← All districts

Sidhi, Madhya Pradesh

Partly Scheduled AreaCensus 2011 district code 462
  1. 30 Sept 2026 · Details soughtAdditional details soughtHathgarh Stone Quarry
  2. 22 Sept 2026 · Details soughtAdditional details soughtDADHIYA STONE QUARRY
  3. 13 Sept 2026 · DecidedEnvironmental clearance grantedBadera Stone Quarry
  4. 13 Sept 2026 · DecidedEnvironmental clearance grantedMata Stone Quarry
  5. 2 Sept 2026 · Details soughtEssential details soughtDADHIYA STONE QUARRY

Dated by the portal's own appraisal history, converted to India Standard Time; a proposal with no recorded history appears on its register submission date.

Other clearances these proposals declare

Forest land diversion declared
3
Forest land sought for diversion
448 ha
Wildlife board recommendation declared
3
In or near a protected area
0
In an eco-sensitive zone
4

These counts are taken from the application forms of the 60 of 60 proposals naming this district whose forms have been read for these questions. In 16 of those forms at least one question was left blank, and a blank answer is counted as unknown. The forest area is the area stated for forest clearance, with each forest proposal counted once, in the district where its project is primarily sited.

Proposals naming this district
60
Category A proposals
3
Families declared displaced
None declared
Families declared affected
None declared

Displacement figures are the proponents’ own declarations. A project sited across several districts declares one figure for the whole project, and that figure is counted once, in the district where the project is primarily sited. 1 of the proposals listed below declare displacement and are sited primarily in another district, so their figures are counted in that district’s total.

Fifth Schedule status

Partly within a Fifth Schedule Scheduled Area

The Order fixes the area by reference to territorial divisions as existing at 20 February 2003. It names only part of this district, so district-level status cannot settle whether a particular site is inside it.

OrderThe Scheduled Areas (States of Chhattisgarh, Jharkhand and Madhya Pradesh) Order, 2003 · C.O. 192, notified 2003-02-20

What the record shows

  • The Scheduled Tribe share here, 27.8%, is at least double the national figure of 8.55%.

  • Cultivators and agricultural labourers make up 79% of workers here, against 55% nationally, so at least three in four people who work here do so on the land.

  • Agricultural labourers, who work other people's land for wages, make up 57% of workers here. Compensation for acquired land is paid to those who hold title to it, so it does not reach them. They can still claim the rehabilitation and resettlement entitlements of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (RFCTLARR), because its section 3(c) counts a family whose livelihood depends on the land as an affected family, wherever that Act governs how the land is obtained.

  • Part of this district is a Fifth Schedule Scheduled Area. Acquiring land for a project sited in that part needs the Gram Sabha's prior consent under section 41(3) of RFCTLARR, and the district-level record cannot settle whether a particular site lies there.

Each of these observations appears when a fixed rule is met by the figures on this page, so the same figures always give the same sentences. None of them is a view on whether a project should go ahead.

Who lives there

Figures from Census 2011, each compared with the all-India value computed on the same definition.

Total population
11,27,033
Households
2,38,448
Average household size
4.73
0.12 below India's 4.85India
Scheduled Tribe share of population
27.8%
19.3 points above IndiaIndia
Scheduled Caste share of population
11.6%
5.1 points below IndiaIndia
Children aged 0-6
17.3%
3.7 points above IndiaIndia
Literacy rate
64.4%
8.5 points below IndiaIndia
Sex ratio
957
14.4 above India's 942.6India

What they live on

How the district's workers earn a living, from Census 2011. The land-dependent share counts cultivators and agricultural labourers as a share of all workers, and it is the group most directly affected when land is acquired.

Total workers
4,61,760
Work participation rate
41.0%
1.2 points above IndiaIndia
Workers dependent on land
79.0%
24.4 points above IndiaIndia
Cultivators
22.2%
2.4 points below IndiaIndia
Agricultural labourers
56.8%
26.8 points above IndiaIndia
Marginal workers
40.3%
15.6 points above IndiaIndia
Household industry workers
3.4%
0.4 points below IndiaIndia

How households live

Land, income and work among rural households, from the Socio Economic and Caste Census 2011, which recorded these where the population census did not. Only the survey's rural part is used here, so urban households do not appear.

Rural households owning land
39.6%
6.5 points below IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households whose highest earner makes over ₹5,000 a month
19.6%
4.7 points below IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households living mainly on manual casual labour
62.1%
10.3 points above IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households with a salaried member
7.0%
1.3 points below IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

When these were filed

Each proposal is dated by the first step in its appraisal history, the dated record of steps the portal keeps for it.

2023-Q22026-Q3

The timeline counts 47 of the 60 proposals here. The first filing date comes from each proposal's appraisal history, and we have not yet read it for the other 13, so they are left out. Most of them are older proposals, so the early part of the timeline undercounts what was filed then. The register itself records a date for each of them; the gap is in our copy of the histories.

Hatched columns undercount, so they cannot be compared with solid ones. 4 of them cover periods for which we have read few filing dates so far, and they count only the proposals whose date we have.

What kind of projects these are

The proposals naming this district, grouped by the sector each was filed under.

  • Non-Coal Mining 90%
  • River Valley and Hydroelectric Projects 5%
  • Industrial Projects - 2 1.7%
  • INFRA-2 1.7%
  • Other (1) 1.7%

The four largest sectors are shown by name and the rest are grouped as Other.

What is proposed here

These are the proposals in the national environmental clearance register whose application names a site in this district, newest first. A project with sites in several districts appears under each of them.

  1. Category B2Referred to SEAC2026-09-02

    DADHIYA STONE QUARRY

    SURAJ BAGHEL · Non-Coal Mining

  2. Category B2Referred to SEIAA2026-07-22

    obtaining Environment Clearance in B-2 category for 1.00Ha Rampur Murrum Mine with production capacity of ROM ROM 10270 cum per year (Murrum = 9006 m3/Year, 316m3 per year of soil, 474 m3 per year of overburden and 474m3/year of mineral reject)at village Rampur, Tehsil – Rampur Naikin, District – Sidhi(M.P.). by Smt. Rashmi Mukesh Tiwari

    rashmi mukesh tiwari · Non-Coal Mining

  3. Category B1Forwarded to MS SPCB/PCC by MS2026-06-18

    Sihuliya Stone (Gitti) Quarry

    trutech corporation · Non-Coal Mining

  4. Category B1Standard ToR Granted2026-06-01

    AMAHWA STONE QUARRY LEASE

    GANESH PRATAP SINGH INFRA PRIVATE LIMITED · Non-Coal Mining

  5. Category B2ADS Raised2026-05-27

    Hathgarh Stone Quarry

    ANIK KUMAR MISHRA · Non-Coal Mining

  6. Category B2EC Granted2026-05-20

    Badera Stone Quarry

    gopal naresh singh · Non-Coal Mining

  7. Category B2EC Granted2026-05-19

    Mata Stone Quarry

    gopal naresh singh · Non-Coal Mining

  8. Category B1Referred to SEIAA2026-05-08

    Bhumka Sand Deposit

    RAM SONI · Non-Coal Mining

  9. Category B1Proposal pulled back (withdrawn)2026-04-17

    Bhumka Sand Deposit

    RAM SONI · Non-Coal Mining

  10. Category B1Forwarded to MS SPCB/PCC by MS2026-02-02

    BARPAN SAND QUARRY

    RAM SONI · Non-Coal Mining

  11. Category B1Standard ToR Granted2026-01-17

    Tikri -1 Sand Deposit_2.00 ha

    RAM SONI · Non-Coal Mining

  12. Category B1Forwarded to MS SPCB/PCC by MS2026-01-02

    PADRI SAND QUARRY

    RAM SONI · Non-Coal Mining

  13. Category B1Forwarded to MS SPCB/PCC by MS2026-01-02

    BHARUHI SAND QUARRY

    RAM SONI · Non-Coal Mining

  14. Category B2EC Granted2025-12-03

    Shivpurwa Stone (Granite/Gneiss) Quarry Lease

    suvesha infra private limited · Non-Coal Mining

  15. Category B2EC Rejected2025-10-30

    Bari Stone Quarry Lease

    GANESH SINGH · Non-Coal Mining

  16. Category AToR Granted2025-10-09declares affected families

    Gond Major Irrigation Project

    EEWRD SINGRAULI · River Valley and Hydroelectric Projects

  17. Category B2EC Granted2025-10-07

    Research & Development Project for Helium Exploration

    ONGC Energy centre Trust · Industrial Projects - 2

  18. Category B2EC Granted2025-09-29

    Bamuri Stone Quarry

    Bharat singh · Non-Coal Mining

  19. Category B1ToR Granted2025-09-28declares affected families

    SITAPUR-HANUMANA MICRO IRRIGATION PROJECT

    BHAGWAAN DUTT TIWARI · River Valley and Hydroelectric Projects

  20. Category B2EC Granted2025-07-28

    AMHAWA STONE QUARRY

    ANIL SINGH CHAUHAN · Non-Coal Mining

  21. Category B2EC Granted2025-06-19

    Karmai Stone Quarry Lease

    LAVKESH SINGH · Non-Coal Mining

  22. Category B1Standard ToR Granted2025-05-08

    KATARWAR STONE MINE-2.40HA

    ARPIT MINERALS & CONSTRUCTION COMPANY · Non-Coal Mining

  23. Category B1Standard ToR Granted2025-05-03

    KHAJURIHA STONE MINE-1.55HA.

    A S CONSTRUCTION · Non-Coal Mining

  24. Category B1Referred to SEAC2025-04-29

    Gotra-3 Sand Deposit

    RAM SONI · Non-Coal Mining

  25. Category B1Referred to SEAC2025-04-29

    Pondi-3 Sand Deposit

    RAM SONI · Non-Coal Mining

  26. Category B1Referred to SEAC2025-04-29

    Pondi-2 Sand Deposit

    RAM SONI · Non-Coal Mining

  27. Category B1EC Rejected2025-04-29

    Bhumka Sand Deposit

    RAM SONI · Non-Coal Mining

  28. Category B1Referred to SEAC2025-04-29

    Guduadhar-2 Sand Deposit

    RAM SONI · Non-Coal Mining

  29. Category B1Referred to SEAC2025-04-29

    Guduadhar-1 Sand Deposit

    RAM SONI · Non-Coal Mining

  30. Category B1Referred to SEAC2025-04-29

    Pondi-1 Sand Deposit

    RAM SONI · Non-Coal Mining

  31. Category B1Standard ToR Granted2025-04-28

    KATARWAR STONE MINE-1.810HA

    sharad kumar singh · Non-Coal Mining

  32. Category B1Standard ToR Granted2025-04-26

    KATARWAR STONE MINE-1.660HA

    sharad kumar singh · Non-Coal Mining

  33. Category B1EC Granted2024-05-11

    Nidhipuri - 1 Sand Deposit

    RAM SONI · Non-Coal Mining

  34. Category B1EC Granted2024-05-11

    Gotra - 2 Sand Deposit

    RAM SONI · Non-Coal Mining

  35. Category B2EC Granted2024-05-11

    TIKAT KALA SOIL/CLAY QUARRY LEASE

    SUNEEL SINGH · Non-Coal Mining

  36. Category B1EC Granted2024-05-10

    Gotra - 1 Sand Deposit

    RAM SONI · Non-Coal Mining

  37. Category B2EC Granted2024-04-27

    Commercial Complex (Mall)

    DJV INFRASTRUCTURE PRIVATE LIMITED · INFRA-2

  38. Category B1Standard ToR Granted2024-04-12

    Bhumka Sand Deposit

    RAM SONI · Non-Coal Mining

  39. Category B1Standard ToR Granted2024-04-12

    Pondi-2 Sand Deposit

    RAM SONI · Non-Coal Mining

  40. Category B1Standard ToR Granted2024-04-12

    Pondi-3 Sand Deposit

    RAM SONI · Non-Coal Mining

  41. Category B1Standard ToR Granted2024-04-12

    NIDHIPURI-2 SAND DEPOSIT

    RAM SONI · Non-Coal Mining

  42. Category B1Standard ToR Granted2024-04-11

    Guduadhar-1 Sand Deposit

    RAM SONI · Non-Coal Mining

  43. Category B1Standard ToR Granted2024-04-11

    Guduadhar-2 Sand Deposit

    RAM SONI · Non-Coal Mining

  44. Category B1Standard ToR Granted2024-04-11

    Pondi-1 Sand Deposit

    RAM SONI · Non-Coal Mining

  45. Category B1Standard ToR Granted2024-04-11

    Gotra-3 Sand Deposit

    RAM SONI · Non-Coal Mining

  46. Category B1TOR GRANTED2024-01-20

    Gotra - 2 Sand Deposit

    RAM SONI · Non-Coal Mining

  47. Category B1TOR GRANTED2024-01-20

    Gotra - 1 Sand Deposit

    RAM SONI · Non-Coal Mining

  48. Category B1TOR GRANTED2024-01-20

    Nidhipuri - 1 Sand Deposit

    RAM SONI · Non-Coal Mining

  49. Category B1TOR Granted2023-11-23

    HARDI CRUSHER STONE QUARRY

    GILL STONE CRUSHER · Non-Coal Mining

  50. Category B2EC Granted2023-11-09

    BHARUHI SAND DEPOSIT

    RAM SONI · Non-Coal Mining

  51. Category AEC Granted2023-10-16

    Expansion of Cement Plant - Clinker (3.0 to 7.0 Million TPA), Cement (3.5 to 8.0 Million TPA) along with installation of WHRS (32 MW) at Villages: Majhigawan, Kariyajhar, Malgaon, Piparaon and Dhaurhara, Tehsil: Rampur Naikin, District: Sidhi (Madhya Pradesh) by M/s. UltraTech Cement Ltd. (Unit: Sidhi Cement Works)

    UltraTech Cement Limited · Industrial Projects - 1

  52. Category B2EC Granted2023-07-19

    DOL-2 SAND DEPOSIT

    RAM SONI · Non-Coal Mining

  53. Category B2EC Granted2023-07-13

    PADRI SAND DEPOSIT

    RAM SONI · Non-Coal Mining

  54. Category B2EC Granted2023-07-13

    Pondi Sand Deposit

    RAM SONI · Non-Coal Mining

  55. Category B2EC Granted2023-07-13

    DOL SAND DEPOSIT

    RAM SONI · Non-Coal Mining

  56. Category B2EC Granted2023-07-13

    DALAPIPER SAND DEPOSIT

    RAM SONI · Non-Coal Mining

  57. Category AToR Granted2023-07-07declares affected families

    Gond Major Irrigation Project

    EEWRD SINGRAULI · River Valley and Hydroelectric Projects

  58. Category B1EC Granted2023-04-05

    Hardi Stone Quarry Project

    M/S A.K. STONE PRODUCTS · Non-Coal Mining

  59. Category B2EC Granted2023-02-09

    SHIKARGANJ SAND DEPOSIT QUARRY

    SAINIK INDUSTRIES PRIVATE LIMITED · Non-Coal Mining

  60. Category B1EC Granted2022-11-17

    1.04 Ha Naikin- 1 Bauxite & Fire Clay Mine

    SHRIKRISHANDASTIKARAM · Non-Coal Mining

All 60 proposals that name this district, newest first.