← All districts

Narsimhapur, Madhya Pradesh

Not a Scheduled AreaCensus 2011 district code 452
  1. 29 Sept 2026 · Details soughtAdditional details soughtShakkar Pench Link Combined Project
  2. 22 Sept 2026 · Details soughtAdditional details soughtMachhrewa Irrigation Project on Machhrewa River covering a Cultural Command Area (CCA) of 16,375 ha &…
  3. 15 Sept 2026 · FiledSubmittedDudhi Project

Dated by the portal's own appraisal history, converted to India Standard Time; a proposal with no recorded history appears on its register submission date.

Other clearances these proposals declare

Forest land diversion declared
7
Forest land sought for diversion
1,731 ha
Wildlife board recommendation declared
0
In or near a protected area
0
In an eco-sensitive zone
0

These counts are taken from the application forms of the 92 of 92 proposals naming this district whose forms have been read for these questions. In 28 of those forms at least one question was left blank, and a blank answer is counted as unknown. The forest area is the area stated for forest clearance, with each forest proposal counted once, in the district where its project is primarily sited.

Proposals naming this district
92
Category A proposals
3
Families declared displaced
1,481
Families declared affected
4,294

Displacement figures are the proponents’ own declarations. A project sited across several districts declares one figure for the whole project, and that figure is counted once, in the district where the project is primarily sited. 4 of the proposals listed below declare displacement and are sited primarily in another district, so their figures are counted in that district’s total.

Fifth Schedule status

Not within a Fifth Schedule Scheduled Area

The Presidential Order for Madhya Pradesh declares which areas in the State are Scheduled Areas. It does not name this district, in whole or in part, so no part of it is a Scheduled Area under that Order. A later Order could add one; this reference states the position as transcribed and reviewed on 2026-08-21.

OrderThe Scheduled Areas (States of Chhattisgarh, Jharkhand and Madhya Pradesh) Order, 2003

What the record shows

  • Cultivators and agricultural labourers make up 78% of workers here, against 55% nationally, so at least three in four people who work here do so on the land.

  • Agricultural labourers, who work other people's land for wages, make up 54% of workers here. Compensation for acquired land is paid to those who hold title to it, so it does not reach them. They can still claim the rehabilitation and resettlement entitlements of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (RFCTLARR), because its section 3(c) counts a family whose livelihood depends on the land as an affected family, wherever that Act governs how the land is obtained.

  • Applicants for projects sited mainly in this district have declared 1,481 families to be displaced. The figure comes from their applications, and we have not verified it.

Each of these observations appears when a fixed rule is met by the figures on this page, so the same figures always give the same sentences. None of them is a view on whether a project should go ahead.

Who lives there

Figures from Census 2011, each compared with the all-India value computed on the same definition.

Total population
10,91,854
Households
2,50,286
Average household size
4.36
0.49 below India's 4.85India
Scheduled Tribe share of population
13.4%
4.8 points above IndiaIndia
Scheduled Caste share of population
16.9%
0.2 points above IndiaIndia
Children aged 0-6
13.0%
0.6 points below IndiaIndia
Literacy rate
75.7%
2.7 points above IndiaIndia
Sex ratio
920
23.1 below India's 942.6India

What they live on

How the district's workers earn a living, from Census 2011. The land-dependent share counts cultivators and agricultural labourers as a share of all workers, and it is the group most directly affected when land is acquired.

Total workers
4,77,818
Work participation rate
43.8%
4.0 points above IndiaIndia
Workers dependent on land
77.8%
23.2 points above IndiaIndia
Cultivators
23.8%
0.8 points below IndiaIndia
Agricultural labourers
54.0%
24.0 points above IndiaIndia
Marginal workers
25.0%
0.3 points above IndiaIndia
Household industry workers
2.2%
1.6 points below IndiaIndia

How households live

Land, income and work among rural households, from the Socio Economic and Caste Census 2011, which recorded these where the population census did not. Only the survey's rural part is used here, so urban households do not appear.

Rural households owning land
33.4%
12.7 points below IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households whose highest earner makes over ₹5,000 a month
15.5%
8.8 points below IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households living mainly on manual casual labour
67.0%
15.3 points above IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households with a salaried member
3.6%
4.7 points below IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

When these were filed

Each proposal is dated by the first step in its appraisal history, the dated record of steps the portal keeps for it.

2023-Q32026-Q3

The timeline counts 53 of the 92 proposals here. The first filing date comes from each proposal's appraisal history, and we have not yet read it for the other 39, so they are left out. Most of them are older proposals, so the early part of the timeline undercounts what was filed then. The register itself records a date for each of them; the gap is in our copy of the histories.

Hatched columns undercount, so they cannot be compared with solid ones. 3 of them cover periods for which we have read few filing dates so far, and they count only the proposals whose date we have.

What kind of projects these are

The proposals naming this district, grouped by the sector each was filed under.

  • Non-Coal Mining 82.6%
  • River Valley and Hydroelectric Projects 10.9%
  • Industrial Projects - 2 3.3%
  • Thermal Projects 3.3%

The four largest sectors are shown by name and the rest are grouped as Other.

What is proposed here

These are the proposals in the national environmental clearance register whose application names a site in this district, newest first. A project with sites in several districts appears under each of them.

  1. Category B1Proposal Accepted and Referred to SEAC2026-09-15declares affected families

    Dudhi Project

    CHIEF ENGINEER,RANI AVANTI BAI LODHI SAGAR PROJECT · River Valley and Hydroelectric Projects

  2. Category B1ADS Raised2026-08-27declares affected families

    Shakkar Pench Link Combined Project

    CHIEF ENGINEER,RANI AVANTI BAI LODHI SAGAR PROJECT · River Valley and Hydroelectric Projects

  3. Category B1Referred to SEAC2026-08-16declares affected families

    Machhrewa Irrigation Project on Machhrewa River covering a Cultural Command Area (CCA) of 16,375 ha & submergence area of 745.8123 Ha in Narsinghpur Tehsil & District of Madhya Pradesh State by Water Resources Department, Madhya Pradesh

    Department of Irrigation · River Valley and Hydroelectric Projects

  4. Category B1Forwarded to MS SPCB/PCC by MS2025-11-04declares affected families

    Badadev Combined Micro Irrigation Project (Saner Dam & Micro Irrigation System)

    SANKALP SHRIVASTAVA · River Valley and Hydroelectric Projects

  5. Category B1Standard ToR Granted2025-08-27

    Capacity Expansion In Grain Based Fuel Ethanol Plant From 300KLD & 6MW CO Generation Plant To 800KLD and 19MW Co Generation Plant

    MAHAKAUSHAL SUGAR AND POWER INDUSTRIES LTD · Industrial Projects - 2

  6. Category B1ToR Granted2025-05-02declares affected families

    Shakkar Pench Link Combined Project

    CHIEF ENGINEER,RANI AVANTI BAI LODHI SAGAR PROJECT · River Valley and Hydroelectric Projects

  7. Category AEC Granted2025-04-17

    Gadarwara Super Thermal Power Project, Stage-II (2x800MW)

    NTPC LIMITED · Thermal Projects

  8. Category B1EC Rejected2025-03-12

    PANAGAR-2 RIVER SAND QUARRY

    SHASHI SINGH · Non-Coal Mining

  9. Category B1EC Rejected2025-03-12

    GADARWARA RIVER SAND QUARRY

    SHASHI SINGH · Non-Coal Mining

  10. Category B1Pending at MS SEIAA2025-03-12

    SANSARKHEDA-2 RIVER SAND QUARRY

    SHASHI SINGH · Non-Coal Mining

  11. Category AProposal returned in present form2025-03-11

    Gadarwara Super Thermal Power Project, Stage-II (2x800MW)

    NTPC LIMITED · Thermal Projects

  12. Category B1ToR Granted2025-03-04declares affected families

    Machhrewa Irrigation Project on Machhrewa River covering a Cultural Command Area (CCA) of 16,375 ha & submergence area of 745.8123 Ha in Narsinghpur Tehsil & District of Madhya Pradesh State by Water Resources Department, Madhya Pradesh

    Department of Irrigation · River Valley and Hydroelectric Projects

  13. Category B1Standard ToR Granted2024-06-17declares affected families

    sher complex

    Department of Irrigation · River Valley and Hydroelectric Projects

  14. Category B1EC Granted2024-06-01

    AJANDA - 2 RIVER SAND QUARRY

    SHASHI SINGH · Non-Coal Mining

  15. Category B1EC Granted2024-06-01

    PANAGAR - 1 RIVER SAND QUARRY

    SHASHI SINGH · Non-Coal Mining

  16. Category B1EC Granted2024-05-30

    KHIRIYA RIVER SAND QUARRY

    SHASHI SINGH · Non-Coal Mining

  17. Category B1EC Granted2024-05-30

    AJANDA - 1 RIVER SAND QUARRY

    SHASHI SINGH · Non-Coal Mining

  18. Category B1EC Granted2024-05-30

    KARAHIYA RIVER SAND QUARRY

    SHASHI SINGH · Non-Coal Mining

  19. Category B1EC Granted2024-05-28

    MEHRAGAON RIVER SAND QUARRY

    SHASHI SINGH · Non-Coal Mining

  20. Category B1EC Granted2024-05-28

    GHATPIPARIYA RIVER SAND QUARRY

    SHASHI SINGH · Non-Coal Mining

  21. Category B1EC Granted2024-05-28

    GHOORPUR RIVER SAND QUARRY

    SHASHI SINGH · Non-Coal Mining

  22. Category B1EC Granted2024-05-28

    CHIRAHKALA RIVER SAND QUARRY

    SHASHI SINGH · Non-Coal Mining

  23. Category B1EC Granted2024-05-28

    SANSARKHEDA - 1 RIVER SAND QUARRY

    SHASHI SINGH · Non-Coal Mining

  24. Category B1EC Granted2024-05-09

    DHIGSARA RIVER SAND QUARRY

    SHASHI SINGH · Non-Coal Mining

  25. Category B1EC Granted2024-05-09

    ARJUNGAON RIVER SAND QUARRY

    SHASHI SINGH · Non-Coal Mining

  26. Category B1EC Granted2024-05-08

    DIGHORI RIVER SAND QUARRY

    SHASHI SINGH · Non-Coal Mining

  27. Category B1EC Granted2024-05-08

    MAHESWAR RIVER SAND QUARRY

    SHASHI SINGH · Non-Coal Mining

  28. Category B1EC Granted2024-05-08

    TUMDA RIVER SAND QUARRY

    SHASHI SINGH · Non-Coal Mining

  29. Category B1EC Rejected2024-05-08

    UMARIA RIVER SAND QUARRY

    SHASHI SINGH · Non-Coal Mining

  30. Category AToR Granted2024-03-09

    Gadarwara Super Thermal Power Project, Stage-II (2x800MW)

    NTPC LIMITED · Thermal Projects

  31. Category B1Standard ToR Granted2024-02-04

    PANAGAR-2 RIVER SAND QUARRY

    SHASHI SINGH · Non-Coal Mining

  32. Category B1Standard ToR Granted2024-02-04

    SANSARKHEDA-2 RIVER SAND QUARRY

    SHASHI SINGH · Non-Coal Mining

  33. Category B1Standard ToR Granted2024-02-02

    GADARWARA RIVER SAND QUARRY

    SHASHI SINGH · Non-Coal Mining

  34. Category B1Standard ToR Granted2024-01-30

    SANSARKHEDA - 1 RIVER SAND QUARRY

    SHASHI SINGH · Non-Coal Mining

  35. Category B1Standard ToR Granted2024-01-30

    AJANDA - 1 RIVER SAND QUARRY

    SHASHI SINGH · Non-Coal Mining

  36. Category B1Standard ToR Granted2024-01-30

    KHIRIYA RIVER SAND QUARRY

    SHASHI SINGH · Non-Coal Mining

  37. Category B1Standard ToR Granted2024-01-30

    KARAHIYA RIVER SAND QUARRY

    SHASHI SINGH · Non-Coal Mining

  38. Category B1Standard ToR Granted2024-01-30

    PANAGAR - 1 RIVER SAND QUARRY

    SHASHI SINGH · Non-Coal Mining

  39. Category B1Standard ToR Granted2024-01-30

    MEHRAGAON RIVER SAND QUARRY

    SHASHI SINGH · Non-Coal Mining

  40. Category B1Standard ToR Granted2024-01-29

    GHOORPUR RIVER SAND QUARRY

    SHASHI SINGH · Non-Coal Mining

  41. Category B1Standard ToR Granted2024-01-29

    CHIRAHKALA RIVER SAND QUARRY

    SHASHI SINGH · Non-Coal Mining

  42. Category B1Standard ToR Granted2024-01-29

    GHATPIPARIYA RIVER SAND QUARRY

    SHASHI SINGH · Non-Coal Mining

  43. Category B1Standard ToR Granted2024-01-29

    AJANDA - 2 RIVER SAND QUARRY

    SHASHI SINGH · Non-Coal Mining

  44. Category B1Under Examination2024-01-28

    SANSARKHEDA - 1 RIVER SAND QUARRY

    SHASHI SINGH · Non-Coal Mining

  45. Category B1Under Examination2024-01-27

    CHIRAHKALA RIVER SAND QUARRY

    SHASHI SINGH · Non-Coal Mining

  46. Category B1Under Examination2024-01-27

    GHOORPUR RIVER SAND QUARRY

    SHASHI SINGH · Non-Coal Mining

  47. Category B1Under Examination2024-01-27

    GHATPIPARIYA RIVER SAND QUARRY

    SHASHI SINGH · Non-Coal Mining

  48. Category B1Under Examination2024-01-27

    KARAHIYA RIVER SAND QUARRY

    SHASHI SINGH · Non-Coal Mining

  49. Category B1Under Examination2024-01-27

    PANAGAR - 1 RIVER SAND QUARRY

    SHASHI SINGH · Non-Coal Mining

  50. Category B1Under Examination2024-01-27

    KHIRIYA RIVER SAND QUARRY

    SHASHI SINGH · Non-Coal Mining

  51. Category B1Under Examination2024-01-27

    MEHRAGAON RIVER SAND QUARRY

    SHASHI SINGH · Non-Coal Mining

  52. Category B1Under Examination2024-01-26

    AJANDA - 2 RIVER SAND QUARRY

    SHASHI SINGH · Non-Coal Mining

  53. Category B1Under Examination2024-01-26

    AJANDA - 1 RIVER SAND QUARRY

    SHASHI SINGH · Non-Coal Mining

  54. Category B1TOR GRANTED2024-01-19

    DIGHORI RIVER SAND QUARRY

    SHASHI SINGH · Non-Coal Mining

  55. Category B1TOR GRANTED2024-01-19

    DHIGSARA RIVER SAND QUARRY

    SHASHI SINGH · Non-Coal Mining

  56. Category B1TOR GRANTED2024-01-19

    MAHESWAR RIVER SAND QUARRY

    SHASHI SINGH · Non-Coal Mining

  57. Category B1TOR GRANTED2024-01-19

    UMARIA RIVER SAND QUARRY

    SHASHI SINGH · Non-Coal Mining

  58. Category B1TOR GRANTED2024-01-19

    ARJUNGAON RIVER SAND QUARRY

    SHASHI SINGH · Non-Coal Mining

  59. Category B1TOR GRANTED2024-01-19

    TUMDA RIVER SAND QUARRY

    SHASHI SINGH · Non-Coal Mining

  60. Category B2EC Granted2024-01-16

    DEWAKACHHAR RIVER SAND QUARRY

    SHASHI SINGH · Non-Coal Mining

  61. Category B1TOR Granted2023-11-23

    Tumda Sand Mining

    RASMEET MALHOTRA · Non-Coal Mining

  62. Category B1TOR Granted2023-11-23

    Maheshwar Sand Mining Project

    RASMEET MALHOTRA · Non-Coal Mining

  63. Category B1TOR Granted2023-11-23

    Dhigsara Sand Mining Project

    RASMEET MALHOTRA · Non-Coal Mining

  64. Category B1TOR Granted2023-11-23

    Arjungaon Sand Mining

    RASMEET MALHOTRA · Non-Coal Mining

  65. Category B1TOR Granted2023-11-23declares affected families

    Shakkar Pench Link Combined Project

    CHIEF ENGINEER,RANI AVANTI BAI LODHI SAGAR PROJECT · River Valley and Hydroelectric Projects

  66. Category B1TOR Granted2023-11-23declares affected families

    Dudhi Project

    CHIEF ENGINEER,RANI AVANTI BAI LODHI SAGAR PROJECT · River Valley and Hydroelectric Projects

  67. Category B2EC Granted2023-11-16

    Rewanagar Sand Quarry (Narmada River)

    RASMEET MALHOTRA · Non-Coal Mining

  68. Category B1EC Granted2023-11-16

    Riverbed Sand Mining

    RASMEET MALHOTRA · Non-Coal Mining

  69. Category B2EC Granted2023-11-16

    Bagdara Sand Quarry

    RASMEET MALHOTRA · Non-Coal Mining

  70. Category B1EC Granted2023-11-16

    Sansarkheda Sand Mine

    RASMEET MALHOTRA · Non-Coal Mining

  71. Category B2EC Granted2023-11-16

    Bhumiyadana Sand Quarry

    RASMEET MALHOTRA · Non-Coal Mining

  72. Category B2EC Granted2023-11-16

    KIHIRIYA SAND QUARRY (SHAKKAR RIVER)

    RASMEET MALHOTRA · Non-Coal Mining

  73. Category B1EC Granted2023-11-16

    Ajanda-2 Sand Mining

    RASMEET MALHOTRA · Non-Coal Mining

  74. Category B2EC Granted2023-11-16

    Bairagarh Sand Quarry (On Dudhi River )

    RASMEET MALHOTRA · Non-Coal Mining

  75. Category B1EC Granted2023-11-16declares affected families

    Chinki Boras Barrage Combined Multipurpose Project

    CHIEF ENGINEER,RANI AVANTI BAI LODHI SAGAR PROJECT · River Valley and Hydroelectric Projects

  76. Category B2EC Granted2023-09-28

    MUAR RIVER SAND QUARRY

    SHASHI SINGH · Non-Coal Mining

  77. Category B2EC Granted2023-09-23

    CHHENAKACHHAR - 1 RIVER SAND QUARRY

    SHASHI SINGH · Non-Coal Mining

  78. Category B2EC Granted2023-09-23

    CHHENAKACHHAR - 2 RIVER SAND QUARRY

    SHASHI SINGH · Non-Coal Mining

  79. Category B2EC Granted2023-09-19

    DHARAMPURI RIVER SAND QUARRY

    SHASHI SINGH · Non-Coal Mining

  80. Category B2EC Granted2023-09-15

    BHUMIYADHANA RIVER SAND QUARRY

    SHASHI SINGH · Non-Coal Mining

  81. Category B2EC Granted2023-09-15

    SAIKHEDA RIVER SEND QUARRY

    SHASHI SINGH · Non-Coal Mining

  82. Category B2EC Granted2023-08-29

    BAGDARA RIVER SAND QUARRY

    SHASHI SINGH · Non-Coal Mining

  83. Category B2EC Granted2023-08-29

    BAIRAGARH RIVER SAND QUARRY

    SHASHI SINGH · Non-Coal Mining

  84. Category B2EC Granted2023-08-17

    MURGAKHEDA RIVER SAND QUARRY

    SHASHI SINGH · Non-Coal Mining

  85. Category B2EC Granted2023-08-17

    KUDARI RIVER SEND QUARRY

    SHASHI SINGH · Non-Coal Mining

  86. Category B2EC Granted2023-08-17

    REWANAGAR RIVER SAND QUARRY

    SHASHI SINGH · Non-Coal Mining

  87. Category B2EC Granted2023-07-01

    KHAIRI SAND QUARRY

    RAMESH BHUMARKAR · Non-Coal Mining

  88. Category B1EC Granted2023-02-25

    PATAI SAND QUARRY ON NARMADA RIVER

    ANAND TAMRAKAR · Non-Coal Mining

  89. Category B2EC Granted2023-02-23

    Proposal of Grain Base fuel ethanol unit of 200KLD, 6.0MW Co- generation power plant By product : 102-110 TPD of DDGS and CO2 generation 150 TPD

    MAHAKAUSHAL SUGAR AND POWER INDUSTRIES LTD · Industrial Projects - 2

  90. Category B2EC Granted2023-02-11

    100KLPD fuel ethanol unit (B- Molasses based) along with 2.5MW Co- generation power plant By product : 50 TPD of CO2 Generation

    NARMADA SUGAR PRIVATE LIMITED · Industrial Projects - 2

  91. Category B2EC Granted2023-01-30

    MURGAKHEDA SAND QUARRY (NARMADA RIVER)

    RASMEET MALHOTRA · Non-Coal Mining

  92. Category B1TOR Granted2022-11-12

    Belkhedi Sand Quarry on Narmada River

    SHARMA ASSOCIATES · Non-Coal Mining

All 92 proposals that name this district, newest first.