponge & Steel Private Limited pertaining to correction in land and plant configuration at Bilha & Mohbhatta Villages, Bilha Tehsil, Bilaspur District, Chhattisgarh
MANGAL SPONGE AND STEEL PVT. LTD. · Industrial Projects - 1
- Category AEC Granted2024-08-24
Proposed expansion of existing Sponge Iron Plant by installation of 1 x 350 TPD DRI kilns along with expansion of CPP (WHRB) from 4 MW to 12 MW at Kh. No part of 18/1 situated at village Silpahari at Sirgitti industrial area, Bilaspur (Chhattisgarh) by M/s Agrawal Structure Mills Pvt Ltd.
AGRAWAL STRUCTURE MILLS PVT LIMITED · Industrial Projects - 1
- Category B1EC Granted2024-08-02
Amendment in E.C. for Amalgamation of E.C. issued to M/s. CLEAN COAL ENTERPRISES PVT. LTD. at Gatora (V), Masturi (T), Bilaspur (D), Chhattisgarh with E.C. of M/s. CLEAN COAL ENTERPRISES PVT. LTD. [Formerly HIND ENERGY & COAL BENEFICIATION (INDIA) PVT. LTD.] at Gatora (V), Masturi (T), Bilaspur (D), Chhattisgarh (E.C. Merger)
CLEAN COAL ENTERPRISES PRIVATE LIMITED · Coal Mining
- Category AToR Granted2024-07-30
Establishment of Greenfield steel plant for production of 1,81,500 TPA Sponge Iron, 2,32,850 TPA MS Billets, 2,25,860 TPA Rerolled Steel products, 34,000 TPA (max) Ferro Alloys, Captive Power Plant for 24 MW (WHRB-12 MW and AFBC-12 MW) power generation, Installation of 1,200,000 TPA Coal Washery and 37,500 TPA Fly Ash Bricks/Blocks Plant by M/s HD India Iron and Coal Power Pvt. Ltd at Village: Ameriakbari, Tehsil: Bilha, District: Bilaspur, State: Chhattisgarh.
hd india iron and coal power private limited · Industrial Projects - 1