← All districts

Gwalior, Madhya Pradesh

Not a Scheduled AreaCensus 2011 district code 421
  1. 21 Oct 2026 · Details soughtEssential details soughtLakhanpura Crusher Stone Quarry
  2. 21 Oct 2026 · Details soughtEssential details soughtGangapur Stone Quarry
  3. 17 Oct 2026 · Details soughtAdditional details soughtGadhota/Kupeda Sand Quarry
  4. 13 Oct 2026 · Details soughtAdditional details soughtBabupur Sand Quarry Deposit
  5. 8 Oct 2026 · FiledSubmittedLakhanpura Crusher Stone Quarry
  6. 6 Oct 2026 · FiledSubmittedGangapur Stone Quarry
  7. 5 Oct 2026 · ClosedDelisted automaticallyBabupur Sand Quarry Deposit
  8. 5 Oct 2026 · DecidedEnvironmental clearance refusedLakhanpura Crusher Stone Deposit- 2.320 Ha
  9. 5 Oct 2026 · DecidedEnvironmental clearance refusedLakhanpura Gitti, Boulder & M-Sand Mine
  10. 11 Sept 2026 · DecidedEnvironmental clearance grantedRichhera Khanda/Dhoka & M-Sand Mine
  11. 2 Sept 2026 · FiledSubmittedProposed expansion in existing distillery unit from 225 KLD to 500 KLD for production of Rectified Spirit/…
  12. 1 Sept 2026 · Details soughtAdditional details soughtChandrapura Stone Quarry

Dated by the portal's own appraisal history, converted to India Standard Time; a proposal with no recorded history appears on its register submission date.

Other clearances these proposals declare

Forest land diversion declared
0
Forest land sought for diversion
None declared
Wildlife board recommendation declared
0
In or near a protected area
0
In an eco-sensitive zone
2

These counts are taken from the application forms of the 199 of 199 proposals naming this district whose forms have been read for these questions. In 62 of those forms at least one question was left blank, and a blank answer is counted as unknown. The forest area is the area stated for forest clearance, with each forest proposal counted once, in the district where its project is primarily sited.

Proposals naming this district
199
Category A proposals
6
Families declared displaced
None declared
Families declared affected
None declared

Displacement figures are the proponents’ own declarations. A project sited across several districts declares one figure for the whole project, and that figure is counted once, in the district where the project is primarily sited. 1 of the proposals listed below declare displacement and are sited primarily in another district, so their figures are counted in that district’s total.

Fifth Schedule status

Not within a Fifth Schedule Scheduled Area

The Presidential Order for Madhya Pradesh declares which areas in the State are Scheduled Areas. It does not name this district, in whole or in part, so no part of it is a Scheduled Area under that Order. A later Order could add one; this reference states the position as transcribed and reviewed on 2026-08-21.

OrderThe Scheduled Areas (States of Chhattisgarh, Jharkhand and Madhya Pradesh) Order, 2003

Who lives there

Figures from Census 2011, each compared with the all-India value computed on the same definition.

Total population
20,32,036
Households
3,83,845
Average household size
5.29
0.44 above India's 4.85India
Scheduled Tribe share of population
3.6%
5.0 points below IndiaIndia
Scheduled Caste share of population
19.3%
2.7 points above IndiaIndia
Children aged 0-6
12.9%
0.7 points below IndiaIndia
Literacy rate
76.7%
3.7 points above IndiaIndia
Sex ratio
864
78.9 below India's 942.6India

What they live on

How the district's workers earn a living, from Census 2011. The land-dependent share counts cultivators and agricultural labourers as a share of all workers, and it is the group most directly affected when land is acquired.

Total workers
6,85,311
Work participation rate
33.7%
6.1 points below IndiaIndia
Workers dependent on land
36.6%
17.9 points below IndiaIndia
Cultivators
19.1%
5.6 points below IndiaIndia
Agricultural labourers
17.6%
12.4 points below IndiaIndia
Marginal workers
18.3%
6.4 points below IndiaIndia
Household industry workers
3.3%
0.5 points below IndiaIndia

How households live

Land, income and work among rural households, from the Socio Economic and Caste Census 2011, which recorded these where the population census did not. Only the survey's rural part is used here, so urban households do not appear.

Rural households owning land
46.7%
0.6 points above IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households whose highest earner makes over ₹5,000 a month
28.9%
4.6 points above IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households living mainly on manual casual labour
53.1%
1.3 points above IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households with a salaried member
4.3%
4.0 points below IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

When these were filed

Each proposal is dated by the first step in its appraisal history, the dated record of steps the portal keeps for it.

2023-Q12026-Q4

The timeline counts 123 of the 199 proposals here. The first filing date comes from each proposal's appraisal history, and we have not yet read it for the other 76, so they are left out. Most of them are older proposals, so the early part of the timeline undercounts what was filed then. The register itself records a date for each of them; the gap is in our copy of the histories.

Hatched columns undercount, so they cannot be compared with solid ones. 5 of them cover periods for which we have read few filing dates so far, and they count only the proposals whose date we have. 2026-Q4 was still running when the register was read, so its column counts only the filings made up to that date.

What kind of projects these are

The proposals naming this district, grouped by the sector each was filed under.

  • Non-Coal Mining 91%
  • INFRA-2 4%
  • Industrial Projects - 2 2%
  • Industrial Projects - 1 1.5%
  • Other (2) 1.5%

The four largest sectors are shown by name and the rest are grouped as Other.

What is proposed here

These are the proposals in the national environmental clearance register whose application names a site in this district, newest first. A project with sites in several districts appears under each of them.

  1. Category B1EDS raised2026-10-08

    Lakhanpura Crusher Stone Quarry

    AMARNATH SHARMA · Non-Coal Mining

  2. Category B2EDS raised2026-10-06

    Gangapur Stone Quarry

    OM SHRI STONE CRUSHER · Non-Coal Mining

  3. Category AUnder Processing with Authority2026-09-02

    Proposed expansion in existing distillery unit from 225 KLD to 500 KLD for production of Rectified Spirit/ Country Liquor (Proof)/ ENA/ Neutral Spirit/ Faint Spirit/ C.L. / IMFL/ IMFL Bottling along with production of 500 KLD grain/molasses based ethanol at Village: Jinawali and Milawali (Rairu farm), Block Ghatigaon, Tehsil and District- Gwalior (M.P.) by M/s Bapuna Alcobrew Pvt. Ltd.

    bapuna alcobrew private limited · Industrial Projects - 2

  4. Category B1ADS Raised2026-07-21

    Chandrapura Stone Quarry

    emerald industries · Non-Coal Mining

  5. Category B2Referred to SEIAA2026-06-26

    MAITHANA STONE MINE

    urmila Kirar · Non-Coal Mining

  6. Category B2EC Granted2026-04-30

    Richhera Khanda/Dhoka & M-Sand Mine

    SAROJ RAWAT · Non-Coal Mining

  7. Category B2Referred to SEAC2026-04-22

    BANDHOLI STONE QUARRY

    girraj yadav · Non-Coal Mining

  8. Category B1Referred to SEIAA2026-03-27

    Jakhauda Flagstone Mine

    AKASH · Non-Coal Mining

  9. Category B1Standard ToR Granted2026-03-26

    Bilaua Stone (Gitti) & M-Sand Quarry

    mamta sharma · Non-Coal Mining

  10. Category B1Referred to SEAC2026-03-23

    Chandrapura Stone Quarry

    emerald industries · Non-Coal Mining

  11. Category B2EC Granted2026-02-19

    BILHETI STONE & M-SAND QUARRY

    banke Bihari stones · Non-Coal Mining

  12. Category B1Standard ToR Granted2026-01-22

    Bilaua stone(gitti) and M-Sand Quarry

    vikas yadav · Non-Coal Mining

  13. Category B1Standard ToR Granted2026-01-01

    Bilaua Stone Quarry

    NAVEEN BAJAJ · Non-Coal Mining

  14. Category B1Standard ToR Granted2025-12-22

    Bilaua Gitti Stone Mine

    rajendra prasad khandelwal · Non-Coal Mining

  15. Category B1EC Granted2025-12-12

    Parsen Stone Quarry

    RAM SHARMA · Non-Coal Mining

  16. Category B1EC Rejected2025-11-12

    Bilaua Stone Mine (for making gitti through crusher and bolder)

    JAI YADAV · Non-Coal Mining

  17. Category B1EC Rejected2025-11-01

    Lakhanpura Crusher Stone Deposit- 2.320 Ha

    AMARNATH SHARMA · Non-Coal Mining

  18. Category B1Standard ToR Granted2025-10-30

    Development of Regional Sanitary Landfill for Common Municipal Solid Waste Management Facility (CMSWMF) for Gwalior and its Cluster ULBs at Khasra Number: Kedarpur Area - 123,124,125,131,137,151,152,154,155,161, Tehsil: City Center and Chandoha Khurd Area - 125,126,136, Tehsil: Gwalior Rural, Dist: Gwalior by Nagar Nigam Gwalior.

    Nagar Nigam Gwalior · INFRA-2

  19. Category B1EC Rejected2025-10-28

    Lakhanpura Gitti, Boulder & M-Sand Mine

    BABA HARIDAS SAND INDUsTRIES · Non-Coal Mining

  20. Category B1Standard ToR Granted2025-10-13

    BILAUA STONE & M-SAND MINE

    SAPNA RATHORE · Non-Coal Mining

  21. Category B2EC Granted2025-09-16

    Bilheti Stone Mine

    SHRI BANKE BIHARI SARKAR STONE CRUSHER · Non-Coal Mining

  22. Category B1EC Granted2025-08-18

    Elixrr Industries Private Limited

    Elixrr industries private limited · Industrial Projects - 3

  23. Category B1EC Granted2025-08-13

    Jakhoda Flag Stone Mine (1.10 Hectare)

    RAMKALI ADIWASI · Non-Coal Mining

  24. Category B1EC Granted2025-08-12

    JAKHAUDA FLAG STONE QUARRY

    basanti · Non-Coal Mining

  25. Category B1EC Granted2025-07-29

    Panihar Iron Mine Area-4.705 ha

    RADHEY SINGH · Non-Coal Mining

  26. Category B1Standard ToR Granted2025-07-26

    Enhancement of production capacity of "Santau Iron Ore Mines"

    AYODHYA KUWARANI · Non-Coal Mining

  27. Category B1Standard ToR Granted2025-07-25

    Biloua Stone Mine For Making Gitti Through Crusher

    aashriya mines and minerals · Non-Coal Mining

  28. Category B2Referred to SEAC2025-07-02

    Gangapur Gitti Stone Mine, Area- 2.00 Ha.

    neelam chaurasiya · Non-Coal Mining

  29. Category B2EC Granted2025-07-01

    MAITHANA STONE QUARRY

    urmila Kirar · Non-Coal Mining

  30. Category B1Standard ToR Granted2025-06-30

    BILAUA STONE QUARRY

    VANDANA SINGH · Non-Coal Mining

  31. Category B1Standard ToR Granted2025-06-27

    Bilaua Stone Mine for making Gitti through crusher

    kamal bajaj · Non-Coal Mining

  32. Category B1EC Granted2025-06-21

    Proposed capacity expansion in common bio-medical waste treatment facility

    DEVIS SURGICO · INFRA-2

  33. Category B2EC Granted2025-06-10

    Lakhanpura Stone (Gitti) Quarry

    SHREE JOURASHI SARKAR STONE CRUSHER · Non-Coal Mining

  34. Category B1Standard ToR Granted2025-06-09

    Bilaua Stone (Gitti) Quarry

    NAVEEN BAJAJ · Non-Coal Mining

  35. Category B1EC Granted2025-06-02

    Berja Stone Quarry

    shri balaji granite · Non-Coal Mining

  36. Category B1EC Granted2025-05-27

    Jakhoda Flag Stone Quarry (1.50 Ha)

    SAROJ · Non-Coal Mining

  37. Category B1EC Granted2025-05-27

    Jakhoda Flag Stone Quarry Lease

    Rajabeti Adiwwasi · Non-Coal Mining

  38. Category B1ToR Granted2025-05-20

    Rafadpur Stone Quarry

    ASHOK GUPTA · Non-Coal Mining

  39. Category B1Standard ToR Granted2025-05-08

    Bilaua Crusher Stone Quarry

    KRISHNA YADAV · Non-Coal Mining

  40. Category B1Standard ToR Granted2025-05-08

    Elixrr Industries Private Limited

    Elixrr industries private limited · Industrial Projects - 3

  41. Category B1Standard ToR Granted2025-05-07

    Bilaua Stone mine for making gitti through crusher Project

    RAHUL SINGH · Non-Coal Mining

  42. Category B1EC Granted2025-05-05

    Jakhauda Flagstone Mine

    KULDEEP DUBEY · Non-Coal Mining

  43. Category B1Standard ToR Granted2025-05-05

    Biloua Stone Mine for making gitti through crusher

    RAJENDRA SINGH · Non-Coal Mining

  44. Category B1Standard ToR Granted2025-05-03

    BAHANGIKALAN STONE (GITTI) & M-SAND QUARRY

    vikas dwivedi · Non-Coal Mining

  45. Category B1Standard ToR Granted2025-05-03

    Bahangikalan Stone (Gitti) & M-Sand Mine

    vivek dwivedi · Non-Coal Mining

  46. Category B1Standard ToR Granted2025-05-03

    BAHANGIKALAN STONE (GITTI) & M-SAND MINE

    vivek dwivedi · Non-Coal Mining

  47. Category B1Standard ToR Granted2025-05-03

    BAHANGIKALAN GITTI & M-SAND MINE

    vivek dwivedi · Non-Coal Mining

  48. Category B2Pending at MS for Proposal Withdraw2025-04-30

    Parsen Stone Quarry

    SADHNA GURJAR · Non-Coal Mining

  49. Category B1ADS Raised2025-04-29

    Gadhota/Kupeda Sand Quarry

    ARUN SHARMA · Non-Coal Mining

  50. Category B1Standard ToR Granted2025-04-28

    Parsen Stone (Gitti) Quarry Project

    SADHNA GURJAR · Non-Coal Mining

  51. Category B1Standard ToR Granted2025-04-22

    Bilaua Gitti Stone Mine

    virendra sharma · Non-Coal Mining

  52. Category B1Standard ToR Granted2025-04-10

    Rafadpur Stone Quarry

    GOPAL AGARWAL · Non-Coal Mining

  53. Category B1Standard ToR Granted2025-04-10

    Rafadpur Stone Quarry

    VED GOYAL · Non-Coal Mining

  54. Category B1Standard ToR Granted2025-04-08

    Bilaua Stone Quarry

    ashish yadav · Non-Coal Mining

  55. Category B1Standard ToR Granted2025-04-07

    Bilaua Stone Mine for Making Gitti Through Crusher

    SHYAM SHARMA · Non-Coal Mining

  56. Category B1Standard ToR Granted2025-04-07

    Bilaua Stone Mine for Making Gitti Through Crusher

    SHYAM SHARMA · Non-Coal Mining

  57. Category B1Standard ToR Granted2025-04-05

    Biloua Stone Mine for making gitti through crusher Project

    VINITA YADAV · Non-Coal Mining

  58. Category B1EC Granted2025-04-05

    Biloua Stone (Gitti) Quarry

    NEW JAI DAUBABA STONE CRUSHER · Non-Coal Mining

  59. Category B1Standard ToR Granted2025-04-05

    Lakhanpura Stone (Gitti) Quarry

    ANIL SHRIVASTAVA · Non-Coal Mining

  60. Category B1Standard ToR Granted2025-04-04

    Rafadpur Stone Mine

    SANJEEV MITTAL · Non-Coal Mining

  61. Category B1Pending at MS for Proposal Withdraw2025-04-04

    Biloua Stone Mine Project

    VINITA YADAV · Non-Coal Mining

  62. Category B1Standard ToR Granted2025-04-04

    Bilaua Stone Quarry

    SUNIL SHARMA · Non-Coal Mining

  63. Category B1Standard ToR Granted2025-04-03

    Chandrapura Crusher Stone Quarry

    EMErald Industries · Non-Coal Mining

  64. Category B1Standard ToR Granted2025-04-03

    Chandrapura Stone Quarry

    emerald industries · Non-Coal Mining

  65. Category B1Standard ToR Granted2025-04-02

    Bilaua Stone Quarry

    manju gupta · Non-Coal Mining

  66. Category B1Standard ToR Granted2025-04-01

    Biloua Stone Quarry Project

    BAHADUR SINGH · Non-Coal Mining

  67. Category B1EC Granted2025-03-31

    Bilaua Stone Mine for Making Gitti Through Crusher

    shri sai stone industry · Non-Coal Mining

  68. Category AToR Granted2025-03-31

    Proposed expansion in existing distillery unit from 225 KLD to 500 KLD for production of Rectified Spirit/ Country Liquor (Proof)/ ENA/ Neutral Spirit/ Faint Spirit/ C.L. / IMFL/ IMFL Bottling along with production of 500 KLD grain/molasses based ethanol at Village: Jinawali and Milawali (Rairu farm), Block Ghatigaon, Tehsil and District- Gwalior (M.P.) by M/s Bapuna Alcobrew Pvt. Ltd.

    bapuna alcobrew private limited · Industrial Projects - 2

  69. Category B1Standard ToR Granted2025-03-28

    Lakhanpura Crusher Stone Deposit- 2.320 Ha

    AMARNATH SHARMA · Non-Coal Mining

  70. Category B1EC Granted2025-03-28

    Bilaua Stone Quarry

    STONEX INFRA · Non-Coal Mining

  71. Category B1Standard ToR Granted2025-03-27

    BILAUA STONE QUARRY, AREA- 2.0 Ha.

    MURARI SHARMA · Non-Coal Mining

  72. Category B1EC Granted2025-03-24

    Bilaua Stone Quarry

    LATA GUPTA · Non-Coal Mining

  73. Category B1Standard ToR Granted2025-03-21

    Bilaua Stone (Gitti) Quarry

    sushil kumar jain · Non-Coal Mining

  74. Category B1Standard ToR Granted2025-03-17

    JAKHAUDA FLAG STONE QUARRY

    basanti · Non-Coal Mining

  75. Category B1EC Granted2025-03-06

    Biloua Stone (Gitti) Quarry

    DHIRAJ GARG · Non-Coal Mining

  76. Category B1EC Granted2025-03-06

    Biloua Stone (Gitti) Quarry

    SHREE JEE STONES · Non-Coal Mining

  77. Category B1EC Granted2025-03-06

    Rafadpur Stone (Gitti) Quarry

    DHARMENDRA KANSANA · Non-Coal Mining

  78. Category B1EC Granted2025-03-06

    Biloua Stone (Gitty) Quarry

    MIRENDER GUPTA · Non-Coal Mining

  79. Category B1Standard ToR Granted2025-02-17

    Lakhanpura Gitti, Boulder & M-Sand Mine

    BABA HARIDAS SAND INDUsTRIES · Non-Coal Mining

  80. Category B1Standard ToR Granted2025-02-17

    Rafadpur Cement Grinding Plant, 90,000 TPA

    KIRAR SHRIVASTAV CEMENT PRIVATE LIMITED · Industrial Projects - 1

  81. Category B1Standard ToR Granted2025-02-10

    Bilaua Stone Mine (for making gitti through crusher and bolder)

    JAI YADAV · Non-Coal Mining

  82. Category B1Standard ToR Granted2025-02-10

    Jakhauda Flagstone Mine

    Hotam singh · Non-Coal Mining

  83. Category B1Standard ToR Granted2025-02-10

    Fuel ethanol manufacturing project (multi-grain Based) by M/s Bramhaganga Agro Organics Private Ltd (BAPL)

    BRAMHAGANGA AGRO ORGANICS PRIVATE LIMITED · Industrial Projects - 2

  84. Category B1Standard ToR Granted2025-01-24

    BAHANGI KHURD LATERITE DEPOSIT

    MUNENDRA SINGH · Non-Coal Mining

  85. Category B2Pending at MS SEIAA2025-01-23

    Expansion of Residential Project "Salasar Heights"

    SALASAR BALAJI REAL INFRA · INFRA-2

  86. Category B1Pending at MS SEIAA2025-01-16

    PRIME GOLD -SAIL JVC LIMITED

    PRIME GOLD SAIL JVC LIMITED · Industrial Projects - 1

  87. Category AStandard ToR Granted2024-12-24

    Proposed expansion in existing distillery unit from 225 KLD to 500 KLD for production of Rectified Spirit/ Country Liquor (Proof)/ ENA/ Neutral Spirit/ Faint Spirit/ C.L. / IMFL/ IMFL Bottling along with production of 500 KLD grain/molasses based ethanol at Village: Jinawali and Milawali (Rairu farm), Block Ghatigaon, Tehsil and District- Gwalior (M.P.) by M/s Bapuna Alcobrew Pvt. Ltd.

    bapuna alcobrew private limited · Industrial Projects - 2

  88. Category B1Withdrawal Request Accepted2024-11-14

    Bilaua Stone Quarry

    ashish yadav · Non-Coal Mining

  89. Category B2EC Granted2024-08-02

    Proposed Group Housing Project “Signature City” at Village Khureri, Bada Gaon, Gwalior, Madhya Pradesh

    Fenway Buildtech LLP · INFRA-2

  90. Category B1Standard ToR Granted2024-06-03

    Bilaua Stone Mine for Making Gitti Through Crusher

    shri sai stone industry · Non-Coal Mining

  91. Category B1Referred to SEAC2024-06-02

    Lidhoura Sand Quarry Deposit

    ARUN SHARMA · Non-Coal Mining

  92. Category B1Referred to SEAC2024-06-02

    Babupur Sand Quarry Deposit

    ARUN SHARMA · Non-Coal Mining

  93. Category B1EC Granted2024-06-02

    Basai Sand Quarry Deposit

    ARUN SHARMA · Non-Coal Mining

  94. Category B1EC Granted2024-06-02

    Gajapur Sand Quarry Deposit

    ARUN SHARMA · Non-Coal Mining

  95. Category B1Standard ToR Granted2024-05-29

    Bilaua Stone Mine for Making Gitti through Crusher (7.231 Ha)

    SHREE SHYAM SARKAR STONE CRUSHER LLP · Non-Coal Mining

  96. Category B2EC Granted2024-05-29

    Parsen Crusher Stone Quarry

    shree sitaram stone crusher · Non-Coal Mining

  97. Category B1Pending at MS SEIAA2024-05-27

    Jiganiya Stone Quarry

    RAJ CORPORATION LIMITED · Non-Coal Mining

  98. Category B2Pending at MS SEIAA2024-05-27

    GUNJHAR CRUSHER STONE & M-SAND QUARRY

    Savitri · Non-Coal Mining

  99. Category B2Pending at MS SEIAA2024-05-14

    MAITHANA STONE QUARRY

    RAJKUMAR · Non-Coal Mining

  100. Category B1Standard ToR Granted2024-05-02

    Rafadpur Stone Quarry

    ASHOK GUPTA · Non-Coal Mining

Showing 100 of 199 proposals, newest first. The button below loads the rest.