← All districts

Chhindwara, Madhya Pradesh

Partly Scheduled AreaCensus 2011 district code 455
  1. 18 Oct 2026 · Details soughtEssential details soughtTikadi Murrum, Crusher Stone & M Sand Mining Project
  2. 17 Oct 2026 · DecidedTerms of Reference grantedSetting-up of Greenfield NG based 2200 MTPD Ammonia & 3850 MTPD Urea fertilizer project at Jatamkhora…
  3. 13 Oct 2026 · FiledSubmittedTikadi Murrum, Crusher Stone & M Sand Mining Project
  4. 29 Sept 2026 · Details soughtAdditional details soughtShakkar Pench Link Combined Project
  5. 21 Sept 2026 · Details soughtEssential details soughtKhapapand Dolomite Mine
  6. 21 Sept 2026 · Details soughtEssential details examination completedSetting-up of Greenfield NG based 2200 MTPD Ammonia & 3850 MTPD Urea fertilizer project at Jatamkhora…
  7. 19 Sept 2026 · FiledSubmittedKhapapand Dolomite Mine
  8. 18 Sept 2026 · DecidedStandard Terms of Reference grantedBharat OC Patch Coal Mine
  9. 16 Sept 2026 · Details soughtEssential details soughtPremier Synthochem Industries Pvt. Ltd.
  10. 16 Sept 2026 · FiledSubmittedPremier Synthochem Industries Pvt. Ltd.
  11. 15 Sept 2026 · FiledSubmittedDudhi Project
  12. 14 Sept 2026 · DecidedTerms of Reference grantedPatalkot Pumped Storage Project

Dated by the portal's own appraisal history, converted to India Standard Time; a proposal with no recorded history appears on its register submission date.

Other clearances these proposals declare

Forest land diversion declared
11
Forest land sought for diversion
2,598 ha
Wildlife board recommendation declared
0
In or near a protected area
0
In an eco-sensitive zone
0

These counts are taken from the application forms of the 115 of 115 proposals naming this district whose forms have been read for these questions. In 25 of those forms at least one question was left blank, and a blank answer is counted as unknown. The forest area is the area stated for forest clearance, with each forest proposal counted once, in the district where its project is primarily sited.

Proposals naming this district
115
Category A proposals
6
Families declared displaced
8,622
Families declared affected
10,230

Displacement figures are the proponents’ own declarations. A project sited across several districts declares one figure for the whole project, and that figure is counted once, in the district where the project is primarily sited. 3 of the proposals listed below declare displacement and are sited primarily in another district, so their figures are counted in that district’s total.

Fifth Schedule status

Partly within a Fifth Schedule Scheduled Area

The Order fixes the area by reference to territorial divisions as existing at 20 February 2003. It names only part of this district, so district-level status cannot settle whether a particular site is inside it.

OrderThe Scheduled Areas (States of Chhattisgarh, Jharkhand and Madhya Pradesh) Order, 2003 · C.O. 192, notified 2003-02-20

What the record shows

  • The Scheduled Tribe share here, 36.8%, is at least double the national figure of 8.55%.

  • Agricultural labourers, who work other people's land for wages, make up 44% of workers here. Compensation for acquired land is paid to those who hold title to it, so it does not reach them. They can still claim the rehabilitation and resettlement entitlements of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (RFCTLARR), because its section 3(c) counts a family whose livelihood depends on the land as an affected family, wherever that Act governs how the land is obtained.

  • Part of this district is a Fifth Schedule Scheduled Area. Acquiring land for a project sited in that part needs the Gram Sabha's prior consent under section 41(3) of RFCTLARR, and the district-level record cannot settle whether a particular site lies there.

  • Applicants for projects sited mainly in this district have declared 8,622 families to be displaced. The figure comes from their applications, and we have not verified it.

Each of these observations appears when a fixed rule is met by the figures on this page, so the same figures always give the same sentences. None of them is a view on whether a project should go ahead.

Who lives there

Figures from Census 2011, each compared with the all-India value computed on the same definition.

Total population
20,90,922
Households
4,43,361
Average household size
4.72
0.13 below India's 4.85India
Scheduled Tribe share of population
36.8%
28.3 points above IndiaIndia
Scheduled Caste share of population
11.1%
5.5 points below IndiaIndia
Children aged 0-6
13.0%
0.6 points below IndiaIndia
Literacy rate
71.2%
1.8 points below IndiaIndia
Sex ratio
964
21.7 above India's 942.6India

What they live on

How the district's workers earn a living, from Census 2011. The land-dependent share counts cultivators and agricultural labourers as a share of all workers, and it is the group most directly affected when land is acquired.

Total workers
9,57,984
Work participation rate
45.8%
6.0 points above IndiaIndia
Workers dependent on land
73.7%
19.1 points above IndiaIndia
Cultivators
29.6%
4.9 points above IndiaIndia
Agricultural labourers
44.1%
14.2 points above IndiaIndia
Marginal workers
29.7%
4.9 points above IndiaIndia
Household industry workers
1.5%
2.3 points below IndiaIndia

How households live

Land, income and work among rural households, from the Socio Economic and Caste Census 2011, which recorded these where the population census did not. Only the survey's rural part is used here, so urban households do not appear.

Rural households owning land
48.7%
2.6 points above IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households whose highest earner makes over ₹5,000 a month
15.4%
8.9 points below IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households living mainly on manual casual labour
55.6%
3.8 points above IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households with a salaried member
5.9%
2.4 points below IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

When these were filed

Each proposal is dated by the first step in its appraisal history, the dated record of steps the portal keeps for it.

2023-Q12026-Q4

The timeline counts 66 of the 115 proposals here. The first filing date comes from each proposal's appraisal history, and we have not yet read it for the other 49, so they are left out. Most of them are older proposals, so the early part of the timeline undercounts what was filed then. The register itself records a date for each of them; the gap is in our copy of the histories.

Hatched columns undercount, so they cannot be compared with solid ones. 4 of them cover periods for which we have read few filing dates so far, and they count only the proposals whose date we have. 2026-Q4 was still running when the register was read, so its column counts only the filings made up to that date.

What kind of projects these are

The proposals naming this district, grouped by the sector each was filed under.

  • Non-Coal Mining 80%
  • River Valley and Hydroelectric Projects 11.3%
  • Industrial Projects - 2 3.5%
  • Coal Mining 2.6%
  • Other (2) 2.6%

The four largest sectors are shown by name and the rest are grouped as Other.

What is proposed here

These are the proposals in the national environmental clearance register whose application names a site in this district, newest first. A project with sites in several districts appears under each of them.

  1. Category B2EDS raised2026-10-13

    Tikadi Murrum, Crusher Stone & M Sand Mining Project

    siddhivinayak minerals · Non-Coal Mining

  2. Category B2Under Verification2026-10-07

    Khapapand Dolomite Mine

    GOKUL ARYA · Non-Coal Mining

  3. Category B1Under Examination2026-10-01

    Premier Synthochem Industries Pvt. Ltd.

    RAJGOPAL NARAYAN SHASTRI DRAVID · Industrial Projects - 3

  4. Category AForwarded to MS SPCB/PCC by MS2026-09-21

    Setting-up of Greenfield NG based 2200 MTPD Ammonia & 3850 MTPD Urea fertilizer project at Jatamkhora village, Saoner, District- Nagpur, Maharashtra

    GAIL INDIA LIMITED · Industrial Projects - 3

  5. Category B1Proposal Accepted and Referred to SEAC2026-09-15declares affected families

    Dudhi Project

    CHIEF ENGINEER,RANI AVANTI BAI LODHI SAGAR PROJECT · River Valley and Hydroelectric Projects

  6. Category B1Forwarded to MS SPCB/PCC by MS2026-08-31

    Bharat OC Patch Coal Mine

    Western Coalfields Limited · Coal Mining

  7. Category B1ADS Raised2026-08-27declares affected families

    Shakkar Pench Link Combined Project

    CHIEF ENGINEER,RANI AVANTI BAI LODHI SAGAR PROJECT · River Valley and Hydroelectric Projects

  8. Category B1Forwarded to MS SPCB/PCC by MS2026-08-23

    Regional Common Sanitary Landfill Facility for Chhindwara and it’s cluster ULBs at Survey No: 228(S), 257(S), 258(S), 314(S), 316(S), Jamunjhiri, Chhindwara, Madhya Pradesh

    NAGAR PALIKA PARISHAD CHHINDWARA · INFRA-2

  9. Category AForwarded to MS SPCB/PCC by MS2026-08-04declares affected families

    Patalkot Pumped Storage Project

    TORRENT ENERGY STORAGE SOLUTIONS PRIVATE LIMITED · River Valley and Hydroelectric Projects

  10. Category AForwarded to MS SPCB/PCC by MS2026-08-03

    Expansion of Grain based Distillery Plant from 180 KLPD to 300 KLPD along with Cogeneration Power Plant from 2.5 MW to 6 MW At Plot no. 60, Industrial Growth Centre Borgaon, Village Khairitaygaon,Tehsil Sauser, District Pandhurna, Madhya Pradesh by M/s. UKR Industries Limited

    UKR INDUSTRIES LIMITED · Industrial Projects - 2

  11. Category B1Referred to SEAC2026-07-15

    MALEGAON DOLOMITE MINE

    SHRI YAGYADATTA SHARMA · Non-Coal Mining

  12. Category B1Standard ToR Granted2026-06-24

    Malegaon Dolomite Quarry

    SHRI YAGYADATTA SHARMA · Non-Coal Mining

  13. Category B2EC Granted2026-04-30

    Lavhana Crusher Stone Quarry of Shri Rudrangad BarkuSingh Chauhan

    RUDRANGAD B CHAUHAN · Non-Coal Mining

  14. Category B2Referred to SEIAA2026-02-20

    HIwarasenadwar Crusher Stone & M Sand Quarry

    PRAVIN TRADERS · Non-Coal Mining

  15. Category B1Forwarded to MS SPCB/PCC by MS2026-02-17

    Saykheda Stone Quarry Project Khasra No. 21/1/2,22/1,22/2, Village: Saykheda, Tehsil- Sousar, District-Pandhura, State- Madhya Pradesh Area: 2.75 Ha

    RAHUL MOHOD · Non-Coal Mining

  16. Category B2Referred to SEIAA2026-01-31

    Gonawadi Crusher Stone Quarry

    SHAILENDRA SINGH CHOUHAN · Non-Coal Mining

  17. Category B1Standard ToR Granted2026-01-14

    Saykheda Metal Stone Quarry Project at Khasra No. 89 & 90, Village: Saykheda, Tehsil- Sousar, District-Pandhura, State- Madhya Pradesh Area: 2.0 Ha

    ASHIQULLA KHAN · Non-Coal Mining

  18. Category B2EC Granted2026-01-14

    Chicholibad Crusher Stone, Murum, M Sand Quarry

    PRAVIN CHAUHAN · Non-Coal Mining

  19. Category AStandard ToR Granted2026-01-08

    Expansion of Grain based Distillery from 200 KLPD to 540 KLPD including 200 KLPD Sustainable Aviation Fuel plant, proposed 20 TPD Compressed Biogas plant and Co-generation Power Plant from 4 MW to 14 MW at Village Silora, Tehsil Sausar, District Chhindwara, Madhya Pradesh by M/s. Lohiya Green Energy Private Limited

    LOHIYA GREEN ENERGY PRIVATE LIMITED · Industrial Projects - 2

  20. Category B1EC Granted2025-12-31declares affected families

    CIC Balancing Reservoir

    WATER RESOURCES DEPARTMENT · River Valley and Hydroelectric Projects

  21. Category B1Pending at MS SEIAA2025-12-29

    Waghoda Manganese Ore Mining Project

    ANOJ KUMAR AGARWALA · Non-Coal Mining

  22. Category B1Standard ToR Granted2025-12-27

    Project: Khunajhuirkhurd Stone & M-sand Quarry Project” Project location- at Khasra no. 466/4 Village: Khunajhuirkhurd, Tehsil- Mohkhed, District-Chhindwara, State- Madhya Pradesh Proponent: M/S SARKAR INFRA Area: 1.0 Ha

    SARKAR INFRA · Non-Coal Mining

  23. Category B2EC Granted2025-12-22

    Dundaseoni Crusher Stone & M Sand Quarry

    PANDEY METALS · Non-Coal Mining

  24. Category B1Standard ToR Granted2025-12-04

    Malegaon Dolomite Mine

    BHAGYASHREE RADHESHYAM CHOUDHARY · Non-Coal Mining

  25. Category B1Standard ToR Granted2025-11-05

    Saykheda Stone Quarry Project Khasra No. 38/1-2, Village: Saykheda, Tehsil- Sausar, District-Chhindwara, State- Madhya Pradesh Area-2.0 Ha Proponent: M/s Om Mines and Minerals

    JAYRAJ SHARADRAO CHAVAN · Non-Coal Mining

  26. Category B1EC Granted2025-10-23declares affected families

    Shakkar Pench Link Combined Project Phase I (Hard Dam)

    CHIEF ENGINEER,RANI AVANTI BAI LODHI SAGAR PROJECT · River Valley and Hydroelectric Projects

  27. Category B1Standard ToR Granted2025-10-20

    Project: Sajkuhi Stone Quarry Project Khasra No. 193, Village: Sajkuhi, Tehsil- Tamiya, District-Chhindwara, State- Madhya Pradesh Proponent: M/S AFCONS INFRA Area: 1.0 Ha

    MOHIT KHAN · Non-Coal Mining

  28. Category B1EC Rejected2025-10-15

    MALEGAON DOLOMITE MINE

    SHRI YAGYADATTA SHARMA · Non-Coal Mining

  29. Category B1EC Granted2025-08-05

    Bhanadehi Crusher Stone Quarry of Shri Taranjeet Singh Bedi

    TARANJEET BEDI · Non-Coal Mining

  30. Category B2ADS Raised2025-07-26

    Ghadela Dolomite Quarry

    aditya minerals & metals · Non-Coal Mining

  31. Category B2EC Granted2025-07-02

    Patharkati Crusher Stone & M Sand Quarry

    ARVIND KUMAR SURYWANSHI · Non-Coal Mining

  32. Category B2EC Granted2025-05-29

    Anchalkund Crusher Stone Quarry

    OMNAMAN SAHU · Non-Coal Mining

  33. Category B2EC Granted2025-05-17

    Khakrachourai Crusher Stone Quarry

    AMIT DWIVEDI · Non-Coal Mining

  34. Category B2EC Granted2025-05-09

    Pandupipariya Crusher Stone & M Sand Quarry

    VIRENDRA SAHU · Non-Coal Mining

  35. Category B2EC Rejected2025-05-08

    MALEGAON DOLOMITE MINE

    MIRAJ DRYMIX PRIVATE LIMITED · Non-Coal Mining

  36. Category B1EC Granted2025-05-03

    MALEGAON DOLOMITE MINE

    MIRAJ DRYMIX PRIVATE LIMITED · Non-Coal Mining

  37. Category B1ToR Granted2025-05-02declares affected families

    Shakkar Pench Link Combined Project

    CHIEF ENGINEER,RANI AVANTI BAI LODHI SAGAR PROJECT · River Valley and Hydroelectric Projects

  38. Category B2EC Granted2025-04-30

    Muarkala Crusher Stone Quarry

    AMIT BATRA · Non-Coal Mining

  39. Category B1Standard ToR Granted2025-02-25

    MALEGAON DOLOMITE MINE

    SHRI YAGYADATTA SHARMA · Non-Coal Mining

  40. Category B1Standard ToR Granted2025-02-17

    Waghoda Manganese Ore Mining Project

    ANOJ KUMAR AGARWALA · Non-Coal Mining

  41. Category B1EC Granted2024-06-02

    Malegaon Sand Quarry

    JITENDRA CHANDEL · Non-Coal Mining

  42. Category B1EC Granted2024-06-02

    Sayra Sand Quarry

    JITENDRA CHANDEL · Non-Coal Mining

  43. Category B1EC Granted2024-06-02

    PALASPANI SAND QUARRY

    JITENDRA CHANDEL · Non-Coal Mining

  44. Category B1EC Granted2024-06-01

    KAJALWANI SAND QUARRY

    JITENDRA CHANDEL · Non-Coal Mining

  45. Category B1EC Granted2024-06-01

    Baradevi Khapa Sand Quarry

    JITENDRA CHANDEL · Non-Coal Mining

  46. Category B1EC Granted2024-06-01

    Lohani Sand Quarry

    JITENDRA CHANDEL · Non-Coal Mining

  47. Category B2Pending at MS SEIAA2024-05-28

    Amari Stone Quarry

    POOJA SURYAWANSHI · Non-Coal Mining

  48. Category B1ToR Granted2024-05-20declares affected families

    Shakkar Pench Link Combined Project Phase I (Hard Dam)

    CHIEF ENGINEER,RANI AVANTI BAI LODHI SAGAR PROJECT · River Valley and Hydroelectric Projects

  49. Category B2EC Granted2024-04-21

    Amaboh Crusher Stone Quarry of Smt Kirti Thakur

    KIRTI THAKUR · Non-Coal Mining

  50. Category B2EC Granted2024-03-27

    Bhaurakhapa Stone Mining Project

    MAHANDRA SALUJA · Non-Coal Mining

  51. Category B1ToR Granted2024-03-26declares affected families

    CIC Balancing Reservoir

    WATER RESOURCES DEPARTMENT · River Valley and Hydroelectric Projects

  52. Category B2EC Granted2024-03-19

    Seoni Crusher Stone Quarry of Shri Sheshrao Digarse

    SHESHRAO DIGARSE · Non-Coal Mining

  53. Category B2EC Granted2024-03-04

    Chicholibad Stone Quarry

    SUDHIR JUNANKAR · Non-Coal Mining

  54. Category B2EC Granted2024-02-26

    Sindrai Guraiyathar Sand Quarry; Quarry lease area 5.0 Ha, Production 2700 m3/year at Khasra No. 98, Village- Sindrai Guraiyathar, Tehsil- Parasia, District- Chhindwara, State- Madhya Pradesh by The Madhya Pradesh State Mining Corporation Ltd

    JITENDRA CHANDEL · Non-Coal Mining

  55. Category B2EC Granted2024-02-26

    Nimni Sand Quarry; Quarry lease area 0.404 Ha, Production 1188 m3/year at Khasra No. 255, Village- Nimni, Tehsil- Sausar, District- Chhindwara, State- Madhya Pradesh by The Madhya Pradesh State Mining Corporation Ltd

    JITENDRA CHANDEL · Non-Coal Mining

  56. Category B1Standard ToR Granted2024-01-30

    Malegaon Sand Quarry

    JITENDRA CHANDEL · Non-Coal Mining

  57. Category B1Standard ToR Granted2024-01-30

    KAJALWANI SAND QUARRY

    JITENDRA CHANDEL · Non-Coal Mining

  58. Category B1Standard ToR Granted2024-01-30

    Lohani Sand Quarry

    JITENDRA CHANDEL · Non-Coal Mining

  59. Category B1Standard ToR Granted2024-01-30

    PIPLA KANHAN SAND QUARRY

    JITENDRA CHANDEL · Non-Coal Mining

  60. Category B1Standard ToR Granted2024-01-30

    Baradevi Khapa Sand Quarry

    JITENDRA CHANDEL · Non-Coal Mining

  61. Category B1Standard ToR Granted2024-01-30

    PALASPANI SAND QUARRY

    JITENDRA CHANDEL · Non-Coal Mining

  62. Category B1Standard ToR Granted2024-01-30

    Sayra Sand Quarry

    JITENDRA CHANDEL · Non-Coal Mining

  63. Category B1ToR Granted2024-01-18

    Lohani Dolomite Mine Quarry

    GOKUL ARYA · Non-Coal Mining

  64. Category B1EC Granted2023-12-01

    5.639 Ha Malegaon Dolomite Mine

    VIDHAN SHARMA · Non-Coal Mining

  65. Category B1EC Granted2023-11-24

    Lavhana Stone (used stone Crusher as gitti) Quarry Lease Project

    GANESH KOLHE · Non-Coal Mining

  66. Category B1TOR Granted2023-11-23declares affected families

    Sangam 2 Dam Project

    WATER RESOURCES DEPARTMENT · River Valley and Hydroelectric Projects

  67. Category B1TOR Granted2023-11-23declares affected families

    Shakkar Pench Link Combined Project

    CHIEF ENGINEER,RANI AVANTI BAI LODHI SAGAR PROJECT · River Valley and Hydroelectric Projects

  68. Category B1TOR Granted2023-11-23declares affected families

    Dudhi Project

    CHIEF ENGINEER,RANI AVANTI BAI LODHI SAGAR PROJECT · River Valley and Hydroelectric Projects

  69. Category B2EC Granted2023-11-16

    Hiwarasanadwar Murum Quarry Lease

    RAM SAHU · Non-Coal Mining

  70. Category B2EC Granted2023-11-16

    AACHARKUND STONE AND MURUM MINE (TEMPORARY PERMIT)

    HARRAI BIJOURI HIGHWAYS PRIVATE LIMITED · Non-Coal Mining

  71. Category B2EC Granted2023-10-31

    Ghadela Dolomite Mine Quarry

    IND MINERAL EXPLORERS PRIVATE LIMITED · Non-Coal Mining

  72. Category B2EDS raised2023-10-07

    Jatachaper Sand Quarry (Quarry lease); Area 5 Ha, Production 3000 m3/year, At Khasra No. 01, Village- Jatachaper, Tehsil- Parasia,District- Chhindwara,State- Madhya Pradesh by Madhya Pradesh State Mining Corporation Ltd

    JITENDRA CHANDEL · Non-Coal Mining

  73. Category B1EDS raised2023-10-06

    Bhivdoni Quartz & Quartzite Mine

    FLEX MINERALS · Non-Coal Mining

  74. Category AWithdrawal Request Accepted2023-10-06

    Bhivdoni Quartz & Quartzite Mine

    FLEX MINERALS · Non-Coal Mining

  75. Category B2EC Granted2023-09-06

    Kauakheda Sand Quarry; Quarry lease area 2.0 Ha, Production 3840 m3/year at Khasra No. 95, Village- Kauakheda, Tehsil- Chand, District- Chhindwara, State- Madhya Pradesh by The Madhya Pradesh State Mining Corporation Ltd

    JITENDRA CHANDEL · Non-Coal Mining

  76. Category B2EC Granted2023-09-06

    Rajakhoh Sand Quarry (Quarry lease); Area 4 Ha, Production 5760 m3/year, At Khasra No. 01, Village- Rajakhoh, Tehsil- Chhindwara, District- Chhindwara, State- Madhya Pradesh by Madhya Pradesh State Mining Corporation Ltd

    JITENDRA CHANDEL · Non-Coal Mining

  77. Category B2Proposal Accepted and Referred to SEAC2023-09-05

    Pindrai Khurd Sand Quarry; Quarry lease area 0.809 Ha, Production 4417 m3/year at Khasra No. 01, Village- Pindrai Khurd, Tehsil- Mohkhed, District- Chhindwara, State- Madhya Pradesh by The Madhya Pradesh State Mining Corporation Ltd

    JITENDRA CHANDEL · Non-Coal Mining

  78. Category B2Proposal Accepted and Referred to SEAC2023-08-31

    Khairichetu Sand Quarry; Quarry lease area 5.0 Ha, Production 2700 m3/year at Khasra No. 82, Village- Khairichetu, Tehsil- Parasia, District- Chhindwara, State- Madhya Pradesh by The Madhya Pradesh State Mining Corporation Ltd

    JITENDRA CHANDEL · Non-Coal Mining

  79. Category B2EC Granted2023-08-31

    Kodarkhapa Sand Quarry; Quarry lease area 1.00 Ha, Production 1260 m3/year, at Khasra No. 1, Village- Kodarkhapa, Tehsil- Chand, District- Chhindwara, State- Madhya Pradesh by The Madhya Pradesh State Mining Corporation Ltd

    JITENDRA CHANDEL · Non-Coal Mining

  80. Category B2EC Granted2023-08-24

    Bakamukasa Sand Quarry (Quarry lease); Area 5 Ha, Production 14100 m3/year, At Khasra No. 350, Village- Bakamukasa, Tehsil- Amarwada District- Chhindwara,State- Madhya Pradesh by Madhya Pradesh State Mining Corporation Ltd

    JITENDRA CHANDEL · Non-Coal Mining

  81. Category B2EDS raised2023-08-24

    Khairwada Sand Quarry (Quarry lease); Area 2 Ha, Production -6120 m3/year, At Khasra No. 01, Village- Khairwada, Tehsil- Mohkheda District- Chhindwara,State- Madhya Pradesh by Madhya Pradesh State Mining Corporation Ltd

    JITENDRA CHANDEL · Non-Coal Mining

  82. Category B2EC Granted2023-08-24

    Rohna Sand Quarry (Quarry lease); Area 1.10 Ha, Production 19800 m3/year, At Khasra No. 141, Village- Rohna, Tehsil- Sausar District- Chhindwara,State- Madhya Pradesh by Madhya Pradesh State Mining Corporation Ltd

    JITENDRA CHANDEL · Non-Coal Mining

  83. Category B2EC Granted2023-08-24

    Pareghat - B Sand Quarry; Quarry lease area 3.50 Ha, Production 12,180 m3/year at Khasra No. 180, Village- Pareghat, Tehsil- Sausar, District- Chhindwara, State- Madhya Pradesh by The Madhya Pradesh State Mining Corporation Ltd

    JITENDRA CHANDEL · Non-Coal Mining

  84. Category B2EC Granted2023-08-24

    Mehandi - 2 Sand Quarry (Quarry lease); Area 3.50 Ha, Production 21000 m3/year, At Khasra No. 92, Village- Mehandi, Tehsil- Sausar District- Chhindwara, State- Madhya Pradesh by Madhya Pradesh State Mining Corporation Ltd

    JITENDRA CHANDEL · Non-Coal Mining

  85. Category B2EC Granted2023-08-22

    Sunari Mohgaon Sand Quarry (Quarry lease); Area 1 Ha, Production 3900 m3/year, At Khasra No. 369, Village- Sunari Mohgaon, Tehsil- Chhindwara District- Chhindwara,State- Madhya Pradesh by Madhya Pradesh State Mining Corporation Ltd

    JITENDRA CHANDEL · Non-Coal Mining

  86. Category B2Proposal Accepted and Referred to SEAC2023-08-22

    Jatama Sand Quarry; Quarry lease area 5.0 Ha, Production 2100 m3/year at Khasra No. 449, Village- Jatama, Tehsil- Chhindwara, District- Chhindwara, State- Madhya Pradesh by The Madhya Pradesh State Mining Corporation Ltd

    JITENDRA CHANDEL · Non-Coal Mining

  87. Category B2EC Granted2023-08-22

    Lonikala Sand Quarry; Quarry lease area 2.0 Ha, Production 4800 m3/year at Khasra No. 240, Village- Lonikala, Tehsil- Chand, District- Chhindwara, State- Madhya Pradesh by The Madhya Pradesh State Mining Corporation Ltd

    JITENDRA CHANDEL · Non-Coal Mining

  88. Category B2EDS Raised2023-08-22

    Ambadi Sand Quarry (Quarry lease); Area 4 Ha, Production 23040 m3/year, At Khasra No. 280, Village- Ambadi, Tehsil- Sausar District- Chhindwara,State- Madhya Pradesh by Madhya Pradesh State Mining Corporation Ltd

    JITENDRA CHANDEL · Non-Coal Mining

  89. Category B2EC Granted2023-08-12

    Avariya Sand Quarry; Quarry lease area 5.0 Ha, Production 3000 m3/year at Khasra No. -1,126, Village- Avariya, Tehsil- Junnardeo, District- Chhindwara, State- Madhya Pradesh by The Madhya Pradesh State Mining Corporation Ltd

    JITENDRA CHANDEL · Non-Coal Mining

  90. Category B2EC Granted2023-08-11

    Badiwada Sand Quarry; Quarry lease area 4.30 Ha, Production 12900 m3/year at Khasra No. 439/3, Village- Badiwada, Tehsil- Chand, District- Chhindwara, State- Madhya Pradesh by The Madhya Pradesh State Mining Corporation Ltd

    JITENDRA CHANDEL · Non-Coal Mining

  91. Category B2Proposal Accepted and Referred to SEAC2023-08-11

    Mathni Sand Quarry (Quarry lease); Area 2 Ha, Production 2040 m3/year, At Khasra No. 01, Village- Mathni, Tehsil- Sausar District- Chhindwara, State- Madhya Pradesh by Madhya Pradesh State Mining Corporation Ltd

    JITENDRA CHANDEL · Non-Coal Mining

  92. Category B2EC Granted2023-08-11

    Phutera Sand Quarry (Quarry lease); Area 2 Ha, Production 4440 m3/year, At Khasra No. 01, Village- Phutera, Tehsil- Parasia, District- Chhindwara, State- Madhya Pradesh by Madhya Pradesh State Mining Corporation Ltd

    JITENDRA CHANDEL · Non-Coal Mining

  93. Category B2EDS raised2023-08-10

    Hivrakhanderaywar Sand Quarry (Quarry lease); Area 2 Ha, Production 11880 m3/year, At Khasra No. 330, Village- Hivrakhanderaywar, Tehsil- Sausar District- Chhindwara,State- Madhya Pradesh by Madhya Pradesh State Mining Corporation Ltd

    JITENDRA CHANDEL · Non-Coal Mining

  94. Category B2EC Granted2023-08-10

    Pareghat - A Sand Quarry; Quarry lease area 3.50 Ha, Production 12,600 m3/year at Khasra No. 180, Village- Pareghat, Tehsil- Sausar, District- Chhindwara, State- Madhya Pradesh by The Madhya Pradesh State Mining Corporation Ltd

    JITENDRA CHANDEL · Non-Coal Mining

  95. Category B2EC Granted2023-08-10

    Pareghat - C Sand Quarry; Quarry lease area 3.50 Ha, Production 13,020 m3/year at Khasra No. 180, Village- Pareghat, Tehsil- Sausar, District- Chhindwara, State- Madhya Pradesh by The Madhya Pradesh State Mining Corporation Ltd

    JITENDRA CHANDEL · Non-Coal Mining

  96. Category B2EC Granted2023-08-10

    Sangam 1 Sand Quarry; Quarry lease area 3.0 Ha, Production 17,100 m3/year at Khasra No. 184, Village- Sangam, Tehsil- Sausar, District- Chhindwara, State- Madhya Pradesh by The Madhya Pradesh State Mining Corporation Ltd

    JITENDRA CHANDEL · Non-Coal Mining

  97. Category B2EC Granted2023-08-10

    Mehandi 1 Sand Quarry; Quarry lease area 3.50 Ha, Production 25,830 m3/year at Khasra No. 92, Village- Mehandi, Tehsil- Sausar, District- Chhindwara, State- Madhya Pradesh by The Madhya Pradesh State Mining Corporation Ltd

    JITENDRA CHANDEL · Non-Coal Mining

  98. Category B2EC Granted2023-08-10

    Bijorifulla Sand Quarry (Quarry lease); Area 1.0 Ha, Production 1200 m3/year, At Khasra No. 01, Village- Bijorifulla, Tehsil- Parasia, District- Chhindwara State- Madhya Pradesh by Madhya Pradesh State Mining Corporation Ltd

    JITENDRA CHANDEL · Non-Coal Mining

  99. Category B2EC Granted2023-08-10

    Navegaon Sand Quarry (Quarry lease); Area 2.0 Ha, Production 2880 m3/year, At Khasra No. 1/1, Village- Navegaon, Tehsil- Parasia District- Chhindwara,State- Madhya Pradesh by Madhya Pradesh State Mining Corporation Ltd

    JITENDRA CHANDEL · Non-Coal Mining

  100. Category B2EC Granted2023-08-10

    Bichhwa Baggu Sand Quarry; Quarry lease area 4.0 Ha, Production 35,520 m3/year at Khasra No. 172/1, Village- Bichhwa Baggu, Tehsil- Sausar, District- Chhindwara, State- Madhya Pradesh by The Madhya Pradesh State Mining Corporation Ltd

    JITENDRA CHANDEL · Non-Coal Mining

Showing 100 of 115 proposals, newest first. The button below loads the rest.