All 28 in the last 60 days- 27 Oct 2026 · DecidedEnvironmental clearance grantedGudbhela Crusher Stone Quarry
- 27 Oct 2026 · FiledSubmittedRAMPURA CHAKALDI GITTI & M-SAND MINE-2.832HA
- 23 Oct 2026 · FiledSubmittedPanari Crusher Stone Quarry
- 21 Oct 2026 · FiledSubmittedGudbhela Stone Quarry Located at Khasra No.: 358 Village- Gudbhela, Tehsil- Sehore, Dist- Sehore, State-…
- 5 Oct 2026 · DecidedEnvironmental clearance granted"Abidabad Stone Quarry" of M/s Serman (I) Road Makers Pvt. Ltd., Bhopal (Director Rakesh Sharma)
- 5 Oct 2026 · DecidedEnvironmental clearance grantedAbidabad Stone Quarry
- 5 Oct 2026 · DecidedEnvironmental clearance grantedIndustrial Shed at M/s CG Power and Industrial Solutions Limited, MPIDC Industrial Area, Sehore, Madhya…
- 5 Oct 2026 · DecidedEnvironmental clearance grantedChakaldi Stone Mine-2.0ha
- 30 Sept 2026 · FiledSubmittedLanchore Stone Quarry
- 29 Sept 2026 · DecidedStandard Terms of Reference grantedKASBA STONE MINE
- 29 Sept 2026 · FiledSubmittedTipakhedi Stone Quarry
- 18 Sept 2026 · Details soughtEssential details soughtKASBA STONE MINE
Dated by the portal's own appraisal history, converted to India Standard Time; a proposal with no recorded history appears on its register submission date.
Other clearances these proposals declare
- Forest land diversion declared
- 0
- Forest land sought for diversion
- None declared
- Wildlife board recommendation declared
- 0
- In or near a protected area
- 0
- In an eco-sensitive zone
- 0
These counts are taken from the application forms of the 150 of 150 proposals naming this district whose forms have been read for these questions. In 40 of those forms at least one question was left blank, and a blank answer is counted as unknown. The forest area is the area stated for forest clearance, with each forest proposal counted once, in the district where its project is primarily sited.
- Proposals naming this district
- 150
- Category A proposals
- None
- Families declared displaced
- 882
- Families declared affected
- 5,958
Displacement figures are the proponents’ own declarations. A project sited across several districts declares one figure for the whole project, and that figure is counted once, in the district where the project is primarily sited.
Fifth Schedule status
Not within a Fifth Schedule Scheduled Area
The Presidential Order for Madhya Pradesh declares which areas in the State are Scheduled Areas. It does not name this district, in whole or in part, so no part of it is a Scheduled Area under that Order. A later Order could add one; this reference states the position as transcribed and reviewed on 2026-08-21.
OrderThe Scheduled Areas (States of Chhattisgarh, Jharkhand and Madhya Pradesh) Order, 2003
What the record shows
Applicants for projects sited mainly in this district have declared 882 families to be displaced. The figure comes from their applications, and we have not verified it.
Each of these observations appears when a fixed rule is met by the figures on this page, so the same figures always give the same sentences. None of them is a view on whether a project should go ahead.
Who lives there
Figures from Census 2011, each compared with the all-India value computed on the same definition.
- Total population
- 13,11,332
- Households
- 2,57,311
- Average household size
- 5.10
- 0.25 above India's 4.85India
- Scheduled Tribe share of population
- 11.1%
- 2.5 points above IndiaIndia
- Scheduled Caste share of population
- 20.7%
- 4.1 points above IndiaIndia
- Children aged 0-6
- 15.1%
- 1.5 points above IndiaIndia
- Literacy rate
- 70.1%
- 2.9 points below IndiaIndia
- Sex ratio
- 918
- 24.7 below India's 942.6India
What they live on
How the district's workers earn a living, from Census 2011. The land-dependent share counts cultivators and agricultural labourers as a share of all workers, and it is the group most directly affected when land is acquired.
- Total workers
- 5,86,087
- Work participation rate
- 44.7%
- 4.9 points above IndiaIndia
- Workers dependent on land
- 73.1%
- 18.5 points above IndiaIndia
- Cultivators
- 34.4%
- 9.7 points above IndiaIndia
- Agricultural labourers
- 38.7%
- 8.8 points above IndiaIndia
- Marginal workers
- 36.5%
- 11.8 points above IndiaIndia
- Household industry workers
- 1.7%
- 2.1 points below IndiaIndia
How households live
Land, income and work among rural households, from the Socio Economic and Caste Census 2011, which recorded these where the population census did not. Only the survey's rural part is used here, so urban households do not appear.
- Rural households owning land
- 46.4%
- 0.2 points above IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
- Rural households whose highest earner makes over ₹5,000 a month
- 18.8%
- 5.6 points below IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
- Rural households living mainly on manual casual labour
- 53.3%
- 1.5 points above IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
- Rural households with a salaried member
- 3.7%
- 4.6 points below IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
When these were filed
Each proposal is dated by the first step in its appraisal history, the dated record of steps the portal keeps for it.
The timeline counts 119 of the 150 proposals here. The first filing date comes from each proposal's appraisal history, and we have not yet read it for the other 31, so they are left out. Most of them are older proposals, so the early part of the timeline undercounts what was filed then. The register itself records a date for each of them; the gap is in our copy of the histories.
Hatched columns undercount, so they cannot be compared with solid ones. 2 of them cover periods for which we have read few filing dates so far, and they count only the proposals whose date we have. 2026-Q4 was still running when the register was read, so its column counts only the filings made up to that date.
What kind of projects these are
The proposals naming this district, grouped by the sector each was filed under.
- Non-Coal Mining 93.3%
- River Valley and Hydroelectric Projects 4%
- INFRA-2 2.7%
The four largest sectors are shown by name and the rest are grouped as Other.
What is proposed here
These are the proposals in the national environmental clearance register whose application names a site in this district, newest first. A project with sites in several districts appears under each of them.
- Category B1Under Verification2026-10-27
RAMPURA CHAKALDI GITTI & M-SAND MINE-2.832HA
MANOHAR SINGH RAJPUT · Non-Coal Mining
- Category B2Under Verification2026-10-23
Panari Crusher Stone Quarry
SANTOSH KUMAR JAIN · Non-Coal Mining
- Category B1Under Verification2026-10-21
Gudbhela Stone Quarry Located at Khasra No.: 358 Village- Gudbhela, Tehsil- Sehore, Dist- Sehore, State- Madhya Pradesh
DINESH · Non-Coal Mining
- Category B2Proposal Accepted and Referred to SEAC2026-09-30
Lanchore Stone Quarry
VIJAY KUMAR · Non-Coal Mining
- Category B2Referred to SEAC2026-09-29
Tipakhedi Stone Quarry
SURENDRA SINGH THAKUR · Non-Coal Mining
- Category B1Forwarded to MS SPCB/PCC by MS2026-09-28
KASBA STONE MINE
RANJHA RAI · Non-Coal Mining
- Category B1Proposal Accepted and Referred to SEAC2026-09-14
BAMLADAD STONE QUARRY
SANDEEP SOOD · Non-Coal Mining
- Category B2Pending at MS SEIAA2026-09-08
Khaikheda Stone Quarry
RAGHUNATH · Non-Coal Mining
- Category B2Pending at MS SEIAA2026-09-03
Nipaniya Kalan Stone (Gitti & M-Sand)
vasundhara ultramining private limited · Non-Coal Mining
- Category B1Forwarded to MS SPCB/PCC by MS2026-08-25
Rasulpura Stone Quarry
satish singh mewada · Non-Coal Mining
- Category B1Pending at MS SEIAA2026-08-22
Rampura Chakaldi stone Quarry
RAHUL MALVIYA · Non-Coal Mining
- Category B2Pending at MS SEIAA2026-07-21
Factory shed construction for Printed Circuit Board manufacturing plant
SECURE CIRCUITS LIMITED · INFRA-2
- Category B2Referred to SEAC2026-07-17
JAGMALPURA STONE & M-SAND MINE
SANJAY KUMAR RATHI · Non-Coal Mining
- Category B2Referred to SEAC2026-06-13
SEMRI STONE QUARRY
Arvind Rajput · Non-Coal Mining
- Category B1Referred to SEIAA2026-06-04
Rampura Chakaldi Stone Quarry
BABA STONES AND EARTH MOVERS · Non-Coal Mining
- Category B1Proposal pulled back (withdrawn)2026-06-01declares affected families
Environmental Clearance for Parbati Complex Major Micro Irrigation Project having CCA of 18,500 Ha. at District Sehore, State Madhya Pradesh by Water Resources Division, Sehore, Madhya Pradesh
WATER RESORCES DIVISION, SEHORE · River Valley and Hydroelectric Projects
- Category B1Forwarded to MS SPCB/PCC by MS2026-06-01declares affected families
Environmental Clearance for the Parbati Complex Major Micro Irrigation Project having C.C.A. of 18,500 Ha. in District Sehore, State Madhya Pradesh by Water Resources Division, Sehore, Madhya Pradesh
WATER RESORCES DIVISION, SEHORE · River Valley and Hydroelectric Projects
- Category B2Pending at MS SEIAA2026-05-21
Barley Malt Manufacturing Unit (Food Processing Industry)(Malteries Without distillation)
BARMALT MALTING INDIA PRIVATE LIMITED · INFRA-2
- Category B2EC Granted2026-05-05
Veer singh
VEER GURJAR · Non-Coal Mining
- Category B2EC Rejected2026-04-29
BHADKUL STONE MINE (Area of 1.000 Ha.)
DEVESH RAJPUT · Non-Coal Mining
- Category B2EC Granted2026-04-28
Industrial Shed at M/s CG Power and Industrial Solutions Limited, MPIDC Industrial Area, Sehore, Madhya Pradesh. (Proposed built-up area: 93051.18 sqm), Plot area: 1,82,632 sqm;
CG POWER AND INDUSTRIAL SOLUTIONS LIMITED · INFRA-2
- Category B2EC Granted2026-04-25
Jawahar Kheda Stone (Gitti) & M-Sand Quarry
rajlaxami devbuild india private limited · Non-Coal Mining
- Category B2EC Granted2026-04-23
Ramnagar Stone & M-Sand Quarry_2.0 Ha
BHUPENDRA SINGH · Non-Coal Mining
- Category B1Standard ToR Granted2026-04-22
RAMPURA CHAKALDI GITTI & M-SAND MINE-2.832HA
MANOHAR SINGH RAJPUT · Non-Coal Mining
- Category B1Referred to SEIAA2026-04-10
BAMLADAD STONE MINE of M/s S M STONES
S M STONES · Non-Coal Mining
- Category B2EC Granted2026-03-30
Stone Quarry of Pipaliya Ba...
VIMLA BAI GOUR · Non-Coal Mining
- Category B2EC Granted2026-03-27
Chainpura Stone & M-Sand Quarry
Sandeep singh thakur · Non-Coal Mining
- Category B2EC Granted2026-03-27
Leelakhadi Stone Quarry
kishor verma · Non-Coal Mining
- Category B2EC Granted2026-03-27
Leelakhadi Stone (Gitti) Quarry
kishor verma · Non-Coal Mining
- Category B2EC Granted2026-03-21
MAHODIYA STONE QUARRY
KUBER STONE CRUSHING INDUSTRIES · Non-Coal Mining
- Category B2EC Granted2026-03-20
SEMRI STONE (GITTI) QUARRY
Arvind Rajput · Non-Coal Mining
- Category B2EC Granted2026-03-19
Hakeempur Murrum Quarry
usaman Khan · Non-Coal Mining
- Category B1Forwarded to MS SPCB/PCC by MS2026-03-18
Malikhedi Stone & M-Sand Quarry
Pankaj thakur · Non-Coal Mining
- Category B2EC Granted2026-02-25
KATPON MURRUM QUARRY
SHAKIL MIYAN · Non-Coal Mining
- Category B1EC Granted2026-02-04
Chakaldi Stone Mine-2.0ha
Rasna Chouhan · Non-Coal Mining
- Category B1Forwarded to MS SPCB/PCC by MS2026-01-24
Rampura Chakaldi stone Quarry
RAHUL MALVIYA · Non-Coal Mining
- Category B1EC Granted2025-12-23
Gudbhela Crusher Stone Quarry
IQBAL AHMAD · Non-Coal Mining
- Category B2EC Granted2025-12-22
Narela Stone Quarry
VISHVANATH KHANDELWAL · Non-Coal Mining
- Category B2EC Granted2025-12-20
Hasnabad Crusher Stone (Gitti) Quarry
ANNAPURNA THAKUR · Non-Coal Mining
- Category B2EC Granted2025-11-24
RAFIQUEGANJ MURRUM MINE
neeraj parmar · Non-Coal Mining
- Category B1EC Granted2025-11-05
ABIDABAD STONE QUARRY
SAHYOG METALS · Non-Coal Mining
- Category B2EC Granted2025-11-01
Panari Stone Quarry
MUNDAN CONSTRUCTION CO · Non-Coal Mining
- Category B1EC Granted2025-10-28
Abidabad Stone Quarry
SERMAN (INDIA) ROAD MAKERS PRIVATE LIMITED · Non-Coal Mining
- Category B1EC Granted2025-10-28
"Abidabad Stone Quarry" of M/s Serman (I) Road Makers Pvt. Ltd., Bhopal (Director Rakesh Sharma)
SERMAN (INDIA) ROAD MAKERS PRIVATE LIMITED · Non-Coal Mining
- Category B1Referred to SEIAA2025-10-15
Rampura Chakaladi Stone Quarry
BABA STONES AND EARTH MOVERS · Non-Coal Mining
- Category B2EC Rejected2025-10-14
PIPALIYA BAZYAFT STONE QUARRY
VIMLA BAI GOUR · Non-Coal Mining
- Category B1Standard ToR Granted2025-10-13
Katpon Stone & M-Sand Quarry
rakesh verma · Non-Coal Mining
- Category B1Standard ToR Granted2025-10-04
KATPON STONE & M-SAND QUARRY
prateek ralhan · Non-Coal Mining
- Category B1Standard ToR Granted2025-09-18
BAMLADAD STONE QUARRY
SANDEEP SOOD · Non-Coal Mining
- Category B1Standard ToR Granted2025-09-18
BAMLADAD STONE QUARRY
VARSHA SOOD · Non-Coal Mining
- Category B1Standard ToR Granted2025-09-05
RAMPURA CHAKALDI STONE MINE OF M/s AMJAD ALI STONE CRUSHER PROPRIETOR AMJAD ALI
AMJAD ALI · Non-Coal Mining
- Category B1Standard ToR Granted2025-09-05
Rampura Chakaldi Stone Quarry
BABA STONES AND EARTH MOVERS · Non-Coal Mining
- Category B1EC Granted2025-08-26
Rampura Chakaldi Stone Quarry
AMJAD ALI · Non-Coal Mining
- Category B1Standard ToR Granted2025-08-19
BAMLADAD STONE QUARRY
VARSHA SOOD · Non-Coal Mining
- Category B1Standard ToR Granted2025-08-18
BAMLADAD STONE QUARRY
SANDEEP SOOD · Non-Coal Mining
- Category B2EC Granted2025-08-11
Khaikheda Stone mine for making Gitti & M-sand
ELAM SINGH DANGI · Non-Coal Mining
- Category B2EC Granted2025-08-05
Hasnabad Murum Quarry
DINESH THAKUR · Non-Coal Mining
- Category B2EC Granted2025-06-18
Bhaukhedi Crusher Stone Quarry
Pranat chouhan · Non-Coal Mining
- Category B2EC Granted2025-06-13
Kachnariya Stone mine for making Gitti through Crusher
PRASHANT BHAI PATEL · Non-Coal Mining
- Category B2EC Granted2025-06-09
LEELAKHEDI STONE QUARRY
kalpna jain · Non-Coal Mining
- Category B1Standard ToR Granted2025-06-03
Seoda Crusher Stone Quarry
JITENDRA KUMAR · Non-Coal Mining
- Category B2EC Granted2025-05-30
Sevda Murum Quarry
KAMAL SINGH · Non-Coal Mining
- Category B1Proposal pulled back (withdrawn)2025-05-19
KATPON MURRUM DEPOSIT QUARRY
MURARI SHARMA · Non-Coal Mining
- Category B1EC Granted2025-04-25
Bamladad Stone Quarry (M/s Sahyog Metals, Partner Kunal Sood)
SAHYOG METALS · Non-Coal Mining
- Category B2EDS raised2025-04-22
BHADKUL STONE MINE
DEVESH RAJPUT · Non-Coal Mining
- Category B1Standard ToR Granted2025-03-29
Bamaladad Stone Quarry
SOURABH SHARMA · Non-Coal Mining
- Category B1Standard ToR Granted2025-03-27
M/S EARTH STONE CRUSHER
earth stone · Non-Coal Mining
- Category B1Standard ToR Granted2025-03-27
"Abidabad Stone Quarry" of M/s Serman (I) Road Makers Pvt. Ltd., Bhopal (Director Rakesh Sharma)
SERMAN (INDIA) ROAD MAKERS PRIVATE LIMITED · Non-Coal Mining
- Category B1EC Granted2025-03-20
Bamladad Stone Quarry
PRAMOD KAPLISH · Non-Coal Mining
- Category B1Standard ToR Granted2025-03-20
Chakaldi Stone Mine-2.0ha
Rasna Chouhan · Non-Coal Mining
- Category B2EC Granted2025-03-13
TAKIYA STONE QUARRY
NARENDRA KUMAR PATIDAR · Non-Coal Mining
- Category B1Referred to SEAC2025-03-12
JAHAJPURA- 2 SAND MINE
ARJUN SHRIVASTAVA · Non-Coal Mining
- Category B1EC Rejected2025-03-12
MAHUKALA SAND MINE
ARJUN SHRIVASTAVA · Non-Coal Mining
- Category B1EC Rejected2025-03-12
JANWASA - 2 SAND MINE
ARJUN SHRIVASTAVA · Non-Coal Mining
- Category B1Referred to SEAC2025-03-12
DIMAWAR SAND MINE
ARJUN SHRIVASTAVA · Non-Coal Mining
- Category B1Referred to SEAC2025-03-12
BABRI - 2 SAND MINE
ARJUN SHRIVASTAVA · Non-Coal Mining
- Category B1EC Granted2025-03-12
BABRI - 1 SAND MINE
ARJUN SHRIVASTAVA · Non-Coal Mining
- Category B1EC Rejected2025-03-12
SARDARNAGAR SAND MINE
ARJUN SHRIVASTAVA · Non-Coal Mining
- Category B2Referred to SEAC2025-02-13
TITORIYA CRUSHER STONE (GITTI) QUARRY 3.00 Ha.
ravindra kumar jhala · Non-Coal Mining
- Category B1Standard ToR Granted2025-02-06
ABIDABAD STONE QUARRY
SAHYOG METALS · Non-Coal Mining
- Category B1Standard ToR Granted2025-02-04
Abidabad Stone Quarry
SERMAN (INDIA) ROAD MAKERS PRIVATE LIMITED · Non-Coal Mining
- Category B1Pending at MS SEIAA2024-06-05
AMBAJDID - 4 SAND QUARRY
ARJUN SHRIVASTAVA · Non-Coal Mining
- Category B2EC Granted2024-05-11
KankariyaKhedi Crusher Stone Quarry for making Gitti
RAJENDRA THAKUR · Non-Coal Mining
- Category B2EC Granted2024-03-28
KATPON STONE QUARRY
DIVYA SHUKLA · Non-Coal Mining
- Category B1Pending at MS SEIAA2024-03-28
Bamaladad Stone Quarry
HEMLATA KOTHARI · Non-Coal Mining
- Category B1EC Granted2024-03-23
Bamladad Stone Quarry
SHUBHANGI SINGH · Non-Coal Mining
- Category B2EC Granted2024-03-16
Dongri Crusher Stone Quarry
NEEL JAIN · Non-Coal Mining
- Category B2Pending at MS SEIAA2024-02-28
Ahamadpur Viran Basalt Stone Quarry
VISHNU PATIDAR · Non-Coal Mining
- Category B1ToR Granted2024-02-06
Dobi Irrigation Scheme
Department of Irrigation · River Valley and Hydroelectric Projects
- Category B1ToR Granted2024-02-05
Khandorapur Stone Quarry
SUNITA THAKUR · Non-Coal Mining
- Category B1ToR Granted2024-02-05
RAFIQUEGANJ STONE (GITTI) QUARRY
SHEETAL ROY · Non-Coal Mining
- Category B1Standard ToR Granted2024-02-02
SOMALWADA SAND MINE
ARJUN SHRIVASTAVA · Non-Coal Mining
- Category B1Standard ToR Granted2024-02-02
JAJNA SAND MINE
ARJUN SHRIVASTAVA · Non-Coal Mining
- Category B1Standard ToR Granted2024-02-02
SARDARNAGAR SAND MINE
ARJUN SHRIVASTAVA · Non-Coal Mining
- Category B1Standard ToR Granted2024-02-02
NILKANTH SAND MINE
ARJUN SHRIVASTAVA · Non-Coal Mining
- Category B1Standard ToR Granted2024-02-02
NAHLAI SAND MINE
ARJUN SHRIVASTAVA · Non-Coal Mining
- Category B1Standard ToR Granted2024-02-02
JANWASA- 1 SAND MINE
ARJUN SHRIVASTAVA · Non-Coal Mining
- Category B1Standard ToR Granted2024-02-02
BABRI - 1 SAND MINE
ARJUN SHRIVASTAVA · Non-Coal Mining
- Category B1Standard ToR Granted2024-02-02
NINOR SAND MINE
ARJUN SHRIVASTAVA · Non-Coal Mining
- Category B1Standard ToR Granted2024-02-02
MAHUKALA SAND MINE
ARJUN SHRIVASTAVA · Non-Coal Mining
Showing 100 of 150 proposals, newest first. The button below loads the rest.