  1. 9 Oct 2026 · DecidedEnvironmental clearance grantedGolakheda Crusher Stone (Gitti & M-sand) Quarry
  2. 30 Sept 2026 · Details soughtAdditional details soughtJAGANYAPURA STONE QUARRY
  3. 29 Sept 2026 · Details soughtEssential details soughtM-SAND & CRUSHER STONE QUARRY of MS SHRI BALAJI CONSTRUCTION
  4. 29 Sept 2026 · FiledSubmittedM-SAND & CRUSHER STONE QUARRY of MS SHRI BALAJI CONSTRUCTION
  5. 13 Sept 2026 · DecidedEnvironmental clearance grantedGulaota Crusher Stone (Gitti & M-sand) Quarry
  6. 13 Sept 2026 · DecidedEnvironmental clearance grantedPalasi Crusher Stone Quarry
  7. 10 Sept 2026 · Details soughtEssential details soughtDalelpura Stone (Gitti & M-sand) Quarry
  8. 7 Sept 2026 · Details soughtAdditional details soughtSemlapar Crusher Stone & M-Sand Quarry
  9. 1 Sept 2026 · Details soughtAdditional details soughtMANYAKHEDI CRUSHER STONE QUARRY
  10. 1 Sept 2026 · Details soughtAdditional details soughtJAGANYAPURA STONE QUARRY

Dated by the portal's own appraisal history, converted to India Standard Time; a proposal with no recorded history appears on its register submission date.

Other clearances these proposals declare

Forest land diversion declared
0
Forest land sought for diversion
None declared
Wildlife board recommendation declared
0
In or near a protected area
0
In an eco-sensitive zone
1

These counts are taken from the application forms of the 105 of 105 proposals naming this district whose forms have been read for these questions. In 21 of those forms at least one question was left blank, and a blank answer is counted as unknown. The forest area is the area stated for forest clearance, with each forest proposal counted once, in the district where its project is primarily sited.

Proposals naming this district
105
Category A proposals
None
Families declared displaced
None declared
Families declared affected
None declared

Displacement figures are the proponents’ own declarations. A project sited across several districts declares one figure for the whole project, and that figure is counted once, in the district where the project is primarily sited.

Fifth Schedule status

Not within a Fifth Schedule Scheduled Area

The Presidential Order for Madhya Pradesh declares which areas in the State are Scheduled Areas. It does not name this district, in whole or in part, so no part of it is a Scheduled Area under that Order. A later Order could add one; this reference states the position as transcribed and reviewed on 2026-08-21.

OrderThe Scheduled Areas (States of Chhattisgarh, Jharkhand and Madhya Pradesh) Order, 2003

What the record shows

  • Cultivators and agricultural labourers make up 83% of workers here, against 55% nationally, so at least three in four people who work here do so on the land.

  • Agricultural labourers, who work other people's land for wages, make up 44% of workers here. Compensation for acquired land is paid to those who hold title to it, so it does not reach them. They can still claim the rehabilitation and resettlement entitlements of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (RFCTLARR), because its section 3(c) counts a family whose livelihood depends on the land as an affected family, wherever that Act governs how the land is obtained.

Each of these observations appears when a fixed rule is met by the figures on this page, so the same figures always give the same sentences. None of them is a view on whether a project should go ahead.

Who lives there

Figures from Census 2011, each compared with the all-India value computed on the same definition.

Total population
15,45,814
Households
3,45,297
Average household size
4.48
0.37 below India's 4.85India
Scheduled Tribe share of population
3.5%
5.1 points below IndiaIndia
Scheduled Caste share of population
19.1%
2.5 points above IndiaIndia
Children aged 0-6
15.0%
1.4 points above IndiaIndia
Literacy rate
61.2%
11.8 points below IndiaIndia
Sex ratio
956
13.6 above India's 942.6India

What they live on

How the district's workers earn a living, from Census 2011. The land-dependent share counts cultivators and agricultural labourers as a share of all workers, and it is the group most directly affected when land is acquired.

Total workers
7,45,603
Work participation rate
48.2%
8.4 points above IndiaIndia
Workers dependent on land
82.6%
28.0 points above IndiaIndia
Cultivators
38.2%
13.6 points above IndiaIndia
Agricultural labourers
44.4%
14.4 points above IndiaIndia
Marginal workers
36.7%
12.0 points above IndiaIndia
Household industry workers
1.6%
2.2 points below IndiaIndia

How households live

Land, income and work among rural households, from the Socio Economic and Caste Census 2011, which recorded these where the population census did not. Only the survey's rural part is used here, so urban households do not appear.

Rural households owning land
46.3%
0.2 points above IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households whose highest earner makes over ₹5,000 a month
8.6%
15.7 points below IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households living mainly on manual casual labour
57.2%
5.4 points above IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households with a salaried member
2.7%
5.5 points below IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

When these were filed

Each proposal is dated by the first step in its appraisal history, the dated record of steps the portal keeps for it.

2023-Q42026-Q3

The timeline counts 83 of the 105 proposals here. The first filing date comes from each proposal's appraisal history, and we have not yet read it for the other 22, so they are left out. Most of them are older proposals, so the early part of the timeline undercounts what was filed then. The register itself records a date for each of them; the gap is in our copy of the histories.

Hatched columns undercount, so they cannot be compared with solid ones. One of them covers a period for which we have read few filing dates so far, and it counts only the proposals whose date we have.

What kind of projects these are

The proposals naming this district, grouped by the sector each was filed under.

  • Non-Coal Mining 96.2%
  • INFRA-2 2.9%
  • Industrial Projects - 2 1%

The four largest sectors are shown by name and the rest are grouped as Other.

What is proposed here

These are the proposals in the national environmental clearance register whose application names a site in this district, newest first. A project with sites in several districts appears under each of them.

  1. Category B2EDS raised2026-09-29

    M-SAND & CRUSHER STONE QUARRY of MS SHRI BALAJI CONSTRUCTION

    BALAJI CONSTRUCTION · Non-Coal Mining

  2. Category B2Proposal Accepted and Referred to SEAC2026-09-10

    Dalelpura Stone (Gitti & M-sand) Quarry

    RAMBABU · Non-Coal Mining

  3. Category B2Pending at MS SEIAA2026-08-04

    Baanskheda Crusher Stone (Gitti & M-sand) Quarry

    SHUBHAM AGRAWAL · Non-Coal Mining

  4. Category B2ADS Raised2026-07-20

    MANYAKHEDI CRUSHER STONE QUARRY

    NAND RAM MALAKAR · Non-Coal Mining

  5. Category B2ADS Raised2026-07-17

    JAGANYAPURA STONE QUARRY

    GHANSHYAM SONDHIYA · Non-Coal Mining

  6. Category B2ADS Raised2026-07-14

    JAGANYAPURA STONE QUARRY

    GHANSHYAM SONDHIYA · Non-Coal Mining

  7. Category B2Pending at MS SEIAA2026-07-14

    Semlapar Crusher Stone & M-Sand Quarry

    SORAMBAI · Non-Coal Mining

  8. Category B2Referred to SEIAA2026-07-06

    Lasudalya Ramnath Stone Quarry

    rohit sharma · Non-Coal Mining

  9. Category B2EC Granted2026-06-19

    Golakheda Crusher Stone (Gitti & M-sand) Quarry

    GAJRAJ SINGH SONDHIYA · Non-Coal Mining

  10. Category B2EC Granted2026-05-15

    Gulaota Crusher Stone (Gitti & M-sand) Quarry

    RAISH MOHMMAD · Non-Coal Mining

  11. Category B1Standard ToR Granted2026-04-29

    Development of Regional Sanitary Landfill Site for Common Municipal Solid Waste Management Facility (CMSWMF) for Biaora and its Cluster ULBs located at Khasra No: 39/2, Village Aranya, Tehsil Biaora-465674, District Rajgarh by Nagar Palika Parishad, Biaora

    Nagar Palika Parishad, Biaora · INFRA-2

  12. Category B2EC Granted2026-04-25

    Palasi Crusher Stone Quarry

    NITANSHU GUPTA · Non-Coal Mining

  13. Category B2Referred to SEIAA2026-02-18

    PADONIYA STONE (GITTI) QUARRY

    Rohit Dangi · Non-Coal Mining

  14. Category B2EC Granted2026-02-18

    Pilukhedi Stone (Gitti) & M-Sand Quarry

    SHRAVAN PATIDAR · Non-Coal Mining

  15. Category B2Referred to SEIAA2026-02-16

    PADONIYA STONE QUARRY

    Rahul Dangi · Non-Coal Mining

  16. Category B1EC Granted2025-12-30

    Khilchipur Crusher Stone (Gitti & M-Sand) Mining Project by Smt Hemlata Dangi W/o Shri Hemraj Dangi is located at Khasra No. 1127/1/1, Village: Khilchipur, Tehsil- Khilchipur, District-Rajgarh, State- Madhya Pradesh Area: 2.00 Ha.

    HEMLATA DANGI · Non-Coal Mining

  17. Category B2EC Granted2025-12-13

    Palasi Crusher Stone (Gitti) Quarry

    SHASHIKALA · Non-Coal Mining

  18. Category B2EC Granted2025-12-11

    Proposed "M-Sand & Crusher Stone Quarry"

    MANOJ SHARMA · Non-Coal Mining

  19. Category B2EC Granted2025-11-14

    Peepakhedi Crusher Stone mine for making Gitti & M-sand

    BALUSINGH · Non-Coal Mining

  20. Category B2EC Granted2025-11-10

    NAGAR RAJGARH KHAS STONE & M-SAND QUARRY

    UMA GANDHI · Non-Coal Mining

  21. Category B2EC Granted2025-10-06

    Bhagori Stone mine for making Gitti & M-sand

    SUJAN GURJAR · Non-Coal Mining

  22. Category B2EC Granted2025-09-04

    Bokadi Stone Quarry

    RAMESHWAR MEENA · Non-Coal Mining

  23. Category B2EC Granted2025-08-19

    Kalipith Stone (Gitti) Quarry of Shri Bharat Singh Dangi

    BHARAT SINGH DANGI · Non-Coal Mining

  24. Category B2EC Granted2025-08-16

    KAREDI STONE QUARRY

    RAM KUNWAR CHOUHAN · Non-Coal Mining

  25. Category B2EC Granted2025-08-15

    Lasudalimaharaja Stone mine for making Gitti

    HARIPRASAD DANGI · Non-Coal Mining

  26. Category B2EC Granted2025-08-11

    Kachari Stone mine for making Gitti

    LAXMINARAYAN SONDHIYA · Non-Coal Mining

  27. Category B1EC Granted2025-07-28

    Nagar Khilchipur Stone (Gitti and M-Sand) Quarry

    BHAGWAT PANWAR · Non-Coal Mining

  28. Category B2EC Granted2025-07-15

    Harjipura Stone mine for making Gitti

    RUDRA PRATAP SINGH · Non-Coal Mining

  29. Category B2EC Granted2025-07-12

    Pachore Stone and M-Sand Quarry of Shri Sagar Bhandari

    SAGAR BHANDARI · Non-Coal Mining

  30. Category B2EC Granted2025-07-07

    Dhand Stone Quarry

    KRISHNA SINGH · Non-Coal Mining

  31. Category B2EC Granted2025-07-07

    Bhikanpur Stone Quarry

    TULSEERAM · Non-Coal Mining

  32. Category B2EC Granted2025-06-19

    Beenyakhedi Stone mine for making Gitti

    DILIP SINGH SONDHIYA · Non-Coal Mining

  33. Category B2EC Granted2025-06-18

    Beenyakhedi Stone mine for making Gitti

    DEVRAJ SINGH SONDHIYA · Non-Coal Mining

  34. Category B2EC Granted2025-06-18

    Dobadha Stone mine for making Gitti

    mangi lal sondhiya · Non-Coal Mining

  35. Category B1EC Granted2025-06-18

    Common Bio Medical Waste Treatment Facility at Survey No 36/5 ,Village Tutipura, Tehsil & District Rajgarh, Madhya Pradesh proposed by M/s Prathvi Eco Care

    PRAMILA SHARMA · INFRA-2

  36. Category B1Standard ToR Granted2025-05-14

    Khilchipur Crusher Stone (Gitti & M-Sand) Mining Project by Smt Hemlata Dangi W/o Shri Hemraj Dangi is located at Khasra No. 1127/1/1, Village: Khilchipur, Tehsil- Khilchipur, District-Rajgarh, State- Madhya Pradesh Area: 2.00 Ha.

    HEMLATA DANGI · Non-Coal Mining

  37. Category B2EC Granted2025-05-10

    Lakhanwas Stone mine for making Gitti & M-sand

    VISHAL SHIVHARE · Non-Coal Mining

  38. Category B1Standard ToR Granted2025-01-16

    Nagar Khilchipur Stone (Gitti and M-Sand) Quarry

    BHAGWAT PANWAR · Non-Coal Mining

  39. Category B1EC Granted2024-06-05

    ARANYA SAND QUARRY

    SHASHIKANT TIWARI · Non-Coal Mining

  40. Category B1EC Granted2024-06-05

    DABDI SAND QUARRYR

    SHASHIKANT TIWARI · Non-Coal Mining

  41. Category B1EC Granted2024-06-05

    Parsana Sand Quarry

    SHASHIKANT TIWARI · Non-Coal Mining

  42. Category B1EC Rejected2024-06-05

    ATAIKHEDA DHATURI SAND QUARRY

    SHASHIKANT TIWARI · Non-Coal Mining

  43. Category B1EC Granted2024-06-05

    Sekhanpur Sand Quarry

    SHASHIKANT TIWARI · Non-Coal Mining

  44. Category B1Pending at MS SEIAA2024-06-05

    Pipaliya Sand Quarry

    SHASHIKANT TIWARI · Non-Coal Mining

  45. Category B1EC Rejected2024-06-05

    JATIAKHEDA SAND QUARRY

    SHASHIKANT TIWARI · Non-Coal Mining

  46. Category B1EC Rejected2024-06-04

    BILAPURA PANWADI SAND QUARRY

    SHASHIKANT TIWARI · Non-Coal Mining

  47. Category B1EC Granted2024-06-04

    BHAGORI SAND QUARRY

    SHASHIKANT TIWARI · Non-Coal Mining

  48. Category B1Pending at MS SEIAA2024-06-04

    ABHAYPURA SAND QUARRY

    SHASHIKANT TIWARI · Non-Coal Mining

  49. Category B1EC Granted2024-06-04

    Pahadgarh Sand Quarry

    SHASHIKANT TIWARI · Non-Coal Mining

  50. Category B1EC Rejected2024-06-04

    Jaitpura Sand Quarry

    SHASHIKANT TIWARI · Non-Coal Mining

  51. Category B2EC Granted2024-06-02

    Pilukhedi Stone & Murrum Quarry

    SHRAVAN PATIDAR · Non-Coal Mining

  52. Category B2EC Granted2024-02-03

    Kadiyakhichi Crusher Stone Quarry (Temporary permit)

    SARAN CONSTRUCTION COMPANY · Non-Coal Mining

  53. Category B1Standard ToR Granted2024-01-30

    JATIAKHEDA SAND QUARRY

    SHASHIKANT TIWARI · Non-Coal Mining

  54. Category B1Standard ToR Granted2024-01-30

    Pipaliya Sand Quarry

    SHASHIKANT TIWARI · Non-Coal Mining

  55. Category B1Standard ToR Granted2024-01-30

    Jaitpura Sand Quarry

    SHASHIKANT TIWARI · Non-Coal Mining

  56. Category B1Standard ToR Granted2024-01-30

    Parsana Sand Quarry

    SHASHIKANT TIWARI · Non-Coal Mining

  57. Category B1Standard ToR Granted2024-01-30

    Pahadgarh Sand Quarry

    SHASHIKANT TIWARI · Non-Coal Mining

  58. Category B1Standard ToR Granted2024-01-30

    GANESHPUR SAND QUARRY

    SHASHIKANT TIWARI · Non-Coal Mining

  59. Category B1Standard ToR Granted2024-01-30

    Sekhanpur Sand Quarry

    SHASHIKANT TIWARI · Non-Coal Mining

  60. Category B1Standard ToR Granted2024-01-29

    ABHAYPURA SAND QUARRY

    SHASHIKANT TIWARI · Non-Coal Mining

  61. Category B1Standard ToR Granted2024-01-29

    CHAKROD SAND QUARRY

    SHASHIKANT TIWARI · Non-Coal Mining

  62. Category B1Standard ToR Granted2024-01-29

    BILAPURA PANWADI SAND QUARRY

    SHASHIKANT TIWARI · Non-Coal Mining

  63. Category B1Standard ToR Granted2024-01-29

    BARMANKHEDI SAND QUARRY

    SHASHIKANT TIWARI · Non-Coal Mining

  64. Category B1Standard ToR Granted2024-01-29

    BHAGORI SAND QUARRY

    SHASHIKANT TIWARI · Non-Coal Mining

  65. Category B1Standard ToR Granted2024-01-29

    DABDI SAND QUARRYR

    SHASHIKANT TIWARI · Non-Coal Mining

  66. Category B1Standard ToR Granted2024-01-29

    ARANYA SAND QUARRY

    SHASHIKANT TIWARI · Non-Coal Mining

  67. Category B1Standard ToR Granted2024-01-29

    ATAIKHEDA DHATURI SAND QUARRY

    SHASHIKANT TIWARI · Non-Coal Mining

  68. Category B1Under Examination2024-01-27

    JAITPURA SAND QUARRY

    SHASHIKANT TIWARI · Non-Coal Mining

  69. Category B1Under Examination2024-01-27

    PARSANA SAND QUARRY

    SHASHIKANT TIWARI · Non-Coal Mining

  70. Category B1Under Examination2024-01-27

    PAHADGARH SAND QUARRY

    SHASHIKANT TIWARI · Non-Coal Mining

  71. Category B1Under Examination2024-01-27

    PIPALIYA SAND QUARRY

    SHASHIKANT TIWARI · Non-Coal Mining

  72. Category B1Under Examination2024-01-27

    JATIAKHEDI SAND QUARRY

    SHASHIKANT TIWARI · Non-Coal Mining

  73. Category B1Under Examination2024-01-27

    SHEKHANPUR SAND QUARRY

    SHASHIKANT TIWARI · Non-Coal Mining

  74. Category B1Under Examination2024-01-26

    CHAKROD SAND QUARRY

    SHASHIKANT TIWARI · Non-Coal Mining

  75. Category B1Under Examination2024-01-26

    ARANYA SAND QUARRY

    SHASHIKANT TIWARI · Non-Coal Mining

  76. Category B1Under Examination2024-01-26

    BHAGORI SAND QUARRY

    SHASHIKANT TIWARI · Non-Coal Mining

  77. Category B1Under Examination2024-01-26

    BILAPURA PANWADI SAND QUARRY

    SHASHIKANT TIWARI · Non-Coal Mining

  78. Category B1Under Examination2024-01-26

    ATAIKHEDA DHATURI SAND QUARRY

    SHASHIKANT TIWARI · Non-Coal Mining

  79. Category B1Under Examination2024-01-26

    BARMANKHEDI SAND QUARRY

    SHASHIKANT TIWARI · Non-Coal Mining

  80. Category B1Under Examination2024-01-26

    ABHAYPURA SAND QUARRY

    SHASHIKANT TIWARI · Non-Coal Mining

  81. Category B1Under Examination2024-01-26

    DABDI SAND QUARRY

    SHASHIKANT TIWARI · Non-Coal Mining

  82. Category B2EC Granted2024-01-17

    Panjri Crusher Stone Quarry

    RAM RASONIYA · Non-Coal Mining

  83. Category B2EC Granted2023-12-15

    Grain Base fuel ethanol unit of 120 KLPD, 3.4 MW Co- generation power plant By product: 60 TPD of CO2 Generation & 54 TPD of DDGS

    MAAS BIONOMICS PRIVATE LIMITED · Industrial Projects - 2

  84. Category B2EC Granted2023-11-16

    Patadiya Dabi Crusher Stone Quarry

    ISHWAR RAJPUT · Non-Coal Mining

  85. Category B2EC Granted2023-11-16

    Dingalpur Crusher Stone Quarry

    RAISH MOHMMAD · Non-Coal Mining

  86. Category B2EC Granted2023-11-16

    Bhaisana Crusher Stone Quarry

    RAGHVENDRA GURJAR · Non-Coal Mining

  87. Category B2EC Granted2023-10-31

    Kankariya Meena Crusher Stone Quarry

    KAPIL AGRAWAL · Non-Coal Mining

  88. Category B2EC Granted2023-10-29

    Rugnathgarh Crusher Stone & M-Sand Quarry

    PALASH VIJAY · Non-Coal Mining

  89. Category B2EC Granted2023-10-21

    Padoniya Crusher Stone Quarry

    JAGDISH DANGI · Non-Coal Mining

  90. Category B2EC Granted2023-09-27

    Hasalbay Stone Quarry

    RAVINDRA DHAKAD · Non-Coal Mining

  91. Category B2EC Granted2023-09-10

    Naipuriya Crusher Stone Quarry

    GABA SONDHIYA · Non-Coal Mining

  92. Category B2EC Granted2023-08-31

    DHABLIKALAN CRUSHER STONE QUARRY

    ARJUN PARIHAR · Non-Coal Mining

  93. Category B2EC Granted2023-07-12

    SAYEEDABAD SAND MINE

    SHASHIKANT TIWARI · Non-Coal Mining

  94. Category B2EC Granted2023-07-12

    BERAD SAND QUARRY

    SHASHIKANT TIWARI · Non-Coal Mining

  95. Category B2EC Granted2023-06-21

    Kakariya Meena Crusher Stone Quarry of Shri Anil Meena

    ANIL · Non-Coal Mining

  96. Category B1TOR Granted2023-04-25

    Common Bio Medical Waste Treatment Facility at Survey No 36/5 ,Village Tutipura, Tehsil & District Rajgarh, Madhya Pradesh proposed by M/s Prathvi Eco Care

    PRAMILA SHARMA · INFRA-2

  97. Category B2EC Granted2023-03-01

    Talawada Crusher Stone Quarry

    DEVRAJ GURJAR · Non-Coal Mining

  98. Category B2EC Granted2023-02-26

    Jalampura Crusher Stone Quarry

    DILIP MEHTA · Non-Coal Mining

  99. Category B2EC Granted2023-02-17

    Bhatkhedi Stone Quarry

    DURGAPRSAD NAGAR · Non-Coal Mining

  100. Category B2EC Granted2023-02-10

    Bhatkhedi Stone Quarry

    PREMNARAYAN NAGAR · Non-Coal Mining

Showing 100 of 105 proposals, newest first. The button below loads the rest.