← All districts

Satara, Maharashtra

Not a Scheduled AreaCensus 2011 district code 527
  1. 27 Oct 2026 · DecidedStandard Terms of Reference grantedProposed Manufacturing Unit for the Production of Synthetic Organic Chemicals comprising Adhesives,…
  2. 27 Oct 2026 · DecidedEnvironmental clearance grantedEnvironmental Clearance for Stone Quarry Project (Area 3.00 Ha) (Private Land) at Survey No. 95 (Part)…
  3. 24 Oct 2026 · FiledSubmittedProposed Project at Phaltan by M/s ViData PowerTech Ltd
  4. 23 Oct 2026 · FiledSubmittedMr. Navnath Narayan Bhosale & Mr. Vikramsinh Jitoba Shinde
  5. 22 Oct 2026 · Details soughtAdditional details soughtNivakane (Integrated) Pumped Storage Project
  6. 21 Oct 2026 · Details soughtEssential details soughtProposed Ethyl Acetate manufacturing with production capacity of 40TPD within the existing premises…
  7. 21 Oct 2026 · Details soughtAdditional details soughtEnvironmental Clearance for Stone Quarry Project (Area 1.00 Ha) (Private Land) at Gut No. 1460 (Part) of…
  8. 21 Oct 2026 · Details soughtAdditional details soughtEnvironmental Clearance for Stone Quarry Project (Area 1.20 Ha) (Private Land) at Gut No. 1460 (Part)…
  9. 21 Oct 2026 · Details soughtAdditional details soughtEnvironmental Clearance for Stone Quarry Project (Area 1.20 Ha) (Private Land) at Survey No. 1460 (Part)…
  10. 21 Oct 2026 · FiledSubmittedProposed Industrial shed construction project by Thermax Babcock & Wilcox Energy Solutions Limited…
  11. 15 Oct 2026 · FiledSubmittedShri. Dnyaneshwar Shivaji Bhosale
  12. 9 Oct 2026 · FiledSubmittedExpansion of Sugar Factory from 7,500 TCD to 13,500 TCD & Distillery Unit from 150 KLPD to 220 KLPD by…

Dated by the portal's own appraisal history, converted to India Standard Time; a proposal with no recorded history appears on its register submission date.

Other clearances these proposals declare

Forest land diversion declared
6
Forest land sought for diversion
Area not stated
Wildlife board recommendation declared
5
In or near a protected area
0
In an eco-sensitive zone
3

These counts are taken from the application forms of the 192 of 192 proposals naming this district whose forms have been read for these questions. In 105 of those forms at least one question was left blank, and a blank answer is counted as unknown. The forest area is the area stated for forest clearance, with each forest proposal counted once, in the district where its project is primarily sited.

Proposals naming this district
192
Category A proposals
32
Families declared displaced
100
Families declared affected
2,000

Displacement figures are the proponents’ own declarations. A project sited across several districts declares one figure for the whole project, and that figure is counted once, in the district where the project is primarily sited. 1 of the proposals listed below declare displacement and are sited primarily in another district, so their figures are counted in that district’s total.

Fifth Schedule status

Not within a Fifth Schedule Scheduled Area

The Presidential Order for Maharashtra declares which areas in the State are Scheduled Areas. It does not name this district, in whole or in part, so no part of it is a Scheduled Area under that Order. A later Order could add one; this reference states the position as transcribed and reviewed on 2026-08-21.

OrderThe Scheduled Areas (Maharashtra) Order, 1985

What the record shows

  • Applicants for projects sited mainly in this district have declared 100 families to be displaced. The figure comes from their applications, and we have not verified it.

Each of these observations appears when a fixed rule is met by the figures on this page, so the same figures always give the same sentences. None of them is a view on whether a project should go ahead.

Who lives there

Figures from Census 2011, each compared with the all-India value computed on the same definition.

Total population
30,03,741
Households
6,53,735
Average household size
4.59
0.26 below India's 4.85India
Scheduled Tribe share of population
1.0%
7.6 points below IndiaIndia
Scheduled Caste share of population
10.8%
5.9 points below IndiaIndia
Children aged 0-6
10.6%
3.0 points below IndiaIndia
Literacy rate
82.9%
9.9 points above IndiaIndia
Sex ratio
988
45.5 above India's 942.6India

What they live on

How the district's workers earn a living, from Census 2011. The land-dependent share counts cultivators and agricultural labourers as a share of all workers, and it is the group most directly affected when land is acquired.

Total workers
13,54,947
Work participation rate
45.1%
5.3 points above IndiaIndia
Workers dependent on land
65.2%
10.6 points above IndiaIndia
Cultivators
43.2%
18.6 points above IndiaIndia
Agricultural labourers
21.9%
8.0 points below IndiaIndia
Marginal workers
12.6%
12.1 points below IndiaIndia
Household industry workers
2.9%
0.9 points below IndiaIndia

How households live

Land, income and work among rural households, from the Socio Economic and Caste Census 2011, which recorded these where the population census did not. Only the survey's rural part is used here, so urban households do not appear.

Rural households owning land
64.6%
18.5 points above IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households whose highest earner makes over ₹5,000 a month
36.9%
12.5 points above IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households living mainly on manual casual labour
28.7%
23.1 points below IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households with a salaried member
16.6%
8.4 points above IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

When these were filed

Each proposal is dated by the first step in its appraisal history, the dated record of steps the portal keeps for it.

2023-Q22026-Q4

The timeline counts 155 of the 192 proposals here. The first filing date comes from each proposal's appraisal history, and we have not yet read it for the other 37, so they are left out. Most of them are older proposals, so the early part of the timeline undercounts what was filed then. The register itself records a date for each of them; the gap is in our copy of the histories.

Hatched columns undercount, so they cannot be compared with solid ones. 4 of them cover periods for which we have read few filing dates so far, and they count only the proposals whose date we have. 2026-Q4 was still running when the register was read, so its column counts only the filings made up to that date.

What kind of projects these are

The proposals naming this district, grouped by the sector each was filed under.

  • Non-Coal Mining 59.4%
  • INFRA-2 15.1%
  • Industrial Projects - 2 11.5%
  • River Valley and Hydroelectric Projects 5.7%
  • Other (3) 8.3%

The four largest sectors are shown by name and the rest are grouped as Other.

What is proposed here

These are the proposals in the national environmental clearance register whose application names a site in this district, newest first. A project with sites in several districts appears under each of them.

  1. Category B2Forwarded to MS SPCB/PCC by MS2026-10-24

    Proposed Project at Phaltan by M/s ViData PowerTech Ltd

    VIDATA POWERTECH LIMITED · INFRA-2

  2. Category B2Under Verification2026-10-23

    Mr. Navnath Narayan Bhosale & Mr. Vikramsinh Jitoba Shinde

    Navnath Narayan Bhosale · Non-Coal Mining

  3. Category B2Forwarded to MS SPCB/PCC by MS2026-10-21

    Proposed Industrial shed construction project by Thermax Babcock & Wilcox Energy Solutions Limited (Formerly known as Thermax Babcock & Wilcox Energy Solutions Pvt. Ltd.) at Plot No A2 & A3, MIDC Khandala, Industrial Area Phase-I, Kesurdi, Tal. Khandala, Dist. Satara 412801

    THERMAX BABCOCK & WILCOX ENERGY SOLUTIONS LIMITED · INFRA-2

  4. Category B2Under Verification2026-10-15

    Shri. Dnyaneshwar Shivaji Bhosale

    DNYANESHWAR SHIVAJI BHOSALE · Non-Coal Mining

  5. Category AUnder Examination2026-10-09

    Expansion of Sugar Factory from 7,500 TCD to 13,500 TCD & Distillery Unit from 150 KLPD to 220 KLPD by using C/B heavy Molasses/ Cane Juice/ Cane Syrup/ Grain along with Power Generation from 1.9 MW to 4 MW by Jaywant Sugars Ltd. (JSL) located at Village: Dhawarwadi & Marali, Tal.: Karad, Dist.: Satara, Maharashtra State

    JAYWANT SUGARS LIMITED · Industrial Projects - 2

  6. Category AEDS Raised2026-10-08

    Proposed Ethyl Acetate manufacturing with production capacity of 40TPD within the existing premises located at Gat. No. 147/A, Village- Sukhed, Taluka- Khandala, District- Satara, Maharashtra by M/s Ashirwad Industries.

    ashirwad industries · Industrial Projects - 3

  7. Category AUnder Processing with Authority2026-10-07declares affected families

    Nivakane (Integrated) Pumped Storage Project

    ADANi SAUR URJA (KA) LIMITED · River Valley and Hydroelectric Projects

  8. Category B1Forwarded to MS SPCB/PCC by MS2026-10-05

    Proposed Manufacturing Unit for the Production of Synthetic Organic Chemicals comprising Adhesives, Polymer Resins, Organic Peroxides, Specialty Chemicals and Chemical Intermediates located at Plot No.: B-112, MIDC Taswade, Karad Industrial Area, Village: Taswade, Taluka: Karad, Dist.: Satara – 415109, Maharashtra, by M/s. Jaldhara Organics Pvt. Ltd.

    jaldhara organics private limited · Industrial Projects - 3

  9. Category B2Under Verification2026-09-28

    Proposed “Industrial Shed” Located at Gat No. 211 / 1, 212, 214, 215, 216 (P), Karadwadi, Lonand Shirwal Road, Khandala, Dist:- Satara, Maharashtra- 415521 by Siara Engineering Pvt. Ltd.

    SIARA ENGINEERING PRIVATE LIMITED · INFRA-2

  10. Category B2ADS Raised2026-09-05

    Environmental Clearance for Stone Quarry Project (Area 1.00 Ha) (Private Land) at Gut No. 1460 (Part) of Village- Sasapade, Taluka- Satara & District- Satara, State- Maharashtra by Shri. Hanamant Tukaram Kanase

    HANMANT TUKARAM KANSE · Non-Coal Mining

  11. Category B2ADS Raised2026-09-05

    Environmental Clearance for Stone Quarry Project (Area 1.20 Ha) (Private Land) at Survey No. 1460 (Part) Village- Sasapade, Taluka- Satara, District- Satara, Maharashtra by Shri. Abhay Bhimrao Yadav

    YADAV ABHAY BHIMRAO · Non-Coal Mining

  12. Category B2ADS Raised2026-09-05

    Environmental Clearance for Stone Quarry Project (Area 1.20 Ha) (Private Land) at Gut No. 1460 (Part) Village- Sasapade, Taluka- Satara, District- Satara, Maharashtra by Shri. Aditya Mahendra Sawant

    SAWANT ADITYA MAHENDRA · Non-Coal Mining

  13. Category AStandard ToR Granted2026-09-02

    Manufacturing of “Synthetic Organic Chemicals” in the existing premises of inorganic chemicals manufacturing unit by Arista Chemicals LLP (ACLLP) located at Gat No. - 81/A/2 & 81/A/3/1, Lonand - Parhar Village Road, Village: Koregaon (Lonand), Taluka: Phaltan, District: Satara, State: Maharashtra, PIN: 415523.

    ARISTA CHEMICALS LLP · Industrial Projects - 3

  14. Category B2Proposal Accepted and Referred to SEAC2026-08-31

    Proposed Expansion of Power Generation Business Unit by M/s. Cummins India Limited, at Plot No. B-2, Phaltan MIDC, Village Survadi , Tal- Phaltan, Dist-Satara, 415523.

    Cummins India limited · INFRA-2

  15. Category B2EC Granted2026-08-18

    EC transfer proposal pertaining to Basalt Stone Quarry, Satara from Shri. Dattatray Hanmant Desai to Shri. Vikas Subhash Shinde, Shri. Vinod Virsen Fadtare & Shri. Dhairyashil Ashokrao Patil, Area 2.00 Ha. At Gut no. 26/2 Village: Sanjaynagar (Shere), Taluka Karad & District Satara, Maharashtra

    SHINDE VIKAS SUBHASH · Non-Coal Mining

  16. Category B2Proposal Accepted and Referred to SEAC2026-08-18

    Environmental Clearance for Proposed Revitalization of Sainik School Satara Located At C. S. No. 434, 435, 438, 515/5, At Sadar Bazar, Satara 415001 By Sainik School of Satara.

    sainik school satara · INFRA-2

  17. Category AForwarded to MS SPCB/PCC by MS2026-08-18

    Proposed Bulk Drugs & Drug Intermediates (Active Pharmaceutical Ingredients) Manufacturing Facility of Capacity 6950.005 MT/A at Survey No. 1252, 1251/A, Village - Atit, Tal. Satara, Dist. Satara, State – Maharashtra by M/s. Suntej Lifesciences Pvt. Ltd.

    SUNTEJ LIFESCIENCES PRIVATE LIMITED · Industrial Projects - 3

  18. Category AStandard ToR Granted2026-08-14

    Proposed Expansion and Modernization of Integrated Mini Steel Plant from 0.3 MTPA to 0.5 MTPA by Enhancing the Capacity of Blast Furnace, Steel Melting Shop, Rolling Mill, Captive Power Plant and New Installation of 0.3 MTPA Coke Oven Plant, At Plot No. C-1 & C-1 (part) MIDC Industrial Estate Lonand, District- Satara, Maharashtra by M/s. Sona Alloys Private Limited

    sona alloys private limited · Industrial Projects - 1

  19. Category B2EC Granted2026-08-11

    Environmental Clearance for Stone Quarry Project (Area 3.00 Ha) (Private Land) at Survey No. 95 (Part) Village- Ambawade, Taluka- Patan, District- Satara, Maharashtra by Shri. Mahesh Raghunath Patil

    MAHESH RAGHUNATH PATIL · Non-Coal Mining

  20. Category B2Referred to SEIAA2026-07-31

    Environmental Clearance for Stone Quarry Mining Project (Area 1.00 ha) at Gut No. 484 (Part), Village Kalgaon,Taluka Karad, District Satara, Maharashtra by Shri Vilas Vishwanath Mane

    SWapnil Vilas Mane · Non-Coal Mining

  21. Category B2Referred to SEIAA2026-07-27

    Environmental Clearance for factory building located at Plot No I-45/A,at Chordia Industrial Park, Village Sangvi, Taluka - Chandela, District - Satara. Pin-412801 by Inoxpa India Pvt. Ltd.

    Inoxpa india private limited · INFRA-2

  22. Category AProposal returned in present form2026-07-22

    Expansion of Distillery from 142 KLPD to 300 KLPD (C/ B Heavy Molasses/Sugarcane Juice/Syrup), Sugar Factory from 7,500 TCD to 12,000 TCD & Co-generation Plant from 16 MW to 38 MW by Yashwantrao Mohite Krishna Sahakari Sakhar Karkhana Ltd. at Village: Shivnagar, Rethare Bk., Tal.: Karad, Dist.: Satara, Maharashtra State.

    YASHWANTRAO MOHITE KRISHNA SAHAKARI SAKHAR KARKHANA LIMITED · Industrial Projects - 2

  23. Category B2ADS Raised2026-07-21

    Cummins India Limited

    Cummins India limited · INFRA-2

  24. Category B2EC Granted2026-07-09

    Environmental Clearance for Basalt Stone Quarry having area 2.00 Ha of Shri. Vishwanath Yadu Nalwade Located at gut no. 624 Part, Village- Kokrale, Taluka- Khatav, Distict- Satara

    vishwanath yadu nalwade · Non-Coal Mining

  25. Category B2Referred to SEIAA2026-07-03

    Proposed Expansion of DG set Manufacturing unit at Plot no. B-3/1, MIDC Phaltan, Tal. Phaltan, Dist. Satara 415523 by M/s. Cummins Technologies India Private Limited under 8(a) Building & Construction project B2 category

    CUMMINS TECHNOLOGIES INDIA PRIVATE LIMITED · INFRA-2

  26. Category B2EC Granted2026-06-20

    Environmental Clearance for Basalt Stone Quarry of Shri. Devraj Babaso Patil Located at gut no. 35/2, Village- Marali, Tahsil- Karad, District- Satara

    devraj babaso patil · Non-Coal Mining

  27. Category AStandard ToR Granted2026-06-20

    Proposed expansion for manufacturing of 20000 TPA Flex Pack Adhesives & (Earlier 20000 TPA Engineering Adhesives; 16500 TPA Pressure Sensitive Adhesive Hygiene; 7200 TPA Hot Melt Adhesive; 7200 TPA Water based adhesive; 750 TPA Relabeling and Repacking of Adhesives) by M/s. H. B. Fuller India Adhesives Pvt. Ltd. at Plot No. 1E; Sr. No 1129, 1140, 1295, 1296, 1122, 1134, 1137 & 1138; Mauje - Shirwal, Tal-Khandala, Dist.-Satara, Maharashtra – 412801 over an area 3.387 ha.

    H B FULLER INDIA ADHESIVES PRIVATE LIMITED · Industrial Projects - 3

  28. Category AEC Granted2026-06-12declares affected families

    Nivakane (Integrated) Pumped Storage Project

    ADANI GREEN ENERGY LIMITED · River Valley and Hydroelectric Projects

  29. Category B2Referred to SEIAA2026-06-10

    Sangwad (Basalt Stone) Quarry Project located at Survey/Gut No.: 203 Part, Village: Sangwad Taluka: Patan, District: Satara, State:Maharashtra by M/s. Vedant Landmark Tarfe Shri. Navnath Shivram Palekar & Other.

    Navnath Shivram Palekar · Non-Coal Mining

  30. Category AProposal returned in present form2026-06-02

    Proposed Ethyl Acetate manufacturing with production capacity of 40TPD within the existing premises located at Gat. No. 147/A, Village- Sukhed, Taluka- Khandala, District- Satara, Maharashtra by M/s Ashirwad Industries.

    ashirwad industries · Industrial Projects - 3

  31. Category B2EC Granted2026-05-23

    Environmental Clearance for Basalt Stone Quarry of Shri. Satish Balaso Yadav, Shri. Ramprasad Balaso Yadav & Shri. Shamprasad Balaso Yadav Located at Gut no. 395/ A part of village- Atit, Taluka- Satara, Dist.- Satara.

    satish yadav · Non-Coal Mining

  32. Category B2Referred to SEIAA2026-05-22

    Proposed Project at Shindewadi, Satara by M/s Volex Interconnect India Pvt Ltd

    volex interconnect india private limited · INFRA-2

  33. Category B2EC Granted2026-05-22

    Proposed Expansion of MU2 Data Centre Project by M/s. Amanthin Info Parks Pvt. Ltd. Located at Plot No. D-31 and D-32, TTC Industrial Area, Turbhe, Navi Mumbai, Dist Thane- 400703

    Amanthin info parks private limited · INFRA-2

  34. Category B2EC Granted2026-04-03

    Transfer of Environmental Clearance of Bidal Sand Spot 4 having adjoining Gut no. 275, 109, 110 & 111, Village Bidal, Taluka Man, District Satara granted by the name of District Mining Officer, Satara to the Successful Bidder Shri. Prashant Laxman Shahapure

    PRASHANT SHAHAPURE · Non-Coal Mining

  35. Category B2EC Granted2026-04-03

    Transfer of Environmental Clearance of Bidal Sand Spot 6 having adjoining Gut no. 182, 156, 157, 158, Village Bidal, Taluka Man, District Satara granted by the name of District Mining Officer, Satara to the Successful Bidder Shri. Prashant Laxman Shahapure.

    PRASHANT SHAHAPURE · Non-Coal Mining

  36. Category B2EC Granted2026-03-28

    Transfer of Environmental Clearance of Jihe Sand Spot 2 having adjacent gut no. 18 to 24 & 25 to 27, Taluka Satara, District Satara granted by the name of District Mining Officer, Satara to the Successful Bidder Shri. Jaysing Bhagavan Katkar

    jaysing bhagavan katkar · Non-Coal Mining

  37. Category AForwarded to MS SPCB/PCC by MS2026-03-19

    Humbarli Birmani Off Stream Open Loop Pumped Storage Project

    THDC INDIA LIMITED · River Valley and Hydroelectric Projects

  38. Category B2EC Granted2026-03-18

    Transfer of Environmental Clearance of Wathar Budruk Sand Spot 01 having adjoining Gut no. 81, 82, 84, 85, 86 & 87 Village Wathar Budruk, Taluka Khandala, District Satara granted by the name of District Mining Officer, Satara to the Successful Bidder Mahi Enterprises Tarfe Sou. Shubhangi Avinash Yele

    SUBHANGI AVINASH YELE · Non-Coal Mining

  39. Category B2Referred to SEIAA2026-02-27

    Proposed Expansion Industrial Shed Construction Project located at Gut No. 821/B, Shirwal, Taluka Khandala, Dist. Satara- 412801 by M/s ACG Pam Pharma Technologies Private Limited.

    ACG PAM PHARMA TECHNOLOGIES PRIVATE LIMITED · INFRA-2

  40. Category B2EC Granted2026-02-18

    Transfer of Environmental Clearance of Sand Ghat Palashi Sand Spot 1, gut no 1353, 1364, 1366, 1296, 1282 & 1297 granted by the name of District Mining Officer, Satara to the Successful Bidder Shri. Anil Laxman Sawant.

    anil laxman sawant · Non-Coal Mining

  41. Category B2EC Granted2026-02-17

    Transfer of Environmental Clearance of Sand Ghat Shirtaav Sand Spot 1, gut no 243 to 257 granted by the name of District Mining Officer, Satara to the Successful Bidder Shri. Nitin Atmaram Shinde.

    NITIN ATMARAM SHINDE · Non-Coal Mining

  42. Category B2EC Granted2026-02-16

    Transfer of Environmental Clearance of Sand Ghat Kale Sand Spot 1, gut no 1213, 415/1/2, 413, 418 to 420, 425, 428, 1851, 1852, 1854, 1855/2 granted by the name of District Mining Officer, Satara to the Successful Bidder Siddhesh Enterprises tarfe Proprietor Shri. Santosh Vasant Salunkhe.

    SALUNKHE sANTOSH Vasant · Non-Coal Mining

  43. Category B2EC Granted2026-02-16

    Transfer of Environmental Clearance of Sand Ghat Pimpode Khurd, gut no 444, 442, 446, 453, 454, 455, 479, 480, 481/A & 482 granted by the name of District Mining Officer, Satara to the Successful Bidder Shri. Vaibhav Vijay Raut.

    vaibhav vijay raut · Non-Coal Mining

  44. Category B2EC Granted2026-02-16

    Transfer of Environment Clearance of Sand Ghat Wathar Sand Spot 2, gut no 1740 to 1755 granted by the name of District Mining Officer Satara to the Successful Bidder Shri. Basit Khadimhussain Choudhari.

    basit khadimhussain choudhari · Non-Coal Mining

  45. Category B2EC Granted2026-02-13

    Shri. Jitendra Bajirao Pawar

    Jitendra Bajirao Pawar · Non-Coal Mining

  46. Category B2EC Granted2026-02-04

    Environmental Clearance for the Basalt Stone Quarry of Shri. Amit Mansing Pawar located at gut no. 727 part, Village Vadoli Nileshwar, Taluka Karad, District Satara

    pawar amit mansing · Non-Coal Mining

  47. Category B1EC Granted2026-02-04

    M/s. Karad Hospital Association (CBMWT&DF)

    KARAD HOSPITAL ASSOCIATION KARAD · INFRA-2

  48. Category B2EC Granted2026-01-30

    Proposed Industrial Shed at Gat No. 211/1, 212, 214, 215, 216, Plot No.2, Karadwadi, Taluka Khandala, Dist.- Satara by Flexipol Foams Pvt. Ltd.

    FLEXIPOL FOAMS PVT LTD · INFRA-2

  49. Category B2EC Granted2026-01-29

    Environmental Clearance for the AAsu Sand Spot 2 on Nira river located at gut no. 109 to 113, 244 to 251, 274 & 275 of Village-Aasu, Taluka- Phaltan, and District: Satara

    minakshi ajit bhor · Non-Coal Mining

  50. Category B2EC Granted2026-01-29

    Environmental Clearance for the Padegaon Sand Spot on Nira river located at gut no. 173 of Village-Padegaon, Taluka- Phaltan, and District: Satara

    minakshi ajit bhor · Non-Coal Mining

  51. Category B2EC Granted2026-01-29

    Environmental Clearance for the Jihe Sand Spot 2 on Krushna river located at gut no. 18 to 24 & 25 to 27 Part of Village - Jihe Taluka- Satara, and District: Satara

    minakshi ajit bhor · Non-Coal Mining

  52. Category B2EC Granted2026-01-29

    Environmental Clearance for the Atit Majgaon Sand Spot on Urmodi river located at gut no. 761,762,773,774,775,776,777, 704,707, 708, 709, 711, 725,728, 727, 730, 732, 733 Part of Village – Atit and Gut No. 397 & 398, 462,448,446,421,420,419,417,416,402 to 404 Part of Village –Majgaon Taluka- Satara, and District: Satara

    minakshi ajit bhor · Non-Coal Mining

  53. Category B2EC Granted2026-01-29

    Environmental Clearance for the Patkhal- Kshetramahuli Sand Spot on Krushna river located at gut no. 89,90,91,92,93 & 97 Part of Village Pathkal & Gut No.22,23,21 & 20 Part of Village Kshetra Mahuli ,Taluka- Satara, and District: Satara

    minakshi ajit bhor · Non-Coal Mining

  54. Category B2EC Granted2026-01-29

    Environmental Clearance for the AAsu Sand Spot 3 on Nira river located at gut no. 302,304,305,306,338,343,345,349,350 & 352 of Village-Aasu, Taluka- Phaltan, and District: Satara

    minakshi ajit bhor · Non-Coal Mining

  55. Category B2EC Granted2026-01-29

    Environmental Clearance for the Wathar Budruk Sand Spot on Nira river located at gut no. 81,82,84,85,86 & 87 of Village-Wathar Bu., Taluka- Khandala, and District: Satara

    minakshi ajit bhor · Non-Coal Mining

  56. Category B2EC Granted2026-01-29

    Environmental Clearance for the Mhaswad Masaiwadi Sand Spot on Man river located at gut no. 283 Masaiwadi,139,125 of Mhaswad Old Survey No 1181,1167,1226,1179 Taluka- Man, and District: Satara

    minakshi ajit bhor · Non-Coal Mining

  57. Category B2EC Granted2026-01-29

    Environmental Clearance for the Jihe Sand Spot 4 on Krushna river located at gut no. 791,793,794, 797 & 799 of Village - Jihe Taluka- Satara, and District: Satara

    minakshi ajit bhor · Non-Coal Mining

  58. Category B2EC Granted2025-12-18

    Environmental Clearance for the Basalt Stone Quarry of Shri. Bhushan Dashrath Sonawane, located at gut no. 465/4, 465/5 part, Village Mulikwadi, Taluka Phaltan, District Satara

    bhushan dasharath sonawane · Non-Coal Mining

  59. Category B2EC Granted2025-12-09

    Environmental Clearance for the Bidal Sand spot 3 on Manganga river located at Gut No 280,281,282,283,284,285 & 286 of Village-Bidal, Taluka- Man, District: Satara

    SATARA DMO · Non-Coal Mining

  60. Category B2EC Granted2025-11-27

    Environmental Clearance for Stone Quarry Project (Area 2.50 Ha) with production capacity 6,000 Brass/Annum at Gut No. 313 (Part) Village- Kalaj, Taluka- Phaltan, District- Satara, Maharashtra by Shri.Bapurao Dada Gadhave & Shri Indrajeet Sanjay Gadhave

    BAPURAO DADA GADHAVE · Non-Coal Mining

  61. Category AToR Granted2025-11-21declares affected families

    Savitri Pumped Storage Project (2400 MW)

    NHPC LIMITED · River Valley and Hydroelectric Projects

  62. Category B2EC Rejected2025-11-12

    Mr. Shrikant Shankar Butala

    SHRIKANT BUTALA · Non-Coal Mining

  63. Category B2EC Granted2025-11-12

    Environmental Clearance for the Basalt Stone Quarry of Shri. Ranjeet Limbaji Shinde, located at gut no. 436 part, Village Jashi, Taluka Man, District Satara

    ranjit l shinde · Non-Coal Mining

  64. Category B2EC Granted2025-10-19

    Environmental Clearance for factory building located at Plot No I-45/A,at Chordia Industrial Park, Village Sangvi, Taluka - Chandela, District - Satara. Pin-412801 by Inoxpa India Pvt. Ltd.

    Inoxpa india private limited · INFRA-2

  65. Category B2EC Granted2025-10-10

    Cummins India Limited

    Cummins India limited · INFRA-2

  66. Category B2EC Granted2025-08-31

    Environmental Clearance for the Basalt Stone quarry of Shri. Sunil Tukaram Vetal & Sou. Sunita Sunil Vetal, located at gut no. 62/B part, Village Sambhajinagar, Taluka Patan, District Satara.

    sunil tukaram vetal · Non-Coal Mining

  67. Category B2EC Granted2025-08-30

    Environmental Clearance for the Basalt Stone Quarry of Shri. Sarang Balasaheb Khabale Patil, located at gut no. 62/B part, Village Sambhajinagar, Taluka Patan, District Satara.

    sarang balasaheb khabale patil · Non-Coal Mining

  68. Category B2EC Rejected2025-08-30

    Shri. Chandrakant Gajanan Pokale, Shri. Karan Sanjeev Kusalkar, Shri. Chintamani Ankush Pokale, Shri. Tanuraj Sanjeev Kusalkar, Shri. Shankar Gajanan Pokale, Shri. Sanjeev Rajaram Kusalkar

    CHANDRAKANT POKALE · Non-Coal Mining

  69. Category B2EC Rejected2025-08-04

    Transfer of Environmental Clearance of Existing Stone Quarry Project (Area 1.50 Ha) (Private Land) at Gut No. 190/1 (Part) Village- Dalawadi, Taluka- Phaltan, District- Satara, Maharashtra by Shri. Yogesh Gangadharrao Ohal Patil to M/s. Sagunamata Construction Pvt. Ltd. Tarfe Shri. Yashwant Yogesh Ohal Patil.

    YASHWANT YOGESH OHAL PATIL · Non-Coal Mining

  70. Category B2EC Granted2025-07-30

    Environmental Clerance for the Basalt Stone Quarry of Shri. Shrinivas Mahadev Patil, located at gut no. 1393, Village Ranand, Taluka Man, District Satara

    patil shriniwas mahadeo · Non-Coal Mining

  71. Category B1EC Granted2025-07-26

    Transfer of Environmental Clearance from M/s. Krishna Sahakari Sakhar Karkhana Ltd. to M/s. Yashwantrao Mohite Krishna Sahakari Sakhar Karkhana Ltd.

    YASHWANTRAO MOHITE KRISHNA SAHAKARI SAKHAR KARKHANA LIMITED · Industrial Projects - 2

  72. Category B1EC Granted2025-07-26

    Transfer of Environmental Clearance from M/s. Krishna Sahakari Sakhar Karkhana Ltd. to M/s. Yashwantrao Mohite Krishna Sahakari Sakhar Karkhana Ltd.

    YASHWANTRAO MOHITE KRISHNA SAHAKARI SAKHAR KARKHANA LIMITED · Industrial Projects - 2

  73. Category B2EC Granted2025-07-14

    Proposed Construction Project at Khindwadi, Satara by The Agricultural Produce Market Committee, Satara

    THE AGRICULTURAL PRODUCE MARKET COMMITEE SATARA · INFRA-2

  74. Category AToR Granted2025-07-04declares affected families

    Nivakane (Integrated) Pumped Storage Project

    ADANI GREEN ENERGY LIMITED · River Valley and Hydroelectric Projects

  75. Category AGranted2025-06-26declares affected families

    Tarali Pumping Storage Project (1500 MW)

    ADANI GREEN ENERGY LIMITED · River Valley and Hydroelectric Projects

  76. Category B2EC Granted2025-06-22

    Environmental Clearance for Stone Quarry Project (Area 1.0 ha) (Private Land) with production capacity 5,000 Brass/Annum at Gut No. 929 (Part) Village Charegaon, Taluka Karad, District-Satara, Maharashtra by Shri. Vikas Diliprao Jadhav.

    Vikas D jADHAV · Non-Coal Mining

  77. Category B2EC Granted2025-06-15

    Environmental Clearance for Stone Quarry Project (Area 1.00 Ha) (Private Land) at Khasra No. 26/5 (Part) Village- Sanhaynagar (Shere), Taluka- Karad, District- Satara, Maharashtra by Shri. Vishal Pralhad Nikam.

    VISHAL PRALHAD nikam · Non-Coal Mining

  78. Category B2EC Granted2025-06-13

    Environmental Clearance for Stone Quarry Project (Area 2.00 Ha) (Private Land)at Khasra No. 263/2 (Part) Village- Shendre, Taluka- Satara & District- Satara, Maharashtra by Shri. Shakir Siraj Shaikh, Shri. Jabir Siraj Shaikh & Shri. Siraj Chotumiya Shaikh.

    SHAKIR SIRAJ SHAIKH · Non-Coal Mining

  79. Category AEC Granted2025-05-28

    Amendment in Environmental Clearance (EC22A022MH144994 dated 17.09.2022) of M/s. Swaraj Green Power & Fuel Ltd. (SGPAFL) located at Village - Upalave, Tal – Phaltan, Dist- Satara, State-Maharashtra regarding to use grain as feed stock during Non-sugarcane crushing season to produce ethanol in 1100 KLPD Distillery without changing the ultimate capacity of distillery

    SWARAJ INDIA AGRO LTD · Industrial Projects - 2

  80. Category B2EC Granted2025-05-17

    Environmental Clearance for the Basalt stone quarry by the name of Shri. Maruti Ramchandra Kadam & Shri. Vishwajeet Anandrao Nikam, located at gut no. 26/5 part, Village Sanjaynagar (Shere), Taluka Karad, District Satara

    maruti ramchandra nikam · Non-Coal Mining

  81. Category AStandard ToR Granted2025-05-16

    Expansion of Sugar Factory from 7,500 TCD to 13,500 TCD & Distillery Unit from 150 KLPD to 220 KLPD by using C/B heavy Molasses/ Cane Juice/ Cane Syrup along with Power Generation from 1.9 MW to 3 MW by Jaywant Sugars Ltd.; Village: Dhawarwadi & Marali, Tal.: Karad, Dist.: Satara, Maharashtra State

    JAYWANT SUGARS LIMITED · Industrial Projects - 2

  82. Category B2EC Granted2025-05-10

    Re-appraisal of Environmental Clearance for Stone Quarry Project (Area 2.00 Ha) (Private Land) at Gut No. 26/2 (Part) of Village- Sanjaynagar (Shere), Taluka- Karad & District- Satara, State- Maharashtra by Shri. Dattatray Hanmant Desai.

    DATTATRAY DESAI · Non-Coal Mining

  83. Category B2EC Granted2025-05-06

    Environmental Clearance for the proposed expansion of stone quarry of shri. Arun Shivajirao Desai located at gut no. 169 part, Village Mahigaon, Taluka Javali, District Satara

    ARUN DESAI · Non-Coal Mining

  84. Category B2EC Granted2025-05-05

    Environmental Clearance for the proposed expansion of stone quarry of Shri. Vijay Shivajirao Desai located at gut no. 169 part, Village Mahigaon, Taluka Javali, District Satara

    VIJAY DESAI · Non-Coal Mining

  85. Category AToR Granted2025-04-28

    ENVIRONMENTAL CLEARANCE FOR GURUVARYA LATE LAXMANRAOJI INAMDAR LIFT IRRIGATION SCHEME (JIHE KATHAPUR), PHASE I & II, DIST; SATARA, STATE- MAHARASHTRA BY JIHE KATHAPUR LIFT IRRIGATION DIVISION, SATARA

    EX ENGR JIHE KATHAPUR LI DIVISION SATARA · River Valley and Hydroelectric Projects

  86. Category B2EC Granted2025-04-23

    Environmental Clearance for Industrial shed project located at Gat No. 463/A/2/6, 463/A/2/7 Village Dhangarwadi, Taluka Khandala, District – Satara by M/s. Wipro Pari Robotics Pvt. Ltd.

    wipro pari robotics private limited · INFRA-2

  87. Category B2EC Granted2025-04-21

    Transfer of Environmental Clearance granted by the name of Mr. Sanjay Suresh Desai to the new owner Mr. Shrinivas Mahadev Patil.

    patil shriniwas mahadeo · Non-Coal Mining

  88. Category B2EC Granted2025-04-12

    Proposed Industrial Construction Project at Plot No. B-22, MIDC, Lonand Industrial Area, Tal. Khandala, Dist. Satara by M/s. Mukand Sumi Metal Processing Limited

    MUKAND SUMI METAL PROCESSING LIMITED · INFRA-2

  89. Category B2EC Granted2025-04-05

    Environmental Clearance for Stone Quarry Project (Area 2.00 Ha) (Private Land) with production capacity 10,000 Brass/Annum at Khasra No. 262 (Part) Village- Adarki Khu., Taluka- Phaltan, District- Satara, Maharashtra by Shri. Shubham Sanjay Dhumal.

    SHUBHAM SANJAY DHUMAL · Non-Coal Mining

  90. Category B2EC Granted2025-04-04

    Environmental Clearance for Stone Quarry Project (Area 3.00 Ha) (Private Land) with production capacity 14,000 Brass/Annum at Khasra No. 436/2/4 (Part) Village- Latakewadi, Taluka- Karad, District- Satara, Maharashtra by Shri. Amit Diliprao Chavan, Shri. Anirudha Jayprakash Mohite & Shri. Kailas Shivajirao Pawar.

    Chavan amit diliprao · Non-Coal Mining

  91. Category AStandard ToR Granted2025-03-24

    Proposed Ethyl Acetate manufacturing with production capacity of 40TPD within the existing premises located at Gat. No. 147/A, Village- Sukhed, Taluka- Khandala, District- Satara, Maharashtra by M/s Ashirwad Industries.

    ashirwad industries · Industrial Projects - 3

  92. Category B2EC Granted2025-03-22

    Environmental Clearance for the Basalt stone quarry of Sou. Jayashri Chandrashekhar Patil located at gut no. 639 part, village Koriwale, Taluka Karad, District Satara

    patil jayashri chandrashekhar · Non-Coal Mining

  93. Category B2EC Granted2025-03-20

    New Construction Project, “Cummins Power Solutions India Private Limited - Centre of Excellence (COE)

    CUmmins POwer solutions India private limited · INFRA-2

  94. Category B2EC Granted2025-03-11

    Environmental Clearance for the Stone Quarry of Shri. Vijay Kundlik Kadam; located at gut no. 780 part Village Karandi, Taluka Satara, District Satara

    vijay k kadam · Non-Coal Mining

  95. Category AStandard ToR Granted2025-02-27

    Expansion of Distillery from 142 KLPD to 300 KLPD (C/ B Heavy Molasses/Sugarcane Juice/Syrup), Sugar Factory from 7,500 TCD to 12,000 TCD & Co-generation Plant from 16 MW to 38 MW by Yashwantrao Mohite Krishna Sahakari Sakhar Karkhana Ltd. at Village: Shivnagar, Rethare Bk., Tal.: Karad, Dist.: Satara, Maharashtra State.

    YASHWANTRAO MOHITE KRISHNA SAHAKARI SAKHAR KARKHANA LIMITED · Industrial Projects - 2

  96. Category B2EC Rejected2025-02-13

    Re-appraisal of Environmental Clearance for Stone Quarry Project (Area 2.00 ha) (Private Land) with production capacity 2,000 Brass/Annum at Gut No. 286/1/2 (Part) Village- Shendre, Taluka- Satara, District- Satara, Maharashtra by M/s. Bhagyalaxmi Associates of Shri. Dhananjay Bajirao Jambhale & Shri. Santosh Rajan Thorat.

    DHANANJAY BAJIRAO JAMBHALE · Non-Coal Mining

  97. Category B2EC Rejected2025-02-12

    Environmental Clearance for Stone Quarry Project (Area 3.00 Ha) (Private Land) with production capacity 20,000 Brass/Annum at Khasra No. 95 (Part) Village- Ambawade, Taluka- Patan, District- Satara, Maharashtra by Shri. Mahesh Raghunath Patil.

    MAHESH RAGHUNATH PATIL · Non-Coal Mining

  98. Category B2EC Granted2025-02-11

    Expansion of Environmental Clearance for Basalt Stone Quarry Project (Area 2.55 ha) (Private Land) with production capacity 6812 Brass/Annum at Gut Sy. No.47/4 Part of Village-Punanvadi , Taluka & District- Satara, Maharashtra, by Shri. Santosh Anil Bhosale

    SANTOSH ANIL BHOSALE · Non-Coal Mining

  99. Category B1EC Granted2025-02-10

    Amendment in Environmental Clearance for Greenfield Project of SSP - 300 MTPD, GSSP - 200 MTPD and other sulphate based Fertilizer at Village Takewadi, Taluka-Man, Satara by M/s Shree Agro Crop Sciences Pvt. Ltd.

    SHREE AGRO CROP SCIENCES PVT. LTD · Industrial Projects - 3

  100. Category B2EC Granted2025-02-08

    Transfer of Environmental Clearance granted by the name of Mr. Avinash Shripatrao Molawade to the new owner Shri. Prithviraj Avinash Molawade, Smt. Sadhana Avinash Molawade & Shri. Jayraj Avinash Molawade.

    PRITHVIRAJ MOLAWADE · Non-Coal Mining

Showing 100 of 192 proposals, newest first. The button below loads the rest.