Jhabua, Madhya Pradesh
Recent activity
All 6 in the last 60 days- 21 Oct 2026 · Details soughtEssential details soughtBheemfaliya Stone (Murrum & Gitti) Mine, Area- 1.590hac.
- 20 Oct 2026 · Details soughtEssential details suppliedProposed Complex Fertilizer, Phosphoric Acid, Sulphuric Acid (98%) and Beneficiation of Rock Phosphate…
- 7 Oct 2026 · FiledSubmittedBheemfaliya Stone (Murrum & Gitti) Mine, Area- 1.590hac.
- 5 Oct 2026 · FiledSubmittedProposed Secured Landfill Facility (13,79,380 m3) at Plot No. 67, Kasarbardi Industrial Estate, Village…
- 5 Oct 2026 · FiledSubmittedProposed Complex Fertilizer, Phosphoric Acid, Sulphuric Acid (98%) and Beneficiation of Rock Phosphate…
- 9 Sept 2026 · Details soughtAdditional details soughtGadwadi Stone Mine-2.0ha
Dated by the portal's own appraisal history, converted to India Standard Time; a proposal with no recorded history appears on its register submission date.
Other clearances these proposals declare
- Forest land diversion declared
- 0
- Forest land sought for diversion
- None declared
- Wildlife board recommendation declared
- 0
- In or near a protected area
- 0
- In an eco-sensitive zone
- 0
These counts are taken from the application forms of the 46 of 46 proposals naming this district whose forms have been read for these questions. In 14 of those forms at least one question was left blank, and a blank answer is counted as unknown. The forest area is the area stated for forest clearance, with each forest proposal counted once, in the district where its project is primarily sited.
- Proposals naming this district
- 46
- Category A proposals
- 5
- Families declared displaced
- None declared
- Families declared affected
- None declared
Displacement figures are the proponents’ own declarations. A project sited across several districts declares one figure for the whole project, and that figure is counted once, in the district where the project is primarily sited.
Fifth Schedule status
Within a Fifth Schedule Scheduled Area
The Order fixes the area by reference to territorial divisions as existing at 20 February 2003. It names this district as a whole.
OrderThe Scheduled Areas (States of Chhattisgarh, Jharkhand and Madhya Pradesh) Order, 2003 · C.O. 192, notified 2003-02-20
What the record shows
Half or more of the people counted here in 2011 were Scheduled Tribe: 87.0%, against 8.55% nationally.
Cultivators and agricultural labourers make up 86% of workers here, against 55% nationally, so at least three in four people who work here do so on the land.
Literacy was 43.3% in 2011 against 72.98% nationally, so notices and documents issued in writing during a consultation may reach fewer people here.
This district is a Fifth Schedule Scheduled Area. Under section 41(3) of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (RFCTLARR), land here can be acquired only with the prior consent of the Gram Sabha, and the requirement holds even when an acquisition is urgent.
46 clearance proposals name this district, where 87% of people are Scheduled Tribe and 86% of workers depend on the land. 5 of those proposals are Category A, the class the central government appraises.
Each of these observations appears when a fixed rule is met by the figures on this page, so the same figures always give the same sentences. None of them is a view on whether a project should go ahead.
Who lives there
Figures from Census 2011, each compared with the all-India value computed on the same definition.
- Total population
- 10,25,048
- Households
- 1,94,157
- Average household size
- 5.28
- 0.43 above India's 4.85India
- Scheduled Tribe share of population
- 87.0%
- 78.5 points above IndiaIndia
- Scheduled Caste share of population
- 1.7%
- 14.9 points below IndiaIndia
- Children aged 0-6
- 20.7%
- 7.1 points above IndiaIndia
- Literacy rate
- 43.3%
- 29.7 points below IndiaIndia
- Sex ratio
- 990
- 47.7 above India's 942.6India
What they live on
How the district's workers earn a living, from Census 2011. The land-dependent share counts cultivators and agricultural labourers as a share of all workers, and it is the group most directly affected when land is acquired.
- Total workers
- 5,15,121
- Work participation rate
- 50.3%
- 10.5 points above IndiaIndia
- Workers dependent on land
- 86.4%
- 31.8 points above IndiaIndia
- Cultivators
- 63.9%
- 39.3 points above IndiaIndia
- Agricultural labourers
- 22.5%
- 7.5 points below IndiaIndia
- Marginal workers
- 28.1%
- 3.3 points above IndiaIndia
- Household industry workers
- 1.0%
- 2.8 points below IndiaIndia
How households live
Land, income and work among rural households, from the Socio Economic and Caste Census 2011, which recorded these where the population census did not. Only the survey's rural part is used here, so urban households do not appear.
- Rural households owning land
- 69.7%
- 23.5 points above IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
- Rural households whose highest earner makes over ₹5,000 a month
- 8.9%
- 15.5 points below IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
- Rural households living mainly on manual casual labour
- 33.6%
- 18.1 points below IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
- Rural households with a salaried member
- 3.0%
- 5.3 points below IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
When these were filed
Each proposal is dated by the first step in its appraisal history, the dated record of steps the portal keeps for it.
The timeline counts 30 of the 46 proposals here. The first filing date comes from each proposal's appraisal history, and we have not yet read it for the other 16, so they are left out. Most of them are older proposals, so the early part of the timeline undercounts what was filed then. The register itself records a date for each of them; the gap is in our copy of the histories.
Hatched columns undercount, so they cannot be compared with solid ones. 2 of them cover periods for which we have read few filing dates so far, and they count only the proposals whose date we have. 2026-Q4 was still running when the register was read, so its column counts only the filings made up to that date.
What kind of projects these are
The proposals naming this district, grouped by the sector each was filed under.
- Non-Coal Mining 67.4%
- Industrial Projects - 3 19.6%
- Industrial Projects - 1 8.7%
- INFRA-2 4.3%
The four largest sectors are shown by name and the rest are grouped as Other.
What is proposed here
These are the proposals in the national environmental clearance register whose application names a site in this district, newest first. A project with sites in several districts appears under each of them.
- Category AForwarded to MS SPCB/PCC by MS2026-10-23
Proposed Complex Fertilizer, Phosphoric Acid, Sulphuric Acid (98%) and Beneficiation of Rock Phosphate manufacturing unit coming up at MPIDC Meghnagar, District Jhabua (Madhya Pradesh)
Madhyabharat phosphate pRIvate Limited · Industrial Projects - 3
- Category B2EDS raised2026-10-07
Bheemfaliya Stone (Murrum & Gitti) Mine, Area- 1.590hac.
LATA MERAWAT · Non-Coal Mining
- Category B1Under Verification2026-10-05
Proposed Secured Landfill Facility (13,79,380 m3) at Plot No. 67, Kasarbardi Industrial Estate, Village Kasarbardi, Tehsil Petlawad, District Jhabua, Madhya Pradesh.
GSEC WASTE MANAGEMENT SOLUTIONS PRIVATE LIMITED · INFRA-2
- Category B1Referred to SEIAA2026-04-28
M/s Devansh Trading Company
DEVANSH TRADING COMPANY · Industrial Projects - 3
- Category B1Referred to SEAC2026-03-13
Gadwadi Stone Mine-2.0ha
NEELAM ASADA · Non-Coal Mining
- Category B2EC Granted2026-03-02
KACHROTIYA STONE & M-SAND MINE
Mahendra singh rathore · Non-Coal Mining
- Category B1Forwarded to MS SPCB/PCC by MS2026-02-11
M/s Devansh Trading Company
DEVANSH TRADING COMPANY · Industrial Projects - 3
- Category B1Standard ToR Granted2026-01-17
Navapada Stone Mine (making for M-sand)
REKHA MERAWAT · Non-Coal Mining
- Category AStandard ToR Granted2026-01-12
Proposed Complex Fertilizer, Phosphoric Acid, Sulphuric Acid (98%) and Beneficiation of Rock Phosphate manufacturing unit coming up at MPIDC Meghnagar, District Jhabua (Madhya Pradesh)
Madhyabharat phosphate pRIvate Limited · Industrial Projects - 3
- Category B2EC Granted2025-10-18
Kaldela Stone Quarry
VAIBHAV · Non-Coal Mining
- Category B1EC Granted2025-10-13
BHEEMFALIYA STONE & MURRUM MINE
PRITAM KATARA · Non-Coal Mining
- Category AStandard ToR Granted2025-09-09
Proposed Complex Fertilizer, Phosphoric Acid, Sulphuric Acid (98%) and Beneficiation of Rock Phosphate manufacturing unit coming up at MPIDC Meghnagar, District Jhabua (Madhya Pradesh)
Madhyabharat phosphate pRIvate Limited · Industrial Projects - 3
- Category B2EC Granted2025-06-30
Dhamnichhoti Stone Quarry(Temporary Permit)
HARDIK CONSTRUCTION COMPANY · Non-Coal Mining
- Category B1EC Granted2025-06-19
Proposed Expansion of existing synthetic organic chemicals unit, M/s Vini Industries at Plot No 125 AKVN Industrial Estate- Meghnagar, District Jhabua (MP).
VINI INDUSTRIES · Industrial Projects - 3
- Category B2EC Granted2025-06-11
PIPALDEHLA STONE QUARRY (Lease Owner - Surpal Singh Ajnar)
SURPAL SINGH AJNAR · Non-Coal Mining
- Category B1Standard ToR Granted2025-05-08
PIPALDEHLA STONE MINE-2.30HA
RAVI DODIYAR · Non-Coal Mining
- Category B1Standard ToR Granted2025-04-17
NAVAPADA STONE MINE-1.0ha,( Production-9,336.35Cum/Year)
ALKESH BAKALIYA · Non-Coal Mining
- Category B1Standard ToR Granted2025-04-17
NAVAPADA STONE MINE-1.0ha,( Production-25,650Cum/Year)
ALKESH BAKALIYA · Non-Coal Mining
- Category B1Standard ToR Granted2025-03-17
Gadwadi Stone Mine-2.0ha
NEELAM ASADA · Non-Coal Mining
- Category B1Standard ToR Granted2025-02-07
BHEEMFALIYA STONE & MURRUM MINE
PRITAM KATARA · Non-Coal Mining
- Category B1Standard ToR Granted2025-02-06
Proposed Secured Landfill Facility (13,79,380 m3) at Plot No. 67, Kasarbardi Industrial Estate, Village Kasarbardi, Tehsil Petlawad, District Jhabua, Madhya Pradesh.
GSEC WASTE MANAGEMENT SOLUTIONS PRIVATE LIMITED · INFRA-2
- Category B1Pending at MS SEIAA2025-01-24
Rock Phosphate Beneficiation Plant (77 TPH)
SAMRUDDHA MINECHEM PRIVATE LIMITED · Industrial Projects - 1
- Category AStandard ToR Granted2024-10-14
Expansion of Ferro Alloy plant from 13,200 TPA (1 x 7 MVA SEAF) to 39,600 TPA (1 x 9 MVA SEAF & 1 x 12 MVA SEAF) with combination of Si-Mn (not exceeding 26400 TPA), Fe-Mn (not exceeding 13200 TPA), Fe-Cr(not exceeding 6600TPA) and Fe-Si (not exceeding 8400TPA) along with new installation of Pig Iron Unit (36000 TPA), Sinter plant (72000 TPA), Coke oven (100000 TPA), Captive Power Plant (9 MW), Cement Plant (25000 TPA) & Electrolytic Manganese Dioxide (3360 TPA)
SMO FERRO ALLOYS PRIVATE LIMITED · Industrial Projects - 1
- Category B1ToR Granted2024-05-09
Proposed Expansion of existing synthetic organic chemicals unit, M/s Vini Industries at Plot No 125 AKVN Industrial Estate- Meghnagar, District Jhabua (MP).
VINI INDUSTRIES · Industrial Projects - 3
- Category B2Pending at MS SEIAA2024-04-06
Anantkhedi M-Sand Mine
SHREE AMBE STONE CRUSHER MEGHNAGAR · Non-Coal Mining
- Category B2Under Verification2024-03-22
Anantkhedi M-Sand Mine
SHREE AMBE STONE CRUSHER MEGHNAGAR · Non-Coal Mining
- Category B1Pending at MS SEIAA2024-02-21
Proposed Project for Manufacturing of Active Pharmaceutical Ingredients and Intermediates by Eshyasi Pharma Limited
ESHYASI PHARMA LIMITED · Industrial Projects - 3
- Category B1ToR Granted2024-01-17
NAVAPADA STONE MINE
BABU SINGH · Non-Coal Mining
- Category B1Standard ToR Granted2024-01-17
Rock Phosphate Beneficiation Plant (77 TPH)
SAMRUDDHA MINECHEM PRIVATE LIMITED · Industrial Projects - 1
- Category B2EC Granted2023-12-20
Bheemfaliya Stone Mine
LATA MERAWAT · Non-Coal Mining
- Category B1TOR Granted2023-12-15
Devjhiripanda Stone Mine
KRISHNA STONE CRUSHER · Non-Coal Mining
- Category B2EC Granted2023-12-14
ANANTKHEDI STONE & M-SAND MINE
SHREE AMBE STONE CRUSHER MEGHNAGAR · Non-Coal Mining
- Category B2EC Granted2023-12-12
DUNGARA STONE (GITTI), M-SAND & MURRAM QUARRY
JAGDISH PRAJAPAT · Non-Coal Mining
- Category B2EC Granted2023-12-11
Madalda Crusher Stone Mine
ANIL YADAV · Non-Coal Mining
- Category B2EC Granted2023-12-05
RAMPURIYA STONE MINE
HANUMAN MEHTA · Non-Coal Mining
- Category B1TOR Granted2023-12-04
Pipaldehla Stone Mine
RAJKUMAR JAIN · Non-Coal Mining
- Category B1TOR Granted2023-12-04
Hadmatiya Stone Mine
NEELAM ASADA · Non-Coal Mining
- Category B2EC Granted2023-11-16
Dungra Stone Mine
HARISH CHOUHAN · Non-Coal Mining
- Category B2EC Granted2023-10-18
Bheemfaliya Crusher Stone Mine
ALKESH BAKALIYA · Non-Coal Mining
- Category B1TOR Granted2023-10-06
Proposed Project for Manufacturing of Active Pharmaceutical Ingredients and Intermediates by Eshyasi Pharma Limited
ESHYASI PHARMA LIMITED · Industrial Projects - 3
- Category B2EC Granted2023-08-11
KAMALKHEDA STONE MINE
RAMNIK PATEL · Non-Coal Mining
- Category AGranted2023-07-15
Ferro alloy plant (3 x 7 MVA) for production of 13,200 TPA of Ferro manganese, 13,200 TPA of silicon manganese and 6600 TPA of Ferro chrome
SMO FERRO ALLOYS PRIVATE LIMITED · Industrial Projects - 1
- Category B1EC Granted2023-03-30
ANANTKHEDI STONE DEPOSIT
MULASHANKAR LOHAR · Non-Coal Mining
- Category B2EC Granted2023-03-14
PILIYA KHADAN STONE MINE
RITU SHRIDHAR · Non-Coal Mining
- Category B1EC Granted2022-11-18
“Pipaldehla Stone Deposit of Shri Ankit Gupta”
ANKIT GUPTA · Non-Coal Mining
- Category B1EC Granted2022-11-12
37.70 ha Jhabua Rock Phosphate Mine
THE MADHYA PRADESH STATE MINING CORPORATION LTD. · Non-Coal Mining
All 46 proposals that name this district, newest first.