Satna, Madhya Pradesh
Recent activity
All 11 in the last 60 days- 21 Oct 2026 · Details soughtEssential details suppliedIncrease in clinker production from 4 million TPA to 8.5 million TPA through addition of new unit…
- 21 Oct 2026 · FiledSubmittedBihara Laterite Deposit
- 16 Oct 2026 · FiledSubmittedIncrease in clinker production from 4 million TPA to 8.5 million TPA through addition of new unit…
- 15 Oct 2026 · DecidedEnvironmental clearance grantedItoura Limestone Mining with 0.8 MTPA capacity at villages Itoura, Bachwai, Karhi Pawai, Giduri, and Rewra…
- 12 Oct 2026 · Details soughtEssential details soughtSohaula Murrum Mine
- 6 Oct 2026 · Details soughtEssential details examination completedAtarhara Parsokha Limestone Block (Area: 349.172 Ha) with Limestone Production Capacity: 2.30 Million TPA,…
- 1 Oct 2026 · Details soughtAdditional details soughtSagmania Limestones Mines(852.5 Ha)
- 27 Sept 2026 · ClosedDelisted automaticallySohaula Murrum Mine
- 19 Sept 2026 · FiledSubmittedRamsthan Ghunchihai Jamodi Limestone Block (ML Area: 1917.153 ha) with Limestone Production Capacity 5.10…
- 18 Sept 2026 · Details soughtEssential details soughtAtarhara Parsokha Limestone Block (Area: 349.172 Ha) with Limestone Production Capacity: 2.30 Million TPA,…
- 12 Sept 2026 · FiledSubmittedAtarhara Parsokha Limestone Block (Area: 349.172 Ha) with Limestone Production Capacity: 2.30 Million TPA,…
Dated by the portal's own appraisal history, converted to India Standard Time; a proposal with no recorded history appears on its register submission date.
Other clearances these proposals declare
- Forest land diversion declared
- 5
- Forest land sought for diversion
- 756 ha
- Wildlife board recommendation declared
- 1
- In or near a protected area
- 0
- In an eco-sensitive zone
- 0
These counts are taken from the application forms of the 139 of 139 proposals naming this district whose forms have been read for these questions. In 51 of those forms at least one question was left blank, and a blank answer is counted as unknown. The forest area is the area stated for forest clearance, with each forest proposal counted once, in the district where its project is primarily sited.
- Proposals naming this district
- 139
- Category A proposals
- 22
- Families declared displaced
- 126
- Families declared affected
- 10,183
Displacement figures are the proponents’ own declarations. A project sited across several districts declares one figure for the whole project, and that figure is counted once, in the district where the project is primarily sited.
Fifth Schedule status
Not within a Fifth Schedule Scheduled Area
The Presidential Order for Madhya Pradesh declares which areas in the State are Scheduled Areas. It does not name this district, in whole or in part, so no part of it is a Scheduled Area under that Order. A later Order could add one; this reference states the position as transcribed and reviewed on 2026-08-21.
OrderThe Scheduled Areas (States of Chhattisgarh, Jharkhand and Madhya Pradesh) Order, 2003
What the record shows
Agricultural labourers, who work other people's land for wages, make up 41% of workers here. Compensation for acquired land is paid to those who hold title to it, so it does not reach them. They can still claim the rehabilitation and resettlement entitlements of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (RFCTLARR), because its section 3(c) counts a family whose livelihood depends on the land as an affected family, wherever that Act governs how the land is obtained.
Applicants for projects sited mainly in this district have declared 126 families to be displaced. The figure comes from their applications, and we have not verified it.
Each of these observations appears when a fixed rule is met by the figures on this page, so the same figures always give the same sentences. None of them is a view on whether a project should go ahead.
Who lives there
Figures from Census 2011, each compared with the all-India value computed on the same definition.
- Total population
- 22,28,935
- Households
- 4,78,741
- Average household size
- 4.66
- 0.19 below India's 4.85India
- Scheduled Tribe share of population
- 14.4%
- 5.8 points above IndiaIndia
- Scheduled Caste share of population
- 17.9%
- 1.2 points above IndiaIndia
- Children aged 0-6
- 14.8%
- 1.3 points above IndiaIndia
- Literacy rate
- 72.3%
- 0.7 points below IndiaIndia
- Sex ratio
- 926
- 16.9 below India's 942.6India
What they live on
How the district's workers earn a living, from Census 2011. The land-dependent share counts cultivators and agricultural labourers as a share of all workers, and it is the group most directly affected when land is acquired.
- Total workers
- 9,11,349
- Work participation rate
- 40.9%
- 1.1 points above IndiaIndia
- Workers dependent on land
- 65.8%
- 11.2 points above IndiaIndia
- Cultivators
- 25.0%
- 0.4 points above IndiaIndia
- Agricultural labourers
- 40.8%
- 10.9 points above IndiaIndia
- Marginal workers
- 32.8%
- 8.1 points above IndiaIndia
- Household industry workers
- 5.1%
- 1.2 points above IndiaIndia
How households live
Land, income and work among rural households, from the Socio Economic and Caste Census 2011, which recorded these where the population census did not. Only the survey's rural part is used here, so urban households do not appear.
- Rural households owning land
- 35.3%
- 10.8 points below IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
- Rural households whose highest earner makes over ₹5,000 a month
- 17.9%
- 6.5 points below IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
- Rural households living mainly on manual casual labour
- 66.1%
- 14.3 points above IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
- Rural households with a salaried member
- 7.2%
- 1.1 points below IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
When these were filed
Each proposal is dated by the first step in its appraisal history, the dated record of steps the portal keeps for it.
The timeline counts 89 of the 139 proposals here. The first filing date comes from each proposal's appraisal history, and we have not yet read it for the other 50, so they are left out. Most of them are older proposals, so the early part of the timeline undercounts what was filed then. The register itself records a date for each of them; the gap is in our copy of the histories.
Hatched columns undercount, so they cannot be compared with solid ones. 3 of them cover periods for which we have read few filing dates so far, and they count only the proposals whose date we have. 2026-Q4 was still running when the register was read, so its column counts only the filings made up to that date.
What kind of projects these are
The proposals naming this district, grouped by the sector each was filed under.
- Non-Coal Mining 96.4%
- Industrial Projects - 1 2.2%
- River Valley and Hydroelectric Projects 1.4%
The four largest sectors are shown by name and the rest are grouped as Other.
What is proposed here
These are the proposals in the national environmental clearance register whose application names a site in this district, newest first. A project with sites in several districts appears under each of them.
- Category AEDS Under Examination2026-10-27
Increase in clinker production from 4 million TPA to 8.5 million TPA through addition of new unit (line-II) of 4.5 million TPA of Clinker and power generation through WHRB from 12.25 MW to 32.25 MW along with exiting cement production of 5.0MTPA
RCCPL Private Limited · Industrial Projects - 1
- Category B1Forwarded to MS SPCB/PCC by MS2026-10-21
Bihara Laterite Deposit
tejpal singh · Non-Coal Mining
- Category B2Under Verification2026-10-15
Sohaula Murrum Mine
Shubham singh · Non-Coal Mining
- Category AProposal Accepted and Referred to EAC2026-10-06declares affected families
Atarhara Parsokha Limestone Block (Area: 349.172 Ha) with Limestone Production Capacity: 2.30 Million TPA, Top Soil: 0.03 Million TPA and Waste: 1.00 Million TPA (Total Excavation: 3.33 Million TPA) by M/s. UltraTech Cement Limited located at Villages: Atarhara & Parsokha, Tehsil: Maihar, District: Maihar, State: Madhya Pradesh.
UltraTech Cement Limited · Non-Coal Mining
- Category AProposal Accepted and Referred to EAC2026-09-19declares affected families
Ramsthan Ghunchihai Jamodi Limestone Block (ML Area: 1917.153 ha) with Limestone Production Capacity 5.10 Million TPA, Top Soil: 0.13 Million TPA, Overburden: 13.88 Million TPA & Mineral Reject: 1.88 Million TPA (Total Excavation: 20.99 Million TPA) along with installation of Crusher and Wobbler with capacity of 1200 & 400 TPH located At Tehsil: Rampur Baghelan/ Raghurajnagar, District: Satna, State:Madhya Pradesh.
M/s. UltraTech Cement Ltd. · Non-Coal Mining
- Category B1Forwarded to MS SPCB/PCC by MS2026-08-20declares affected families
Proposed Jamodi-Mohanna Sector-III (Part-B) Limestone Block (Area: 74.5457 hect.) with Saleable Limestone production Capacity (ROM):- 1,00,339.20 TPA (0.100 million TPA), Overburden:- 2,34,192.00 TPA (0.234 million TPA); (Total Excavation: 3,34,531.20 TPA (0.334 million TPA) along with 1200 TPH crusher at Village- Mand, Mohanna & Atarhar, Taluka:- Raghurajnagar, District:- Satna, Madhya Pradesh of M/s. Ambuja Cements Limited.
Ambuja Cements Limited · Non-Coal Mining
- Category B1Forwarded to MS SPCB/PCC by MS2026-08-13declares affected families
Proposed Naubasta-Kolard Part (A) (Damha_Barethiya & Kothar) Limestone Block (Area: 127.599 hect.) Limestone production Capacity:- 650,525.94 TPA (0.650 million TPA), Overburden:- 12,49,786.80 TPA (1.249 million TPA) and Topsoil:- 17,306.8 TPA (0.017 million TPA), Total Excavation: 19,17,619.54 TPA (1.917 million TPA) along with 1800 TPH crusher at Villages:- Damha, Kolard, Barethiya Kothar Taluka:- Nagod & Uchahara, District:- Satna, Madhya Pradesh by the M/s. Ambuja Cements Limited.
Ambuja Cements Limited · Non-Coal Mining
- Category B1Forwarded to MS SPCB/PCC by MS2026-08-12
BHATOORA LIMESTONE MINE- 2.696HA.of ANIL NAGRATH
anil nagrath · Non-Coal Mining
- Category AEC Granted2026-08-04declares affected families
Itoura Limestone Mining with 0.8 MTPA capacity at villages Itoura, Bachwai, Karhi Pawai, Giduri, and Rewra with ML area - 747.817 ha, Tehsil Raghurajnagar, Satna district, Madhya Pradesh by M/s. RCCPL Private Limited
RCCPL Private Limited · Non-Coal Mining
- Category B1Referred to SEIAA2026-07-25
Revalidation of the Environmental Clearance as per MoEF&CC Notification dated 6th April, 2018 for Existing Limestone Mine (ML Area: 66.434 ha) with existing 0.3 Million TPA Limestone Production Capacity located at Village: Mankahari, Tehsil: Rampur Baghelan, District: Satna, Madhya Pradesh by Prism Johnson Limited.
PRISM JOHNSON LIMITED · Non-Coal Mining
- Category B1Referred to SEIAA2026-07-09
Bamhaur Stone Mine-1.016ha
SATNA STONE KRUSHAR · Non-Coal Mining
- Category B1Referred to SEIAA2026-06-17
ABER LATERITE AND LIMESTONE BLOCK
ASK RESOURCES & CONSULTANCY · Non-Coal Mining
- Category AForwarded to MS SPCB/PCC by MS2026-05-01declares affected families
Panari Pumped Storage Project
PANARI ENERGY PRIVATE LIMITED · River Valley and Hydroelectric Projects
- Category AToR Granted2026-04-30declares affected families
Riwara Limestone Block (ML Area: 302.245 ha) with Limestone Production Capacity: 2.30 Million TPA, Top Soil: 0.05 Million TPA & Overburden: 0.89 Million TPA (Total Excavation: 3.24 Million TPA) located at Village: Riwara, Tehsil: Maihar, District: Maihar, Madhya Pradesh.
UltraTech Cement Limited · Non-Coal Mining
- Category B1Standard ToR Granted2026-04-21declares affected families
Proposed Karmau and Mungwari Limestone Block (Auctioned Block) (Area: 150.906 ha) with Limestone Production Capacity: 505340 TPA at Villages: Karmau & Mungwari, Tehsil: Rampur Baghelan, District: Satna, Madhya Pradesh of M/s. Ambuja Cements Limited
Ambuja Cements Limited · Non-Coal Mining
- Category AProposal returned in present form2026-04-01declares affected families
Proposed Jamodi Mahanna Sector - II (Part B) Limestone Block (Area: 264.156 ha) with Limestone Production Capacity: 0.05 Million TPA, Top Soil: 0.04 Million TPA, Overburden: 0.367 Million TPA (Total Excavation: 0.457 Million TPA) located at Villages: Ramsthan, Lilauri, Chhipiyadandi, Lohra and Pataura Tehsil: Raghurajnagar, District: Satna, Madhya Pradesh by Prism Johnson Limited.
PRISM JOHNSON LIMITED · Non-Coal Mining
- Category AProposal returned in present form2026-03-26declares affected families
Proposed Jamodi Mahanna Sector - I (Part - B) Limestone Block (Area: 416.73 ha) with Limestone Production Capacity: 0.05 Million TPA, Top Soil: 0.013 Million TPA, Overburden: 0.027 Million TPA (Total Excavation: 0.09 Million TPA) located at Villages: Barikhurd, Phutaundha, Phutaundhi, Kunwa, Dharampura, Majhiyar, Babupur and Lilauri Tehsil: Raghurajnagar, District: Satna, Madhya Pradesh by Prism Johnson Limited.
PRISM JOHNSON LIMITED · Non-Coal Mining
- Category AForwarded to MS SPCB/PCC by MS2026-03-13
Increase in clinker production from 4 million TPA to 8.5 million TPA through addition of new unit (line-II) of 4.5 million TPA of Clinker and power generation through WHRB from 12.25 MW to 32.25 MW along with exiting cement production of 5.0MTPA
RCCPL Private Limited · Industrial Projects - 1
- Category AForwarded to MS SPCB/PCC by MS2026-02-12
Establishment of Clinkerization and Cement Manufacturing Plant along with associated facilities at Villages Jamuna and Tapa, Tehsil Rampur Baghelan, District Satna Madhya Pradesh by Dalmia Cement (Bharat) Ltd.
DALMIA CEMENT (BHARAT) LIMITED · Industrial Projects - 1
- Category B1Referred to SEIAA2026-02-11
Amriti Laterite and Ochre Mine
VIKAS MINERALS · Non-Coal Mining
- Category B1Referred to SEIAA2026-01-29
Pahadi Limestone Block, 102.861 ha.
INDU AHLUWALIA · Non-Coal Mining
- Category AToR Granted2026-01-28declares affected families
Proposed Naubasta-Kolard Part-B (Helaundha) Limestone Block (Area 252.256 Ha) with Limestone Production Capacity: 0.402 Million TPA, Top Soil: 0.004 Million TPA and Waste: 0.168 Million TPA (Total Excavation: 0.574 Million TPA) located at Villages: Helaundha, Mahkona, Vasudha & Sapti Mafi, Taluka: Nagod, District: Satna, State: Madhya Pradesh of Dalmia Cement (Bharat) Ltd.
DALMIA CEMENT (BHARAT) LIMITED · Non-Coal Mining
- Category AToR Granted2026-01-27
Panari Pumped Storage Project
PANARI ENERGY PRIVATE LIMITED · River Valley and Hydroelectric Projects
- Category AToR Granted2026-01-22declares affected families
Proposed Naubasta-Kolard Part-A (Padriya_Rajarwara_Khamhariya Kala) Limestone Block (Area: 569.286 Ha) with Limestone Production Capacity: 1.00 Million TPA, Top Soil: 0.01 Million TPA and Waste: 0.42 Million TPA (Total Excavation: 1.43 Million TPA) along with installation of 1400 TPH Capacity of Crusher located at Villages: Padariya, Rajarwara, Khamhariya Kala, Chhinda, Patna, Damha, Kolard & Naubasta, Taluka: Nagod, District: Satna, State: Madhya Pradesh of Dalmia Cement (Bharat) Ltd.
DALMIA CEMENT (BHARAT) LIMITED · Non-Coal Mining
- Category B1Forwarded to MS SPCB/PCC by MS2026-01-02
Bathiya Gitti & M-Sand (Manufacturing by Mechanical Method) Deposit
Shailesh Soni · Non-Coal Mining
- Category B1EC Granted2025-12-23
Lilauri Stone (For making Gitti by Mechanical Crushing) Quarry
Puniya Kondar · Non-Coal Mining
- Category B1EC Granted2025-12-10
Bhatura Limestone Mine-3.564
rajesh kumar choudha · Non-Coal Mining
- Category B1Standard ToR Granted2025-11-13
ABER LATERITE AND LIMESTONE BLOCK
ASK RESOURCES & CONSULTANCY · Non-Coal Mining
- Category B1EC Granted2025-11-08
Katni Limestone Block
INDU AHLUWALIA · Non-Coal Mining
- Category B1Standard ToR Granted2025-10-31
Jariyari Bauxite Block
M P STATE MINING CORPORATION · Non-Coal Mining
- Category B1EC Granted2025-10-14
Karigohi Laterite Deposit
RATNAKAR CHATURVEDI · Non-Coal Mining
- Category B1EC Granted2025-09-29
Bhadanpur Dakshin Patti Limestone Mine
AMIT KUMAR RAI AND ANSHUMAN RAI · Non-Coal Mining
- Category B1EC Granted2025-09-23
Silauti Stone (For making Gitti by Mechanical Crushing) & M-Sand Deposit
Samruddhi Mines and Minerals Industries · Non-Coal Mining
- Category B1EC Granted2025-08-01
Bhatia Limestone Block
INDU AHLUWALIA · Non-Coal Mining
- Category B1Standard ToR Granted2025-06-18
Bhatoora Limestone Mine (5.529 Ha)
HUKUM CHAND STONE LIME COMPANY · Non-Coal Mining
- Category B1Standard ToR Granted2025-06-17
Bhatoora Limestone Mine (10.560 Ha)
HUKUM CHAND STONE LIME COMPANY · Non-Coal Mining
- Category B2EC Granted2025-06-11
SANNAI FLAGSTONE MINE OF SHRI RAMKUMAR SINGH GOND-1.578HA.
RAMKUMAR SINGH GOND · Non-Coal Mining
- Category B1Standard ToR Granted2025-06-06
Bhatoora Limestone Company- 4.046 Ha
HUKUM CHAND STONE LIME COMPANY · Non-Coal Mining
- Category AEC Granted2025-05-07
Extension in Validity of Environment Clearance letter No J-11015/46/2010-IA.II (M) dated 22nd July., 2015 w.r.t specific condition No (i) granted in favor of M/s. UltraTech Cement Ltd for Argat Limestone Mine (363.070 ha) with granted limestone production Capacity 1.2 Million TPA at Villages - Argat, Bijuri, Jhopa, Jigna, Khorari, Tharghatiya & Kothar, Tehsil - Ramnagar, District - Satna, Madhya Pradesh
UltraTech Cement Limited · Non-Coal Mining
- Category B1Standard ToR Granted2025-05-03
BATAHARA LATERITE, OCHER & WHITE CLAY MINE-11.655ha
SHARAD BANSAL · Non-Coal Mining
- Category B1Standard ToR Granted2025-05-02
Bihara Laterite Deposit
tejpal singh · Non-Coal Mining
- Category B1Standard ToR Granted2025-05-01
Naina Stone Mine (3.376ha.)
PUSHPRAJ SINGH · Non-Coal Mining
- Category B1Standard ToR Granted2025-04-29
BATHIYA STONE (SILICEOUS/CALCAREOUS SHALE) QUARRY LEASE
SHIVSHAKTI CONSTRUCTION COMPANY · Non-Coal Mining
- Category B1Standard ToR Granted2025-04-25
Bathiya Stone (Siliceous/Calcareous Shale) Quarry Lease
SHIVSHAKTI CONSTRUCTION COMPANY · Non-Coal Mining
- Category B1Standard ToR Granted2025-04-24
Chitgarh Laterite Mine
KAMLESH SINGH · Non-Coal Mining
- Category B1EC Granted2025-04-22
Bathiya Stone Mine-3.999ha.
ABHIMANYU CHAUHAN · Non-Coal Mining
- Category B1Ec Form 9 Approved2025-04-12
Rewra Limestone Mine
MANOJ RAI · Non-Coal Mining
- Category AEC Granted2025-04-10
Limestone Mine 889.76 Hectare Village Jamuani Khurd, Chari, Durjanpur, and Padrehi
RCCPL Private Limited · Non-Coal Mining
- Category B1EC Granted2025-04-09
Bathia Stone (for making gitti by mechanical crushing) and M-Sand Quarry
RADHA KRISHNA STONE WORKS · Non-Coal Mining
- Category B1EC Granted2025-04-09
Ghatiniya Laterite Mining project
MAHADEV MINERALS · Non-Coal Mining
- Category B1Standard ToR Granted2025-03-31
Bhatura Limestone Mine-3.564
rajesh kumar choudha · Non-Coal Mining
- Category B1Standard ToR Granted2025-03-30
Bathiya Stone Quarry (QL Area – 1.902 Ha.), Village – Bathiya, Tehsil - Maihar, District- Maihar, State - Madhya Pradesh, By M/s Swami Neelkanth Stone Crusher by Proprietor Smt Anjana Chaturvedi
ANJANA CHATURVEDI · Non-Coal Mining
- Category B1Standard ToR Granted2025-03-28
NADAN SHARDA PRASAD QUARRY LEASE
SHISHIR SHUKLA · Non-Coal Mining
- Category B1Standard ToR Granted2025-03-28
Bhadanpur Dakshin Patti Limestone Mine
AMIT KUMAR RAI AND ANSHUMAN RAI · Non-Coal Mining
- Category B2Pending at MS SEIAA2025-03-17
Amjhar Scrap Stone Quarry
dilip buildcon private limited · Non-Coal Mining
- Category B1Standard ToR Granted2025-03-15
Bamhaur Stone Mine-1.016ha
SATNA STONE KRUSHAR · Non-Coal Mining
- Category B1Referred to SEIAA2025-03-12
Barahia Limestone mine (7.102ha)
KJS CEMENT (I) LIMITED · Non-Coal Mining
- Category B1Referred to SEIAA2025-03-12
Bhatia Limestone mine (45.888ha)
KJS CEMENT (I) LIMITED · Non-Coal Mining
- Category B1Standard ToR Granted2025-02-17
Tamoria Limestone and Reject Stone Mine (M. L. Area – 42.567 ha.) Village –Tamoria, Tehsil - Maihar, District- Maihar, State - Madhya Pradesh
SNS MINERALS PRIVATE LIMITED · Non-Coal Mining
- Category B1Standard ToR Granted2025-02-17
Kherwa Stone Mine
CHITRAKOOT CRUSHING CORPORATION · Non-Coal Mining
- Category B1Standard ToR Granted2025-02-14
Silauti Stone (For making Gitti by Mechanical Crushing) & M-Sand Deposit
Samruddhi Mines and Minerals Industries · Non-Coal Mining
- Category B1Standard ToR Granted2025-02-08
Pahadi Limestone Block, 102.861 ha.
INDU AHLUWALIA · Non-Coal Mining
- Category B1Standard ToR Granted2025-02-08
Katni Limestone Block
INDU AHLUWALIA · Non-Coal Mining
- Category B1Standard ToR Granted2025-02-07
Bihara Laterite Mine
SANKALP SHUKLA · Non-Coal Mining
- Category AEC Granted2025-02-05
Expansion in Limestone Production Capacity from 0.50 million TPA to 1.0 Million TPA, Top Soil 240 TPA (0.00024 Million TPA), OB 0.88 million TPA (Total Excavation 1.88 Million TPA) in Hinauti Extension Limestone Mine (ML Area - 258.867 ha) at Villages- Hinauti, Dengraha, Biharganj & Judmani, Tehsil- Ramnagar, District-Satna, Madhya Pradesh by M/s. UltraTech Cement Limited.
UltraTech Cement Limited · Non-Coal Mining
- Category AProposal Withdrawal Request Accepted2025-01-20
Revalidation of Environmental Clearance as per MoEF&CC Notification dated 6th April, 2018 for Existing Limestone Mine (ML Area: 253.326 ha) with existing 2.175 Million TPA Limestone Production Capacity at Villages: Hinauti and Sijhatta, Tehsil: Rampur Baghelan, District: Satna, Madhya Pradesh by M/s. Prism Johnson Limited.
PRISM JOHNSON LIMITED · Non-Coal Mining
- Category B1Ec Form 9 Accepted2025-01-18
Rewra Limestone Block by M/S Arrow Associates
MANOJ RAI · Non-Coal Mining
- Category B1EC Granted2025-01-11
Baruyee Bauxite Quarry
SANJAY RAI · Non-Coal Mining
- Category B2Pending at MS SEIAA2024-05-29
ABER STONE QUARRY
gaurav khatri · Non-Coal Mining
- Category B2Pending at MS SEIAA2024-05-24
DEVDAHA STONE QUARRY
DEVDAHA GITTI STONE MINE OF SHRI BHUPENDRA KUMAR PANDEY · Non-Coal Mining
- Category B2Pending at MS SEIAA2024-05-24
SHAKULGAWAN STONE QUARRY
atul singh parihar · Non-Coal Mining
- Category B1ToR Granted2024-04-23
Bhatia Limestone Block
INDU AHLUWALIA · Non-Coal Mining
- Category B1Pending at MS SEIAA2024-04-20declares affected families
Expansion of Bathia Kala Limestone Mines from 0.15 MTPA to 0.70 MTPA over an area of 107.785 Ha at Village Bathia Kala, District Satna, MP by M/s Shri Marutaye Balaji Steels Ltd.
SHRI MARUTAYE BALAJI STEELS LIMITED · Non-Coal Mining
- Category B1EC Rejected2024-03-15
Rewra Limestone Block by M/S Arrow Associates
MANOJ RAI · Non-Coal Mining
- Category B1EC Granted2024-03-01
Bathia Stone Quarry Project (4.717 ha.)
PHOENIX MINING AND MINERALS · Non-Coal Mining
- Category B1EC Granted2024-02-12
Bathia Stone Quarry (3.962 ha.)
M/S VIJAY & COMPANY. · Non-Coal Mining
- Category B1EC Granted2024-02-10
Additional Limestone Mine (ML Area: 66.434 ha) with Limestone Production Capacity: 0.3 Million TPA at Village: Mankahari, Tehsil: Rampur Baghelan, District: Satna, Madhya Pradesh.
PRISM JOHNSON LIMITED · Non-Coal Mining
- Category B1EC Granted2024-02-09declares affected families
Proposed Badarkha Limestone Block (Auctioned Block) over an area of 121.10 Ha with Limestone Production Capacity: 0.46 Million TPA, Soil: 0.1 Million TPA, OB: 0.36 Million TPA, Mineral Reject: 0.1 Million TPA (Total Excavation: 1.02 Million TPA) along with 200 TPH Crusher at Villages: Badarkha, Bigodi and Sannehi Sigti Tehsil: Amarpatan, District: Satna, Madhya Pradesh M/s. Dalmia Cement (Bharat) Limited.
DALMIA CEMENT (BHARAT) LIMITED · Non-Coal Mining
- Category B2EC Granted2024-02-03
JHALI STONE MINE FOR MAKING GITTI, BOULDER & M-SAND THROUGH CRUSHER
ASHISH BAGRI · Non-Coal Mining
- Category B1EC Granted2024-01-18
Bathiya Stone Mine of M/s Sai Stone Crusher (1.045ha)
BATHIYA STONE MINE · Non-Coal Mining
- Category B1ToR Granted2024-01-12
Bathiya Stone Mine-3.999ha.
ABHIMANYU CHAUHAN · Non-Coal Mining
- Category B2Pending at MS SEIAA2024-01-12
JHARI STONE MINE
SHYAMKALI KOL · Non-Coal Mining
- Category B2EC Granted2024-01-09
Kulkhat Laterite Mine
SUNIL KHARE · Non-Coal Mining
- Category B1TOR Granted2024-01-05
Baruyee Bauxite Quarry
SANJAY RAI · Non-Coal Mining
- Category B2EC Granted2024-01-02
PAPRA STONE MINE
SIIPL-SCC (JV) · Non-Coal Mining
- Category B1ToR Granted2023-12-24
Lilauri Stone (For making Gitti by Mechanical Crushing) Quarry
Puniya Kondar · Non-Coal Mining
- Category B1TOR Granted2023-12-14
Ghatiniya Laterite Mining project
MAHADEV MINERALS · Non-Coal Mining
- Category B1TOR Granted2023-12-13
Bamhaur Stone & M. Sand Mine
SSAI STONE CRUSHER · Non-Coal Mining
- Category B2EC Granted2023-12-13
Satari Stone Mine
MAHESH CHAURASIA · Non-Coal Mining
- Category B2EC Granted2023-12-06
Pahdi Laterite Mine of M/s Maa Sharda Mines & Minerals
INDRAKANT SHUKLA · Non-Coal Mining
- Category B2EC Granted2023-12-04
AMJHAR LATERITE DEPOSIT
VISHNU PRATAP PARIHAR · Non-Coal Mining
- Category AGranted2023-12-01
Limestone Mine 889.76 Hectare Village Jamuani Khurd, Chari, Durjanpur, and Padrehi
RCCPL Private Limited · Non-Coal Mining
- Category B2EC Granted2023-11-28
BHURUHARA FLAG STONE MINE
MOHIT PARIHAR · Non-Coal Mining
- Category B2EC Granted2023-11-24
Hariharpura Laterite Mine
MANJU SINGH · Non-Coal Mining
- Category B1TOR Granted2023-11-23declares affected families
Expansion of Bathia Kala Limestone Mines from 0.15 MTPA to 0.70 MTPA over an area of 107.785 Ha at Village Bathia Kala, District Satna, MP by M/s Shri Marutaye Balaji Steels Ltd.
SHRI MARUTAYE BALAJI STEELS LIMITED · Non-Coal Mining
- Category B1EC Granted2023-11-16
Tamoria Limestone, Dolomite And Reject Stone Mine (ML Area-26.224 Ha) Village Tamoria, Tehsil – Maihar, District- Satna, Madhya Pradesh by M/s. Maihar Traders
M/S MAIHAR TRADERS · Non-Coal Mining
- Category B1EC Granted2023-11-16
3.845 ha Ghatania Bauxite, Ochre & White – Earth Mine
M/S MADHYA PRADESH MINERALS SUPPLY COMPANY · Non-Coal Mining
- Category B2EC Granted2023-11-16
Kherwa Stone & M-Sand Mine
CHITRAKOOT CRUSHING CORPORATION · Non-Coal Mining
- Category B1EC Granted2023-11-16declares affected families
Tiloura Limestone Mine (ML Area – 193.252 ha) Expansion in Limestone Production Capacity from 0.5 Million TPA To 2.30 Million TPA along with Top Soil 0.05 Million TPA, Over Burden 0.45 Million TPA (Total Excavation 2.8 Million TPA) With along with installation of Crusher with capacity of 1100 TPH with installation of conveyor belt of length 8.6 km at Village: Tiloura, Jurwa, Silouti, Sirmilli, Tehsil: Maihar District: Satna, Madhya Pradesh of M/s. UltraTech Cement Limited (Maihar Cement Works)
UltraTech Cement Limited · Non-Coal Mining
- Category B1EC Granted2023-11-16
Bhadanpur Limestone Mine (ML Area: 217.681 ha) with expansion in Limestone production capacity from 0.9 Million TPA to 1.9 Million TPA at Villages: Bhadanpur (North) Patti, Bhadanpur (South) Patti & Umrour Tehsil: Maihar District: Satna, Madhya Pradesh of M/s. UltraTech Cement Limited (Unit Maihar Cement Works)
UltraTech Cement Limited · Non-Coal Mining
Showing 100 of 139 proposals, newest first. The button below loads the rest.