← All districts

Morena, Madhya Pradesh

Not a Scheduled AreaCensus 2011 district code 419
  1. 17 Oct 2026 · FiledSubmittedMangrol Stone Quarry
  2. 5 Oct 2026 · Details soughtEssential details soughtDhanela Stone Quarry
  3. 4 Oct 2026 · ClosedDelisted automaticallyDhanela Stone Quarry
  4. 30 Sept 2026 · DecidedStandard Terms of Reference grantedSehadpur-Itoura Limestone Mine-186.790Ha.
  5. 30 Sept 2026 · DecidedStandard Terms of Reference grantedMahawa, Saipura, Bhilampur, Badhreta Limestone Mine
  6. 30 Sept 2026 · FiledSubmittedSehadpur-Itoura Limestone Mine-186.790Ha.
  7. 30 Sept 2026 · FiledSubmittedMahawa, Saipura, Bhilampur, Badhreta Limestone Mine
  8. 29 Sept 2026 · DecidedTerms of Reference grantedShyampur Barrage Major Micro Irrigation Project
  9. 18 Sept 2026 · Details soughtEssential details soughtBIsentha Stone Mine
  10. 18 Sept 2026 · Details soughtEssential details soughtBISENTHA FLAG STONE & M-SAND MINE
  11. 18 Sept 2026 · Details soughtEssential details soughtBISENTHA FLAG STONE & M-SAND MINE
  12. 18 Sept 2026 · FiledSubmittedKheriya Chunheti Stone Quarry

Dated by the portal's own appraisal history, converted to India Standard Time; a proposal with no recorded history appears on its register submission date.

Other clearances these proposals declare

Forest land diversion declared
2
Forest land sought for diversion
Area not stated
Wildlife board recommendation declared
1
In or near a protected area
0
In an eco-sensitive zone
1

These counts are taken from the application forms of the 152 of 152 proposals naming this district whose forms have been read for these questions. In 43 of those forms at least one question was left blank, and a blank answer is counted as unknown. The forest area is the area stated for forest clearance, with each forest proposal counted once, in the district where its project is primarily sited.

Proposals naming this district
152
Category A proposals
4
Families declared displaced
65
Families declared affected
103

Displacement figures are the proponents’ own declarations. A project sited across several districts declares one figure for the whole project, and that figure is counted once, in the district where the project is primarily sited. 2 of the proposals listed below declare displacement and are sited primarily in another district, so their figures are counted in that district’s total.

Fifth Schedule status

Not within a Fifth Schedule Scheduled Area

The Presidential Order for Madhya Pradesh declares which areas in the State are Scheduled Areas. It does not name this district, in whole or in part, so no part of it is a Scheduled Area under that Order. A later Order could add one; this reference states the position as transcribed and reviewed on 2026-08-21.

OrderThe Scheduled Areas (States of Chhattisgarh, Jharkhand and Madhya Pradesh) Order, 2003

What the record shows

  • Applicants for projects sited mainly in this district have declared 65 families to be displaced. The figure comes from their applications, and we have not verified it.

Each of these observations appears when a fixed rule is met by the figures on this page, so the same figures always give the same sentences. None of them is a view on whether a project should go ahead.

Who lives there

Figures from Census 2011, each compared with the all-India value computed on the same definition.

Total population
19,65,970
Households
3,62,646
Average household size
5.42
0.57 above India's 4.85India
Scheduled Tribe share of population
0.9%
7.7 points below IndiaIndia
Scheduled Caste share of population
21.4%
4.8 points above IndiaIndia
Children aged 0-6
15.5%
1.9 points above IndiaIndia
Literacy rate
71.0%
2.0 points below IndiaIndia
Sex ratio
840
102.5 below India's 942.6India

What they live on

How the district's workers earn a living, from Census 2011. The land-dependent share counts cultivators and agricultural labourers as a share of all workers, and it is the group most directly affected when land is acquired.

Total workers
6,75,993
Work participation rate
34.4%
5.4 points below IndiaIndia
Workers dependent on land
67.0%
12.4 points above IndiaIndia
Cultivators
45.1%
20.4 points above IndiaIndia
Agricultural labourers
21.9%
8.0 points below IndiaIndia
Marginal workers
22.9%
1.8 points below IndiaIndia
Household industry workers
2.4%
1.4 points below IndiaIndia

How households live

Land, income and work among rural households, from the Socio Economic and Caste Census 2011, which recorded these where the population census did not. Only the survey's rural part is used here, so urban households do not appear.

Rural households owning land
57.7%
11.6 points above IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households whose highest earner makes over ₹5,000 a month
29.7%
5.3 points above IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households living mainly on manual casual labour
41.0%
10.8 points below IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households with a salaried member
5.7%
2.6 points below IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

When these were filed

Each proposal is dated by the first step in its appraisal history, the dated record of steps the portal keeps for it.

2023-Q42026-Q4

The timeline counts 126 of the 152 proposals here. The first filing date comes from each proposal's appraisal history, and we have not yet read it for the other 26, so they are left out. Most of them are older proposals, so the early part of the timeline undercounts what was filed then. The register itself records a date for each of them; the gap is in our copy of the histories.

Hatched columns undercount, so they cannot be compared with solid ones. One of them covers a period for which we have read few filing dates so far, and it counts only the proposals whose date we have. 2026-Q4 was still running when the register was read, so its column counts only the filings made up to that date.

What kind of projects these are

The proposals naming this district, grouped by the sector each was filed under.

  • Non-Coal Mining 92.1%
  • River Valley and Hydroelectric Projects 2%
  • Industrial Projects - 3 2%
  • INFRA-2 1.3%
  • Other (3) 2.6%

The four largest sectors are shown by name and the rest are grouped as Other.

What is proposed here

These are the proposals in the national environmental clearance register whose application names a site in this district, newest first. A project with sites in several districts appears under each of them.

  1. Category B2Under Verification2026-10-17

    Dhanela Stone Quarry

    m/s shri vaishno mines · Non-Coal Mining

  2. Category B1Under Verification2026-10-17

    Mangrol Stone Quarry

    SHIV DASS mariya · Non-Coal Mining

  3. Category B1Forwarded to MS SPCB/PCC by MS2026-09-30

    Mahawa, Saipura, Bhilampur, Badhreta Limestone Mine

    ABHIJEET CEMENT LIMITED · Non-Coal Mining

  4. Category B1Forwarded to MS SPCB/PCC by MS2026-09-30

    Sehadpur-Itoura Limestone Mine-186.790Ha.

    ABHIJEET CEMENT LIMITED · Non-Coal Mining

  5. Category B1Proposal Accepted and Referred to SEAC2026-09-28

    BIsentha Stone Mine

    RAVINDRA SINGH · Non-Coal Mining

  6. Category B1Proposal Accepted and Referred to SEAC2026-09-18

    BISENTHA FLAG STONE & M-SAND MINE

    rahul Singh · Non-Coal Mining

  7. Category B1Under Verification2026-09-18

    BISENTHA FLAG STONE & M-SAND MINE

    rahul Singh · Non-Coal Mining

  8. Category B1Proposal Accepted and Referred to SEAC2026-09-18

    Kheriya Chunheti Stone Quarry

    REKHA SHARMA · Non-Coal Mining

  9. Category B2Under Verification2026-09-15

    Parauli Stone (Gitti) and M-Sand Quarry

    ravi gurjar · Non-Coal Mining

  10. Category B2Proposal Accepted and Referred to SEAC2026-09-15

    Bhatpura Dang (Gitti) and M-Sand Quarry

    saroj · Non-Coal Mining

  11. Category B1Proposal Accepted and Referred to SEAC2026-09-15

    Bisentha Flagstone, Gitti, Boulder & M-Sand Mine

    PRIYANKA DWIVEDI · Non-Coal Mining

  12. Category B1Under Verification2026-09-12

    BISENTHA FLAGSTONE & M-SAND QUARRY

    asmita tyagi · Non-Coal Mining

  13. Category B1Proposal Accepted and Referred to SEAC2026-09-12

    Bisentha Flag Stone & M-Sand Mine

    PRABHANSHU SARAHIYA · Non-Coal Mining

  14. Category B1Proposal Accepted and Referred to SEAC2026-09-12

    Bisentha Flag Stone & M-Sand Quarry

    asmita tyagi · Non-Coal Mining

  15. Category B1Proposal Accepted and Referred to SEAC2026-09-12

    BISENTHA FLAGSTONE, BOULDER & M-SAND MINE

    puneet sharma · Non-Coal Mining

  16. Category B1Proposal Accepted and Referred to SEAC2026-09-12

    BISENTHA FLAG STONE & M-SAND QUARRY

    rahul Singh · Non-Coal Mining

  17. Category B1Proposal Accepted and Referred to SEAC2026-09-12

    BISENTHA FLAG STONE, BOULDER & M-SAND MINE

    Rapid vista projects private limited · Non-Coal Mining

  18. Category B1Proposal Accepted and Referred to SEAC2026-09-12

    Bisentha Flag Stone & M-Sand Quarry

    Rapid vista projects private limited · Non-Coal Mining

  19. Category B1Under Verification2026-09-12

    Bisentha Flag Stone, Boulder & M-Sand MIne

    NARAYAN SWAROOP BARUA · Non-Coal Mining

  20. Category B1Proposal Accepted and Referred to SEAC2026-09-12

    BISENTHA FLAG STONE, BOULDER & M-SAND MINE

    vikas sharma · Non-Coal Mining

  21. Category B1Proposal Accepted and Referred to SEAC2026-09-12

    Bisentha Flag stone & M-sand Mine

    asmita tyagi · Non-Coal Mining

  22. Category B1Proposal Accepted and Referred to SEAC2026-09-12

    BISENTHA FLAGSTONE & M-SAND MINE

    asmita tyagi · Non-Coal Mining

  23. Category B1Under Verification2026-09-12

    BISENTHA FLAG STONE & M-SAND MINE

    rahul Singh · Non-Coal Mining

  24. Category B1Under Verification2026-09-12

    BISENTHA FLAGSTONE, BOULDER & M-SAND MINE

    puneet sharma · Non-Coal Mining

  25. Category B1Forwarded to MS SPCB/PCC by MS2026-09-11

    Urhana Stone Crusher Quarry

    Prerna Singh · Non-Coal Mining

  26. Category B1Forwarded to MS SPCB/PCC by MS2026-09-10

    Urhana Crusher Stone Quarry

    Ravindra Singh yadav · Non-Coal Mining

  27. Category B1Under Verification2026-09-09

    Urhana Stone Quarry

    ghirongi minerals · Non-Coal Mining

  28. Category B1Under Verification2026-08-16

    BISENTHA FLAG STONE, BOULDER & M-SAND MINE

    vikas sharma · Non-Coal Mining

  29. Category AForwarded to MS SPCB/PCC by MS2026-08-14declares affected families

    Shyampur Barrage Major Micro Irrigation Project

    PROJECT MANAGER (Executive Engineer) · River Valley and Hydroelectric Projects

  30. Category B1Referred to SEAC2026-07-25

    Badwari Stone (Gitti, Boulder & M-Sand) Quarry

    pragati buildcon · Non-Coal Mining

  31. Category B1Referred to SEAC2026-07-25

    Badwari Stone (Gitti & Boulder)Quarry

    grace infratech · Non-Coal Mining

  32. Category B2Referred to SEIAA2026-06-27

    Adhanpur Soil Quarry

    PAVAN SHARAMA · Non-Coal Mining

  33. Category B1Standard ToR Granted2026-06-10

    Urhana Stone & M Sand Quarry

    apex mines and minerals · Non-Coal Mining

  34. Category B1Standard ToR Granted2026-06-10

    Urhana Stone Quarry

    apex mines and minerals · Non-Coal Mining

  35. Category B1Referred to SEAC2026-06-01

    BISENTHA FLAG STONE & M-SAND MINE

    asha singh sikarwar · Non-Coal Mining

  36. Category B2Referred to SEIAA2026-05-26

    Dohara Soil Mine

    AKASH SHARMA · Non-Coal Mining

  37. Category B2EC Granted2026-05-23

    Itawali Flag Stone Quarry

    chatursingh · Non-Coal Mining

  38. Category B1Standard ToR Granted2026-04-25

    BISENTHA FLAG STONE, GITTI & BOULDER QUARRY

    KULDEEP DUBEY · Non-Coal Mining

  39. Category B1Standard ToR Granted2026-04-25

    Dhanela Stone Quarry

    PRESTIGIOUS SCORS P LTD · Non-Coal Mining

  40. Category B2EC Granted2026-04-23

    TIKARI STONE MINE

    PURSHOTTAM SINGH KANSANA · Non-Coal Mining

  41. Category B1Standard ToR Granted2026-04-17

    BISENTHA FLAG STONE, GITTY, BOULDER & M-SAND QUARRY

    AJAY YADAV · Non-Coal Mining

  42. Category B1Standard ToR Granted2026-04-17

    BISENTHA GITTY, BOULDER & M-SAND QUARRY

    Rajiv singh gurjar · Non-Coal Mining

  43. Category B1Standard ToR Granted2026-03-14

    Badwari Stone (Gitti & Boulder)Quarry

    grace infratech · Non-Coal Mining

  44. Category B1Standard ToR Granted2026-03-14

    Badwari Stone (Gitti, Boulder & M-Sand) Quarry

    pragati buildcon · Non-Coal Mining

  45. Category AADS Raised2026-03-13declares affected families

    CHENTIKHEDA MAJOR IRRIGATION PROJECT

    Dinesh kumar ratnakar · River Valley and Hydroelectric Projects

  46. Category B1Pending at MS SEIAA2026-02-28

    Proposed API & Drug Intermediates Unit

    PIVOTAL ORGANICS PRIVATE LIMITED · Industrial Projects - 3

  47. Category B2EC Granted2026-02-26

    PARAULI FLAGSTONE QUARRY

    JITENDRA SINGH · Non-Coal Mining

  48. Category B2EC Granted2026-02-23

    Mehtoli Stone Quarry

    manoj singh kushwah · Non-Coal Mining

  49. Category B1Forwarded to MS SPCB/PCC by MS2026-02-02

    Bisentha Flag Stone & Gitti Mine

    Rajendra sharma · Non-Coal Mining

  50. Category B1Forwarded to MS SPCB/PCC by MS2026-02-02

    BISENTHA FLAG STONE,GITTY & M-SAND QUARRY

    puneet sharma · Non-Coal Mining

  51. Category B1Standard ToR Granted2026-01-31

    Fulonda Stone Quarry

    chandra yadav · Non-Coal Mining

  52. Category B1Standard ToR Granted2026-01-30

    Rancholi Flag stone & Khanda/ Dhoka Quarry

    Abhishek Singh Yadav · Non-Coal Mining

  53. Category B1Standard ToR Granted2026-01-17

    Badwari Stone (Gitti & Boulder) Quarry

    grace infratech · Non-Coal Mining

  54. Category B1Standard ToR Granted2026-01-17

    Badwari Stone (Gitti, Boulder & M-Sand) Quarry

    pragati buildcon · Non-Coal Mining

  55. Category B2EC Granted2026-01-14

    Urahan Stone Quarry

    Om Shri Nath JI Stone Crusher · Non-Coal Mining

  56. Category B1Standard ToR Granted2026-01-09

    Malkhanpura Gitti & Boulder Quarry

    puneet sharma · Non-Coal Mining

  57. Category B1Standard ToR Granted2026-01-09

    Bisentha Flag Stone & Boulder, M-Sand, Dimension Stone Quarry

    geo shining enterprises · Non-Coal Mining

  58. Category B1Standard ToR Granted2026-01-09

    MALKHANPURA GITTI, BOULDER & M-SAND QUARRY

    NARAYAN SWAROOP BARUA · Non-Coal Mining

  59. Category B2EC Granted2026-01-03

    AGI Greenpac Limited

    AGI GREENPAC LIMITED · INFRA-2

  60. Category B1Forwarded to MS SPCB/PCC by MS2026-01-01

    Fulonda Stone Quarry

    TULKA · Non-Coal Mining

  61. Category B1Forwarded to MS SPCB/PCC by MS2025-12-18

    Development of Regional Sanitary Landfill Site for Common Municipal Solid Waste Management Facility (CMSWMF) for Morena and its Cluster ULBs located at Khasra No. 14(s), Village: Nivi, Tehsil: Morena, District: Morena - 476001 by Municipal Corporation Morena

    Municipal Corporation Morena · INFRA-2

  62. Category B1EC Granted2025-11-28

    Urhana Stone Quarry

    shakuntla raje · Non-Coal Mining

  63. Category B1EC Granted2025-10-13

    Clinker Grinding Units (200 TPD)

    bhagwati cement industries · Industrial Projects - 1

  64. Category B2EC Granted2025-10-09

    IMILIYA SOIL MINE

    ramlakan rajoriya · Non-Coal Mining

  65. Category B2EC Granted2025-10-06

    Kutaghan Murrum Quarry

    avdesh rawat · Non-Coal Mining

  66. Category B1Standard ToR Granted2025-10-01

    BISENTHA FLAG STONE & M-SAND QUARRY

    rahul Singh · Non-Coal Mining

  67. Category B2EC Granted2025-09-24

    Kajona Soil & Clay Quarry

    jagdish bansal · Non-Coal Mining

  68. Category B1Standard ToR Granted2025-09-20

    Bisentha Flag Stone, Boulder & M-Sand MIne

    NARAYAN SWAROOP BARUA · Non-Coal Mining

  69. Category B2EC Granted2025-09-17

    Jeengani Soil Quarry

    Rekha RAJPOOT · Non-Coal Mining

  70. Category B1Standard ToR Granted2025-09-11

    Mangrol Stone Quarry

    SHIV DASS mariya · Non-Coal Mining

  71. Category B1Standard ToR Granted2025-08-18

    Bisentha Flagstone, Gitti, Boulder & M-Sand Mine

    PRIYANKA DWIVEDI · Non-Coal Mining

  72. Category B1Standard ToR Granted2025-08-16

    Kheriya Chunheti Stone Quarry

    REKHA SHARMA · Non-Coal Mining

  73. Category B1Standard ToR Granted2025-08-13

    Majra Khanda Stone Mine

    Ravindra singh · Non-Coal Mining

  74. Category B1Standard ToR Granted2025-08-13

    Bisentha Flag Stone & M-Sand Mine

    PRABHANSHU SARAHIYA · Non-Coal Mining

  75. Category B1Standard ToR Granted2025-08-13

    Sabalgarh Khanda Patthar/Dhoka Mine

    SONPAL SINGH · Non-Coal Mining

  76. Category B2EC Granted2025-07-07

    Devhans Ka Pura Soil Quarry

    saurabh singh · Non-Coal Mining

  77. Category B2EC Rejected2025-06-18

    RANCHOLI FLAG STONE MINE

    SONALI SINGH · Non-Coal Mining

  78. Category B1Standard ToR Granted2025-06-17

    Urhana Stone Quarry

    shakuntla raje · Non-Coal Mining

  79. Category B1Standard ToR Granted2025-06-07

    Urhana Crusher Stone Quarry

    Ravindra Singh yadav · Non-Coal Mining

  80. Category B1Standard ToR Granted2025-06-06

    BISENTHA FLAG STONE & M-SAND MINE

    rahul Singh · Non-Coal Mining

  81. Category B1Standard ToR Granted2025-06-06

    BISENTHA FLAG STONE & M-SAND MINE

    rahul Singh · Non-Coal Mining

  82. Category B1Standard ToR Granted2025-06-06

    BISENTHA FLAG STONE & M-SAND MINE

    rahul Singh · Non-Coal Mining

  83. Category B1Standard ToR Granted2025-06-06

    Clinker Grinding Units (200 TPD)

    bhagwati cement industries · Industrial Projects - 1

  84. Category B1Standard ToR Granted2025-06-04

    BIsentha Stone Mine

    RAVINDRA SINGH · Non-Coal Mining

  85. Category B1Standard ToR Granted2025-05-31

    Bisentha Flag Stone & M-Sand Quarry

    Rapid vista projects private limited · Non-Coal Mining

  86. Category B1Standard ToR Granted2025-05-31

    BISENTHA FLAG STONE & M-SAND MINE

    asha singh sikarwar · Non-Coal Mining

  87. Category B1Standard ToR Granted2025-05-31

    BISENTHA FLAGSTONE, BOULDER & M-SAND MINE

    puneet sharma · Non-Coal Mining

  88. Category B1Standard ToR Granted2025-05-31

    BISENTHA FLAG STONE, BOULDER & M-SAND MINE

    Rapid vista projects private limited · Non-Coal Mining

  89. Category B1Standard ToR Granted2025-05-31

    BISENTHA FLAGSTONE, BOULDER & M-SAND MINE

    puneet sharma · Non-Coal Mining

  90. Category B1Proposal pulled back (withdrawn)2025-05-30

    Bisentha Flag Stone & M-Sand Quarry

    asmita tyagi · Non-Coal Mining

  91. Category B1Standard ToR Granted2025-05-30

    BISENTHA FLAGSTONE & M-SAND QUARRY

    asmita tyagi · Non-Coal Mining

  92. Category B1Standard ToR Granted2025-05-30

    BISENTHA FLAG STONE, BOULDER & M-SAND MINE

    vikas sharma · Non-Coal Mining

  93. Category B1Standard ToR Granted2025-05-30

    BISENTHA FLAG STONE, BOULDER & M-SAND MINE

    vikas sharma · Non-Coal Mining

  94. Category B1Proposal pulled back (withdrawn)2025-05-30

    BISENTHA FLAGSTONE & M-SAND QUARRY

    asmita tyagi · Non-Coal Mining

  95. Category B1Standard ToR Granted2025-05-30

    BISENTHA FLAGSTONE & M-SAND MINE

    asmita tyagi · Non-Coal Mining

  96. Category B1Standard ToR Granted2025-05-30

    Bisentha Flag Stone & M-Sand Quarry

    asmita tyagi · Non-Coal Mining

  97. Category B1Standard ToR Granted2025-05-30

    Bisentha Flag stone & M-sand Mine

    asmita tyagi · Non-Coal Mining

  98. Category B1Proposal pulled back (withdrawn)2025-05-30

    BISENTHA FLAG STONE & M-SAND QUARRY

    asmita tyagi · Non-Coal Mining

  99. Category B1Proposal pulled back (withdrawn)2025-05-30

    Bisentha Flag stone & M-sand Mine

    asmita tyagi · Non-Coal Mining

  100. Category B1Standard ToR Granted2025-05-20

    Kheriya Chunheti Stone Mine for making gitti through crusher Project

    rahul harsana · Non-Coal Mining

Showing 100 of 152 proposals, newest first. The button below loads the rest.