  1. 23 Oct 2026 · FiledSubmittedRamdiha Stone Quarry
  2. 22 Oct 2026 · FiledSubmittedMakrohar Stone Quarry
  3. 21 Oct 2026 · Details soughtEssential details soughtJhara Stone Quarry
  4. 19 Oct 2026 · DecidedTerms of Reference grantedExpansion of Aluminium Smelter from 3.98 LTPA to 7.96 LTPA and Captive Thermal Power Plant from 900 MW to…
  5. 17 Oct 2026 · Details soughtEssential details soughtExpansion of Suliyari Coal Mine from 6.0 MTPA to 7.0 MTPA (20% Phase II Expansion)
  6. 17 Oct 2026 · Details soughtAdditional details soughtHARRAHWAHA-4 SAND DEPOSIT
  7. 17 Oct 2026 · Details soughtAdditional details soughtORGAI-I SAND DEPOSIT
  8. 17 Oct 2026 · Details soughtAdditional details soughtORGAI-II SAND DEPOSIT
  9. 16 Oct 2026 · Details soughtAdditional details soughtExpansion of Aluminium Smelter from 3.98 LTPA to 7.96 LTPA and Captive Thermal Power Plant from 900 MW to…
  10. 9 Oct 2026 · DecidedEnvironmental clearance grantedPhulwari Stone Quarry
  11. 9 Oct 2026 · FiledSubmittedJhara Stone Quarry
  12. 7 Oct 2026 · DecidedEnvironmental clearance grantedPhulwari Stone Quarry

Dated by the portal's own appraisal history, converted to India Standard Time; a proposal with no recorded history appears on its register submission date.

Other clearances these proposals declare

Forest land diversion declared
24
Forest land sought for diversion
2,749 ha
Wildlife board recommendation declared
3
In or near a protected area
0
In an eco-sensitive zone
2

These counts are taken from the application forms of the 213 of 213 proposals naming this district whose forms have been read for these questions. In 86 of those forms at least one question was left blank, and a blank answer is counted as unknown. The forest area is the area stated for forest clearance, with each forest proposal counted once, in the district where its project is primarily sited.

Proposals naming this district
213
Category A proposals
57
Families declared displaced
41,991
Families declared affected
62,863

Displacement figures are the proponents’ own declarations. A project sited across several districts declares one figure for the whole project, and that figure is counted once, in the district where the project is primarily sited. 2 of the proposals listed below declare displacement and are sited primarily in another district, so their figures are counted in that district’s total.

Fifth Schedule status

Not within a Fifth Schedule Scheduled Area

This district was carved from Sidhi in 2008; the only part of Sidhi the Order names, the Kusmi tribal development block, stayed in Sidhi. C.O. 192 fixes its area by reference to territorial divisions as existing at 20 February 2003, and a district drawn later does not change the ground the Order scheduled. No part of the ground the Order scheduled passed to this district, so no part of it is a Scheduled Area under that Order. The Ministry of Panchayati Raj's list of notified Fifth Schedule Areas does not name it either.

OrderThe Scheduled Areas (States of Chhattisgarh, Jharkhand and Madhya Pradesh) Order, 2003 · C.O. 192, notified 2003-02-20

What the record shows

  • The Scheduled Tribe share here, 32.6%, is at least double the national figure of 8.55%.

  • Cultivators and agricultural labourers make up 75% of workers here, against 55% nationally, so at least three in four people who work here do so on the land.

  • Agricultural labourers, who work other people's land for wages, make up 46% of workers here. Compensation for acquired land is paid to those who hold title to it, so it does not reach them. They can still claim the rehabilitation and resettlement entitlements of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (RFCTLARR), because its section 3(c) counts a family whose livelihood depends on the land as an affected family, wherever that Act governs how the land is obtained.

  • Applicants for projects sited mainly in this district have declared 41,991 families to be displaced. The figure comes from their applications, and we have not verified it.

Each of these observations appears when a fixed rule is met by the figures on this page, so the same figures always give the same sentences. None of them is a view on whether a project should go ahead.

Who lives there

Figures from Census 2011, each compared with the all-India value computed on the same definition.

Total population
11,78,273
Households
2,43,925
Average household size
4.83
level with IndiaIndia
Scheduled Tribe share of population
32.6%
24.0 points above IndiaIndia
Scheduled Caste share of population
12.8%
3.9 points below IndiaIndia
Children aged 0-6
17.8%
4.2 points above IndiaIndia
Literacy rate
60.4%
12.6 points below IndiaIndia
Sex ratio
920
22.5 below India's 942.6India

What they live on

How the district's workers earn a living, from Census 2011. The land-dependent share counts cultivators and agricultural labourers as a share of all workers, and it is the group most directly affected when land is acquired.

Total workers
4,99,439
Work participation rate
42.4%
2.6 points above IndiaIndia
Workers dependent on land
75.3%
20.8 points above IndiaIndia
Cultivators
29.6%
4.9 points above IndiaIndia
Agricultural labourers
45.8%
15.8 points above IndiaIndia
Marginal workers
30.2%
5.5 points above IndiaIndia
Household industry workers
1.8%
2.0 points below IndiaIndia

How households live

Land, income and work among rural households, from the Socio Economic and Caste Census 2011, which recorded these where the population census did not. Only the survey's rural part is used here, so urban households do not appear.

Rural households owning land
38.8%
7.3 points below IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households whose highest earner makes over ₹5,000 a month
14.0%
10.4 points below IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households living mainly on manual casual labour
58.7%
6.9 points above IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households with a salaried member
4.4%
3.9 points below IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

When these were filed

Each proposal is dated by the first step in its appraisal history, the dated record of steps the portal keeps for it.

2023-Q22026-Q4

The timeline counts 169 of the 213 proposals here. The first filing date comes from each proposal's appraisal history, and we have not yet read it for the other 44, so they are left out. Most of them are older proposals, so the early part of the timeline undercounts what was filed then. The register itself records a date for each of them; the gap is in our copy of the histories.

Hatched columns undercount, so they cannot be compared with solid ones. 3 of them cover periods for which we have read few filing dates so far, and they count only the proposals whose date we have. 2026-Q4 was still running when the register was read, so its column counts only the filings made up to that date.

What kind of projects these are

The proposals naming this district, grouped by the sector each was filed under.

  • Non-Coal Mining 67.1%
  • Coal Mining 25.4%
  • Industrial Projects - 1 3.3%
  • Thermal Projects 1.9%
  • Other (3) 2.3%

The four largest sectors are shown by name and the rest are grouped as Other.

What is proposed here

These are the proposals in the national environmental clearance register whose application names a site in this district, newest first. A project with sites in several districts appears under each of them.

  1. Category B2Under Verification2026-10-23

    Ramdiha Stone Quarry

    ramdiha enterprises · Non-Coal Mining

  2. Category B1Under Examination2026-10-22

    Makrohar Stone Quarry

    UNITED COMPANY · Non-Coal Mining

  3. Category AProposal Accepted and Referred to EAC2026-10-17

    JHINGURDA OPENCAST COAL PROJECT

    NORTHERN COALFIELDS LTD. · Coal Mining

  4. Category B2EDS raised2026-10-09

    Jhara Stone Quarry

    DASHRATH GUPTA · Non-Coal Mining

  5. Category AEDS Raised2026-10-06declares affected families

    Expansion of Suliyari Coal Mine from 6.0 MTPA to 7.0 MTPA (20% Phase II Expansion)

    AP MINERAL DEVELOPMENT CORPORATION · Coal Mining

  6. Category B1ADS Raised2026-08-24

    Karami Stone Quarry of Shri Sandeep garg

    SANDEEP GARG · Non-Coal Mining

  7. Category B1Standard ToR Granted2026-08-21

    Proposed 2.48 MTPA Coal Washery Project by Mahavir Coal Resources Private Limited (Unit-II)

    MAHAVIR COAL RESOURCES PRIVATE LIMITED · Coal Mining

  8. Category B1Referred to SEAC2026-08-19

    Gadariya Stone Quarry

    MANISH AGRAWAL · Non-Coal Mining

  9. Category AToR Granted2026-07-22

    Setting up a Mineral Processing and Metal Recovery unit of 6000 TPD (Phase 1: 1500 TPD, Phase 2: 1500 TPD, Phase 3: 3000 TPD) including supportive infrastructure by M/s Kundan Gold Mines Private Limited

    KUNDAN GOLD MINES PRIVATE LIMITED · Industrial Projects - 1

  10. Category AForwarded to MS SPCB/PCC by MS2026-07-20declares affected families

    Development of Vindhya Expressway

    UTTAR PRADESH EXPRESSWAYS INDUSTRIAL DEVELOPMENT AUTHORITY (UPEIDA) · INFRA-1

  11. Category B1Forwarded to MS SPCB/PCC by MS2026-07-16

    Piparwan Stone Quarry

    MAA AMBA enterprises · Non-Coal Mining

  12. Category AForwarded to MS SPCB/PCC by MS2026-07-03declares affected families

    Jayant Opencast Project

    NORTHERN COALFIELDS LIMITED · Coal Mining

  13. Category AProposal returned in present form2026-06-30

    Setting up a Mineral Processing and Metal Recovery unit of 6000 TPD (Phase 1: 1500 TPD, Phase 2: 1500 TPD, Phase 3: 3000 TPD) including supportive infrastructure by M/s Kundan Gold Mines Private Limited

    KUNDAN GOLD MINES PRIVATE LIMITED · Industrial Projects - 1

  14. Category B1ADS Raised2026-06-26

    ORGAI-I SAND DEPOSIT

    YODHA UMARE · Non-Coal Mining

  15. Category B1ADS Raised2026-06-26

    HARRAHWAHA-4 SAND DEPOSIT

    YODHA UMARE · Non-Coal Mining

  16. Category B1ADS Raised2026-06-26

    ORGAI-II SAND DEPOSIT

    YODHA UMARE · Non-Coal Mining

  17. Category B1Referred to SEAC2026-06-26

    Piprakurund-2 Sand Deposit

    YODHA UMARE · Non-Coal Mining

  18. Category AEC Granted2026-06-24declares affected families

    Block-B Expansion OCP Project

    BLOCK-B PROJECT NORTHERN COALFIELDS LIMITED · Coal Mining

  19. Category AEC Granted2026-06-04declares affected families

    Amelia Coal Mine Project

    THDC INDIA LIMITEDSINGRAULI · Coal Mining

  20. Category B1Standard ToR Granted2026-06-02

    Katheri Stone Quarry

    SURENDER SINGH · Non-Coal Mining

  21. Category AForwarded to MS SPCB/PCC by MS2026-05-28

    Expansion of Aluminium Smelter from 3.98 LTPA to 7.96 LTPA and Captive Thermal Power Plant from 900 MW to 1500 MW at Villages: Gidher, Orgari, Dhaurar, Barainia, Badokhar, Daga, Tehsil: Bargawan, District: Singrauli (Madhya Pradesh) by M/s. Hindalco Industries Limited (Unit: Mahan Aluminium)

    HINDALCO INDUSTRIES LIMITED · Industrial Projects - 1

  22. Category AProposal returned in present form2026-05-22

    Setting up a Mineral Processing and Metal Recovery unit of 6000 TPD (Phase 1: 1500 TPD, Phase 2: 1500 TPD, Phase 3: 3000 TPD) including supportive infrastructure by M/s Kundan Gold Mines Private Limited

    KUNDAN GOLD MINES PRIVATE LIMITED · Industrial Projects - 1

  23. Category B1Referred to SEAC2026-05-08

    HARRAHWAHA-3 SAND DEPOSIT

    YODHA UMARE · Non-Coal Mining

  24. Category AEC Granted2026-05-01

    Bina Expansion Opencast project

    NORTHERN COALFIELDS LTD. · Coal Mining

  25. Category B1Proposal pulled back (withdrawn)2026-04-24

    Setting up a Mineral Processing and Metal Recovery unit of 1500 TPD (Phase 1: 500 TPD, Phase 2: 1000 TPD) including supportive infrastructure by M/s Kundan Gold Mines Private Limited

    KUNDAN GOLD MINES PRIVATE LIMITED · Industrial Projects - 1

  26. Category B1ToR Granted2026-04-09

    "Gurhar Pahar Gold Block" (ML area-149.30 Ha) by M/s Kundan Gold Mines Private Limited.

    KUNDAN GOLD MINES PRIVATE LIMITED · Non-Coal Mining

  27. Category B1EC Granted2026-04-02

    Phulwari Stone Quarry

    viral varshekar · Non-Coal Mining

  28. Category B1EC Granted2026-04-02

    Phulwari Stone Quarry

    saral vershekar · Non-Coal Mining

  29. Category AEC Granted2026-03-30

    4 Million Tons Per Annum (MTPA) Coal washery

    RAIPUR COAL FEEDER PRIVATE LIMITED · Coal Mining

  30. Category B2Referred to SEIAA2026-03-09

    Bargawan Murrum Quarry

    divya singh · Non-Coal Mining

  31. Category B1EC Granted2026-02-27

    Katheri Stone Quarry

    SEEMA JAISWAL · Non-Coal Mining

  32. Category B1EC Granted2026-02-27

    Katheri Stone Quarry

    SADAN JAYSWAL · Non-Coal Mining

  33. Category B1Standard ToR Granted2026-02-03

    Badkud Stone Quarry

    B AGRAWAL & CO. · Non-Coal Mining

  34. Category B1Standard ToR Granted2026-02-02

    Badkud Stone Quarry

    nagendra pratap singh · Non-Coal Mining

  35. Category B1Standard ToR Granted2026-02-02

    Badkud Stone Quarry

    archana singh · Non-Coal Mining

  36. Category AToR Granted2026-01-14

    Khadia Expansion Opencast Project

    Northern Coalfields Ltd. (NCL) · Coal Mining

  37. Category B1Standard ToR Granted2026-01-08

    Phulwari Stone quarry

    SHANKER VAISHYA · Non-Coal Mining

  38. Category B1Forwarded to MS SPCB/PCC by MS2026-01-06

    Singrawal Stone Quarry

    SHANKER VAISHYA · Non-Coal Mining

  39. Category AEC Granted2025-12-16

    Jayant Expansion Project

    NORTHERN COALFIELDS LIMITED · Coal Mining

  40. Category AEC Granted2025-12-12

    Mahan Underground Coal mine

    J K CEMENT LIMITED · Coal Mining

  41. Category B1ToR Rejected2025-11-17

    Environmental Clearance for the Proposed JPVL Coal Washery Plant

    JAIPRAKASH POWER VENTURES LIMITED · Coal Mining

  42. Category B1EC Granted2025-11-06

    Karami Stone (Gitti) Quarry

    SARIKA ALAWA · Non-Coal Mining

  43. Category AToR Granted2025-10-30

    Proposed Coal Washery Plant of 2.5 MTPA Capacity of Alpha Coal Benefication and Infrastructure LLP at Pidartali Industrial Area, District - Singrauli, Madhya Pradesh

    ALPHA COAL BENEFICATION AND INFRASTRUCTURE LLP · Coal Mining

  44. Category AToR Granted2025-10-09declares affected families

    Gond Major Irrigation Project

    EEWRD SINGRAULI · River Valley and Hydroelectric Projects

  45. Category B1ToR Granted2025-09-28declares affected families

    SITAPUR-HANUMANA MICRO IRRIGATION PROJECT

    BHAGWAAN DUTT TIWARI · River Valley and Hydroelectric Projects

  46. Category B1Standard ToR Granted2025-09-18

    Jhara Stone Quarry

    SHYAMLAL JAYSWAL · Non-Coal Mining

  47. Category AEC Granted2025-09-11

    GONDBAHERA UJHENI EAST COAL MINE

    MAHAN ENERGEN LIMITED · Coal Mining

  48. Category B1Standard ToR Granted2025-09-09

    Phulwari Stone Quarry

    viral varshekar · Non-Coal Mining

  49. Category B1Proposal pulled back (withdrawn)2025-09-06

    Setting up a Mineral Processing and Metal Recovery unit of 3000 TPD (Phase 1: 500 TPD, Phase 2: 1000 TPD, Phase 3: 1500 TPD) including supportive infrastructure by M/s Kundan Gold Mines Private Limited

    KUNDAN GOLD MINES PRIVATE LIMITED · Industrial Projects - 1

  50. Category AProposal returned in present form2025-09-06

    Proposed Coal Washery Plant of 2.5 MTPA Capacity of Alpha Coal Benefication and Infrastructure LLP at Pidartali Industrial Area, District - Singrauli, Madhya Pradesh

    ALPHA COAL BENEFICATION AND INFRASTRUCTURE LLP · Coal Mining

  51. Category B1Standard ToR Granted2025-09-05

    Phulwari Stone Quarry

    saral vershekar · Non-Coal Mining

  52. Category AProposal returned in present form2025-07-21

    4 Million Tons Per Annum (MTPA) Coal washery

    RAIPUR COAL FEEDER PRIVATE LIMITED · Coal Mining

  53. Category AToR Granted2025-07-09

    Mahan Underground Coal mine

    J K CEMENT LIMITED · Coal Mining

  54. Category AProposal returned in present form2025-07-04

    Proposed Coal Washery Plant of 2.5 MTPA Capacity of Alpha Coal Benefication and Infrastructure LLP at Pidartali Industrial Area, District - Singrauli, Madhya Pradesh

    ALPHA COAL BENEFICATION AND INFRASTRUCTURE LLP · Coal Mining

  55. Category B1EC Granted2025-07-02

    Daga Stone Quarry

    bhaiya lal infrastructure private limited · Non-Coal Mining

  56. Category AGranted2025-07-02declares affected families

    Dhirauli Coal Mine Project of Opencast cum Underground of 6.5 MTPA (5 MTPA OC & 1.5 MTPA UG) in mine lease area of 2672 Ha

    STRATATECH MINERAL RESOURCES PRIVATE LIMITED · Coal Mining

  57. Category AEC Granted2025-06-16declares affected families

    Bandha Coal Mine

    EMIL MINES AND MINERAL RESOURCES LIMITED · Coal Mining

  58. Category B1Standard ToR Granted2025-06-07

    Singrawal Stone Quarry

    SINGRAULI MINERAL PRODUCTS PRIVATE LIMITED · Non-Coal Mining

  59. Category B2EC Granted2025-05-26

    Parasi Stone Mine

    SANTOSH KUMAR JAISWAL · Non-Coal Mining

  60. Category B1EC Rejected2025-05-13

    Environmental Clearance for the Proposed JPVL Coal Washery Plant

    JAIPRAKASH POWER VENTURES LIMITED · Coal Mining

  61. Category B1Standard ToR Granted2025-05-07

    Gadariya Metal Stone Deposit Of M/s Global Infrastructure

    GLOBAL INFRASTRUCTURE · Non-Coal Mining

  62. Category B1Withdrawal Request Accepted2025-05-05

    Setting up a Gold Concentrate unit 3000 TPD (Phase 1: 500 TPD, Phase 2: 1000 TPD, Phase 3 : 1500 TPD) and Mineral Processing unit including supportive Infrastructure by M/s Kundan Gold Mines Private Limited

    KUNDAN GOLD MINES PRIVATE LIMITED · Industrial Projects - 1

  63. Category B2EC Granted2025-05-01

    Phulwari Stone Quarry

    ramsumer vaishy · Non-Coal Mining

  64. Category B1EC Rejected2025-04-29

    HARRAHWAHA-4 SAND DEPOSIT

    YODHA UMARE · Non-Coal Mining

  65. Category B1EC Rejected2025-04-29

    Piprakurund-2 Sand Deposit

    YODHA UMARE · Non-Coal Mining

  66. Category B1EC Rejected2025-04-29

    ORGAI-II SAND DEPOSIT

    YODHA UMARE · Non-Coal Mining

  67. Category B1Referred to SEAC2025-04-29

    Khajuri Sand Deposit

    YODHA UMARE · Non-Coal Mining

  68. Category B1Referred to SEAC2025-04-29

    Bhudkud-2 Sand Deposit

    YODHA UMARE · Non-Coal Mining

  69. Category B1EC Rejected2025-04-29

    ORGAI-I SAND DEPOSIT

    YODHA UMARE · Non-Coal Mining

  70. Category B1Pending at MS SEIAA2025-04-29

    Nigri Sand Deposit

    YODHA UMARE · Non-Coal Mining

  71. Category B1Referred to SEAC2025-04-29

    Bhudkud - 1 Sand Deposit

    YODHA UMARE · Non-Coal Mining

  72. Category B1Standard ToR Granted2025-04-29

    Katheri Stone Quarry

    SADAN JAYSWAL · Non-Coal Mining

  73. Category B1Standard ToR Granted2025-04-28

    Semariya Stone Quarry

    GYANENDRA BISEN · Non-Coal Mining

  74. Category B1EC Rejected2025-04-23

    Mauhariya Stone Quarry

    VAISHALI BAGHEL · Non-Coal Mining

  75. Category B2EC Rejected2025-04-22

    DAGA MURAM DEPOSIT

    PRAVEEN SINGH · Non-Coal Mining

  76. Category B1Standard ToR Granted2025-04-21

    Ukhrawal Metal Stone Deposit of Shri Amit Dwivedi

    AMIT DWIVEDI · Non-Coal Mining

  77. Category B1Standard ToR Granted2025-04-20

    Gadariya Stone Quarry

    RASHMI DWIVEDI · Non-Coal Mining

  78. Category B1Standard ToR Granted2025-04-17

    Semariya Stone Quarry

    SATTENDRA BAGHEL · Non-Coal Mining

  79. Category AToR Granted2025-04-17

    GONDBAHERA UJHENI EAST COAL MINE

    MAHAN ENERGEN LIMITED · Coal Mining

  80. Category B1Standard ToR Granted2025-04-14

    Jhara Stone Quarry

    SHYAMLAL JAYSWAL · Non-Coal Mining

  81. Category B1Standard ToR Granted2025-04-12

    Katheri Stone Quarry

    SEEMA JAISWAL · Non-Coal Mining

  82. Category B1Standard ToR Granted2025-04-04

    MAA ADI SHAKTI STONE CRUSHER

    MAA AADISHAKTI STONE CRUSHER · Non-Coal Mining

  83. Category B1Standard ToR Granted2025-03-22

    Karami Stone (Gitti) Quarry

    SARIKA ALAWA · Non-Coal Mining

  84. Category B1Standard ToR Granted2025-03-22

    Mahugadi Pawai Stone Quarry

    RADHA JAISWAL · Non-Coal Mining

  85. Category B1EC Granted2025-03-20

    Karami Stone Quarry

    RUDRA GUPTA · Non-Coal Mining

  86. Category B1EC Granted2025-03-12

    Piprakurund-1 Sand Deposit

    YODHA UMARE · Non-Coal Mining

  87. Category B1Standard ToR Granted2025-03-11

    Karami Stone Quarry

    KAMLESH SINGH · Non-Coal Mining

  88. Category B2EC Granted2025-02-20

    Gadariya Stone Quarry M/s Gloabal Infrastructure Ltd.

    GLOBAL INFRASTRUCTURE · Non-Coal Mining

  89. Category B1Standard ToR Granted2025-02-05

    Karami Stone Quarry of Shri Sandeep garg

    SANDEEP GARG · Non-Coal Mining

  90. Category AEC Granted2025-02-05declares affected families

    Block-B Expansion OCP Project

    BLOCK-B PROJECT NORTHERN COALFIELDS LIMITED · Coal Mining

  91. Category B1EC Granted2025-01-18

    Chakariya Gold Block

    GARIMA NATURAL RESOURCES PRIVATE LIMITED · Non-Coal Mining

  92. Category B1Pending at MS SEIAA2025-01-17

    Karami Stone (Gitti) Quarry

    BHRIGU GUPTA · Non-Coal Mining

  93. Category B1Standard ToR Granted2025-01-11

    Daga Stone Quarry

    bhaiya lal infrastructure private limited · Non-Coal Mining

  94. Category AEC Granted2025-01-10

    Proposed Expansion of Bandhaura Thermal Power Plant under Phase–III by adding 1600 (2x800) MW Ultra Super Critical TPP to Existing 2800 (1200+1600) MW Ph-I & Ph-II within the existing plant boundary of Thermal Power Plant at District Singrauli, Madhya Pradesh by Mahan Energen Limited (MEL)

    MAHAN ENERGEN LIMITED · Thermal Projects

  95. Category AEC Granted2024-12-06declares affected families

    Nigahi Opencast Project

    NIGAHI PROJECT NORTHERN COALFIELDS LIMITED · Coal Mining

  96. Category AEC Granted2024-12-04

    Gondbahera Ujheni Underground Coal mine

    MP NATURAL RESOURCES PRIVATE LIMITED · Coal Mining

  97. Category AEC Granted2024-11-16declares affected families

    Suliyari Coal Mine (Expansion from 5.0 MTPA to 7.0 MTPA)

    AP MINERAL DEVELOPMENT CORPORATION · Coal Mining

  98. Category AGranted2024-10-25

    Transfer of Environment Clearance (EC), EC amendment and EC for Expansion granted by MoEF&CC, New Delhi for Wet Type Coal Washery Project based on Heavy Media Cyclone at village Gorbi, Tehsil Chitrangi, District Singrauli, (Madhya Pradesh) from M/s R.K. Transport & Constructions Ltd. to M/s Cosmos Iron and Power Private Limited

    COSMOS IRON AND POWER PRIVATE LIMITED · Coal Mining

  99. Category AToR Granted2024-10-24

    Bina Expansion Opencast project

    NORTHERN COALFIELDS LTD. · Coal Mining

  100. Category B1ToR Granted2024-10-22

    "Gurhar Pahar Gold Block" (ML area-149.30 Ha) by M/s Kundan Gold Mines Private Limited.

    KUNDAN GOLD MINES PRIVATE LIMITED · Non-Coal Mining