Shivpuri, Madhya Pradesh
Recent activity
All 12 in the last 60 days- 19 Oct 2026 · FiledSubmittedKamalpur Stone(Gitti & M Sand) Quarry
- 5 Oct 2026 · DecidedEnvironmental clearance grantedDongari Flag Stone Mine
- 30 Sept 2026 · FiledSubmittedAtalpur Stone (Gitti) , M-Sand & Boulder
- 23 Sept 2026 · FiledSubmittedRaokhurd Murram & Boulder Quarry
- 21 Sept 2026 · Details soughtEssential details soughtChandpatha Stone (Gitti & M-Sand) & Murrum Quarry
- 18 Sept 2026 · FiledSubmittedNaraua Murrum & Stone (M-Sand) Quarry
- 16 Sept 2026 · FiledSubmittedChandpatha Stone (Gitti & M-Sand) & Murrum Quarry
- 13 Sept 2026 · DecidedEnvironmental clearance grantedGARETHA STONE (GITTI) & M-SAND MINE-4.0HA.
- 13 Sept 2026 · DecidedEnvironmental clearance grantedAmarpur Devra Stone (Gitti & M-Sand) Quarry
- 13 Sept 2026 · DecidedEnvironmental clearance grantedBamor Stone Quarry
- 13 Sept 2026 · DecidedEnvironmental clearance grantedDinara Stone(Gitti) Quarry
- 11 Sept 2026 · DecidedEnvironmental clearance grantedDabardehi Stone (Gitti & M-Sand) Quarry
Dated by the portal's own appraisal history, converted to India Standard Time; a proposal with no recorded history appears on its register submission date.
Other clearances these proposals declare
- Forest land diversion declared
- 4
- Forest land sought for diversion
- Area not stated
- Wildlife board recommendation declared
- 0
- In or near a protected area
- 0
- In an eco-sensitive zone
- 0
These counts are taken from the application forms of the 123 of 123 proposals naming this district whose forms have been read for these questions. In 32 of those forms at least one question was left blank, and a blank answer is counted as unknown. The forest area is the area stated for forest clearance, with each forest proposal counted once, in the district where its project is primarily sited.
- Proposals naming this district
- 123
- Category A proposals
- 2
- Families declared displaced
- 800
- Families declared affected
- 990
Displacement figures are the proponents’ own declarations. A project sited across several districts declares one figure for the whole project, and that figure is counted once, in the district where the project is primarily sited. 1 of the proposals listed below declare displacement and are sited primarily in another district, so their figures are counted in that district’s total.
Fifth Schedule status
Not within a Fifth Schedule Scheduled Area
The Presidential Order for Madhya Pradesh declares which areas in the State are Scheduled Areas. It does not name this district, in whole or in part, so no part of it is a Scheduled Area under that Order. A later Order could add one; this reference states the position as transcribed and reviewed on 2026-08-21.
OrderThe Scheduled Areas (States of Chhattisgarh, Jharkhand and Madhya Pradesh) Order, 2003
What the record shows
Cultivators and agricultural labourers make up 80% of workers here, against 55% nationally, so at least three in four people who work here do so on the land.
Applicants for projects sited mainly in this district have declared 800 families to be displaced. The figure comes from their applications, and we have not verified it.
Each of these observations appears when a fixed rule is met by the figures on this page, so the same figures always give the same sentences. None of them is a view on whether a project should go ahead.
Who lives there
Figures from Census 2011, each compared with the all-India value computed on the same definition.
- Total population
- 17,26,050
- Households
- 3,59,969
- Average household size
- 4.79
- 0.06 below India's 4.85India
- Scheduled Tribe share of population
- 13.2%
- 4.6 points above IndiaIndia
- Scheduled Caste share of population
- 18.6%
- 2.0 points above IndiaIndia
- Children aged 0-6
- 16.6%
- 3.0 points above IndiaIndia
- Literacy rate
- 62.6%
- 10.4 points below IndiaIndia
- Sex ratio
- 877
- 66.0 below India's 942.6India
What they live on
How the district's workers earn a living, from Census 2011. The land-dependent share counts cultivators and agricultural labourers as a share of all workers, and it is the group most directly affected when land is acquired.
- Total workers
- 7,59,281
- Work participation rate
- 44.0%
- 4.2 points above IndiaIndia
- Workers dependent on land
- 79.5%
- 25.0 points above IndiaIndia
- Cultivators
- 50.5%
- 25.9 points above IndiaIndia
- Agricultural labourers
- 29.0%
- 0.9 points below IndiaIndia
- Marginal workers
- 23.9%
- 0.8 points below IndiaIndia
- Household industry workers
- 1.7%
- 2.1 points below IndiaIndia
How households live
Land, income and work among rural households, from the Socio Economic and Caste Census 2011, which recorded these where the population census did not. Only the survey's rural part is used here, so urban households do not appear.
- Rural households owning land
- 54.2%
- 8.0 points above IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
- Rural households whose highest earner makes over ₹5,000 a month
- 17.1%
- 7.3 points below IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
- Rural households living mainly on manual casual labour
- 42.8%
- 8.9 points below IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
- Rural households with a salaried member
- 2.5%
- 5.8 points below IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
When these were filed
Each proposal is dated by the first step in its appraisal history, the dated record of steps the portal keeps for it.
The timeline counts 90 of the 123 proposals here. The first filing date comes from each proposal's appraisal history, and we have not yet read it for the other 33, so they are left out. Most of them are older proposals, so the early part of the timeline undercounts what was filed then. The register itself records a date for each of them; the gap is in our copy of the histories.
Hatched columns undercount, so they cannot be compared with solid ones. 2 of them cover periods for which we have read few filing dates so far, and they count only the proposals whose date we have. 2026-Q4 was still running when the register was read, so its column counts only the filings made up to that date.
What kind of projects these are
The proposals naming this district, grouped by the sector each was filed under.
- Non-Coal Mining 94.3%
- River Valley and Hydroelectric Projects 3.3%
- Industrial Projects - 1 1.6%
- INFRA-2 0.8%
The four largest sectors are shown by name and the rest are grouped as Other.
What is proposed here
These are the proposals in the national environmental clearance register whose application names a site in this district, newest first. A project with sites in several districts appears under each of them.
- Category B1Under Verification2026-10-19
Kamalpur Stone(Gitti & M Sand) Quarry
jaisika shivhare · Non-Coal Mining
- Category B1Proposal Accepted and Referred to SEAC2026-09-30
Atalpur Stone (Gitti) , M-Sand & Boulder
rajkumari adiwasi · Non-Coal Mining
- Category B2Proposal Accepted and Referred to SEAC2026-09-23
Raokhurd Murram & Boulder Quarry
ravi saxena · Non-Coal Mining
- Category B2Proposal Accepted and Referred to SEAC2026-09-21
Chandpatha Stone (Gitti & M-Sand) & Murrum Quarry
HIMANSHU SHARMA · Non-Coal Mining
- Category B2Proposal Accepted and Referred to SEAC2026-09-18
Naraua Murrum & Stone (M-Sand) Quarry
A.S. Stone · Non-Coal Mining
- Category B2Pending at MS SEIAA2026-08-06
Tongra Murrum Quarry
urmila adiwasi · Non-Coal Mining
- Category B2Referred to SEIAA2026-07-23
Garetha Stone (gitti & M-sand) Quarry
Souveer Jain · Non-Coal Mining
- Category B1Referred to SEIAA2026-07-20
Bamor Stone Quarry
RAJNARAYAN BHARGAVA · Non-Coal Mining
- Category B2EC Granted2026-06-04
Dongari Flag Stone Mine
IMRAN KHAN · Non-Coal Mining
- Category B2EC Granted2026-05-29
Amarpur Devra Stone (Gitti & M-Sand) Quarry
pawan khatik · Non-Coal Mining
- Category B1Standard ToR Granted2026-05-25
Tongra Stone & Murrum Quarry
JMK GROUP · Non-Coal Mining
- Category B1EC Granted2026-04-04
Bamor Stone Quarry
DEVRAJ ASSOCIATES · Non-Coal Mining
- Category B1Forwarded to MS SPCB/PCC by MS2026-02-28
Atalpur Stone (Gitti) , M-Sand & Boulder
rajkumari adiwasi · Non-Coal Mining
- Category B1Referred to SEIAA2026-02-16
Proposed Clinker Grinding Unit for Ordinary Portland Cement Plant of 50 TPD
Archana Raghuwanshi · Industrial Projects - 1
- Category B2EC Granted2026-02-06
Dinara Stone(Gitti) Quarry
shri balaji stone crusher · Non-Coal Mining
- Category B2Referred to SEIAA2026-02-06
Mehdawali Murram Quarry
mana adiwasi · Non-Coal Mining
- Category B2EC Granted2026-01-16
Sillarpur Stone(gitti), M-Sand, and Boulder Quarry
balram · Non-Coal Mining
- Category B2EC Granted2026-01-10
Toda Karera Murum Quarry
shishupal yadav · Non-Coal Mining
- Category B1Forwarded to MS SPCB/PCC by MS2026-01-03
Kamalpur Stone(Gitti & M Sand) Quarry
jaisika shivhare · Non-Coal Mining
- Category B2EC Granted2025-12-31
Jargawansani Stone(Gitti) & M Sand Quarry
gajendra singh · Non-Coal Mining
- Category B1EC Granted2025-11-25
Garetha Stone (Gitti & M-sand)Quarry
pushpraj khatik · Non-Coal Mining
- Category B2EC Granted2025-11-21
Panihara Stone (Gitti & M-Sand) Quarry
devraj khatik · Non-Coal Mining
- Category B1EC Granted2025-11-17
Garetha Stone and M-Sand Quarry
sarita golkar · Non-Coal Mining
- Category B2EC Granted2025-11-06
Dabardehi Stone (Gitti & M-Sand) Quarry
rahul sharma · Non-Coal Mining
- Category B1Standard ToR Granted2025-10-24
Bamor Stone Quarry
RAJNARAYAN BHARGAVA · Non-Coal Mining
- Category B1EC Granted2025-09-22
GARETHA STONE & M-SAND MINE-2.0ha
BHANU JAIN · Non-Coal Mining
- Category B1EC Granted2025-09-20
GARETHA STONE (GITTI) & M-SAND MINE-4.0HA.
saksham kumar jain · Non-Coal Mining
- Category B1EC Granted2025-09-20
GARETHA STONE & M-SAND MINE-4.0 Ha.
indrapal singh sikarwar · Non-Coal Mining
- Category B1EC Granted2025-09-17
GARETHA STONE & M-SAND MINE-4.0ha
ABHISHEK SINGH BANAFAR · Non-Coal Mining
- Category B2EC Granted2025-09-17
Parichchha Ahir Stone Mine (Temporary Permit)
TOMAR BUILDERS AND CONTRACTORS PRIVATE LIMITED · Non-Coal Mining
- Category B2EC Granted2025-08-26
Kenwaha Flagstone quarry
VINOD KUMAR GUPTA · Non-Coal Mining
- Category AToR Granted2025-08-19declares affected families
Sonpura Major Micro Irrigation Project
PROJECT MANAGER (Executive Engineer) · River Valley and Hydroelectric Projects
- Category B2EC Granted2025-07-14
Bichi Granite Stone Quarry
shri siddh stonex · Non-Coal Mining
- Category B2EC Granted2025-07-07
Khonkar Murum Mine
KISHAN SINGH RAWAT · Non-Coal Mining
- Category B2EC Granted2025-07-03
BHAGOR QUARTZ MINE
MUNNA AGARWAL · Non-Coal Mining
- Category B2EC Granted2025-07-01
Tharkheda Stone (Gitti) & M-Sand
VED SHARMA · Non-Coal Mining
- Category B1Standard ToR Granted2025-06-26
Barai Stone(gitti) and M-Sand Quarry
DEVRAJ ASSOCIATES · Non-Coal Mining
- Category B1Standard ToR Granted2025-06-14
Garetha Stone and M-Sand Quarry
sarita golkar · Non-Coal Mining
- Category B2EC Granted2025-06-10
Chitora Murum Quarry
neeraj aadivasi · Non-Coal Mining
- Category B2EC Rejected2025-06-04
CHITAHARI SAND QUARRY
BALA MEHRA · Non-Coal Mining
- Category B2EC Rejected2025-06-04
Raipahadi Sand Mine
BALA MEHRA · Non-Coal Mining
- Category B2EC Rejected2025-06-04
JARGAWAN SANI SAND QUARRY
BALA MEHRA · Non-Coal Mining
- Category B2EC Granted2025-05-27
Vedmau Flagstone Mine
Munni bai adiwashi · Non-Coal Mining
- Category B2EC Granted2025-05-26
Ramabasai Murrum Quarry
sashi rawat · Non-Coal Mining
- Category B2EC Granted2025-05-24
Bhadora Flagstone Quarry
NIRDOSH GOYAL · Non-Coal Mining
- Category B1Standard ToR Granted2025-05-12
GARETHA STONE (GITTI) & M-SAND MINE-4.0HA.
saksham kumar jain · Non-Coal Mining
- Category B2EC Granted2025-05-07
TODI KARERA & AASPUR STONE (GITTI) & M-SAND QUARRY
osho associates · Non-Coal Mining
- Category B2EC Granted2025-04-24
Tongra khanda/Dhoka and Boulder Quarry
DHARMENDRA RAWAT · Non-Coal Mining
- Category B2EC Granted2025-04-21
Badadah Stone Quarry
krishnashray mines and minerals · Non-Coal Mining
- Category B2EC Granted2025-04-18
Bhadora Flagstone Quarry
shobha gupta · Non-Coal Mining
- Category B1Standard ToR Granted2025-04-17
GARETHA STONE & M-SAND MINE-2.0ha
BHANU JAIN · Non-Coal Mining
- Category B2EC Granted2025-04-16
Paragarh Stone (Gitti & M-sand) Quarry
pooja khatik · Non-Coal Mining
- Category B1EC Granted2025-04-14
KHERONA FLAG STONE MINE
EMERALD INDUSTRIES LIMITED · Non-Coal Mining
- Category B1EC Granted2025-03-26
Bamor Stone Quarry
OM CRASHER STONE · Non-Coal Mining
- Category B1EC Granted2025-03-18
Bamor Stone Quarry
NEERAJ KHATIK · Non-Coal Mining
- Category B1EC Granted2025-03-18
Bamor Stone Quarry
JAI SIDH BABA STONE CRUSHUR · Non-Coal Mining
- Category B1EC Granted2025-03-18
Bamor Stone Quarry
DEVRAJ ASSOCIATES · Non-Coal Mining
- Category B1Standard ToR Granted2025-03-15
GARETHA STONE & M-SAND MINE-4.0ha
ABHISHEK SINGH BANAFAR · Non-Coal Mining
- Category B1Standard ToR Granted2025-03-10
Proposed Clinker Grinding Unit for Ordinary Portland Cement Plant of 50 TPD
Archana Raghuwanshi · Industrial Projects - 1
- Category B1Standard ToR Granted2025-01-30
Garetha Stone (Gitti & M-sand)Quarry
pushpraj khatik · Non-Coal Mining
- Category B1Standard ToR Granted2025-01-29
GARETHA STONE & M-SAND MINE-4.0 Ha.
indrapal singh sikarwar · Non-Coal Mining
- Category B1EC Granted2025-01-21
Dabradinara Stone Quarry
MAHAKALESHWAR STONE CRUSHER · Non-Coal Mining
- Category B1EC Granted2025-01-21
Parichha Kirar Stone Quarry
SHRI GIRRAJ JI STONE CRUSHER · Non-Coal Mining
- Category B2EC Granted2025-01-15declares affected families
SANGATHA (AER) MEDIUM PROJECT
EXECUTIVE ENGINEER WATER RESOURCES DIVISION SHIVPURI · River Valley and Hydroelectric Projects
- Category B1Pending at MS SEIAA2025-01-14
Devri Khurd Stone Quarry
DEV ASSOCIATES · Non-Coal Mining
- Category B1Pending at MS SEIAA2025-01-13
Tongra Murram Quarry
SURESH SHIVHARE · Non-Coal Mining
- Category B1Pending at MS SEIAA2025-01-13
Tongara Murram Quarry
DHARMENDRA RAWAT · Non-Coal Mining
- Category B1Pending at MS SEIAA2024-05-28
Deori Khurd Stone & M-Sand Quarry
JITENDRA GURJAR · Non-Coal Mining
- Category B2Pending at MS SEIAA2024-05-27
Bhadora Flagstone, Khanda/ Dhoka Quarry
NITIN CHOCRSEY · Non-Coal Mining
- Category B2Pending at MS SEIAA2024-05-27
Garetha Stone Boulder & M-sand Quarry
NITIN ROY · Non-Coal Mining
- Category B2Pending at MS SEIAA2024-05-24
MAGRONI STONE QUARRY
Rekha · Non-Coal Mining
- Category B2Pending at MS SEIAA2024-05-24
Parichchha Ahir Stone & M-Sand Quarry
tanishk jain · Non-Coal Mining
- Category B2EC Granted2024-05-02
Atalpur Stone Quarry
GANESH DHAKAD · Non-Coal Mining
- Category B2EC Granted2024-05-01
Khadela Flagstone Quarry
RAVINDRA CHOUHAN · Non-Coal Mining
- Category B2Pending at MS SEIAA2024-04-27
Magroni Crusher Stone Quarry
Pratap singh tomar · Non-Coal Mining
- Category B2Pending at MS SEIAA2024-04-18
TONGARA KHANDA BOULDER & MURRUM QUARRY
pratap singh gurjar · Non-Coal Mining
- Category B1Pending at MS SEIAA2024-04-08
Tongra Stone & Murrum Quarry
JMK GROUP · Non-Coal Mining
- Category B2EC Granted2024-03-26
Sillarpur Stone Quarry
CHANDRABHAN · Non-Coal Mining
- Category B1Pending at MS SEIAA2024-03-19
Garetha Stone Quarry
BHANU JAIN · Non-Coal Mining
- Category B2Pending at MS SEIAA2024-03-13
Barai Stone Quarry
M/S BALLARI MAA STONE CRUSHER · Non-Coal Mining
- Category B2EC Granted2024-03-04
Barai Stone Quarry
HIMANSHU SHARMA · Non-Coal Mining
- Category B2EC Granted2024-03-02
Samuha Stone Quarry for making Boulder, Gitti & M-sand
NASIR KHAN · Non-Coal Mining
- Category B2Pending at MS SEIAA2024-02-14
MAGRONI STONE & M-SAND QUARRY
RANJANA SINGH TOMAR · Non-Coal Mining
- Category B2Under Verification2024-02-05
Bedmau Flag Stone Quarry
MANNA YADAV · Non-Coal Mining
- Category B2EC Granted2024-01-30
Bedmau Flagstone Quarry
MANNA YADAV · Non-Coal Mining
- Category B1TOR GRANTED2024-01-20
Chhitipur Sand Quarry Deposit
BALA MEHRA · Non-Coal Mining
- Category B1TOR GRANTED2024-01-20
Mahowadamron Sand Quarry Deposit
BALA MEHRA · Non-Coal Mining
- Category B1TOR GRANTED2024-01-20
Sirsona Sand Quarry Deposit
BALA MEHRA · Non-Coal Mining
- Category B2EC Granted2023-12-29
Atalpur Stone Quarry
SHASHI DWIVEDI · Non-Coal Mining
- Category B1TOR Granted2023-12-28
Bamor Stone Quarry
JAI SIDH BABA STONE CRUSHUR · Non-Coal Mining
- Category B1ToR Granted2023-12-16
Tongra Murram Quarry
SURESH SHIVHARE · Non-Coal Mining
- Category B1TOR Granted2023-12-13
Dabradinara Stone Quarry
MAHAKALESHWAR STONE CRUSHER · Non-Coal Mining
- Category B1TOR Granted2023-12-13
Bamor Stone Quarry
OM CRASHER STONE · Non-Coal Mining
- Category B2EC Granted2023-12-12
Kalipahadi Crusher Stone (Gitti & M-sand) Quarry
RAJESH RAWAT · Non-Coal Mining
- Category B1EDS raised2023-12-12
Bamor Stone Quarry
NEERAJ KHATIK · Non-Coal Mining
- Category B1ToR Granted2023-12-08
Tongara Murram Quarry
DHARMENDRA RAWAT · Non-Coal Mining
- Category B2EC Granted2023-12-05
Banskhedi Khanda, Boulder, Dhoka, Murrum Quarry
PANKAJ · Non-Coal Mining
- Category B1TOR Granted2023-11-23
Deori Khurd Stone & M-Sand Quarry
JITENDRA GURJAR · Non-Coal Mining
- Category B1EC Granted2023-11-21
Flagstone Quarry
RAJASAHAB BUNDELA · Non-Coal Mining
- Category AUnder Processing with Authority2023-11-21declares affected families
Lower Orr
National Water Development Agency · River Valley and Hydroelectric Projects
Showing 100 of 123 proposals, newest first. The button below loads the rest.