Nanded, Maharashtra
Recent activity
All 0 in the last 60 daysNo proposal naming this district recorded a step between 30 Aug 2026 and 28 Oct 2026.
Dated by the portal's own appraisal history, converted to India Standard Time; a proposal with no recorded history appears on its register submission date.
Other clearances these proposals declare
- Forest land diversion declared
- 2
- Forest land sought for diversion
- Area not stated
- Wildlife board recommendation declared
- 0
- In or near a protected area
- 0
- In an eco-sensitive zone
- 0
These counts are taken from the application forms of the 197 of 197 proposals naming this district whose forms have been read for these questions. In 126 of those forms at least one question was left blank, and a blank answer is counted as unknown. The forest area is the area stated for forest clearance, with each forest proposal counted once, in the district where its project is primarily sited.
- Proposals naming this district
- 197
- Category A proposals
- 6
- Families declared displaced
- None declared
- Families declared affected
- None declared
Displacement figures are the proponents’ own declarations. A project sited across several districts declares one figure for the whole project, and that figure is counted once, in the district where the project is primarily sited.
Fifth Schedule status
Partly within a Fifth Schedule Scheduled Area
The Order fixes the area by reference to territorial divisions as existing at 2 December 1985. It names only part of this district, so district-level status cannot settle whether a particular site is inside it.
OrderThe Scheduled Areas (Maharashtra) Order, 1985 · C.O. 123, notified 1985-12-02
What the record shows
Agricultural labourers, who work other people's land for wages, make up 42% of workers here. Compensation for acquired land is paid to those who hold title to it, so it does not reach them. They can still claim the rehabilitation and resettlement entitlements of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (RFCTLARR), because its section 3(c) counts a family whose livelihood depends on the land as an affected family, wherever that Act governs how the land is obtained.
Part of this district is a Fifth Schedule Scheduled Area. Acquiring land for a project sited in that part needs the Gram Sabha's prior consent under section 41(3) of RFCTLARR, and the district-level record cannot settle whether a particular site lies there.
Each of these observations appears when a fixed rule is met by the figures on this page, so the same figures always give the same sentences. None of them is a view on whether a project should go ahead.
Who lives there
Figures from Census 2011, each compared with the all-India value computed on the same definition.
- Total population
- 33,61,292
- Households
- 6,65,434
- Average household size
- 5.05
- 0.20 above India's 4.85India
- Scheduled Tribe share of population
- 8.4%
- 0.2 points below IndiaIndia
- Scheduled Caste share of population
- 19.1%
- 2.4 points above IndiaIndia
- Children aged 0-6
- 13.7%
- 0.1 points above IndiaIndia
- Literacy rate
- 75.5%
- 2.5 points above IndiaIndia
- Sex ratio
- 943
- 0.30 above India's 942.6India
What they live on
How the district's workers earn a living, from Census 2011. The land-dependent share counts cultivators and agricultural labourers as a share of all workers, and it is the group most directly affected when land is acquired.
- Total workers
- 14,93,953
- Work participation rate
- 44.5%
- 4.7 points above IndiaIndia
- Workers dependent on land
- 72.3%
- 17.8 points above IndiaIndia
- Cultivators
- 30.0%
- 5.4 points above IndiaIndia
- Agricultural labourers
- 42.3%
- 12.4 points above IndiaIndia
- Marginal workers
- 11.8%
- 12.9 points below IndiaIndia
- Household industry workers
- 2.0%
- 1.9 points below IndiaIndia
How households live
Land, income and work among rural households, from the Socio Economic and Caste Census 2011, which recorded these where the population census did not. Only the survey's rural part is used here, so urban households do not appear.
- Rural households owning land
- 53.9%
- 7.8 points above IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
- Rural households whose highest earner makes over ₹5,000 a month
- 29.0%
- 4.6 points above IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
- Rural households living mainly on manual casual labour
- 49.6%
- 2.1 points below IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
- Rural households with a salaried member
- 5.8%
- 2.5 points below IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
When these were filed
Each proposal is dated by the first step in its appraisal history, the dated record of steps the portal keeps for it.
The timeline counts 133 of the 197 proposals here. The first filing date comes from each proposal's appraisal history, and we have not yet read it for the other 64, so they are left out. Most of them are older proposals, so the early part of the timeline undercounts what was filed then. The register itself records a date for each of them; the gap is in our copy of the histories.
Hatched columns undercount, so they cannot be compared with solid ones. 3 of them cover periods for which we have read few filing dates so far, and they count only the proposals whose date we have.
What kind of projects these are
The proposals naming this district, grouped by the sector each was filed under.
- Non-Coal Mining 90.4%
- INFRA-2 4.6%
- Industrial Projects - 2 2.5%
- INFRA-1 1.5%
- Other (2) 1%
The four largest sectors are shown by name and the rest are grouped as Other.
What is proposed here
These are the proposals in the national environmental clearance register whose application names a site in this district, newest first. A project with sites in several districts appears under each of them.
- Category B1Forwarded to MS SPCB/PCC by MS2026-07-23
Sand screening unit
tirupati panditrao shinde · Industrial Projects - 1
- Category B2EC Granted2026-07-08
Environmental Clearance for Proposed Residential and Commercial project at Plot No. 1 To 19, Sr No. 25/A Part, Mauje Wadi Bk., Nanded-431605 by Govindraj Buildcon.
Govindraj buildcon · INFRA-2
- Category B2EC Granted2026-05-22
Proposed Expansion of MU2 Data Centre Project by M/s. Amanthin Info Parks Pvt. Ltd. Located at Plot No. D-31 and D-32, TTC Industrial Area, Turbhe, Navi Mumbai, Dist Thane- 400703
Amanthin info parks private limited · INFRA-2
- Category B2Proposal pulled back (withdrawn)2026-05-06
Proposed project at Plot No. D-2, MIDC Industrial Area, Krushnoor, taluka – Naigaon, Dist – Nanded. 431709 by M/s. Sahyadri Farms Post Harvest care Limited.
sahyadri farms post harvest care limited · INFRA-2
- Category B2EC Granted2026-04-11
Stone Quarry proposal of Mr. Ramesh Devrao Maske ,Vill.-Palsa, Tq Hadgaon, Dist Nanded, Gut No. 70P,Area-1.00 ha
PROJECT PROPONENT · Non-Coal Mining
- Category B2EC Granted2026-04-11
Stone Quarry proposal of Mr. Taver Junaid Feroz ,Vill.-Nichpur, Tq Kinwat, Dist Nanded, Gut No. 83 P, Area-1.00 Ha
PROJECT PROPONENT · Non-Coal Mining
- Category B2EC Granted2026-04-11
Murrum Quarry Proposal of Mr. Pralhad Laxman Shinde & Mrs. Roshna Pralhad Shinde ,Vill.-Dabhadi, Tq Kinvat, Dist Nanded, Gut No. 76 P, Area-1.00 Ha
PROJECT PROPONENT · Non-Coal Mining
- Category B2EC Granted2026-03-18
Transfer of Environmental Clearance of Shewala-2 Sandghat, Gut No. 90, 357, 358, Area – 1.75 Ha, River – Manjara, Qty.- 4329 Brass for 2 years @2165 Brass/ Year, Village – Shewala, Tal.- Degloor, Dist.- Nanded from District Mining Office, Nanded to M/s Rudra Earthmovers (Proj.Prop. - Shri. Datta Balasaheb Deshmukh)
DATTA BALASAHEB DESHMUKH · Non-Coal Mining
- Category B2EC Granted2026-03-18
Transfer of Environmental Clearance of Shelgaon-1 Sandghat, Gut No. 231, 232 (Sur. No. 39, 40, 44), Area – 3.15 Ha, River – Manjara, Qty.- 7792 Brass for 2 years @ 3896 Brass/ Year, Village – Shelgaon, Tal.- Degloor, Dist.- Nanded from District Mining Office, Nanded to M/s Rudra Earthmovers (Proj.Prop. - Shri. Datta Balasaheb Deshmukh)
DATTA BALASAHEB DESHMUKH · Non-Coal Mining
- Category B2EC Granted2026-03-17
Transfer of Environmental Clearance of Medankallur Sandghat, Gut No. 82, 83, 84, 225, 226, 228, Area – 1.93 Ha, River – Lendi, Qty.- 4761 Brass for 2 years @2381 Brass/ Year, Village – Medankallur, Tal.- Degloor, Dist.- Nanded from District Mining Office, Nanded to M/s Rudra Earthmovers (Proj.Prop. - Shri. Datta Balasaheb Deshmukh)
DATTA BALASAHEB DESHMUKH · Non-Coal Mining
- Category B2Proposal pulled back (withdrawn)2026-03-17
Transfer of Environmental Clearance of Tamloor Sandghat, Gut No. 222, 226, 257, 258, 303, 301, 263, 264, 265, Area – 2.68 Ha, River – Lendi, Qty.- 6623 Brass for 2 years @3312 Brass/ Year, Village – Tamloor, Tal.- Degloor, Dist.- Nanded from M/s Rudra Earthmovers (Proj.Prop. - Shri. Datta Balasaheb Deshmukh)
DATTA BALASAHEB DESHMUKH · Non-Coal Mining
- Category B2EC Granted2026-03-17
Transfer of Environmental Clearance of Shelgaon-3 Sandghat, Gut No. 166,167,175 (Sur. No. 67, 68), Area – 1.50 Ha, River – Manjara, Qty.- 3710 Brass for 2 years @1855 Brass/ Year, Village – Shelgaon, Tal.- Degloor, Dist.- Nanded from District Mining Office, Nanded to M/s Rudra Earthmovers (Proj.Prop. - Shri. Datta Balasaheb Deshmukh)
DATTA BALASAHEB DESHMUKH · Non-Coal Mining
- Category B2EC Granted2026-03-17
Transfer of Environmental Clearance of Tamloor Sandghat, Gut No. 222, 226, 257, 258, 303, 301, 263, 264, 265, Area – 2.68 Ha, River – Lendi, Qty.- 6623 Brass for 2 years @3312 Brass/ Year, Village – Tamloor, Tal.- Degloor, Dist.- Nanded from District Mining Office, Nanded to M/s Rudra Earthmovers (Proj.Prop. - Shri. Datta Balasaheb Deshmukh)
DATTA BALASAHEB DESHMUKH · Non-Coal Mining
- Category B2EC Granted2026-03-17
Transfer of Environmental Clearance of Shewala-1 Sandghat, Gut No. 354, 355, 356, Area – 2.40 Ha, River – Manjara, Qty.- 5936 Brass for 2 years @2968 Brass/ Year, Village – Shewala, Tal.- Degloor, Dist.- Nanded from District Mining Office, Nanded to M/s Rudra Earthmovers (Proj.Prop. - Shri. Datta Balasaheb Deshmukh)
DATTA BALASAHEB DESHMUKH · Non-Coal Mining
- Category B2EC Granted2026-03-17
Transfer of Environmental Clearance of Shekhapur Sandghat, Gut No. 21, 22, 23, 27, Area – 3.82 Ha, River – Manjara, Qty.- 9439 Brass for 2 years @4720 Brass/ Year, Village – Shekhapur, Tal.- Degloor, Dist.- Nanded from District Mining Office, Nanded to M/s Rudra Earthmovers (Proj.Prop. - Shri. Datta Balasaheb Deshmukh)
DATTA BALASAHEB DESHMUKH · Non-Coal Mining
- Category B2EC Granted2026-03-17
Transfer of Environmental Clearance of Sangviumar Sandghat, Gut No. 25, 26, 27, 28, 38, 142, 143, Area – 1.47 Ha, River – Lendi, Qty.- 3636 Brass for 2 years @1818 Brass/ Year, Village – Sangviumar, Tal.- Degloor, Dist.- Nanded from District Mining Office, Nanded to M/s Rudra Earthmovers (Proj.Prop. - Shri. Datta Balasaheb Deshmukh)
DATTA BALASAHEB DESHMUKH · Non-Coal Mining
- Category B2Proposal pulled back (withdrawn)2026-03-17
Transfer of Environmental Clearance of Shewala-3 Sandghat, Gut No. 91, 92, 352, Area – 1.68 Ha, River – Manjara, Qty.- 4155 Brass for 2 years @2078 Brass/ Year, Village – Shewala, Tal.- Degloor, Dist.- Nanded from M/s Rudra Earthmovers (Proj.Prop. - Shri. Datta Balasaheb Deshmukh)
DATTA BALASAHEB DESHMUKH · Non-Coal Mining
- Category B2EC Granted2026-03-17
Transfer of Environmental Clearance of Shewala-3 Sandghat, Gut No. 91, 92, 352, Area – 1.68 Ha, River – Manjara, Qty.- 4155 Brass for 2 years @2078 Brass/ Year, Village – Shewala, Tal.- Degloor, Dist.- Nanded from District Mining Office, Nanded to M/s Rudra Earthmovers (Proj.Prop. - Shri. Datta Balasaheb Deshmukh)
DATTA BALASAHEB DESHMUKH · Non-Coal Mining
- Category B2Proposal pulled back (withdrawn)2026-03-17
Transfer of Environmental Clearance of Shewala-1 Sandghat, Gut No. 354, 355, 356, Area – 2.40 Ha, River – Manjara, Qty.- 5936 Brass for 2 years @2968 Brass/ Year, Village – Shewala, Tal.- Degloor, Dist.- Nanded from M/s Rudra Earthmovers (Proj.Prop. - Shri. Datta Balasaheb Deshmukh)
DATTA BALASAHEB DESHMUKH · Non-Coal Mining
- Category B2EC Granted2026-03-17
Transfer of Environmental Clearance of Shelgaon-2 Sandghat, Gut No. 177, 178, 179, 180 (Sur. No. 66), Area – 2.45 Ha, River – Manjara, Qty.- 6060 Brass for 2 years @3030 Brass/ Year, Village – Shelgaon, Tal.- Degloor, Dist.- Nanded from District Mining Office, Nanded to M/s Rudra Earthmovers (Proj.Prop. - Shri. Datta Balasaheb Deshmukh)
DATTA BALASAHEB DESHMUKH · Non-Coal Mining
- Category B2EC Granted2026-03-11
Transfer of Environmental Clearance of Dolhari Sandghat, Gut No. 131, 132, 136, 137, 138, 140, Area – 1.01 Ha, River – Painganga, Qty.- 2504 Brass for 2 years @ 1252 Brass/Year, Village – Dolhari, Tal.- Himayatnagar, Dist.- Nanded from District Mining Office, Nanded to Proj.Prop.-Shri. Mahesh Shivajirao Alat.
MAHESH SHIVAJIRAO ALAT · Non-Coal Mining
- Category B2EC Granted2026-02-26
Environmental Clearance for Proposed Residential and Commercial project at Plot No. 1 To 19, Sr No. 25/A Part, Mauje Wadi Bk., Nanded-431605 by Govindraj Buildcon.
Govindraj buildcon · INFRA-2
- Category B2EC Granted2026-02-25
Transfer of EC of Kamari Sand Ghat, Lakhadi river , Vill. Kamari Tq. Himayatnagar Dist. Nanded, Nearest Gut No. 181,182,183,184,191, Area-1.05 Ha, Qty-1299 Brass in the name of Mr. Amol Bhimrao Devraye
AMOL BHIMRAO DEVRAYE · Non-Coal Mining
- Category B2EC Granted2026-02-20
Transfer of EC of Belmandal Sand Ghat, Painganga river , Vill. Belmandal Tq. Hadgaon Dist. Nanded, Nearest Gut No. 1,5,6,6/1,6/2,6/3,9, Area-1.85 Ha, Qty-1961 Brass in the name of Mr. Sayed Parvej Sayed Isa
SAYED PARVEZ · Non-Coal Mining
- Category B2EC Granted2026-02-04
Transfer of EC of Dighdi Khu. Sand Ghat, Painganga river , Vill. Dighdi Khu. Tq. Mahur Dist. Nanded, Nearest Gut No. 8,58/A, Area-1.25 Ha, Qty-1104 Brass in the name of Mr. Shubham Shankar Gaikwad
SHUBHAM SHANKAR GAIKWAD · Non-Coal Mining
- Category B2EC Granted2026-02-04
Transfer of EC of Takali Sand Ghat, Painganga river , Vill. Takali Tq. Mahur Dist. Nanded, Nearest Gut No. 7,8,9,84,85,86,87, Area-1.25 Ha, Qty-1104 Brass in the name of Mr. Shubham Shankar Gaikwad
SHUBHAM SHANKAR GAIKWAD · Non-Coal Mining
- Category B2EC Granted2026-02-04
Transfer of EC of Lanji Sand Ghat, Painganga river , Vill. Lanji Tq. Mahur Dist. Nanded, Nearest Gut No. 15,16,17,78,79, Area-1.25 Ha, Qty-1104 Brass in the name of Mr. Shubham Shankar Gaikwad
SHUBHAM SHANKAR GAIKWAD · Non-Coal Mining
- Category B2EC Granted2026-02-04
Transfer of EC of Ner Sand Ghat, Painganga river , Vill. Ner Tq. Mahur Dist. Nanded, Nearest Gut No. 7,8, Area-1.25 Ha, Qty-1104 Brass in the name of Mr. Shubham Shankar Gaikwad
SHUBHAM SHANKAR GAIKWAD · Non-Coal Mining
- Category B2EC Granted2026-02-04
Transfer of EC of Sayfal Sand Ghat, Painganga river , Vill. Sayfal Tq. Mahur Dist. Nanded, Nearest Gut No. 2,3, Area-1.05 Ha, Qty-1391 Brass in the name of Mr. Shubham Shankar Gaikwad
SHUBHAM SHANKAR GAIKWAD · Non-Coal Mining
- Category AEC Granted2026-01-08
Environmental Clearance for Proposed 120 KLPD Syrup/ Molasses to Ethanol Based Distillery Plant along with 2.5 MW Co-generation Unit by M/s. MVK Agro Food Product Ltd. at Gat No. 45 (P) & 46, 44/1/3, 44/1 (P), Kusumnagar Village, Waghalwada, Taluka Umri, District Nanded, Maharashtra.
MVK AGRO FOOD PRODUCT LTD. · Industrial Projects - 2
- Category B2EC Granted2025-12-24
Transfer of Environmental Clearance of Karla bu.-3 Sandghat from DMO, Nanded to Shri. Vijaykumar Satyanarayan Agroya
AGROYA VIJAYKUMAR S · Non-Coal Mining
- Category B2EC Granted2025-12-24
Transfer of Environmental Clearance of Nagani-1 Sandghat from DMO, Nanded to Shri. Vijaykumar Satyanarayan Agroya
AGROYA VIJAYKUMAR S · Non-Coal Mining
- Category B2EC Granted2025-12-24
Transfer of Environmental Clearance of Machnoor-1 Sandghat from DMO, Nanded to Shri. Vijaykumar Satyanarayan Agroya
AGROYA VIJAYKUMAR S · Non-Coal Mining
- Category B2EC Granted2025-12-24
Transfer of Environmental Clearance of Hungunda Sandghat from DMO, Nanded to Shri. Vijaykumar Satyanarayan Agroya
AGROYA VIJAYKUMAR S · Non-Coal Mining
- Category B2EC Granted2025-12-24
Transfer of Environmental Clearance of Machnoor-2 Sandghat from DMO, Nanded to Shri. Vijaykumar Satyanarayan Agroya
AGROYA VIJAYKUMAR S · Non-Coal Mining
- Category B2EC Granted2025-12-24
Transfer of Environmental Clearance of Ganjgaon-10 Sandghat from DMO, Nanded to Shri. Vijaykumar Satyanarayan Agroya
AGROYA VIJAYKUMAR S · Non-Coal Mining
- Category B2EC Granted2025-12-24
Transfer of Environmental Clearance of Karla bu.-1/1 Sandghat from DMO, Nanded to Shri. Vijaykumar Satyanarayan Agroya
AGROYA VIJAYKUMAR S · Non-Coal Mining
- Category B2EC Granted2025-12-24
Transfer of Environmental Clearance of Karla bu.-1 Sandghat from DMO, Nanded to Shri. Vijaykumar Satyanarayan Agroya
AGROYA VIJAYKUMAR S · Non-Coal Mining
- Category B2EC Granted2025-12-24
Transfer of Environmental Clearance of Machnoor-5 Sandghat from DMO, Nanded to Shri. Vijaykumar Satyanarayan Agroya
AGROYA VIJAYKUMAR S · Non-Coal Mining
- Category B2EC Granted2025-12-24
Transfer of Environmental Clearance of Nagani-2 Sandghat from DMO, Nanded to Shri. Vijaykumar Satyanarayan Agroya
AGROYA VIJAYKUMAR S · Non-Coal Mining
- Category B2EC Granted2025-12-24
Transfer of Environmental Clearance of Machnoor-3 Sandghat from DMO, Nanded to Shri. Vijaykumar Satyanarayan Agroya
AGROYA VIJAYKUMAR S · Non-Coal Mining
- Category B2EC Granted2025-12-24
Transfer of Environmental Clearance of Machnoor-8 Sandghat from DMO, Nanded to Shri. Vijaykumar Satyanarayan Agroya
AGROYA VIJAYKUMAR S · Non-Coal Mining
- Category B2EC Granted2025-12-23
Transfer of Environmental Clearance of Yesgi-1 Sandghat from DMO, Nanded to Shri. Vijaykumar Satyanarayan Agroya
AGROYA VIJAYKUMAR S · Non-Coal Mining
- Category B2EC Granted2025-12-23
Transfer of Environmental Clearance of Bolegaon-3 Sandghat from DMO, Nanded to Shri. Vijaykumar Satyanarayan Agroya
AGROYA VIJAYKUMAR S · Non-Coal Mining
- Category B2EC Granted2025-12-23
Transfer of Environmental Clearance of Ganjgaon-5 Sandghat from DMO, Nanded to Shri. Vijaykumar Satyanarayan Agroya
AGROYA VIJAYKUMAR S · Non-Coal Mining
- Category B2EC Granted2025-12-23
Transfer of Environmental Clearance of Sagroli-1 Sandghat from DMO, Nanded to Shri. Vijaykumar Satyanarayan Agroya
AGROYA VIJAYKUMAR S · Non-Coal Mining
- Category B2EC Granted2025-12-23
Transfer of Environmental Clearance of Ganjgaon-2 Sandghat from DMO, Nanded to Shri. Vijaykumar Satyanarayan Agroya
AGROYA VIJAYKUMAR S · Non-Coal Mining
- Category B2EC Granted2025-12-23
Transfer of Environmental Clearance of Yesgi-2 Sandghat from DMO, Nanded to Shri. Vijaykumar Satyanarayan Agroya
AGROYA VIJAYKUMAR S · Non-Coal Mining
- Category B2EC Granted2025-12-23
Transfer of Environmental Clearance of Yesgi-7 Sandghat from DMO, Nanded to Shri. Vijaykumar Satyanarayan Agroya
AGROYA VIJAYKUMAR S · Non-Coal Mining
- Category B2EC Granted2025-12-23
Transfer of Environmental Clearance of Yesgi-3 Sandghat from DMO, Nanded to Shri. Vijaykumar Satyanarayan Agroya
AGROYA VIJAYKUMAR S · Non-Coal Mining
- Category B2EC Granted2025-12-23
Transfer of Environmental Clearance of Ganjgaon-1 Sandghat from DMO, Nanded to Shri. Vijaykumar Satyanarayan Agroya
AGROYA VIJAYKUMAR S · Non-Coal Mining
- Category B2EC Granted2025-12-23
Transfer of Environmental Clearance of Sagroli-2 Sandghat from DMO, Nanded to Shri. Vijaykumar Satyanarayan Agroya
AGROYA VIJAYKUMAR S · Non-Coal Mining
- Category B2EC Granted2025-12-23
Transfer of Environmental Clearance of Sagroli-3 Sandghat from DMO, Nanded to Shri. Vijaykumar Satyanarayan Agroya
AGROYA VIJAYKUMAR S · Non-Coal Mining
- Category B2EC Granted2025-12-23
Transfer of Environmental Clearance of Bolegaon-1 Sandghat from DMO, Nanded to Shri. Vijaykumar Satyanarayan Agroya
AGROYA VIJAYKUMAR S · Non-Coal Mining
- Category B2EC Granted2025-12-23
Transfer of Environmental Clearance of Ganjgaon-4 Sandghat from DMO, Nanded to Shri. Vijaykumar Satyanarayan Agroya
AGROYA VIJAYKUMAR S · Non-Coal Mining
- Category B2EC Granted2025-12-23
Transfer of Environmental Clearance of Ganjgaon-3 Sandghat from DMO, Nanded to Shri. Vijaykumar Satyanarayan Agroya
AGROYA VIJAYKUMAR S · Non-Coal Mining
- Category AStandard ToR Granted2025-12-23
Proposed Manufacturing Unit for the Production of Biodiesel having Capacity 30 TPD along with Production of Soap 10 TPD and Fatty Acid 10 TPD, located at Survey No.: 32/3 & 34/A, Plot No.: 2-1/1C, Village: Balapur, Taluka: Dharmabad, District: Nanded, Maharashtra by M/s. MVP Oils and Energies Private Limited.
MVP OILS AND ENERGIES PRIVATE LIMITED · Industrial Projects - 3
- Category B2EC Granted2025-12-15
Stone Quarry Proposal of Mr. Namdev Diganber Kalale ,Vill.-Kandala, Tq Naigaon Khai., Dist Nanded, Gut No. 15 P, Area-1.00 Ha
PROJECT PROPONENT · Non-Coal Mining
- Category B2EC Granted2025-12-15
Stone Quarry Proposal of Mr. Sunil Sudhakarrao More, Vill.-Lohgaon, Tq Biloli, Dist Nanded, Gut No. 576 P & 580 P, Area- 1.03 Ha
PROJECT PROPONENT · Non-Coal Mining
- Category B2EC Granted2025-12-13
Stone Quarry Proposal of Mr. Dhanaji Babarao Dighe Vill.-Koregaon, Tq Loha, Dist Nanded, Gut No. 115 P,Area-2.00 Ha
PROJECT PROPONENT · Non-Coal Mining
- Category B2EC Granted2025-12-05
Sand Ghat Proposal of Shekapur Sand Ghat Tq. Degloor Dist. Nanded, Nearest Gut no 21,22,23,27 ,Area-3.82 Ha Qty-9439 Brass for 2 years @4720 Brass/ Year
DMO NANDED · Non-Coal Mining
- Category B2EC Granted2025-10-16
Sand Ghat Proposal of Karla bu.-3 Sand Ghat Tq. Biloli Dist. Nanded, Nearest Gut no 100,101,109,Area-3.85 Ha Qty-10883 Brass for 2 years @5442 Brass/ Year
DMO NANDED · Non-Coal Mining
- Category B2EC Granted2025-10-16
Sand Ghat Proposal of Sayfal Sand Ghat Tq. Mahur Dist. Nanded,Nearest Gut no 2,3 ,Area-1.05 Ha Qty-2783 Brass for 2 years @1392 Brass/ Year
DMO NANDED · Non-Coal Mining
- Category B2EC Granted2025-10-16
Sand Ghat Proposal of Digdi ku. Sand Ghat Tq. Mahur Dist. Nanded,Nearest Gut no 8,58/A ,Area-1.25 Ha, Qty-2208 Brass for 2 years @1104 Brass/ Year
DMO NANDED · Non-Coal Mining
- Category B2EC Granted2025-10-16
Sand Ghat Proposal of Machnoor-2 Sand Ghat Tq. Biloli Dist. Nanded,Nearest Gut no 28,29,30,31 ,Area-4.94 Ha Qty-13965 Brass for 2 years @6983 Brass/ Year
DMO NANDED · Non-Coal Mining
- Category B2EC Granted2025-10-16
Sand Ghat Proposal of Lanji Sand Ghat Tq. Mahur Dist. Nanded,Nearest Gut no 15,16,17,78,79 ,Area-1.25 Ha Qty- 2208 Brass for 2 years @1104 Brass/ Year
DMO NANDED · Non-Coal Mining
- Category B2EC Granted2025-10-16
Sand Ghat Proposal of Ner Sand Ghat Tq. Mahur Dist. Nanded,Nearest Gut no 7,8,Area-1.25 Ha Qty-2208 Brass for 2 years @1104 Brass/ Year
DMO NANDED · Non-Coal Mining
- Category B2EC Granted2025-10-16
Sand Ghat Proposal of Machnoor-1 Sand Ghat Tq. Biloli Dist. Nanded ,Nearest Gut no 14, Area-2.40 Ha Qty-6784 Brass for 2 years @3392 Brass/ Year
DMO NANDED · Non-Coal Mining
- Category B2EC Granted2025-10-16
Sand Ghat Proposal of Machnoor-5 Sand Ghat Tq. Biloli Dist. Nanded, Nearest Gut no 52 , Area-2.20 Ha Qty-6219 Brass for 2 years @3110 Brass/ Year
DMO NANDED · Non-Coal Mining
- Category B2EC Granted2025-10-16
Sand Ghat Proposal of Nagani-2 Sand Ghat Tq. Biloli Dist. Nanded, Nearest Gut no 123,124,125 ,Area-2.04 Ha Qty-5767 Brass for 2 years @2884 Brass/ Year
DMO NANDED · Non-Coal Mining
- Category B2EC Granted2025-10-16
Sand Ghat Proposal of Machnoor-8 Sand Ghat Tq. Biloli Dist. Nanded, Nearest Gut no 52 West ,Area-2.48 Ha Qty- 7011 Brass for 2 years @3506 Brass/ Year
DMO NANDED · Non-Coal Mining
- Category B2EC Granted2025-10-16
Sand Ghat Proposal of Machnoor-3 Sand Ghat Tq. Biloli Dist. Nanded,Nearest Gut no 15 East side ,Area-2.30 Ha Qty-6502 Brass for 2 years @3251 Brass/ Year
DMO NANDED · Non-Coal Mining
- Category B2EC Granted2025-10-16
Sand Ghat Proposal of Hungunda Sand Ghat Tq. Biloli Dist. Nanded,Nearest Gut no 352,211, Area-4.43 Ha Qty-12509 Brass for 2 years @6255 Brass/ Year
DMO NANDED · Non-Coal Mining
- Category B2EC Granted2025-10-16
Sand Ghat Proposal of Takali Sand Ghat Tq. Mahur Dist. Nanded, of Nearest Gut no 7,8,9,84,85,86,87, Area-1.25 Ha Qty-2208 Brass for 2 years @1104 Brass/ Year
DMO NANDED · Non-Coal Mining
- Category B2EC Granted2025-10-16
Sand Ghat Proposal of Nagani-1 Sand Ghat Tq. Biloli Dist. Nanded, Nearest Gut no 121,122 , Area-2.16 Ha Qty-6106 Brass for 2 years @3053 Brass/ Year
DMO NANDED · Non-Coal Mining
- Category B2EC Granted2025-10-15
Sand Ghat Proposal of Ganjgaon-5 Sand Ghat Tq. Biloli Dist. Nanded, Nearest Gut no 283,297 , Area-3.50 Ha Qty-9894 Brass for 2 years @4947 Brass/ Year
DMO NANDED · Non-Coal Mining
- Category B2EC Granted2025-10-15
Sand Ghat Proposal of Tamloor Sand Ghat Tq. Degloor Dist. Nanded, Nearest Gut no 222,226,257,258,303,301,263,264,265 ,Area-2.68 Ha Qty-6623 Brass for 2 years @3312 Brass/ Year
DMO NANDED · Non-Coal Mining
- Category B2EC Granted2025-10-15
Sand Ghat Proposal of Ganjgaon-2 Sand Ghat Tq. Biloli Dist. Nanded,Nearest Gut no 239,240 , Area-2.50 Ha Qty-7067 Brass for 2 years @3534 Brass/ Year
DMO NANDED · Non-Coal Mining
- Category B2EC Granted2025-10-15
Sand Ghat Proposal of Pimpri Sand Ghat Tq. Himayatnagar Dist. Nanded,Nearest Gut no 49/1,49/2,50,1/1,4,5 ,Area-1.00 Ha Qty-2472 Brass for 2 years @ 1237 Brass/ Year
DMO NANDED · Non-Coal Mining
- Category B2EC Granted2025-10-15
Sand Ghat Proposal of Gurfali-1 Sand Ghat Tq. Hadgaon Dist. Nanded,Nearest Gut no 5,6,7,8,11 to 19 ,Area-1.75 Ha Qty-3710 Brass for 2 years @1855 Brass/ Year
DMO NANDED · Non-Coal Mining
- Category B2EC Granted2025-10-15
Sand Ghat Proposal of Borgaon Ha. Sand Ghat Tq. Hadgaon Dist. Nanded,Nearest Gut no 64,314,315,316,Area-1.80 Ha Qty-3816 Brass for 2 years @1908 Brass/ Year
DMO NANDED · Non-Coal Mining
- Category B2EC Granted2025-10-15
Sand Ghat Proposal of Renapur Be. Sand Ghat Tq. Himayatnagar Dist. Nanded,Nearest Gut no 80,81 , Area-1.04 Ha Qty-2194 Brass for 2 years @ 1097 Brass/ Year
DMO NANDED · Non-Coal Mining
- Category B2EC Granted2025-10-15
Sand Ghat Proposal of Yesgi-3 Sand Ghat Tq. Biloli Dist. Nanded,Nearest Gut no 233 Centre side ,Area-3.00 Ha Qty-8481 Brass for 2 years @4241 Brass/ Year
DMO NANDED · Non-Coal Mining
- Category B2EC Granted2025-10-15
Sand Ghat Proposal of Belmandal Sand Ghat Tq. Hadgaon Dist. Nanded, Nearest Gut no 1,5,6,6/1,6/2,6/3,9 , Area-1.85 Ha Qty-3922 Brass for 2 years @1961 Brass/ Year
DMO NANDED · Non-Coal Mining
- Category B2EC Granted2025-10-15
Sand Ghat Proposal of Shelgaon-2 Sand Ghat Tq. Degloor Dist. Nanded,Nearest Gut no 177,178,179,180 (Sur. No. 66) Area-2.45 Ha Qty-6060 Brass for 2 years @3030 Brass/ Year
DMO NANDED · Non-Coal Mining
- Category B2EC Granted2025-10-15
Sand Ghat Proposal of Dhanora (J.) Sand Ghat Tq. Himayatnagar Dist. Nanded Nearest Gut no 74,75,76,78, Area 1.05 Ha Qty-2597 Brass for 2 years @1299 Brass/ Year
DMO NANDED · Non-Coal Mining
- Category B2EC Granted2025-10-15
Sand Ghat Proposal of Chendkapur Sand Ghat Tq. Hadgaon Dist. Nanded, Nearest Gut no 50,51,150,151 ,Area-1.75 ha Qty-3710 Brass for 2 years @1855 Brass/ Year
DMO NANDED · Non-Coal Mining
- Category B2EC Granted2025-10-15
Sand Ghat Proposal of Dighi Sand Ghat Tq. Himayatnagar Dist. Nanded, Nearest Gut no 12/1,13/1 ,Area-1.10 Ha. Qty-2332 Brass for 2 years @1166 Brass/ Year
DMO NANDED · Non-Coal Mining
- Category B2EC Granted2025-10-15
Sand Ghat Proposal of Shewala-2 Sand Ghat Tq. Degloor Dist. Nanded, Nearest Gut no 90,357,358 , Area1.-1.75 Ha. Qty-4329 Brass for 2 years @2165 Brass/ Year
DMO NANDED · Non-Coal Mining
- Category B2EC Granted2025-10-15
Sand Ghat Proposal of Gurfali-2 Sand Ghat Tq. Hadgaon Dist. Nanded, Nearest Gut no 26 to 36 , Area- 2.00 Ha Qty-4240 Brass for 2 years @2120 Brass/ Year
DMO NANDED · Non-Coal Mining
- Category B2EC Granted2025-10-15
Sand Ghat Proposal of Shewala-1 Sand Ghat Tq. Degloor Dist. Nanded, Nearest Gut no 354,355.356, Area-2.40 Ha Qty-5936 Brass for 2 years @2968 Brass/ Year
DMO NANDED · Non-Coal Mining
- Category B2EC Granted2025-10-15
Sand Ghat Proposal of Sagroli-2 Sand Ghat Tq. Biloli Dist. Nanded,Nearest Gut no 451,457,459,460 ,Area-4.00 ha Qty-11307 Brass for 2 years @5654 Brass/ Year
DMO NANDED · Non-Coal Mining
- Category B2EC Granted2025-10-15
Sand Ghat Proposal of Shelgaon-2 Sand Ghat Tq. Degloor Dist. Nanded,Nearest Gut no 166,167,175 (Sur. No. 67,68),Area -1.50 Ha Qty-3710 Brass for 2 years @1855 Brass/ Year
DMO NANDED · Non-Coal Mining
- Category B2EC Granted2025-10-15
Sand Ghat Proposal of Gorlegaon-2 Sand Ghat Tq. Hadgaon Dist. Nanded, Nearest Gut no 133,134,135,136 ,Area-1.75 Ha Qty-3710 Brass for 2 years @1855 Brass/ Year
DMO NANDED · Non-Coal Mining
- Category B2EC Granted2025-10-15
Sand Ghat Proposal of Yesgi-1 Sand Ghat Tq. Biloli Dist. Nanded, Nearest Gut no 230 ,Area-1.76 Ha Qty- 4975 Brass for 2 years @2488 Brass/ Year
DMO NANDED · Non-Coal Mining
- Category B2EC Granted2025-10-15
Sand Ghat Proposal of Dolhari Sand Ghat Tq. Himayatnagar Dist. Nanded, Nearest Gut no 131,132,136,137,138,140 ,Area- 1.01 Ha, Qty-2504 Brass for 2 years @ 1252 Brass/ Year
DMO NANDED · Non-Coal Mining
- Category B2EC Granted2025-10-15
Sand Ghat Proposal of Bolegaon-1 Sand Ghat Tq. Biloli Dist. Nanded, Nearest Gut no 288 Centre Side ,Area-4.50 Ha, Qty-12721 Brass for 2 years @6361 Brass/ Year
DMO NANDED · Non-Coal Mining
- Category B2EC Granted2025-10-15
Sand Ghat Proposal of Kautha Ja Sand Ghat Tq. Himayatnagar Dist. Nanded,Nearest Gut no 81,82,83,84,85,86,87 Area-1.00 Ha Qty-2473 Brass for 2 years @1237 Brass/ Year
DMO NANDED · Non-Coal Mining
- Category B2EC Granted2025-10-15
Sand Ghat Proposal of Virsani Sand Ghat Tq. Himayatnagar Dist. Nanded,Nearest Gut no 88/1,88/2 , Area-1.01 ha, Qty-2492 Brass for 2 years @ 1246 Brass/ Year
DMO NANDED · Non-Coal Mining
- Category B2EC Granted2025-10-15
Sand Ghat Proposal of Sapti Sand Ghat Tq. Hadgaon Dist. Nanded, Nearest Gut no 382,383,384,385,386 , Area-1.60 Ha Qty-3392 Brass for 2 years @1696 Brass/ Year
DMO NANDED · Non-Coal Mining
Showing 100 of 197 proposals, newest first. The button below loads the rest.