← All districts

Bhopal, Madhya Pradesh

Not a Scheduled AreaCensus 2011 district code 444
  1. 24 Oct 2026 · Details soughtAdditional details soughtChandbad Kadeem Stone Quarry (M/s B K Enterprises, Prop Vashim Khan)
  2. 24 Oct 2026 · Details soughtAdditional details soughtPardi Stone Quarry of Vishal Yadav S/o Late Shri Banwari Lal Yadav
  3. 22 Oct 2026 · Details soughtEssential details soughtSage Ashiyana - A proposed Residential Multi Storied Building Project, of M/s Sage Realty Pvt. Ltd. in Bhopal.
  4. 22 Oct 2026 · FiledSubmittedMalikhedi Murram & Stone Quarry
  5. 21 Oct 2026 · ClosedDelisted automaticallyChandbad Kadeem Stone Quarry (M/s B K Enterprises, Prop Vashim Khan)
  6. 21 Oct 2026 · ClosedDelisted automaticallyPardi Stone Quarry of Vishal Yadav S/o Late Shri Banwari Lal Yadav
  7. 15 Oct 2026 · FiledSubmittedSage Ashiyana - A proposed Residential Multi Storied Building Project, of M/s Sage Realty Pvt. Ltd. in Bhopal.
  8. 12 Oct 2026 · Details soughtEssential details soughtShahpur stone quarry
  9. 3 Oct 2026 · FiledSubmittedJaitpura Stone Quarry
  10. 29 Sept 2026 · Details soughtAdditional details soughtKhajuri Stone Quarry
  11. 23 Sept 2026 · Details soughtAdditional details soughtCHANDBAD KADIM STONE & M-SAND QUARRY
  12. 22 Sept 2026 · Details soughtAdditional details soughtChaplasir stone quarry

Dated by the portal's own appraisal history, converted to India Standard Time; a proposal with no recorded history appears on its register submission date.

Other clearances these proposals declare

Forest land diversion declared
1
Forest land sought for diversion
Area not stated
Wildlife board recommendation declared
0
In or near a protected area
0
In an eco-sensitive zone
1

These counts are taken from the application forms of the 159 of 159 proposals naming this district whose forms have been read for these questions. In 34 of those forms at least one question was left blank, and a blank answer is counted as unknown. The forest area is the area stated for forest clearance, with each forest proposal counted once, in the district where its project is primarily sited.

Proposals naming this district
159
Category A proposals
None
Families declared displaced
50
Families declared affected
12

Displacement figures are the proponents’ own declarations. A project sited across several districts declares one figure for the whole project, and that figure is counted once, in the district where the project is primarily sited. 2 of the proposals listed below declare displacement and are sited primarily in another district, so their figures are counted in that district’s total.

Fifth Schedule status

Not within a Fifth Schedule Scheduled Area

The Presidential Order for Madhya Pradesh declares which areas in the State are Scheduled Areas. It does not name this district, in whole or in part, so no part of it is a Scheduled Area under that Order. A later Order could add one; this reference states the position as transcribed and reviewed on 2026-08-21.

OrderThe Scheduled Areas (States of Chhattisgarh, Jharkhand and Madhya Pradesh) Order, 2003

What the record shows

  • Applicants for projects sited mainly in this district have declared 50 families to be displaced. The figure comes from their applications, and we have not verified it.

Each of these observations appears when a fixed rule is met by the figures on this page, so the same figures always give the same sentences. None of them is a view on whether a project should go ahead.

Who lives there

Figures from Census 2011, each compared with the all-India value computed on the same definition.

Total population
23,71,061
Households
5,01,805
Average household size
4.73
0.12 below India's 4.85India
Scheduled Tribe share of population
2.9%
5.6 points below IndiaIndia
Scheduled Caste share of population
15.1%
1.6 points below IndiaIndia
Children aged 0-6
12.9%
0.7 points below IndiaIndia
Literacy rate
80.4%
7.4 points above IndiaIndia
Sex ratio
918
24.5 below India's 942.6India

What they live on

How the district's workers earn a living, from Census 2011. The land-dependent share counts cultivators and agricultural labourers as a share of all workers, and it is the group most directly affected when land is acquired.

Total workers
8,67,457
Work participation rate
36.6%
3.2 points below IndiaIndia
Workers dependent on land
20.6%
34.0 points below IndiaIndia
Cultivators
8.5%
16.2 points below IndiaIndia
Agricultural labourers
12.1%
17.8 points below IndiaIndia
Marginal workers
18.6%
6.1 points below IndiaIndia
Household industry workers
2.9%
1.0 points below IndiaIndia

How households live

Land, income and work among rural households, from the Socio Economic and Caste Census 2011, which recorded these where the population census did not. Only the survey's rural part is used here, so urban households do not appear.

Rural households owning land
34.5%
11.6 points below IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households whose highest earner makes over ₹5,000 a month
18.1%
6.3 points below IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households living mainly on manual casual labour
58.0%
6.2 points above IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households with a salaried member
6.7%
1.6 points below IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

When these were filed

Each proposal is dated by the first step in its appraisal history, the dated record of steps the portal keeps for it.

2024-Q12026-Q4

The timeline counts 107 of the 159 proposals here. The first filing date comes from each proposal's appraisal history, and we have not yet read it for the other 52, so they are left out. Most of them are older proposals, so the early part of the timeline undercounts what was filed then. The register itself records a date for each of them; the gap is in our copy of the histories.

Hatched columns undercount, so they cannot be compared with solid ones. 2 of them cover periods for which we have read few filing dates so far, and they count only the proposals whose date we have. 2026-Q4 was still running when the register was read, so its column counts only the filings made up to that date.

What kind of projects these are

The proposals naming this district, grouped by the sector each was filed under.

  • Non-Coal Mining 73%
  • INFRA-2 24.5%
  • River Valley and Hydroelectric Projects 1.3%
  • Industrial Projects - 1 0.6%
  • Other (1) 0.6%

The four largest sectors are shown by name and the rest are grouped as Other.

What is proposed here

These are the proposals in the national environmental clearance register whose application names a site in this district, newest first. A project with sites in several districts appears under each of them.

  1. Category B1Under Verification2026-10-22

    Malikhedi Murram & Stone Quarry

    ANANYA ENGINEERING PRIVATE LIMITED · Non-Coal Mining

  2. Category B2EDS raised2026-10-15

    Sage Ashiyana - A proposed Residential Multi Storied Building Project, of M/s Sage Realty Pvt. Ltd. in Bhopal.

    SAGE REALTY PRIVATE LIMITED · INFRA-2

  3. Category B1Under Verification2026-10-13

    Shahpur stone quarry

    Godec construction pvt ltd · Non-Coal Mining

  4. Category B1Under Verification2026-10-07

    Rojibe Stone Quarry-3.0 Ha

    shree balaji stone crasher · Non-Coal Mining

  5. Category B1Under Examination2026-10-03

    Jaitpura Stone Quarry

    ASLAM SALEEM KHAN · Non-Coal Mining

  6. Category B2Pending at MS SEIAA2026-09-09

    Dehriya Kalan Murrum Mine

    Ankit verma · Non-Coal Mining

  7. Category B1Forwarded to MS SPCB/PCC by MS2026-08-21

    Proposed Standalone Grinding Unit with Cement (OPC, PPC, PSC & PCC) Production Capacity of 8.0 Million TPA (Phase I: 4.o Million TPA and Phase II: 4.0 Million TPA) at Village: Phanda kalan, Tehsil: Huzur, District: Bhopal, Madhya Pradesh by M/s. UltraTech Cement Limited (Unit: Bhopal Cement Works).

    UltraTech Cement Limited · Industrial Projects - 1

  8. Category B2Referred to SEIAA2026-08-11

    Development of Genex Lakeview Residency Hotel through Right to Use cum Concession Agreement (CA) executed with Madhya Pradesh Hotel Corporation Limited (MPHCL) through Madhya Pradesh State Tourism Development Corporation (MPSTDC)

    GENEX LAKEVIEW RESIDENCY HOTEL PRIVATE LIMITED · INFRA-2

  9. Category B2ADS Raised2026-07-21

    Khajuri Stone Quarry

    Rahul pachori · Non-Coal Mining

  10. Category B2ADS Raised2026-07-13

    “Pamposh” Multi-Unit & L.I.G. Residential Development

    Pomposh gruh nirman sahakari samiti maryadit · INFRA-2

  11. Category B2Pending at MS SEIAA2026-07-06

    CONSTRUCTION OF INDUSTRIAL BUILDING FOR PROPOSED GARMENT FACTORY

    INDO Accord apparels · INFRA-2

  12. Category B1Forwarded to MS SPCB/PCC by MS2026-07-05declares affected families

    Development of Four lane with Paved shoulder of South-Western Bhopal Ring Road in the State of Madhya Pradesh (Total length = 35.611 km)

    MPRDC BHOPAL DIVISION · INFRA-1

  13. Category B1Standard ToR Granted2026-06-18

    Rajeev Nagar Stone & M- Sand Quarry

    amit singh parihar · Non-Coal Mining

  14. Category B1Standard ToR Granted2026-06-16

    CHANDBAD KADIM STONE QUARRY Production Capacity from 95,000 M3/ year (55,000 m3/Year Stone Gitti & 40,000 m3/Year M Sand ) Khasra No. 375/1, 375/2, 378, 378/2/1, 379/1 & 380 Pvt. Land, Area - 4.00 Hectare, At Village - Chandbad Kadim, Tehsil - Berasia, District- Bhopal- (M.P.)

    KOMAL THAKUR · Non-Coal Mining

  15. Category B1ADS Raised2026-06-02

    CHANDBAD KADIM STONE & M-SAND QUARRY

    shubham nagar · Non-Coal Mining

  16. Category B1Proposal pulled back (withdrawn)2026-06-01declares affected families

    Environmental Clearance for Parbati Complex Major Micro Irrigation Project having CCA of 18,500 Ha. at District Sehore, State Madhya Pradesh by Water Resources Division, Sehore, Madhya Pradesh

    WATER RESORCES DIVISION, SEHORE · River Valley and Hydroelectric Projects

  17. Category B1Forwarded to MS SPCB/PCC by MS2026-06-01declares affected families

    Environmental Clearance for the Parbati Complex Major Micro Irrigation Project having C.C.A. of 18,500 Ha. in District Sehore, State Madhya Pradesh by Water Resources Division, Sehore, Madhya Pradesh

    WATER RESORCES DIVISION, SEHORE · River Valley and Hydroelectric Projects

  18. Category B1Referred to SEAC2026-05-29

    Chandbad Kadeem Stone Quarry (M/s B K Enterprises, Prop Vashim Khan)

    Vashim Khan · Non-Coal Mining

  19. Category B1ADS Raised2026-05-29

    Pardi Stone Quarry of Vishal Yadav S/o Late Shri Banwari Lal Yadav

    VISHAL YADAV · Non-Coal Mining

  20. Category B2Pending at MS SEIAA2026-05-29

    Proposed 'K- International' Hotel Building with Integrated Retail Mall located at Bagh Mughaliya, Bhopal

    k international · INFRA-2

  21. Category B1Standard ToR Granted2026-05-26

    Malkhedi Stone (Gitti & M-Sand) Quarry

    ANANYA ENGINEERING PRIVATE LIMITED · Non-Coal Mining

  22. Category B2EC Rejected2026-05-15

    KARDAI FLAGSTONE QUARRY

    wasiq khan · Non-Coal Mining

  23. Category B2Referred to SEAC2026-03-13

    Toomda Stone Quarry

    MEENA MISHRA · Non-Coal Mining

  24. Category B2EC Granted2026-03-12

    Rajeev Nagar Murrum Quarry

    Vinay agrawal · Non-Coal Mining

  25. Category B1Forwarded to MS SPCB/PCC by MS2026-02-27

    Rozibeh Stone Quarry (1.560 Ha)

    shree balaji stone crasher · Non-Coal Mining

  26. Category B1Forwarded to MS SPCB/PCC by MS2026-02-27

    Rojibe Stone Quarry-3.0 Ha

    shree balaji stone crasher · Non-Coal Mining

  27. Category B1Pending at MS SEIAA2026-02-25

    “Shahpur Crusher Stone (Gitti & M-Sand) Project” Project Location- At Khasra No. 239/222, Village: Shahpur, Tehsil- Huzur & District- Bhopal State- Madhya Pradesh Area: 3.00 Ha

    J K STONE CRUSHER · Non-Coal Mining

  28. Category B2Referred to SEIAA2026-02-24

    Re Development of “Ravi Shankar Shukla (RSS) Market”

    PRADEEP KUMAR HEDAU · INFRA-2

  29. Category B2EC Granted2026-02-19

    To Obtain Environment Clearance for Residential Project (" Sagar Sunrise-II)

    AGRAWAL BUILDERS & COLONIZERS CO · INFRA-2

  30. Category B1Standard ToR Granted2026-02-04

    Neelbad Murrum Quarry

    RAKESH NAGAR · Non-Coal Mining

  31. Category B2EC Granted2026-01-18

    Chirayu University Of Chirayu Cheritable Foundation

    CHIRAYU CHARITABLE FOUNDATION · INFRA-2

  32. Category B2EC Granted2025-12-19

    obtaining Environmental Clearance for proposed Educational Project of " Sagar Public School " Plot no P-1 and P-12 of BDA , Phase-1 at Village Misrod , Tehsil Kolar Dist Bhopal (MP) by M/s Shri Agrawal Educational and Cultural Society Bhopal (MP)

    Shri agrawal educational & cultural society · INFRA-2

  33. Category B1Standard ToR Granted2025-12-13

    CHANDBAD KADIM STONE (GITTI) QUARRY

    SHEEBA Saleem · Non-Coal Mining

  34. Category B1Standard ToR Granted2025-12-05

    Kardai Stone (Gitti), Murrum & M-Sand Quarry

    MANOJ AGARWAL · Non-Coal Mining

  35. Category B1Standard ToR Granted2025-12-04

    Chandbad Kadeem Stone Quarry of M/s Anand Stone Crusher

    PRAKASH MANDHWANI · Non-Coal Mining

  36. Category B1Standard ToR Granted2025-12-04

    Shahpur Stone Quarry of M/s. P S Infrastructure

    P S INFRASTRUCTURE · Non-Coal Mining

  37. Category B2EC Granted2025-11-18

    Pardi Stone (Gitti) Quarry

    swastika krashar · Non-Coal Mining

  38. Category B2EC Granted2025-11-15

    KHORI STONE QUARRY

    Pratik patidar · Non-Coal Mining

  39. Category B2EC Granted2025-11-12

    CHANDBAD KADIM CRUSHER STONE & M-SAND QUARRY LEASE

    nachiket sing bais · Non-Coal Mining

  40. Category B1EC Granted2025-11-03

    Chandbad Kadeem Stone Quarry

    RAHUL MALVIYA · Non-Coal Mining

  41. Category B1EC Granted2025-10-25

    Rasuliya Pathar Crusher Stone Quarry

    REKHA SHRIVASTAVA · Non-Coal Mining

  42. Category B1Forwarded to MS SPCB/PCC by MS2025-10-14

    Malikhedi Murram & Stone Quarry

    ANANYA ENGINEERING PRIVATE LIMITED · Non-Coal Mining

  43. Category B2EC Granted2025-10-10

    Babachiya Stone Quarry

    BABALOO KHAN · Non-Coal Mining

  44. Category B1Standard ToR Granted2025-10-07

    Sarvar Stone Quarry

    RAJDULARI PARASHAR · Non-Coal Mining

  45. Category B1EC Granted2025-09-25

    Malikhedi Crusher Stone Quarry Lease Area 4.0 ha Khasra No. 237, 238, 239 P Applicant M/s G.S. Minerals

    G. S. MINERALS · Non-Coal Mining

  46. Category B1Standard ToR Granted2025-09-25

    Malikhedi Stone Quarry

    RAJDULARI PARASHAR · Non-Coal Mining

  47. Category B1EC Granted2025-09-25

    Malikhedi Crusher Stone Quarry Lease Area- 4.0 ha Khasra No.- 240 P Applicant M/s G. S Minerals

    G. S. MINERALS · Non-Coal Mining

  48. Category B1EC Granted2025-09-24

    Malikhedi Crusher Stone Quarry Lease Area 4.0 ha Khasra No. 211, 212 P Applicant M/s G. S. Minerals Capacity- 21118 CUM PER YEAR

    G. S. MINERALS · Non-Coal Mining

  49. Category B1EC Granted2025-09-24

    Malikhedi Crusher Stone Quarry is located at Khasra No.-211, 240 P, Village Malikhedi, Tehsil Huzur, Distt. Bhopal (M.P.). The capacity of Mine 44688 cum per year. Lesse M/S GS Minelas

    G. S. MINERALS · Non-Coal Mining

  50. Category B2Pending at MS SEIAA2025-08-28

    BARKHEDA BONDAR MURRUM DEPOSIT

    AKSHAY BANSAL · Non-Coal Mining

  51. Category B2EC Granted2025-08-28

    Sage World Tower

    SAGE EARTH · INFRA-2

  52. Category B1Standard ToR Granted2025-08-19

    CHANDBAD KADIM STONE & M-SAND QUARRY

    shubham nagar · Non-Coal Mining

  53. Category B2ADS Raised2025-08-19

    Chaplasir stone quarry

    ANAS HUSSAIN · Non-Coal Mining

  54. Category B2EC Granted2025-07-31

    CHANDERI STONE (GITTI & M-SAND) QUARRY

    MURARI SHARMA · Non-Coal Mining

  55. Category B2EC Granted2025-07-22

    Rolukhedi Murrum Quarry

    VAMANA MINING · Non-Coal Mining

  56. Category B1Standard ToR Granted2025-06-28

    Chandbad Kadim Stone Quarry

    NARENDRA DANGGUS · Non-Coal Mining

  57. Category B1Standard ToR Granted2025-06-23

    “Shahpur Crusher Stone (Gitti & M-Sand) Project” Project Location- At Khasra No. 239/222, Village: Shahpur, Tehsil- Huzur & District- Bhopal State- Madhya Pradesh Area: 3.00 Ha

    J K STONE CRUSHER · Non-Coal Mining

  58. Category B1Proposal pulled back (withdrawn)2025-06-21

    “Shahpur Crusher Stone (Gitti & M-Sand) Project” Project Location- At Khasra No. 1239/222, Village: Shahpur, Tehsil- Huzur & District- Bhopal State- Madhya Pradesh Area: 3.00 Ha

    J K STONE CRUSHER · Non-Coal Mining

  59. Category B2EC Granted2025-05-24

    Project of Residential Towers " SAGAR SUNRISE "

    AGRAWAL BUILDERS & COLONIZERS CO · INFRA-2

  60. Category B2EC Granted2025-05-22

    Project of Residential Towers “SAGAR INFINITY “

    AGRAWAL BUILDERS & COLONIZERS CO · INFRA-2

  61. Category B1Standard ToR Granted2025-05-14

    Rasuliya Pathar Crusher Stone Quarry

    REKHA SHRIVASTAVA · Non-Coal Mining

  62. Category B1Standard ToR Granted2025-05-07

    Sikandarabad Stone Quarry

    SUBHASH SHARMA · Non-Coal Mining

  63. Category B2EC Granted2025-05-06

    Kuthar Stone (Gitti & M-Sand) Quarry

    Nishant sharma · Non-Coal Mining

  64. Category B1EC Granted2025-05-01

    Chandbad Kadeem Stone Quarry (Komal Singh Thakur, 4.0 Hectare, EC Extension )

    KOMAL THAKUR · Non-Coal Mining

  65. Category B2EC Rejected2025-05-01

    Parwaliya Sadak Stone Quarry of Devendra Trigunayak

    DEVENDRA TRIGUNAYAK · Non-Coal Mining

  66. Category B2EC Granted2025-04-28

    "Canal Kinship Paramount" of Group Housing (Residential Flat)

    Chetan Patidar · INFRA-2

  67. Category B1Standard ToR Granted2025-04-25

    Malikhedi Crusher Stone Quarry Lease Area 4.0 ha Khasra No. 237, 238, 239 P Applicant M/s G.S. Minerals

    G. S. MINERALS · Non-Coal Mining

  68. Category B1Standard ToR Granted2025-04-25

    Malikhedi Crusher Stone Quarry Lease Area- 4.0 ha Khasra No.- 240 P Applicant M/s G. S Minerals

    G. S. MINERALS · Non-Coal Mining

  69. Category B1Standard ToR Granted2025-04-25

    SIKANDARABAD STONE QUARRY

    PREETI AGRAWAL · Non-Coal Mining

  70. Category B1Standard ToR Granted2025-04-24

    RATATAL STONE MINE

    VINITA SHARMA · Non-Coal Mining

  71. Category B1Standard ToR Granted2025-04-24

    PARDI STONE QUARRY

    GSME Enterprises · Non-Coal Mining

  72. Category B1Standard ToR Granted2025-04-24

    Chandbad Kadeem Stone Quarry (M/s B K Enterprises, Prop Vashim Khan)

    Vashim Khan · Non-Coal Mining

  73. Category B1EC Granted2025-04-22

    Chandbad Kadeem Stone Quarry

    KOMAL THAKUR · Non-Coal Mining

  74. Category B1Standard ToR Granted2025-04-17

    Malikhedi Crusher Stone Quarry Lease Area 4.0 ha Khasra No. 211, 212 P Applicant M/s G. S. Minerals Capacity- 21118 CUM PER YEAR

    G. S. MINERALS · Non-Coal Mining

  75. Category B1Standard ToR Granted2025-04-17

    Shahpur Stone Quarry

    VAMANA MINING · Non-Coal Mining

  76. Category B1Standard ToR Granted2025-04-17

    Malikhedi Stone Quarry

    ANOOP GARG · Non-Coal Mining

  77. Category B1Standard ToR Granted2025-04-16

    Malikhedi Crusher Stone Quarry is located at Khasra No.-211, 240 P, Village Malikhedi, Tehsil Huzur, Distt. Bhopal (M.P.). The capacity of Mine 44688 cum per year. Lesse M/S GS Minelas

    G. S. MINERALS · Non-Coal Mining

  78. Category B1Standard ToR Granted2025-04-08

    PARWALIYA SADAK STONE QUARRY (Khasra No. 501, Area- 2.023 HA)

    RAMCHANDRA PREMCHANDANI · Non-Coal Mining

  79. Category B1EC Granted2025-04-05

    Shahpur Stone Quarry

    JAGDISH SHARMA · Non-Coal Mining

  80. Category B1EC Granted2025-04-05

    Shahpur Stone Quarry

    BHARAT SHUKLA · Non-Coal Mining

  81. Category B1EC Granted2025-04-05

    Shahpur Stone Quarry

    RAJEEV SHUKLA · Non-Coal Mining

  82. Category B1EC Granted2025-04-05

    Shahpur Stone Quarry

    JAGDISH SHARMA · Non-Coal Mining

  83. Category B1Standard ToR Granted2025-04-01

    "Pardi Stone Quarry" of Ruma Malik W/o Praween Malik

    RUMA MALIK · Non-Coal Mining

  84. Category B1Standard ToR Granted2025-03-31

    Pardi Stone Quarry of Vishal Yadav S/o Late Shri Banwari Lal Yadav

    VISHAL YADAV · Non-Coal Mining

  85. Category B1Standard ToR Granted2025-03-29

    CHHAPRI STONE QUARRY

    SUDHIR JAIN · Non-Coal Mining

  86. Category B1Standard ToR Granted2025-03-29

    SARWAR CRUSHER STONE QUARRY

    KRISHNA SHRIVASTAVA · Non-Coal Mining

  87. Category B1EC Granted2025-03-26

    Kardai Stone (Gitti & M-Sand) Quarry

    NIKHIL SINGH · Non-Coal Mining

  88. Category B2EC Granted2025-03-11

    Proposed “Aashima Anupama City Phase II” Development of Plotted Housing (Residential flat)

    Asnani Builders and Developers · INFRA-2

  89. Category B2EC Granted2025-03-11

    Proposed “Mukund Majesty” Development of Multi-Unit Residential (Apartment) Project

    Mukund Developers · INFRA-2

  90. Category B1Standard ToR Granted2025-02-15

    Chandbad Kadeem Stone Quarry

    RAHUL MALVIYA · Non-Coal Mining

  91. Category B2EC Granted2025-01-27

    “Sage Skyline” Development of Residential Tower Project

    Sage properties · INFRA-2

  92. Category B2Pending at MS SEIAA2025-01-21

    proposed residential project " Surendra Select"

    Kolar developers · INFRA-2

  93. Category B2Under Examination2024-12-21

    Sage Skyline Development of Residential Tower Project

    Sage properties · INFRA-2

  94. Category B2EC Granted2024-12-10

    Construction of Additional Quarter for Staff / Officers of Reserve Bank of India at Char Imli, Bhopal, Madhya Pradesh -462016.

    Reserve Bank of India · INFRA-2

  95. Category B2EC Granted2024-11-26

    Proposed Housing project “Sidhi Sanskriti” at Village Salaiya, Tehsil- Huzur, District- Bhopal, State- Madhya Pradesh

    BADRI PRASAD PATEL · INFRA-2

  96. Category B2EC Granted2024-10-05

    Residential Plotted Colony" MAYFAIR"

    GLOBUS BUILDCON · INFRA-2

  97. Category B1EC Granted2024-06-21

    Malikhedi Stone Quarry

    MALIKHEDI STONE QUARRY · Non-Coal Mining

  98. Category B1EC Granted2024-06-21

    MALIKHEDI STONE MINE” OF SMT. PARAS DAGA, W/O SHRI VIJAY DAGA

    SMT. PARAS DAGA, W/O SHRI VIJAY DAGA · Non-Coal Mining

  99. Category B2Pending at MS SEIAA2024-05-28

    Ramanya International Hotel

    RAMANYA INTERNATIONAL · INFRA-2

  100. Category B2Pending at MS SEIAA2024-05-27

    JAITPURA STONE QUARRY

    SUHAIL KHAN · Non-Coal Mining