← All districts

Anuppur, Madhya Pradesh

Partly Scheduled AreaCensus 2011 district code 461
  1. 21 Oct 2026 · Details soughtEssential details soughtBaskhala Stone Quarry, Area-1.808 Ha, Khasra No 32/1, Village- Baskhala, Tehsil- Kotma, Dist- Anuppur M.P.
  2. 21 Oct 2026 · Details soughtEssential details soughtPathraudi Boulder and Murrum Quarry
  3. 15 Oct 2026 · DecidedEnvironmental clearance grantedRampur Batura Opencast project
  4. 12 Oct 2026 · FiledSubmittedPathraudi Boulder and Murrum Quarry
  5. 10 Oct 2026 · FiledSubmittedBaskhala Stone Quarry, Area-1.808 Ha, Khasra No 32/1, Village- Baskhala, Tehsil- Kotma, Dist- Anuppur M.P.
  6. 7 Oct 2026 · FiledSubmittedSplitting of Environmental Clearance granted for 2,860 MW [2X630 MW (Phase-I) & 2x800 MW (Phase-II)]…
  7. 3 Oct 2026 · FiledSubmittedAmadand Opencast Coal Mine Project
  8. 3 Oct 2026 · FiledSubmittedDongaria Tola Stone (Gitti) & Boulder Quarry
  9. 30 Sept 2026 · Details soughtAdditional details soughtPamra Boulder Quarry
  10. 30 Sept 2026 · FiledSubmittedDevelopment & Production of Coal Bed Methane from Sohagpur East: SP (East)-CBM-2001/1 Block (188 wells & 3…
  11. 29 Sept 2026 · Details soughtAdditional details soughtDhangawan Stone Quarry
  12. 21 Sept 2026 · Details soughtAdditional details soughtRampur Batura Opencast project

Dated by the portal's own appraisal history, converted to India Standard Time; a proposal with no recorded history appears on its register submission date.

Other clearances these proposals declare

Forest land diversion declared
7
Forest land sought for diversion
305 ha
Wildlife board recommendation declared
0
In or near a protected area
0
In an eco-sensitive zone
0

These counts are taken from the application forms of the 87 of 87 proposals naming this district whose forms have been read for these questions. In 31 of those forms at least one question was left blank, and a blank answer is counted as unknown. The forest area is the area stated for forest clearance, with each forest proposal counted once, in the district where its project is primarily sited.

Proposals naming this district
87
Category A proposals
23
Families declared displaced
2,890
Families declared affected
3,587

Displacement figures are the proponents’ own declarations. A project sited across several districts declares one figure for the whole project, and that figure is counted once, in the district where the project is primarily sited. 4 of the proposals listed below declare displacement and are sited primarily in another district, so their figures are counted in that district’s total.

Fifth Schedule status

Partly within a Fifth Schedule Scheduled Area

This district was carved from Shahdol in 2003, taking four of the seven Shahdol tahsils the Order names - Pushparajgarh, Anuppur, Jaithari and Kotma. C.O. 192 fixes its area by reference to territorial divisions as existing at 20 February 2003, and a district drawn later does not change the ground the Order scheduled. The Order names part of Shahdol, and part of what it names now lies in this district, so district-level status cannot settle whether a particular site is inside it. The Ministry of Panchayati Raj lists this district among notified Fifth Schedule Areas.

OrderThe Scheduled Areas (States of Chhattisgarh, Jharkhand and Madhya Pradesh) Order, 2003 · C.O. 192, notified 2003-02-20

What the record shows

  • The Scheduled Tribe share here, 47.9%, is at least double the national figure of 8.55%.

  • Part of this district is a Fifth Schedule Scheduled Area. Acquiring land for a project sited in that part needs the Gram Sabha's prior consent under section 41(3) of RFCTLARR, and the district-level record cannot settle whether a particular site lies there.

  • Applicants for projects sited mainly in this district have declared 2,890 families to be displaced. The figure comes from their applications, and we have not verified it.

Each of these observations appears when a fixed rule is met by the figures on this page, so the same figures always give the same sentences. None of them is a view on whether a project should go ahead.

Who lives there

Figures from Census 2011, each compared with the all-India value computed on the same definition.

Total population
7,49,237
Households
1,70,715
Average household size
4.39
0.46 below India's 4.85India
Scheduled Tribe share of population
47.9%
39.3 points above IndiaIndia
Scheduled Caste share of population
9.9%
6.7 points below IndiaIndia
Children aged 0-6
14.2%
0.6 points above IndiaIndia
Literacy rate
67.9%
5.1 points below IndiaIndia
Sex ratio
976
33.7 above India's 942.6India

What they live on

How the district's workers earn a living, from Census 2011. The land-dependent share counts cultivators and agricultural labourers as a share of all workers, and it is the group most directly affected when land is acquired.

Total workers
3,46,471
Work participation rate
46.2%
6.5 points above IndiaIndia
Workers dependent on land
71.0%
16.4 points above IndiaIndia
Cultivators
33.3%
8.7 points above IndiaIndia
Agricultural labourers
37.6%
7.7 points above IndiaIndia
Marginal workers
34.5%
9.7 points above IndiaIndia
Household industry workers
2.0%
1.8 points below IndiaIndia

How households live

Land, income and work among rural households, from the Socio Economic and Caste Census 2011, which recorded these where the population census did not. Only the survey's rural part is used here, so urban households do not appear.

Rural households owning land
63.1%
17.0 points above IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households whose highest earner makes over ₹5,000 a month
12.7%
11.7 points below IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households living mainly on manual casual labour
46.6%
5.2 points below IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households with a salaried member
7.2%
1.0 points below IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

When these were filed

Each proposal is dated by the first step in its appraisal history, the dated record of steps the portal keeps for it.

2024-Q12026-Q4

The timeline counts 73 of the 87 proposals here. The first filing date comes from each proposal's appraisal history, and we have not yet read it for the other 14, so they are left out. Most of them are older proposals, so the early part of the timeline undercounts what was filed then. The register itself records a date for each of them; the gap is in our copy of the histories.

Hatched columns undercount, so they cannot be compared with solid ones. 2026-Q4 was still running when the register was read, so its column counts only the filings made up to that date.

What kind of projects these are

The proposals naming this district, grouped by the sector each was filed under.

  • Non-Coal Mining 64.4%
  • Thermal Projects 14.9%
  • Coal Mining 14.9%
  • Industrial Projects - 2 2.3%
  • Other (2) 3.4%

The four largest sectors are shown by name and the rest are grouped as Other.

What is proposed here

These are the proposals in the national environmental clearance register whose application names a site in this district, newest first. A project with sites in several districts appears under each of them.

  1. Category B1EDS raised2026-10-12

    Pathraudi Boulder and Murrum Quarry

    ajeet kumar agrawal & sons · Non-Coal Mining

  2. Category B2EDS raised2026-10-10

    Baskhala Stone Quarry, Area-1.808 Ha, Khasra No 32/1, Village- Baskhala, Tehsil- Kotma, Dist- Anuppur M.P.

    SHWETA GOENKA · Non-Coal Mining

  3. Category AProposal Accepted and Referred to EAC2026-10-07

    Splitting of Environmental Clearance granted for 2,860 MW [2X630 MW (Phase-I) & 2x800 MW (Phase-II)] Coal-Based Thermal Power Project located at Village Laharpur, Murra, Guwari, Belia & Jaithari in Jaithari Tehsil, District Anuppur, Madhya Pradesh to MB Power (Madhya Pradesh) Limited by Splitting/transferring of one (1) unit of 800 MW Coal-Based Ultra Super Critical Thermal Power Unit of Phase-II, along with its associated facilities to Anuppur Powerprojects Private Limited (APPL).

    MB POWER (MADHYA PRADESH) LIMITED · Thermal Projects

  4. Category B2Under Verification2026-10-03

    Dongaria Tola Stone (Gitti) & Boulder Quarry

    tushar khedia · Non-Coal Mining

  5. Category AProposal Accepted and Referred to EAC2026-10-03declares affected families

    Amadand Opencast Coal Mine Project

    South Eastern Coalfields Limited · Coal Mining

  6. Category AUnder Processing with Authority2026-09-30

    Development & Production of Coal Bed Methane from Sohagpur East: SP (East)-CBM-2001/1 Block (188 wells & 3 GGS), in Shahdol and Anuppur Districts, Madhya Pradesh by Reliance Industries Limited

    RELIANCE INDUSTRIES LIMITED · Industrial Projects - 2

  7. Category AProposal Accepted and Referred to EAC2026-09-10

    Newzone India Pvt Limited proposed expansion of additional 1x800 MW Ultra super critical thermal power plant village Raksa, kolmi, Daikhal, Anuppur Madhya Pradesh

    NEWZONE INDIA PVT LTD · Thermal Projects

  8. Category B2ADS Raised2026-09-02

    Dhangawan Stone Quarry

    RAKESH GUPTA · Non-Coal Mining

  9. Category AEC Granted2026-08-31declares affected families

    Rampur Batura Opencast project

    South Eastern Coalfields Limited · Coal Mining

  10. Category B1Forwarded to MS SPCB/PCC by MS2026-08-25

    TARANG STONE (BASALT) QUARRY LEASE

    DHENA NAYAK · Non-Coal Mining

  11. Category B1Forwarded to MS SPCB/PCC by MS2026-08-24

    Regional Common Sanitary Landfill Facility for Pasan and it’s cluster ULBs at Survey No. 39/1, Gram Jamuna, Tehsil Anuppur, Dist.-Anuppur, Madhya Pradesh.

    CHIEF MUNICIPAL OFFICER PASAN · INFRA-2

  12. Category AProposal Accepted and Referred to EAC2026-08-20

    Lamatola Coal Block, District Anuppur, Madhya Pradesh proposed by M/s ACC Ltd

    ACC LIMITED · Coal Mining

  13. Category B2Forwarded to MS SPCB/PCC by MS2026-08-19

    Obtaining environment clearance for 1.008 Ha Dongaria Khurd Stone Quarry Lease with production capacity of ROM 9748 cum per year (Stone/Gitti = 8232 m3/Year, 1083 m3 per year of overburden and 433m3/year of mineral reject) along with crusher at village Dongaria, Tehsil – Kotma, District – Anuppur (M.P.).

    RAJENDRA SHUKLA · Non-Coal Mining

  14. Category B2Pending at MS SEIAA2026-08-17

    Dogariya Khurd Stone Quarry

    MADHU AGRAWAL · Non-Coal Mining

  15. Category B2Referred to SEAC2026-07-30

    Residential Township of Anuppur Thermal Power Plant at Village Chhatai, Tehsil Kotma, District Anuppur, Madhya Pradesh by Anuppur Thermal Energy (MP) Private Limited

    Adani Power Limited · INFRA-2

  16. Category B2Pending at MS SEIAA2026-07-22

    DONGARIYA KHURD STONE QUARRY

    KHATU SHYAM MINERALS · Non-Coal Mining

  17. Category B2ADS Raised2026-07-20

    DONGARIA KHURD STONE QUARRY

    MADHU AGRAWAL · Non-Coal Mining

  18. Category B2Referred to SEIAA2026-07-14

    CHATUA BOULDER QUARRY

    AURUM MINERALS · Non-Coal Mining

  19. Category AToR Granted2026-07-02

    Development & Production of Coal Bed Methane from Sohagpur East: SP (East)-CBM-2001/1 Block (188 wells & 3 GGS), in Shahdol and Anuppur Districts, Madhya Pradesh by Reliance Industries Limited

    RELIANCE INDUSTRIES LIMITED · Industrial Projects - 2

  20. Category AGranted2026-06-23declares affected families

    New Zone Thermal Power Plant, Anuppur, 2x800 MW Coal Based Ultra Super Critical Thermal Power Plant at village Raksha, Kolmi and Daikhal, Tehsil Anuppur, Anuppur District, Madhya Pradesh by Torrent Power Limited.

    TORRENT POWER LIMITED · Thermal Projects

  21. Category B2Referred to SEAC2026-05-14

    Nai Bhaisantola Stone Mine For Making Boulder & Gitti

    SUNEEL GUPTA · Non-Coal Mining

  22. Category B2Referred to SEAC2026-05-14

    Pamra Boulder Quarry

    sushma tiwari · Non-Coal Mining

  23. Category B1Forwarded to MS SPCB/PCC by MS2026-05-13

    Tarang Quarry (Basalt Stone) Lease

    YUVRAJ NAYAK · Non-Coal Mining

  24. Category B1Forwarded to MS SPCB/PCC by MS2026-05-12

    TARANG STONE (BASALT) QUARRY LEASE

    DHENA NAYAK · Non-Coal Mining

  25. Category AProposal pulled back (withdrawn)2026-05-11

    1x660 MW Amarkantak Ultra Supercritical Thermal Power Project at Village: Chachai (V), Distt: Anuppur (D), Madhya Pradesh by M/s. M. P. Power Generating Company Limited (MPPGCL)

    Madhya pradesh power generating company limited · Thermal Projects

  26. Category B2Referred to SEIAA2026-04-02

    Ghatha Stone Quarry

    AJEET KURMESHWAR · Non-Coal Mining

  27. Category AStandard ToR Granted2026-03-25

    Lamatola Coal Block, District Anuppur, Madhya Pradesh proposed by M/s ACC Ltd

    ACC LIMITED · Coal Mining

  28. Category AStandard ToR Granted2026-03-05declares affected families

    Amadand Opencast Coal Mine Project

    South Eastern Coalfields Limited · Coal Mining

  29. Category B2EC Granted2026-02-28

    MEDHAKHAR STONE QUARRY

    SUNEEL GUPTA · Non-Coal Mining

  30. Category B2EC Granted2026-02-23

    Bhamraha Stone Mine For Making Boulder & Gitti

    MANENDRA SINGH · Non-Coal Mining

  31. Category AEC Granted2026-02-23declares affected families

    New Zone Thermal Power Plant, Anuppur, 2x800 MW Coal Based Ultra Super Critical Thermal Power Plant at village Raksha, Kolmi and Daikhal, Tehsil Anuppur, Anuppur District, Madhya Pradesh by Torrent Power Limited.

    TORRENT POWER LIMITED · Thermal Projects

  32. Category B2EC Granted2026-02-05

    Baskhala Boulder Stone Mine

    associated builders & CONTRACTORS · Non-Coal Mining

  33. Category B2EC Granted2026-01-30

    Mouhari Stone Quarry

    Laxmikant Sharma · Non-Coal Mining

  34. Category B1Forwarded to MS SPCB/PCC by MS2025-12-04

    Pathraudi Boulder and Murrum Quarry

    ajeet kumar agrawal & sons · Non-Coal Mining

  35. Category B1Standard ToR Granted2025-12-04

    Pathraudi Boulder and Murrum Quarry

    ajeet kumar agrawal & sons · Non-Coal Mining

  36. Category B1Standard ToR Granted2025-12-04

    PATHRAUDI STONE (GITTI) QUARRY

    udit agrawal · Non-Coal Mining

  37. Category AToR Granted2025-11-21declares affected families

    Rampur Batura Opencast project

    South Eastern Coalfields Limited · Coal Mining

  38. Category B2EC Granted2025-10-15

    Harratola Stone Quarry

    PRASHANT CHOUDHARY · Non-Coal Mining

  39. Category B2EC Granted2025-09-29

    DHANGAWAN STONE QUARRY

    RAKESH GUPTA · Non-Coal Mining

  40. Category AToR Granted2025-09-16declares affected families

    New Zone Thermal Power Plant, Anuppur, 2x800 MW Coal Based Ultra Super Critical Thermal Power Plant at village Raksha, Kolmi and Daikhal, Tehsil Anuppur, Anuppur District, Madhya Pradesh by Torrent Power Limited.

    TORRENT POWER LIMITED · Thermal Projects

  41. Category AEC Granted2025-09-06declares affected families

    Batura Open Cast Coal Mine Project

    South Eastern Coalfields Limited · Coal Mining

  42. Category AEC Granted2025-07-31

    1x660 MW Amarkantak Ultra Supercritical Thermal Power Project at Village: Chachai (V), Distt: Anuppur (D), Madhya Pradesh by M/s. M. P. Power Generating Company Limited (MPPGCL)

    Madhya pradesh power generating company limited · Thermal Projects

  43. Category AEC Granted2025-07-23

    EXPANSION BY ADDITION OF 2x800 MW (1600 MW) COAL BASED ULTRA SUPER CRITICAL THERMAL POWER PLANT TO EXISTING 2 x 630 MW (1260 MW) MB POWER (MADHYA PRADESH) LIMITED AT VILLAGE LAHARPUR, MURRA, GUWARI, BELIA & JETHARI, IN JAITHARI TEHSIL, ANUPPUR DISTRICT, MADHYA PRADESH

    MB POWER (MADHYA PRADESH) LIMITED · Thermal Projects

  44. Category AEC Granted2025-07-19

    Proposed 4x800 MW Coal Based Ultra Super Critical Thermal Power Plant (USCTPP) at Villages Chhatai, Majhtoliya & Umarda, Tehsil Kotma, District Anuppur, Madhya Pradesh by ANUPPUR THERMAL ENERGY (MP) PRIVATE LIMITED

    Adani Power Limited · Thermal Projects

  45. Category AEC Granted2025-06-01declares affected families

    AMADAND OPENCAST COAL MINE

    South Eastern Coalfields Limited · Coal Mining

  46. Category B1Standard ToR Granted2025-05-14

    Proposed Stand-alone 2.0 MTPA Coal washery based on Batac Jig process located in 9..604 Ha area as a standalone washery at Anuppur, District Anuppur, Madhya Pradesh by Adinath Coal Beneficiation Pvt. Ltd

    ADINATH cOAL bENEFICIATION PRIVATE LIMITED · Coal Mining

  47. Category B2EC Granted2025-04-17

    BADHAR QUARRY (BASALT STONE) LEASE

    DHRUV PATEL · Non-Coal Mining

  48. Category B1Standard ToR Granted2025-04-17

    “Bandhamar Stone Quarry Project” Project Location- At Khasra No. 312/1, 312/2, 314/1, 314/2 Village: Bandhamar Tehsil- Pushprajgarh & District- Anuppur State- Madhya Pradesh Area: 1.692 Ha

    SULABH AGRAWAL · Non-Coal Mining

  49. Category B1EC Rejected2025-03-12

    MANPUR SAND MINE

    PRAMOD SAXENA · Non-Coal Mining

  50. Category B1EC Granted2025-02-11

    Chatua Granite/Dolerite Mine

    RAM BABU SINGH · Non-Coal Mining

  51. Category B1EC Rejected2025-01-18

    Transfer of Environment Clearance from Radiant Coal Beneficiation Pvt. Ltd. to Hind Energy and Coal Beneficiation (India) Ltd. for 0.90 MTPA Coal washery plant at Mantola Village, Kotma Tehsil, Anuppur District, Madhya Pradesh

    HIND ENERGY AND COAL BENEFICATION (INDIA) LIMITED · Coal Mining

  52. Category AProposal returned in present form2025-01-13

    1x660 MW Amarkantak Ultra Supercritical Thermal Power Project at Village: Chachai (V), Distt: Anuppur (D), Madhya Pradesh by M/s. M. P. Power Generating Company Limited (MPPGCL)

    Madhya pradesh power generating company limited · Thermal Projects

  53. Category AToR Granted2024-11-26

    EXPANSION BY ADDITION OF 2x800 MW (1600 MW) COAL BASED ULTRA SUPER CRITICAL THERMAL POWER PLANT TO EXISTING 2 x 630 MW (1260 MW) MB POWER (MADHYA PRADESH) LIMITED AT VILLAGE LAHARPUR, MURRA, GUWARI, BELIA & JETHARI, IN JAITHARI TEHSIL, ANUPPUR DISTRICT, MADHYA PRADESH

    MB POWER (MADHYA PRADESH) LIMITED · Thermal Projects

  54. Category AToR Granted2024-09-19

    Proposed 4x800 MW Coal Based Ultra Super Critical Thermal Power Plant (USCTPP) at Villages Chhatai, Majhtoliya & Umarda, Tehsil Kotma, District Anuppur, Madhya Pradesh by ANUPPUR THERMAL ENERGY (MP) PRIVATE LIMITED

    Adani Power Limited · Thermal Projects

  55. Category B1Referred to SEIAA2024-06-04

    M/s Hind Energy and Coal Benefication (India) Limited

    HIND ENERGY AND COAL BENEFICATION (INDIA) LIMITED · Coal Mining

  56. Category B1EC Granted2024-05-26

    BALBEHRA SAND QUARRY

    PRAMOD SAXENA · Non-Coal Mining

  57. Category B1EC Granted2024-05-26

    BALBEHRA UMARIYA SAND QUARRY

    PRAMOD SAXENA · Non-Coal Mining

  58. Category B2EC Granted2024-05-15

    Dogariya Khurd Stone Quarry

    MADHU AGRAWAL · Non-Coal Mining

  59. Category B2EC Granted2024-05-07

    Pathraudi Stone (Gitti) Quarry

    AJIT AGRAWAL · Non-Coal Mining

  60. Category B1ToR Granted2024-03-16

    Tarang Stone Quarry Lease

    BHUPENDARPAL CHHABRA · Non-Coal Mining

  61. Category AEC Granted2024-02-05

    Expansion of existing Coal Based Sub-Critical Thermal Power Plant from 2X600 MW (1200MW) to 2X630 MW (1260 MW) under clause 7(ii)(a) of EIA Notification 2006 amended from time to time at Villages: Laharpur, Murra, Guwari, Belia & Jaithari, Tehsil: Jaithari & Anuppur, District: Anuppur (Madhya Pradesh)

    MB POWER (MADHYA PRADESH) LIMITED · Thermal Projects

  62. Category B1ToR Granted2024-02-03

    Bandhamar Stone (Gitti) Quarry

    INDRANI SINGRAM · Non-Coal Mining

  63. Category B1Standard ToR Granted2024-02-02

    JAITHARI GOBRI SAND MINE

    PRAMOD SAXENA · Non-Coal Mining

  64. Category B1Standard ToR Granted2024-02-02

    MANPUR SAND MINE

    PRAMOD SAXENA · Non-Coal Mining

  65. Category B1Standard ToR Granted2024-02-02

    CHOLNA SAND MINE

    PRAMOD SAXENA · Non-Coal Mining

  66. Category B1Standard ToR Granted2024-02-02

    PASAN SAND MINE

    PRAMOD SAXENA · Non-Coal Mining

  67. Category B1Standard ToR Granted2024-01-29

    BALBEHRA SAND QUARRY

    PRAMOD SAXENA · Non-Coal Mining

  68. Category B1Standard ToR Granted2024-01-29

    KHUJARWAR SAND QUARRY

    PRAMOD SAXENA · Non-Coal Mining

  69. Category B1Standard ToR Granted2024-01-29

    BALBEHRA UMARIYA SAND QUARRY

    PRAMOD SAXENA · Non-Coal Mining

  70. Category B1Under Examination2024-01-26

    BALBEHRA UMARIYA SAND QUARRY

    PRAMOD SAXENA · Non-Coal Mining

  71. Category B1Under Examination2024-01-26

    BALBEHRA SAND QUARRY

    PRAMOD SAXENA · Non-Coal Mining

  72. Category B1Under Examination2024-01-26

    KHUJARWAR SAND QUARRY

    PRAMOD SAXENA · Non-Coal Mining

  73. Category B1ToR Granted2024-01-09

    Majhauli - Tikradudhi White Clay/Ochre & Laterite Mine

    RANJU GOEL · Non-Coal Mining

  74. Category B1TOR Granted2023-11-23declares affected families

    Upper Narmada Project (45600 ha CCA)

    DINESH SHARMA · River Valley and Hydroelectric Projects

  75. Category B1EC Granted2023-11-16

    Cholna Granite Deposit Quarry of M/s Kisan Exports

    KISAN EXPORTS · Non-Coal Mining

  76. Category B1EC Granted2023-11-16

    Urtan Coal Mine (Normative Capacity: 0.65 MTPA, Peak Rated Capacity: 0.975 MTPA)

    JMS MINING PRIVATE LIMITED · Coal Mining

  77. Category B2EDS raised2023-08-08

    Ghata Stone Quarry

    AJEET KURMESHWAR · Non-Coal Mining

  78. Category B2EDS raised2023-08-08

    Tarang Stone Quarry Lease

    BHUPENDARPAL CHHABRA · Non-Coal Mining

  79. Category B2EDS raised2023-08-07

    Chhilpa Stone Quarry

    MOHD MANSURI · Non-Coal Mining

  80. Category B2EC Granted2023-07-21

    CHANGERI -1 SAND MINE

    PRAMOD SAXENA · Non-Coal Mining

  81. Category B2EC Granted2023-07-11

    DEKHAL SAND MINE

    PRAMOD SAXENA · Non-Coal Mining

  82. Category B2EC Granted2023-07-11

    VENKATNAGAR KADAMSARA SAND MINE

    PRAMOD SAXENA · Non-Coal Mining

  83. Category B2EC Granted2023-07-11

    SENDURI SAND QUARRY

    PRAMOD SAXENA · Non-Coal Mining

  84. Category B2EC Granted2023-07-11

    CHACHAI AABAD SAND MINE

    PRAMOD SAXENA · Non-Coal Mining

  85. Category B2EC Granted2023-07-11

    MAUHARI SAND QUARRY

    PRAMOD SAXENA · Non-Coal Mining

  86. Category B2EC Granted2023-04-24

    Haweli Stone Crusher Quarry

    MANVATI GUPTA · Non-Coal Mining

  87. Category B1EC Granted2022-11-25

    Urtan North Coal Block (Normative Capacity: 0.6 MTPA, PRC: 0.90 MTPA) & Integrated Coal Washery (2.0 MTPA)

    JMS MINING PRIVATE LIMITED · Coal Mining

All 87 proposals that name this district, newest first.