Narsimhapur, Madhya Pradesh
Recent activity
All 3 in the last 60 days- 29 Sept 2026 · Details soughtAdditional details soughtShakkar Pench Link Combined Project
- 22 Sept 2026 · Details soughtAdditional details soughtMachhrewa Irrigation Project on Machhrewa River covering a Cultural Command Area (CCA) of 16,375 ha &…
- 15 Sept 2026 · FiledSubmittedDudhi Project
Dated by the portal's own appraisal history, converted to India Standard Time; a proposal with no recorded history appears on its register submission date.
Other clearances these proposals declare
- Forest land diversion declared
- 7
- Forest land sought for diversion
- 1,731 ha
- Wildlife board recommendation declared
- 0
- In or near a protected area
- 0
- In an eco-sensitive zone
- 0
These counts are taken from the application forms of the 92 of 92 proposals naming this district whose forms have been read for these questions. In 28 of those forms at least one question was left blank, and a blank answer is counted as unknown. The forest area is the area stated for forest clearance, with each forest proposal counted once, in the district where its project is primarily sited.
- Proposals naming this district
- 92
- Category A proposals
- 3
- Families declared displaced
- 1,481
- Families declared affected
- 4,294
Displacement figures are the proponents’ own declarations. A project sited across several districts declares one figure for the whole project, and that figure is counted once, in the district where the project is primarily sited. 4 of the proposals listed below declare displacement and are sited primarily in another district, so their figures are counted in that district’s total.
Fifth Schedule status
Not within a Fifth Schedule Scheduled Area
The Presidential Order for Madhya Pradesh declares which areas in the State are Scheduled Areas. It does not name this district, in whole or in part, so no part of it is a Scheduled Area under that Order. A later Order could add one; this reference states the position as transcribed and reviewed on 2026-08-21.
OrderThe Scheduled Areas (States of Chhattisgarh, Jharkhand and Madhya Pradesh) Order, 2003
What the record shows
Cultivators and agricultural labourers make up 78% of workers here, against 55% nationally, so at least three in four people who work here do so on the land.
Agricultural labourers, who work other people's land for wages, make up 54% of workers here. Compensation for acquired land is paid to those who hold title to it, so it does not reach them. They can still claim the rehabilitation and resettlement entitlements of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (RFCTLARR), because its section 3(c) counts a family whose livelihood depends on the land as an affected family, wherever that Act governs how the land is obtained.
Applicants for projects sited mainly in this district have declared 1,481 families to be displaced. The figure comes from their applications, and we have not verified it.
Each of these observations appears when a fixed rule is met by the figures on this page, so the same figures always give the same sentences. None of them is a view on whether a project should go ahead.
Who lives there
Figures from Census 2011, each compared with the all-India value computed on the same definition.
- Total population
- 10,91,854
- Households
- 2,50,286
- Average household size
- 4.36
- 0.49 below India's 4.85India
- Scheduled Tribe share of population
- 13.4%
- 4.8 points above IndiaIndia
- Scheduled Caste share of population
- 16.9%
- 0.2 points above IndiaIndia
- Children aged 0-6
- 13.0%
- 0.6 points below IndiaIndia
- Literacy rate
- 75.7%
- 2.7 points above IndiaIndia
- Sex ratio
- 920
- 23.1 below India's 942.6India
What they live on
How the district's workers earn a living, from Census 2011. The land-dependent share counts cultivators and agricultural labourers as a share of all workers, and it is the group most directly affected when land is acquired.
- Total workers
- 4,77,818
- Work participation rate
- 43.8%
- 4.0 points above IndiaIndia
- Workers dependent on land
- 77.8%
- 23.2 points above IndiaIndia
- Cultivators
- 23.8%
- 0.8 points below IndiaIndia
- Agricultural labourers
- 54.0%
- 24.0 points above IndiaIndia
- Marginal workers
- 25.0%
- 0.3 points above IndiaIndia
- Household industry workers
- 2.2%
- 1.6 points below IndiaIndia
How households live
Land, income and work among rural households, from the Socio Economic and Caste Census 2011, which recorded these where the population census did not. Only the survey's rural part is used here, so urban households do not appear.
- Rural households owning land
- 33.4%
- 12.7 points below IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
- Rural households whose highest earner makes over ₹5,000 a month
- 15.5%
- 8.8 points below IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
- Rural households living mainly on manual casual labour
- 67.0%
- 15.3 points above IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
- Rural households with a salaried member
- 3.6%
- 4.7 points below IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
When these were filed
Each proposal is dated by the first step in its appraisal history, the dated record of steps the portal keeps for it.
The timeline counts 53 of the 92 proposals here. The first filing date comes from each proposal's appraisal history, and we have not yet read it for the other 39, so they are left out. Most of them are older proposals, so the early part of the timeline undercounts what was filed then. The register itself records a date for each of them; the gap is in our copy of the histories.
Hatched columns undercount, so they cannot be compared with solid ones. 3 of them cover periods for which we have read few filing dates so far, and they count only the proposals whose date we have.
What kind of projects these are
The proposals naming this district, grouped by the sector each was filed under.
- Non-Coal Mining 82.6%
- River Valley and Hydroelectric Projects 10.9%
- Industrial Projects - 2 3.3%
- Thermal Projects 3.3%
The four largest sectors are shown by name and the rest are grouped as Other.
What is proposed here
These are the proposals in the national environmental clearance register whose application names a site in this district, newest first. A project with sites in several districts appears under each of them.
- Category B1Proposal Accepted and Referred to SEAC2026-09-15declares affected families
Dudhi Project
CHIEF ENGINEER,RANI AVANTI BAI LODHI SAGAR PROJECT · River Valley and Hydroelectric Projects
- Category B1ADS Raised2026-08-27declares affected families
Shakkar Pench Link Combined Project
CHIEF ENGINEER,RANI AVANTI BAI LODHI SAGAR PROJECT · River Valley and Hydroelectric Projects
- Category B1Referred to SEAC2026-08-16declares affected families
Machhrewa Irrigation Project on Machhrewa River covering a Cultural Command Area (CCA) of 16,375 ha & submergence area of 745.8123 Ha in Narsinghpur Tehsil & District of Madhya Pradesh State by Water Resources Department, Madhya Pradesh
Department of Irrigation · River Valley and Hydroelectric Projects
- Category B1Forwarded to MS SPCB/PCC by MS2025-11-04declares affected families
Badadev Combined Micro Irrigation Project (Saner Dam & Micro Irrigation System)
SANKALP SHRIVASTAVA · River Valley and Hydroelectric Projects
- Category B1Standard ToR Granted2025-08-27
Capacity Expansion In Grain Based Fuel Ethanol Plant From 300KLD & 6MW CO Generation Plant To 800KLD and 19MW Co Generation Plant
MAHAKAUSHAL SUGAR AND POWER INDUSTRIES LTD · Industrial Projects - 2
- Category B1ToR Granted2025-05-02declares affected families
Shakkar Pench Link Combined Project
CHIEF ENGINEER,RANI AVANTI BAI LODHI SAGAR PROJECT · River Valley and Hydroelectric Projects
- Category AEC Granted2025-04-17
Gadarwara Super Thermal Power Project, Stage-II (2x800MW)
NTPC LIMITED · Thermal Projects
- Category B1EC Rejected2025-03-12
PANAGAR-2 RIVER SAND QUARRY
SHASHI SINGH · Non-Coal Mining
- Category B1EC Rejected2025-03-12
GADARWARA RIVER SAND QUARRY
SHASHI SINGH · Non-Coal Mining
- Category B1Pending at MS SEIAA2025-03-12
SANSARKHEDA-2 RIVER SAND QUARRY
SHASHI SINGH · Non-Coal Mining
- Category AProposal returned in present form2025-03-11
Gadarwara Super Thermal Power Project, Stage-II (2x800MW)
NTPC LIMITED · Thermal Projects
- Category B1ToR Granted2025-03-04declares affected families
Machhrewa Irrigation Project on Machhrewa River covering a Cultural Command Area (CCA) of 16,375 ha & submergence area of 745.8123 Ha in Narsinghpur Tehsil & District of Madhya Pradesh State by Water Resources Department, Madhya Pradesh
Department of Irrigation · River Valley and Hydroelectric Projects
- Category B1Standard ToR Granted2024-06-17declares affected families
sher complex
Department of Irrigation · River Valley and Hydroelectric Projects
- Category B1EC Granted2024-06-01
AJANDA - 2 RIVER SAND QUARRY
SHASHI SINGH · Non-Coal Mining
- Category B1EC Granted2024-06-01
PANAGAR - 1 RIVER SAND QUARRY
SHASHI SINGH · Non-Coal Mining
- Category B1EC Granted2024-05-30
KHIRIYA RIVER SAND QUARRY
SHASHI SINGH · Non-Coal Mining
- Category B1EC Granted2024-05-30
AJANDA - 1 RIVER SAND QUARRY
SHASHI SINGH · Non-Coal Mining
- Category B1EC Granted2024-05-30
KARAHIYA RIVER SAND QUARRY
SHASHI SINGH · Non-Coal Mining
- Category B1EC Granted2024-05-28
MEHRAGAON RIVER SAND QUARRY
SHASHI SINGH · Non-Coal Mining
- Category B1EC Granted2024-05-28
GHATPIPARIYA RIVER SAND QUARRY
SHASHI SINGH · Non-Coal Mining
- Category B1EC Granted2024-05-28
GHOORPUR RIVER SAND QUARRY
SHASHI SINGH · Non-Coal Mining
- Category B1EC Granted2024-05-28
CHIRAHKALA RIVER SAND QUARRY
SHASHI SINGH · Non-Coal Mining
- Category B1EC Granted2024-05-28
SANSARKHEDA - 1 RIVER SAND QUARRY
SHASHI SINGH · Non-Coal Mining
- Category B1EC Granted2024-05-09
DHIGSARA RIVER SAND QUARRY
SHASHI SINGH · Non-Coal Mining
- Category B1EC Granted2024-05-09
ARJUNGAON RIVER SAND QUARRY
SHASHI SINGH · Non-Coal Mining
- Category B1EC Granted2024-05-08
DIGHORI RIVER SAND QUARRY
SHASHI SINGH · Non-Coal Mining
- Category B1EC Granted2024-05-08
MAHESWAR RIVER SAND QUARRY
SHASHI SINGH · Non-Coal Mining
- Category B1EC Granted2024-05-08
TUMDA RIVER SAND QUARRY
SHASHI SINGH · Non-Coal Mining
- Category B1EC Rejected2024-05-08
UMARIA RIVER SAND QUARRY
SHASHI SINGH · Non-Coal Mining
- Category AToR Granted2024-03-09
Gadarwara Super Thermal Power Project, Stage-II (2x800MW)
NTPC LIMITED · Thermal Projects
- Category B1Standard ToR Granted2024-02-04
PANAGAR-2 RIVER SAND QUARRY
SHASHI SINGH · Non-Coal Mining
- Category B1Standard ToR Granted2024-02-04
SANSARKHEDA-2 RIVER SAND QUARRY
SHASHI SINGH · Non-Coal Mining
- Category B1Standard ToR Granted2024-02-02
GADARWARA RIVER SAND QUARRY
SHASHI SINGH · Non-Coal Mining
- Category B1Standard ToR Granted2024-01-30
SANSARKHEDA - 1 RIVER SAND QUARRY
SHASHI SINGH · Non-Coal Mining
- Category B1Standard ToR Granted2024-01-30
AJANDA - 1 RIVER SAND QUARRY
SHASHI SINGH · Non-Coal Mining
- Category B1Standard ToR Granted2024-01-30
KHIRIYA RIVER SAND QUARRY
SHASHI SINGH · Non-Coal Mining
- Category B1Standard ToR Granted2024-01-30
KARAHIYA RIVER SAND QUARRY
SHASHI SINGH · Non-Coal Mining
- Category B1Standard ToR Granted2024-01-30
PANAGAR - 1 RIVER SAND QUARRY
SHASHI SINGH · Non-Coal Mining
- Category B1Standard ToR Granted2024-01-30
MEHRAGAON RIVER SAND QUARRY
SHASHI SINGH · Non-Coal Mining
- Category B1Standard ToR Granted2024-01-29
GHOORPUR RIVER SAND QUARRY
SHASHI SINGH · Non-Coal Mining
- Category B1Standard ToR Granted2024-01-29
CHIRAHKALA RIVER SAND QUARRY
SHASHI SINGH · Non-Coal Mining
- Category B1Standard ToR Granted2024-01-29
GHATPIPARIYA RIVER SAND QUARRY
SHASHI SINGH · Non-Coal Mining
- Category B1Standard ToR Granted2024-01-29
AJANDA - 2 RIVER SAND QUARRY
SHASHI SINGH · Non-Coal Mining
- Category B1Under Examination2024-01-28
SANSARKHEDA - 1 RIVER SAND QUARRY
SHASHI SINGH · Non-Coal Mining
- Category B1Under Examination2024-01-27
CHIRAHKALA RIVER SAND QUARRY
SHASHI SINGH · Non-Coal Mining
- Category B1Under Examination2024-01-27
GHOORPUR RIVER SAND QUARRY
SHASHI SINGH · Non-Coal Mining
- Category B1Under Examination2024-01-27
GHATPIPARIYA RIVER SAND QUARRY
SHASHI SINGH · Non-Coal Mining
- Category B1Under Examination2024-01-27
KARAHIYA RIVER SAND QUARRY
SHASHI SINGH · Non-Coal Mining
- Category B1Under Examination2024-01-27
PANAGAR - 1 RIVER SAND QUARRY
SHASHI SINGH · Non-Coal Mining
- Category B1Under Examination2024-01-27
KHIRIYA RIVER SAND QUARRY
SHASHI SINGH · Non-Coal Mining
- Category B1Under Examination2024-01-27
MEHRAGAON RIVER SAND QUARRY
SHASHI SINGH · Non-Coal Mining
- Category B1Under Examination2024-01-26
AJANDA - 2 RIVER SAND QUARRY
SHASHI SINGH · Non-Coal Mining
- Category B1Under Examination2024-01-26
AJANDA - 1 RIVER SAND QUARRY
SHASHI SINGH · Non-Coal Mining
- Category B1TOR GRANTED2024-01-19
DIGHORI RIVER SAND QUARRY
SHASHI SINGH · Non-Coal Mining
- Category B1TOR GRANTED2024-01-19
DHIGSARA RIVER SAND QUARRY
SHASHI SINGH · Non-Coal Mining
- Category B1TOR GRANTED2024-01-19
MAHESWAR RIVER SAND QUARRY
SHASHI SINGH · Non-Coal Mining
- Category B1TOR GRANTED2024-01-19
UMARIA RIVER SAND QUARRY
SHASHI SINGH · Non-Coal Mining
- Category B1TOR GRANTED2024-01-19
ARJUNGAON RIVER SAND QUARRY
SHASHI SINGH · Non-Coal Mining
- Category B1TOR GRANTED2024-01-19
TUMDA RIVER SAND QUARRY
SHASHI SINGH · Non-Coal Mining
- Category B2EC Granted2024-01-16
DEWAKACHHAR RIVER SAND QUARRY
SHASHI SINGH · Non-Coal Mining
- Category B1TOR Granted2023-11-23
Tumda Sand Mining
RASMEET MALHOTRA · Non-Coal Mining
- Category B1TOR Granted2023-11-23
Maheshwar Sand Mining Project
RASMEET MALHOTRA · Non-Coal Mining
- Category B1TOR Granted2023-11-23
Dhigsara Sand Mining Project
RASMEET MALHOTRA · Non-Coal Mining
- Category B1TOR Granted2023-11-23
Arjungaon Sand Mining
RASMEET MALHOTRA · Non-Coal Mining
- Category B1TOR Granted2023-11-23declares affected families
Shakkar Pench Link Combined Project
CHIEF ENGINEER,RANI AVANTI BAI LODHI SAGAR PROJECT · River Valley and Hydroelectric Projects
- Category B1TOR Granted2023-11-23declares affected families
Dudhi Project
CHIEF ENGINEER,RANI AVANTI BAI LODHI SAGAR PROJECT · River Valley and Hydroelectric Projects
- Category B2EC Granted2023-11-16
Rewanagar Sand Quarry (Narmada River)
RASMEET MALHOTRA · Non-Coal Mining
- Category B1EC Granted2023-11-16
Riverbed Sand Mining
RASMEET MALHOTRA · Non-Coal Mining
- Category B2EC Granted2023-11-16
Bagdara Sand Quarry
RASMEET MALHOTRA · Non-Coal Mining
- Category B1EC Granted2023-11-16
Sansarkheda Sand Mine
RASMEET MALHOTRA · Non-Coal Mining
- Category B2EC Granted2023-11-16
Bhumiyadana Sand Quarry
RASMEET MALHOTRA · Non-Coal Mining
- Category B2EC Granted2023-11-16
KIHIRIYA SAND QUARRY (SHAKKAR RIVER)
RASMEET MALHOTRA · Non-Coal Mining
- Category B1EC Granted2023-11-16
Ajanda-2 Sand Mining
RASMEET MALHOTRA · Non-Coal Mining
- Category B2EC Granted2023-11-16
Bairagarh Sand Quarry (On Dudhi River )
RASMEET MALHOTRA · Non-Coal Mining
- Category B1EC Granted2023-11-16declares affected families
Chinki Boras Barrage Combined Multipurpose Project
CHIEF ENGINEER,RANI AVANTI BAI LODHI SAGAR PROJECT · River Valley and Hydroelectric Projects
- Category B2EC Granted2023-09-28
MUAR RIVER SAND QUARRY
SHASHI SINGH · Non-Coal Mining
- Category B2EC Granted2023-09-23
CHHENAKACHHAR - 1 RIVER SAND QUARRY
SHASHI SINGH · Non-Coal Mining
- Category B2EC Granted2023-09-23
CHHENAKACHHAR - 2 RIVER SAND QUARRY
SHASHI SINGH · Non-Coal Mining
- Category B2EC Granted2023-09-19
DHARAMPURI RIVER SAND QUARRY
SHASHI SINGH · Non-Coal Mining
- Category B2EC Granted2023-09-15
BHUMIYADHANA RIVER SAND QUARRY
SHASHI SINGH · Non-Coal Mining
- Category B2EC Granted2023-09-15
SAIKHEDA RIVER SEND QUARRY
SHASHI SINGH · Non-Coal Mining
- Category B2EC Granted2023-08-29
BAGDARA RIVER SAND QUARRY
SHASHI SINGH · Non-Coal Mining
- Category B2EC Granted2023-08-29
BAIRAGARH RIVER SAND QUARRY
SHASHI SINGH · Non-Coal Mining
- Category B2EC Granted2023-08-17
MURGAKHEDA RIVER SAND QUARRY
SHASHI SINGH · Non-Coal Mining
- Category B2EC Granted2023-08-17
KUDARI RIVER SEND QUARRY
SHASHI SINGH · Non-Coal Mining
- Category B2EC Granted2023-08-17
REWANAGAR RIVER SAND QUARRY
SHASHI SINGH · Non-Coal Mining
- Category B2EC Granted2023-07-01
KHAIRI SAND QUARRY
RAMESH BHUMARKAR · Non-Coal Mining
- Category B1EC Granted2023-02-25
PATAI SAND QUARRY ON NARMADA RIVER
ANAND TAMRAKAR · Non-Coal Mining
- Category B2EC Granted2023-02-23
Proposal of Grain Base fuel ethanol unit of 200KLD, 6.0MW Co- generation power plant By product : 102-110 TPD of DDGS and CO2 generation 150 TPD
MAHAKAUSHAL SUGAR AND POWER INDUSTRIES LTD · Industrial Projects - 2
- Category B2EC Granted2023-02-11
100KLPD fuel ethanol unit (B- Molasses based) along with 2.5MW Co- generation power plant By product : 50 TPD of CO2 Generation
NARMADA SUGAR PRIVATE LIMITED · Industrial Projects - 2
- Category B2EC Granted2023-01-30
MURGAKHEDA SAND QUARRY (NARMADA RIVER)
RASMEET MALHOTRA · Non-Coal Mining
- Category B1TOR Granted2022-11-12
Belkhedi Sand Quarry on Narmada River
SHARMA ASSOCIATES · Non-Coal Mining
All 92 proposals that name this district, newest first.