All 15 in the last 60 days- 27 Oct 2026 · FiledSubmittedBiradei Stone Quarry
- 9 Oct 2026 · Details soughtEssential details soughtHarraha Stone Mine
- 23 Sept 2026 · Details soughtAdditional details soughtSardaman Stone (For making Gitti by Mechanical Crushing) Quarry
- 23 Sept 2026 · Details soughtAdditional details soughtBiradei Stone (For making Gitti by Mechanical Crushing) Quarry
- 11 Sept 2026 · ClosedDelisted automaticallyHarraha Stone Mine
- 8 Sept 2026 · Details soughtEssential details sought16.187ha Tikar B Bauxite mine
- 8 Sept 2026 · Details soughtEssential details sought16.187ha Tikar ‘A’ Bauxite Mine Deposit
- 7 Sept 2026 · FiledSubmitted16.187ha Tikar ‘A’ Bauxite Mine Deposit
- 5 Sept 2026 · Details soughtEssential details sought16.187ha Tikar B Bauxite mine
- 5 Sept 2026 · Details soughtEssential details sought16.187ha Tikar ‘A’ Bauxite Mine Deposit
- 3 Sept 2026 · Details soughtEssential details soughtSardaman Stone (For making Gitti by Mechanical Crushing) Quarry
- 3 Sept 2026 · Details soughtEssential details soughtBiradei Stone (For making Gitti by Mechanical Crushing) Quarry
Dated by the portal's own appraisal history, converted to India Standard Time; a proposal with no recorded history appears on its register submission date.
Other clearances these proposals declare
- Forest land diversion declared
- 8
- Forest land sought for diversion
- Area not stated
- Wildlife board recommendation declared
- 2
- In or near a protected area
- 0
- In an eco-sensitive zone
- 1
These counts are taken from the application forms of the 105 of 105 proposals naming this district whose forms have been read for these questions. In 29 of those forms at least one question was left blank, and a blank answer is counted as unknown. The forest area is the area stated for forest clearance, with each forest proposal counted once, in the district where its project is primarily sited.
- Proposals naming this district
- 105
- Category A proposals
- 8
- Families declared displaced
- 405
- Families declared affected
- 1,134
Displacement figures are the proponents’ own declarations. A project sited across several districts declares one figure for the whole project, and that figure is counted once, in the district where the project is primarily sited.
Fifth Schedule status
Not within a Fifth Schedule Scheduled Area
The Presidential Order for Madhya Pradesh declares which areas in the State are Scheduled Areas. It does not name this district, in whole or in part, so no part of it is a Scheduled Area under that Order. A later Order could add one; this reference states the position as transcribed and reviewed on 2026-08-21.
OrderThe Scheduled Areas (States of Chhattisgarh, Jharkhand and Madhya Pradesh) Order, 2003
What the record shows
Agricultural labourers, who work other people's land for wages, make up 47% of workers here. Compensation for acquired land is paid to those who hold title to it, so it does not reach them. They can still claim the rehabilitation and resettlement entitlements of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (RFCTLARR), because its section 3(c) counts a family whose livelihood depends on the land as an affected family, wherever that Act governs how the land is obtained.
Applicants for projects sited mainly in this district have declared 405 families to be displaced. The figure comes from their applications, and we have not verified it.
Each of these observations appears when a fixed rule is met by the figures on this page, so the same figures always give the same sentences. None of them is a view on whether a project should go ahead.
Who lives there
Figures from Census 2011, each compared with the all-India value computed on the same definition.
- Total population
- 23,65,106
- Households
- 5,26,065
- Average household size
- 4.50
- 0.35 below India's 4.85India
- Scheduled Tribe share of population
- 13.2%
- 4.6 points above IndiaIndia
- Scheduled Caste share of population
- 16.2%
- 0.4 points below IndiaIndia
- Children aged 0-6
- 14.9%
- 1.3 points above IndiaIndia
- Literacy rate
- 71.6%
- 1.4 points below IndiaIndia
- Sex ratio
- 931
- 12.1 below India's 942.6India
What they live on
How the district's workers earn a living, from Census 2011. The land-dependent share counts cultivators and agricultural labourers as a share of all workers, and it is the group most directly affected when land is acquired.
- Total workers
- 9,91,946
- Work participation rate
- 41.9%
- 2.2 points above IndiaIndia
- Workers dependent on land
- 72.8%
- 18.2 points above IndiaIndia
- Cultivators
- 26.0%
- 1.4 points above IndiaIndia
- Agricultural labourers
- 46.7%
- 16.8 points above IndiaIndia
- Marginal workers
- 36.5%
- 11.7 points above IndiaIndia
- Household industry workers
- 5.1%
- 1.3 points above IndiaIndia
How households live
Land, income and work among rural households, from the Socio Economic and Caste Census 2011, which recorded these where the population census did not. Only the survey's rural part is used here, so urban households do not appear.
- Rural households owning land
- 37.1%
- 9.1 points below IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
- Rural households whose highest earner makes over ₹5,000 a month
- 29.5%
- 5.1 points above IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
- Rural households living mainly on manual casual labour
- 56.4%
- 4.6 points above IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
- Rural households with a salaried member
- 11.8%
- 3.6 points above IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
When these were filed
Each proposal is dated by the first step in its appraisal history, the dated record of steps the portal keeps for it.
The timeline counts 63 of the 105 proposals here. The first filing date comes from each proposal's appraisal history, and we have not yet read it for the other 42, so they are left out. Most of them are older proposals, so the early part of the timeline undercounts what was filed then. The register itself records a date for each of them; the gap is in our copy of the histories.
Hatched columns undercount, so they cannot be compared with solid ones. 4 of them cover periods for which we have read few filing dates so far, and they count only the proposals whose date we have. 2026-Q4 was still running when the register was read, so its column counts only the filings made up to that date.
What kind of projects these are
The proposals naming this district, grouped by the sector each was filed under.
- Non-Coal Mining 88.6%
- River Valley and Hydroelectric Projects 5.7%
- Industrial Projects - 2 2.9%
- Industrial Projects - 1 1.9%
- Other (1) 1%
The four largest sectors are shown by name and the rest are grouped as Other.
What is proposed here
These are the proposals in the national environmental clearance register whose application names a site in this district, newest first. A project with sites in several districts appears under each of them.
- Category B1Under Verification2026-10-27
Biradei Stone Quarry
vindhya sharda stone works · Non-Coal Mining
- Category B1Under Verification2026-10-12
Harraha Stone Mine
DEEPENDRA CHAUHAN · Non-Coal Mining
- Category B1Proposal Accepted and Referred to SEAC2026-09-08
16.187ha Tikar B Bauxite mine
RAMDAS VERMA AND CO · Non-Coal Mining
- Category B1Proposal Accepted and Referred to SEAC2026-09-08
16.187ha Tikar ‘A’ Bauxite Mine Deposit
RAMDAS VERMA AND CO · Non-Coal Mining
- Category B1Referred to SEAC2026-09-03
Sardaman Stone (For making Gitti by Mechanical Crushing) Quarry
MCCMAHADEO CONSTRUCTIONS PRIVATE LIMITED · Non-Coal Mining
- Category B1Referred to SEAC2026-09-03
Biradei Stone (For making Gitti by Mechanical Crushing) Quarry
MCCMAHADEO CONSTRUCTIONS PRIVATE LIMITED · Non-Coal Mining
- Category B2Pending at MS SEIAA2026-08-12
Khamra Khurd Stone (M-Sand) Quarry
reewanchal silica udyog · Non-Coal Mining
- Category B2Pending at MS SEIAA2026-08-12
obtaining Environment Clearance in B-2 category for 1.167 Ha Gaddi Flag Stone Quarry Lease with production capacity of ROM 6727 cubic meter per year (Flagstone = 4036 cubic meter Year, 961 cubic meter per year of overburden and 1730 cubic meter year of mineral reject) at village Gaddi, Tehsil – Gurh, District – Rewa (M.P.) proposed by Anil Kumar Patel
ANIL PATEL · Non-Coal Mining
- Category B1Forwarded to MS SPCB/PCC by MS2026-07-27
Harraha Stone Quarry
MONIKA tIWARI · Non-Coal Mining
- Category B2Referred to SEIAA2026-07-04
Jonhi Stone Quarry
SHRIKANT SINGH · Non-Coal Mining
- Category B2Referred to SEAC2026-07-03
Obtaining Environment clearance for proposed Harrai Pratap Singh Stone Quarry Lease is located at Village – Harrai Pratap Singh, Tehsil – Hanumana, District – Mauganj (M.P.),with production of ROM 23205 cum per year (Stone/Gitti = 20,349 m3/Year, 357m3 per year of soil, 1428 m3 per year of overburden and 1071m3/year of mineral reject) by M/s Dev Stone Mining and Construction, Prop. Shri Prem Shankar Dubey
PREM SHANKAR DUBEY · Non-Coal Mining
- Category AToR Granted2026-06-22declares affected families
REWA OFF-STREAM CLOSED LOOP PUMPED STORAGE PROJECT
DHAKARA ENERGY PSP PRIVATE LIMITED · River Valley and Hydroelectric Projects
- Category B1Referred to SEIAA2026-06-04
Harraha Stone Quarry
SKY LIGHT INFRASTRUCTURE · Non-Coal Mining
- Category B1EC Granted2026-05-29
Tikar Bauxite Block ( Mine lease area – 95.26 Ha) Located at Village Tikar, Tehsil- Huzur, District-Rewa, MP by M/s. Katni Minerals Private Limited
KATNI MINERALS PRIVATE LIMITED · Non-Coal Mining
- Category B1Standard ToR Granted2026-04-30
HARRAI GUJRAN STONE QUARRY
DEVLAL JAISWAL · Non-Coal Mining
- Category AForwarded to MS SPCB/PCC by MS2026-04-30declares affected families
Badagaon Off-Stream Close Loop Pumped Storage Project (1000 MW)
RENEW GREEN (TNJ TWO) PRIVATE LIMITED · River Valley and Hydroelectric Projects
- Category B1Forwarded to MS SPCB/PCC by MS2026-04-22
Biradei Stone Quarry
vindhya sharda stone works · Non-Coal Mining
- Category B1Referred to SEIAA2026-04-17
ANSARA SILICA SAND DEPOSIT MINE
AMITA GUPTA · Non-Coal Mining
- Category B1Standard ToR Granted2026-01-08
Biradei Stone Mine
MAHAMAYA STONE · Non-Coal Mining
- Category B2Referred to SEAC2025-12-17
Sumeda Stone Mine 2.00Ha.
PAWAN SINGH · Non-Coal Mining
- Category B2EC Granted2025-11-11
Chhadahna Stone(Gitti & M-Sand) Quarry
shakti singh baghel · Non-Coal Mining
- Category B1Standard ToR Granted2025-10-30
Darhi Quarry Lease
BIHARILAL SINGH · Non-Coal Mining
- Category B1ToR Granted2025-09-28declares affected families
SITAPUR-HANUMANA MICRO IRRIGATION PROJECT
BHAGWAAN DUTT TIWARI · River Valley and Hydroelectric Projects
- Category B1EC Granted2025-09-27
BHAMRA LATERITE & OCHRE MINE-4.061HA,
ANIL PANDEY · Non-Coal Mining
- Category B1EC Granted2025-09-25
BHAMRA LATERITE AND OCHRE MINE-6.810ha.
ANIL PANDEY · Non-Coal Mining
- Category AEC Granted2025-09-18
Expansion of Integrated Cement Plant - Clinker (2.38 to 6.38 MTPA), Cement (2.5 to 7.5 MTPA) and WHRS (13 to 33 MW) by installation of Line - II with no change in existing CPP (28 MW) at Villages: Madhepur & Sonara, Tehsil: Huzur, District: Rewa (Madhya Pradesh) by M/s. UltraTech Cement Ltd. (Unit: Bela Cement Works)
UltraTech Cement Limited · Industrial Projects - 1
- Category AToR Granted2025-08-20declares affected families
Jankhai Pumped Storage Project
GSC PSP MADHYA PRIVATE LIMITED · River Valley and Hydroelectric Projects
- Category AProposal returned in present form2025-08-18declares affected families
REWA OFF-STREAM CLOSED LOOP PUMPED STORAGE PROJECT
DHAKARA ENERGY PSP PRIVATE LIMITED · River Valley and Hydroelectric Projects
- Category B2EC Granted2025-08-12
Bamhani Gadiha Gitti & M. Sand mine (Area- 2.30 Ha.)
sHIV SHAKTI CONSTRUCTIONS · Non-Coal Mining
- Category B2EC Granted2025-07-15
Bhimbada Murum & M-Sand Mine, Area- 2.00 Ha.
seema · Non-Coal Mining
- Category B2EC Rejected2025-06-18
SUMEDA STONE MINE
PAWAN SINGH · Non-Coal Mining
- Category B1Standard ToR Granted2025-06-11
Harraha Stone Mine
HARSH CHAUHAN · Non-Coal Mining
- Category B2EC Granted2025-06-04
JONSI STONE (CALCAREOUS SHALE) QUARRY LEASE (1.430 HA.)
bharti tripathi · Non-Coal Mining
- Category B1EC Granted2025-05-09
Beeradei Stone Quarry
MAHAMAYA STONE · Non-Coal Mining
- Category B1Standard ToR Granted2025-05-07
BHAMRA LATERITE AND OCHRE MINE-6.810ha.
ANIL PANDEY · Non-Coal Mining
- Category B1Standard ToR Granted2025-04-28
BHAMRA LATERITE & OCHRE MINE-4.061HA,
ANIL PANDEY · Non-Coal Mining
- Category B1Standard ToR Granted2025-04-22
Tilau Crusher Stone Quarry, Area-2.0 Ha, Khasra No- 3/9/2/1(P), Village- Tilau, Tehsil- Java, Dist-Rewa, State- Madhya Pradesh
SUMANT DWIVEDI · Non-Coal Mining
- Category B2EC Granted2025-04-21
Lodhi Flagstone Quarry
abhishek singh · Non-Coal Mining
- Category B1Standard ToR Granted2025-04-15
Tilau Quarry Lease Located at Khasra No.: 3/9/6, Village- Tilau, Tehsil- Java, Dist- Rewa, State- Madhya Pradesh
SARTHAK DWIVEDI · Non-Coal Mining
- Category B1Standard ToR Granted2025-04-15
BHAMRA LATERITE & OCHRE MINE-4.50HA,
ANIL PANDEY · Non-Coal Mining
- Category B1Standard ToR Granted2025-04-14
BHATI JUNGLE STONE (SAND STONE) QUARRY LEASE
AMIT CHAUHAN · Non-Coal Mining
- Category B1Standard ToR Granted2025-04-14
BHATI JUNGLE QUARRY LEASE
RENU SINGH · Non-Coal Mining
- Category B2EC Granted2025-04-11
Kudi Silica Sand Quarry
VIVEK GUPTA · Non-Coal Mining
- Category B1Standard ToR Granted2025-04-07
Harraha Stone Quarry
SKY LIGHT INFRASTRUCTURE · Non-Coal Mining
- Category B1Standard ToR Granted2025-04-04
TILAU QUARRY LEASE located at KHASRA NO.: 3/9/8 (P), VILLAGE- TILAU, TEHSIL- JAVA, DIST- REWA, STATE- MADHYA PRADESH
SARTHAK DWIVEDI · Non-Coal Mining
- Category B1Standard ToR Granted2025-04-03
Jonhi Stone Mine (1.20ha.)
SANJEEV MISHRA · Non-Coal Mining
- Category B1Standard ToR Granted2025-04-01
HARRAHA STONE (SAND STONE) QUARRY
POOJA SINGH CHAUHAN · Non-Coal Mining
- Category B1Standard ToR Granted2025-03-21
Raghunathpur Silica Sand Mine
M P STATE MINING CORPORATION · Non-Coal Mining
- Category B2Pending at MS SEIAA2025-02-01
SAMDARIYA AVENUE COMMERCIAL/RESIDENTIAL COMPLEX AT SIRMORE CHOWK DISTRICT REWA
SAMDARIYA BUILDERS (REWA) PRIVATE LIMITED · INFRA-2
- Category AToR Granted2024-12-09declares affected families
Proposed Chorgadi Puraina Limestone Block (Auctioned Block) (Area: 332.654 ha) with Limestone Production Capacity: 6.0 Million TPA along with installation of Crusher of 1800 TPH Capacity at Villages: Chorgadi, Puraina, Koshta, Pahadia, Patna & Sirkhini, Tehsil: Raipur Karchuliyan, District: Rewa, Madhya Pradesh by M/s. Ambuja Cements Limited.
Ambuja Cements Limited · Non-Coal Mining
- Category B2Withdrawal Request Accepted2024-12-02
LODHI FLAGSTONE MINE OF M/S SEETS ENTERPRISES
AMRENDRA SINGH · Non-Coal Mining
- Category B1Standard ToR Granted2024-05-27
Harraha Stone Mine
DEEPENDRA CHAUHAN · Non-Coal Mining
- Category B1Pending at MS SEIAA2024-04-25
Jadakud Stone Mine-3.990 ha
MALAY NIRMAN COMPANY · Non-Coal Mining
- Category B1Pending at MS SEIAA2024-04-23
Harraha Stone Quarry
MAA VINDHAVASHNI STONE CRUSHER · Non-Coal Mining
- Category B2EC Granted2024-04-08
LASA STONE (PHARSHI PATHAR) MINE
SHASHI SHUKLA · Non-Coal Mining
- Category B1EC Granted2024-04-02
Harraha Stone Quarry
AMIT CHAUHAN · Non-Coal Mining
- Category B2EC Granted2024-02-28
Dhanuhinar Stone Quarry
M/S SHREE BALAJI STONE CRUSHER · Non-Coal Mining
- Category B2EC Granted2024-02-26
CHAURA STONE AND M-SAND QUARRY
MOHAMMAD KHAN · Non-Coal Mining
- Category B2EC Granted2024-01-08
Sitapur Stone (Gitti) & M-Sand Quarry
DILIP SINGH · Non-Coal Mining
- Category B1ToR Granted2024-01-08
Harraha Quarry Lease
UPENDRA SENGAR · Non-Coal Mining
- Category B1TOR Granted2023-12-13
Beeradei Stone Quarry
SHIV KRIPA ASSOCIATES · Non-Coal Mining
- Category B1TOR Granted2023-12-13
Harraha Metal Stone Mine
ARVIND CHAUHAN · Non-Coal Mining
- Category B2EC Granted2023-12-12
HARRAHA (CRUSHER) STONE QUARRY LEASE
KRISHAN SINGH · Non-Coal Mining
- Category B2EDS raised2023-12-07
HARRAHA STONE (CRUSHER) QUARRY LEASE
KRISHAN SINGH · Non-Coal Mining
- Category B1TOR Granted2023-12-04
Beeradei Stone Quarry
MAHAMAYA STONE · Non-Coal Mining
- Category B2EC Granted2023-11-28
Madhyepur Stone Crusher (Gitti) Quarry
BHAKT SINGH · Non-Coal Mining
- Category B1TOR Granted2023-11-25
Tikar Bauxite Block ( Mine lease area – 95.26 Ha) Located at Village Tikar, Tehsil- Huzur, District-Rewa, MP by M/s. Katni Minerals Private Limited
KATNI MINERALS PRIVATE LIMITED · Non-Coal Mining
- Category B1TOR Granted2023-11-23
Beeradei Stone Quarry
SHIV KRIPA ASSOCIATES · Non-Coal Mining
- Category B1TOR Granted2023-11-23
Harraha Stone Quarry
ALOK TEWARI · Non-Coal Mining
- Category B1TOR Granted2023-11-23
ANSARA SILICA SAND DEPOSIT MINE
AMITA GUPTA · Non-Coal Mining
- Category B1TOR Granted2023-11-23
Harraha Stone Quarry
PRAKASHDEEP MINERALS · Non-Coal Mining
- Category B2EC Granted2023-11-21
Pahadiya Stone Quarry Lease
DURGHAT MISHRA · Non-Coal Mining
- Category B2EC Granted2023-11-16
Amiliha Stone Boulder Gitti Mine
SANJAY BAGHEL · Non-Coal Mining
- Category B2EC Granted2023-11-16
Gadargawan Stone Quarry
DINESH SINGH · Non-Coal Mining
- Category B1EC Granted2023-11-16
12.95 ha Chitti Jaggir Bauxite Mine
RAKESH AGENCIES · Non-Coal Mining
- Category B1EC Granted2023-11-16
15.78 Ha Kumhra Judwani Bauxite, Laterite, Ocher and White Earth Mine
RAKESH AGENCIES · Non-Coal Mining
- Category B1EC Granted2023-11-16
10.73 ha Kumhra Judwani Bauxite, Ochre and White Earth Mine
JAILAL BHARATLAL · Non-Coal Mining
- Category B1TOR Granted2023-11-13
Tikar Bauxite & White Clay Mine
ASLAM HUSSAIN · Non-Coal Mining
- Category B1TOR Granted2023-11-07
Biradei Stone (For making Gitti by Mechanical Crushing) Quarry
MCCMAHADEO CONSTRUCTIONS PRIVATE LIMITED · Non-Coal Mining
- Category B1TOR Granted2023-11-07
Sardaman Stone (For making Gitti by Mechanical Crushing) Quarry
MCCMAHADEO CONSTRUCTIONS PRIVATE LIMITED · Non-Coal Mining
- Category B2EC Granted2023-10-31
Pahadiya Stone (Crusher) Quarry Lease
DURGHAT MISHRA · Non-Coal Mining
- Category B1EC Granted2023-09-15
Beeradei Stone Quarry
SHIV KRIPA ASSOCIATES · Non-Coal Mining
- Category B1EC Granted2023-09-14
Harraha Stone Quarry
SKY LIGHT INFRASTRUCTURE · Non-Coal Mining
- Category B2EC Granted2023-08-29
Proposed Grain Based Distillery Capacity 130 KLD Fuel Ethanol along with 3.0 MW Co-Gen Power Plant at Plot/Sr. No. - 83, 97, 98, 100, 107, 110, 130, 147, 148, 73, 62 Village-Amradandi, Tehsil -Gurh, Dist-Rewa (MP) by M/s. Bhairav Bio Fuels Pvt. Ltd.,
BHAIRAV BIOFUELS PRIVATE LIMITED · Industrial Projects - 2
- Category B1EDS raised2023-08-18
16.187ha Tikar B Bauxite mine
RAMDAS VERMA AND CO · Non-Coal Mining
- Category B1EDS raised2023-08-18
16.187ha Tikar ‘A’ Bauxite Mine Deposit
RAMDAS VERMA AND CO · Non-Coal Mining
- Category B2EDS raised2023-08-14
Baijnath Stone Quarry
SANJAY PATHAK · Non-Coal Mining
- Category B1EC Granted2023-08-11
Harraha Stone Quarry of Shri Ashutosh Mishra
ASHUTOSH MISHRA · Non-Coal Mining
- Category B1EC Granted2023-08-09
Harraha Stone Quarry
ALOK TEWARI · Non-Coal Mining
- Category B1EDS raised2023-08-09
Harraha Stone Quarry
RAMPRAKASH DWIVEDI · Non-Coal Mining
- Category B1EC Granted2023-07-20
15.78ha kumhra judwani bauxite, Laterite, ochre and white earth mine
M/S MADHYA PRADESH MINERALS SUPPLY COMPANY · Non-Coal Mining
- Category AStandard ToR Granted2023-07-14
Expansion of Integrated Cement Plant - Clinker (2.38 to 6.38 MTPA), Cement (2.5 to 7.5 MTPA) and WHRS (13 to 33 MW) by installation of Line - II with no change in existing CPP (28 MW) at Villages: Madhepur & Sonara, Tehsil: Huzur, District: Rewa (Madhya Pradesh) by M/s. UltraTech Cement Ltd. (Unit: Bela Cement Works)
UltraTech Cement Limited · Industrial Projects - 1
- Category B1TOR Granted2023-07-10
Harraha Stone Quarry
AMIT CHAUHAN · Non-Coal Mining
- Category B2EC Granted2023-07-03
Sitapur Stone & M-sand Quarry
ANANT INFRATECH · Non-Coal Mining
- Category B1EC Granted2023-05-23
Harraha Stone Quarry
REWA MINERALS AND COMPANY · Non-Coal Mining
- Category B1Under Examination2023-05-20
Harraha Stone Quarry
REWA MINERALS AND COMPANY · Non-Coal Mining
- Category B2EC Granted2023-03-31
M/s. Shri Dadani Biofuels Private Ltd
SHRI DADANI BIOFUELS PRIVATE LIMITED · Industrial Projects - 2
- Category AToR Granted2023-03-15declares affected families
Rewa Pumped Storage Project
SASA STONE PRIVATE LIMITED · River Valley and Hydroelectric Projects
- Category B2EC Granted2023-02-14
Harraha Stone Quarry
FULMAIT BAI · Non-Coal Mining
- Category B2EC Granted2022-11-16
Harrai Gujran Stone Quarry
PRAKASHDEEP MINERALS · Non-Coal Mining
Showing 100 of 105 proposals, newest first. The button below loads the rest.