← All districts

West Godavari, Andhra Pradesh

Partly Scheduled AreaCensus 2011 district code 546
  1. 26 Oct 2026 · Details soughtEssential details soughtM/s. SUN SRI LABORATORIES PRIVATE LIMITED
  2. 16 Oct 2026 · Details soughtEssential details examination completedM/s. SUN SRI LABORATORIES PRIVATE LIMITED
  3. 7 Oct 2026 · Details soughtEssential details soughtM/s Sri Mani Sai Stone Crusher
  4. 3 Oct 2026 · FiledSubmittedCHINTALAPUDI LIFT IRRIGATION SCHEME
  5. 30 Sept 2026 · Details soughtEssential details soughtM/s. SUN SRI LABORATORIES PRIVATE LIMITED
  6. 30 Sept 2026 · FiledSubmittedSri Thorati Ganesh
  7. 25 Sept 2026 · FiledSubmittedM/s Sri Mani Sai Stone Crusher
  8. 25 Sept 2026 · FiledSubmittedM/s. SUN SRI LABORATORIES PRIVATE LIMITED
  9. 7 Sept 2026 · FiledSubmitted4.383 Ha., Ball Clay Mine at Sy.No. 18/2 (P) and 66 (P), Dwaraka Tirumala Village & Mandal, Eluru District…

Dated by the portal's own appraisal history, converted to India Standard Time; a proposal with no recorded history appears on its register submission date.

Other clearances these proposals declare

Forest land diversion declared
3
Forest land sought for diversion
Area not stated
Wildlife board recommendation declared
1
In or near a protected area
0
In an eco-sensitive zone
1

These counts are taken from the application forms of the 119 of 119 proposals naming this district whose forms have been read for these questions. In 35 of those forms at least one question was left blank, and a blank answer is counted as unknown. The forest area is the area stated for forest clearance, with each forest proposal counted once, in the district where its project is primarily sited. 1 proposals declare activity in a coastal regulation zone.

Proposals naming this district
119
Category A proposals
14
Families declared displaced
4,789
Families declared affected
4,789

Displacement figures are the proponents’ own declarations. A project sited across several districts declares one figure for the whole project, and that figure is counted once, in the district where the project is primarily sited.

Fifth Schedule status

Partly within a Fifth Schedule Scheduled Area

The Order fixes the area by reference to territorial divisions as existing at 26 January 1950. It names only part of this district, so district-level status cannot settle whether a particular site is inside it.

OrderThe Scheduled Areas (Part A States) Order, 1950 · C.O. 9, notified 1950-01-26

What the record shows

  • Agricultural labourers, who work other people's land for wages, make up 60% of workers here. Compensation for acquired land is paid to those who hold title to it, so it does not reach them. They can still claim the rehabilitation and resettlement entitlements of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (RFCTLARR), because its section 3(c) counts a family whose livelihood depends on the land as an affected family, wherever that Act governs how the land is obtained.

  • Part of this district is a Fifth Schedule Scheduled Area. Acquiring land for a project sited in that part needs the Gram Sabha's prior consent under section 41(3) of RFCTLARR, and the district-level record cannot settle whether a particular site lies there.

  • Applicants for projects sited mainly in this district have declared 4,789 families to be displaced. The figure comes from their applications, and we have not verified it.

Each of these observations appears when a fixed rule is met by the figures on this page, so the same figures always give the same sentences. None of them is a view on whether a project should go ahead.

Who lives there

Figures from Census 2011, each compared with the all-India value computed on the same definition.

Total population
39,36,966
Households
10,91,525
Average household size
3.61
1.24 below India's 4.85India
Scheduled Tribe share of population
2.8%
5.8 points below IndiaIndia
Scheduled Caste share of population
20.6%
4.0 points above IndiaIndia
Children aged 0-6
9.7%
3.8 points below IndiaIndia
Literacy rate
74.6%
1.6 points above IndiaIndia
Sex ratio
1,004
61.0 above India's 942.6India

What they live on

How the district's workers earn a living, from Census 2011. The land-dependent share counts cultivators and agricultural labourers as a share of all workers, and it is the group most directly affected when land is acquired.

Total workers
17,73,112
Work participation rate
45.0%
5.3 points above IndiaIndia
Workers dependent on land
68.6%
14.1 points above IndiaIndia
Cultivators
8.8%
15.9 points below IndiaIndia
Agricultural labourers
59.9%
30.0 points above IndiaIndia
Marginal workers
13.5%
11.3 points below IndiaIndia
Household industry workers
1.9%
1.9 points below IndiaIndia

How households live

Land, income and work among rural households, from the Socio Economic and Caste Census 2011, which recorded these where the population census did not. Only the survey's rural part is used here, so urban households do not appear.

Rural households owning land
20.4%
25.7 points below IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households whose highest earner makes over ₹5,000 a month
24.2%
0.2 points below IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households living mainly on manual casual labour
68.8%
17.1 points above IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households with a salaried member
3.8%
4.5 points below IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

When these were filed

Each proposal is dated by the first step in its appraisal history, the dated record of steps the portal keeps for it.

2023-Q12026-Q4

The timeline counts 68 of the 119 proposals here. The first filing date comes from each proposal's appraisal history, and we have not yet read it for the other 51, so they are left out. Most of them are older proposals, so the early part of the timeline undercounts what was filed then. The register itself records a date for each of them; the gap is in our copy of the histories.

Hatched columns undercount, so they cannot be compared with solid ones. 4 of them cover periods for which we have read few filing dates so far, and they count only the proposals whose date we have. 2026-Q4 was still running when the register was read, so its column counts only the filings made up to that date.

What kind of projects these are

The proposals naming this district, grouped by the sector each was filed under.

  • Non-Coal Mining 74.8%
  • Industrial Projects - 2 13.4%
  • INFRA-2 4.2%
  • Industrial Projects - 3 3.4%
  • Other (2) 4.2%

The four largest sectors are shown by name and the rest are grouped as Other.

What is proposed here

These are the proposals in the national environmental clearance register whose application names a site in this district, newest first. A project with sites in several districts appears under each of them.

  1. Category AEDS Raised2026-10-16

    M/s. SUN SRI LABORATORIES PRIVATE LIMITED

    SUNSRI LABORATORIES PRIVATE LIMITED · Industrial Projects - 3

  2. Category B1Referred to SAEIA2026-10-03

    CHINTALAPUDI LIFT IRRIGATION SCHEME

    Department of Irrigation · River Valley and Hydroelectric Projects

  3. Category B1Under Examination2026-09-30

    Sri Thorati Ganesh

    THORATI GANESH · Non-Coal Mining

  4. Category B1EDS raised2026-09-25

    M/s Sri Mani Sai Stone Crusher

    sri mani sai stone crusher · Non-Coal Mining

  5. Category B1Pending at MS SAEIA2026-09-07

    4.383 Ha., Ball Clay Mine at Sy.No. 18/2 (P) and 66 (P), Dwaraka Tirumala Village & Mandal, Eluru District of Sri O.K. Visweswara Rao

    KASIVISWESWARARAO OBILISETTI · Non-Coal Mining

  6. Category B1Forwarded to MS SPCB/PCC by MS2026-06-26

    M/s SVSM Granites LLP

    SVSM GRANITES LLP · Non-Coal Mining

  7. Category B1EC Granted2026-06-16

    ASRAM Super Specialty Hospital and ASR Institute for Cancer Care, Research and Rehabilitation by M/s Alluri Sitarama Raju Educational Society (ASRAM Hospital & Medical College)

    ALLURI SITARAMA RAJU EDUCATIONAL SOCIETY (ASRAM HOSPITAL & MEDICAL COLLEGE) · INFRA-2

  8. Category B2EC Granted2026-05-08

    Exploratory Drilling of 15 Wells in Dr. B. R. Ambedkar Konaseema, Kakinada and West Godavari Districts, Andhra Pradesh

    DEEP EXPLORATION SERVICES PRIVATE LIMITED · Industrial Projects - 2

  9. Category B2EC Granted2026-05-08

    Exploratory Drilling of 01 Well in West Godavari District, Andhra Pradesh

    DEEP EXPLORATION SERVICES PRIVATE LIMITED · Industrial Projects - 2

  10. Category AToR Granted2026-04-15

    Setting up of Madupalli QPS in East Godavari District and conversion of Exploratory well MDUAA to Development well

    OIL AND NATURAL GAS CORPORATION LIMITED · Industrial Projects - 2

  11. Category B1ToR Granted2026-04-05

    M/s Badri Stone Crusher

    BADRI STONE CRUSHER · Non-Coal Mining

  12. Category B2EC Granted2026-04-03

    M/s Sridevi Granites

    SRIDEVI GRANITES · Non-Coal Mining

  13. Category B1ToR Granted2026-04-03

    M/s SSPN Rocktech

    sspn rock tech · Non-Coal Mining

  14. Category AProposal returned in present form2026-03-31

    Modernization of Existing Ammonia-Urea Complex for Manufacturing of Green Ammonia along with Existing Grey Ammonia and Urea Plant by M/s AM Green Ammonia (India) Pvt. Ltd

    AM Green Ammonia (India) PRIVATE LIMITED · Industrial Projects - 3

  15. Category AStandard ToR Granted2026-03-27

    Setting up of Madupalli QPS in East Godavari District and conversion of Exploratory well MDUAA to Development well

    OIL AND NATURAL GAS CORPORATION LIMITED · Industrial Projects - 2

  16. Category B2EC Granted2026-03-27

    ADDITIONAL EXPLORATORY DRILLING OF45 WELLS IN WEST GODAVARI, MALLESWARAM AND NANDIGAMA PML BLOCKS FALLING IN KRISHNA, ELURU AND WEST GODAVARI DISTRICTS OF ANDHRA PRADESH

    OIL AND NATURAL GAS CORPORATION LIMITED · Industrial Projects - 2

  17. Category B1ToR Granted2026-03-18

    Amendment in Terms of Reference by M/s Alluri Sitarama Raju Educational Society (ASRAM Hospital & Medical College)

    ALLURI SITARAMA RAJU EDUCATIONAL SOCIETY (ASRAM HOSPITAL & MEDICAL COLLEGE) · INFRA-2

  18. Category B2EC Rejected2026-03-18

    EXPLORATORY DRILLING OF 01 WELL IN WEST GODAVARI DISTRICT, ANDHRA PRADESH

    OIL AND NATURAL GAS CORPORATION LIMITED · Industrial Projects - 2

  19. Category B2EC Rejected2026-03-18

    EXPLORATORY DRILLING OF 15 WELLS IN Dr. B.R.AMBEDKAR KONASEEMA/KAKINADA /WEST GODAVARI DISTRICTS ANDHRA PRADESH

    OIL AND NATURAL GAS CORPORATION LIMITED · Industrial Projects - 2

  20. Category B1EC Granted2026-03-13

    M/s Akshaya Granites and Metals; Mg.P. Uma Devi Andru

    AKSHAYA GRANITES AND METALS · Non-Coal Mining

  21. Category B2EC Granted2026-03-09

    Proposed Quarry lease area – 1.309 Ha. for mining of Gravel, Ordinary Earth, Road Metal & Ballast at Sy.No.90/2 (LP No.372) of Kondagudem Village, Devarapalli Mandal, East Godavari District : Mallika Stone Crusher, Prop: Vallabhani Srinivasa Rao

    VALLABHANI SRINIVAS RAO · Non-Coal Mining

  22. Category B1EC Granted2026-03-04

    M/s Sri Sesha Sai Metal Suppliers; Mg.P: Sri Meda Gangadharam

    SRI SESHASAI METAL SUPPLIERS · Non-Coal Mining

  23. Category B1EC Granted2026-03-03

    M/s Madhavi Stone Crusher; Prop: Sri K. Naga Venkata Krishna Ganesh

    KATRAGADDA NAGA VENKATA KRISHNA GANESH · Non-Coal Mining

  24. Category AEC Granted2026-03-03

    Proposed Onshore Development & Production of oil and gas from 172 wells in 8 PML blocks in Konaseema, West Godavari & Krishna Districts

    OIL AND NATURAL GAS CORPORATION LIMITED · Industrial Projects - 2

  25. Category B1ToR Granted2026-02-28

    Sri Koduri Venkata Ratnam

    KODURI VENKATA RATNAM · Non-Coal Mining

  26. Category AProposal returned in present form2026-02-18

    Submission of EC Corrigendum application to mention the List of By-products in the issued EC for the proposed expansion of existing Bulk Drugs & Drug Intermediates manufacturing unit along with 2.5 MW Co-generation by Tagoor Laboratories Pvt. Ltd., Unit-II (Formerly known as Tagoor Chemicals Pvt. Ltd.)

    TAGOOR LABORATORIES PRIVATE LIMITED · Industrial Projects - 3

  27. Category B2EC Granted2026-02-16

    Sri Manapati Abbulu

    manapati abbulu · Non-Coal Mining

  28. Category B1ToR Granted2026-02-07

    CHINTALAPUDI LIFT IRRIGATION SCHEME

    Department of Irrigation · River Valley and Hydroelectric Projects

  29. Category B1EC Granted2026-01-02

    Smt.V. Radhika

    RADHIKA VALLUR · Non-Coal Mining

  30. Category B2EC Granted2025-12-29

    M/s Sri Kanaka Durga Stone Crusher

    SRI KANAKA DURGA STONE CRUSHER · Non-Coal Mining

  31. Category B1ToR Granted2025-12-07

    Expansion of Cancer Hospital and Medicine Allied Block by M/s Alluri Sitarama Raju Educational Society (ASRAM Hospital & Medical College)

    ALLURI SITARAMA RAJU EDUCATIONAL SOCIETY (ASRAM HOSPITAL & MEDICAL COLLEGE) · INFRA-2

  32. Category B2EC Granted2025-11-06

    M/s Sri Venkateswara Granites & Metals, Mg.P: Sri Goli Rami Reddy (1.878 Hects.,)

    SRI VENKATESWARA GRANITES & METALS · Non-Coal Mining

  33. Category B2EC Granted2025-10-18

    SRI PONNAM PRAVEEN

    PRAVEEN PONNAM · Non-Coal Mining

  34. Category AEC Granted2025-09-05

    Proposed Onshore Development & Production of oil and gas from 172 wells in 8 PML blocks in Konaseema, West Godavari & Krishna Districts

    OIL AND NATURAL GAS CORPORATION LIMITED · Industrial Projects - 2

  35. Category B1EC Granted2025-09-03

    Proposal for permission to produce Absolute Alcohol along with ENA/Fuel-Grade Ethanol in the existing plant and to enhance the production capacity of ENA/Fuel-Grade Ethanol/Absolute Alcohol from 90 KLPD to 180 KLPD (120 KLPD using grains as raw material and an additional 60 KLPD by procuring Rectified Spirit from external sources)

    CAPRICORN DISTILLERY PRIVATE LIMITED · Industrial Projects - 2

  36. Category AEC Granted2025-08-22

    Proposed Onshore Oil and Gas Development, Production and Processing Facilities with pipelines within Contract Area of KG/ONDSF/KAVITAM/2021 (Kavitam Block), West Godavari District, Andhra Pradesh By IMC Infrastructure Private Limited

    IMC INFRASTRUCTURE PRIVATE LIMITED · Industrial Projects - 2

  37. Category B1EC Granted2025-08-07

    Smt. Hemalatha Devineni

    DEVINENI HEMALATHA · Non-Coal Mining

  38. Category B2EC Granted2025-08-02

    Smt Rajana Sanjana

    RAJANA SANJANA · Non-Coal Mining

  39. Category AProposal returned in present form2025-08-01

    Proposed Onshore Development & Production of oil and gas from 172 wells in 8 PML blocks in Konaseema, West Godavari & Krishna Districts

    OIL AND NATURAL GAS CORPORATION LIMITED · Industrial Projects - 2

  40. Category B2EC Granted2025-07-02

    SRI LAKSHMI NARAYANA RAJU PATSAMATLA (2.652 Ha)

    lakshmi narayana raju patsamatla · Non-Coal Mining

  41. Category B1ToR Granted2025-06-21

    M/s Sri Sesha Sai Metal Suppliers; Mg.P: Sri Meda Gangadharam

    SRI SESHASAI METAL SUPPLIERS · Non-Coal Mining

  42. Category B1ToR Granted2025-06-17

    M/s Madhavi Stone Crusher; Prop: Sri K. Naga Venkata Krishna Ganesh

    KATRAGADDA NAGA VENKATA KRISHNA GANESH · Non-Coal Mining

  43. Category AProposal returned in present form2025-06-05declares affected families

    Polavaram Banakacherla Link Project (PBLP)

    BANOTHU RAMBABU · River Valley and Hydroelectric Projects

  44. Category B1EC Granted2025-05-15

    M/s Sri Kanaka Durga Stone Crushers

    SRI KANAKA DURGA STONE CRUSHER · Non-Coal Mining

  45. Category B1EC Granted2025-05-13

    M/s. Sri Balaji Stone Crusher

    SRI BALAJI STONE CRUSHER · Non-Coal Mining

  46. Category B1EC Granted2025-05-13

    M/s Vara Lakshmi Granite and Metals,

    VARALAKSHMI KANTIPUDI · Non-Coal Mining

  47. Category B2EC Granted2025-05-11

    Sri Koduri Venkata Ratnam

    KODURI VENKATA RATNAM · Non-Coal Mining

  48. Category B2EC Granted2025-05-09

    M/s Murali Krishna Metal Suppliers, Mg.P: Sri Vangara Gangadhar Rao

    MURALI KRISHNA METAL SUPPLIERS · Non-Coal Mining

  49. Category B1Proposal Withdrawal Request Accepted2025-05-05

    M/s Murali Krishna Granites, Mg.P: Sri Veerabhadra Raju Kanumuri (1.214 Hect)

    MURALI KRISHNA GRANITES · Non-Coal Mining

  50. Category B2EC Granted2025-05-03

    M/s VENKATA SAI STONE CRUSHER, PROP : SMT MATTA MAHALAKSHMI (3.970 Hects)

    MAHALAKSHMI MATTA · Non-Coal Mining

  51. Category B1ToR Granted2025-03-31

    Smt. Hemalatha Devineni

    DEVINENI HEMALATHA · Non-Coal Mining

  52. Category B2EC Granted2025-03-19

    Sri Balaji Granites and Metals, Mg.P.Sri Goli Manmadha Reddy

    G MANMADHA REDDY · Non-Coal Mining

  53. Category B2EC Granted2025-03-05

    Sri. Koduri Venkata Ratnam

    KODURI VENKATA RaTNAM · Non-Coal Mining

  54. Category B1ToR Granted2025-01-11

    Smt.V. Radhika

    RADHIKA VALLUR · Non-Coal Mining

  55. Category B1ToR Granted2024-12-12

    Proposal for permission to produce Absolute Alcohol along with ENA/Fuel-Grade Ethanol in the existing plant and to enhance the production capacity of ENA/Fuel-Grade Ethanol/Absolute Alcohol from 90 KLPD to 180 KLPD (120 KLPD using grains as raw material and an additional 60 KLPD by procuring Rectified Spirit from external sources)

    CAPRICORN DISTILLERY PRIVATE LIMITED · Industrial Projects - 2

  56. Category B1ToR Granted2024-11-11

    Nadipudi – 3 Open Sand Reach

    JAYA GORASA · Non-Coal Mining

  57. Category B1ToR Granted2024-11-11

    Karugorumilli-1 Open Sand Reach

    JAYA GORASA · Non-Coal Mining

  58. Category AProposal returned in present form2024-10-06

    Proposed Onshore Oil and Gas Development, Production and Processing Facilities with pipelines within Contract Area of KG/ONDSF/KAVITAM/2021 (Kavitam Block), West Godavari District, Andhra Pradesh By IMC Infrastructure Private Limited

    IMC INFRASTRUCTURE PRIVATE LIMITED · Industrial Projects - 2

  59. Category B2EC Granted2024-10-01

    M/s Sri Kanaka Durga Stone Crusher

    SRI KANAKA DURGA STONE CRUSHER · Non-Coal Mining

  60. Category B2EC Granted2024-10-01

    M/s Sri Lakshmi Durga Granites

    PEPAKAYALA VEERA VENKATA LAKSHMIDURGA · Non-Coal Mining

  61. Category B1ToR Granted2024-09-30

    M/s. Sri Balaji Stone Crusher

    SRI BALAJI STONE CRUSHER · Non-Coal Mining

  62. Category AGranted2024-07-24

    Grain Based Distillery plant and 2.25 MW Power plant of M/s. MS BIOTECH PRIVATE LIMITED

    MS BIOTECH PRIVATE LIMITED · Industrial Projects - 2

  63. Category B1EC Granted2024-02-11

    M/s. Seetha Rama Granite Metals

    SITARAMA GRANITE METALS · Non-Coal Mining

  64. Category B1EC Granted2024-02-10

    M/s Vara Lakshmi Granite and Metals,

    VARALAKSHMI KANTIPUDI · Non-Coal Mining

  65. Category B1EC Granted2024-02-10

    Sri Maddipati Satyanarayana

    SATYANARAYANA MADDIPATI · Non-Coal Mining

  66. Category B2Withdrawal Request Accepted2024-02-10

    Proposed New Residential High rise Building Project “ARK THE PRIDE”

    ARK VISHNU DEVELOPERS · INFRA-2

  67. Category B2EC Granted2023-12-28

    Smt. Ghanta Padmaja

    GHANTA PADMAJA · Non-Coal Mining

  68. Category B1EC Granted2023-12-15

    M/S. Sri Lakshmi Sai Srinivasa Granites

    SRI LAKSHMI SAI SRINIVASA GRANITES · Non-Coal Mining

  69. Category B1EC Granted2023-12-15

    Sri Prasanna Stone Crusher

    SRI PRASANNA STONE CRUSHER · Non-Coal Mining

  70. Category B1TOR Granted2023-12-14

    Construction of Anti Erosion Embankment in Peda Mainavani Lanka Village, West Godavari District, Andhra Pradesh.

    DELOITTE TOUCHE TOHMATSU INDIA LLP · INFRA-1

  71. Category B1TOR Granted2023-11-23

    Sri Sri Balaji Granites, Mg.P. Smt K. Vara Lakshmi

    M/S SRI SRI BALAJI GRANITES · Non-Coal Mining

  72. Category B2EC Granted2023-11-16

    Sri Venkata Sai Stone Crusher, Prop: Smt. Matta Mahalakshmi

    MAHALAKSHMI MATTA · Non-Coal Mining

  73. Category B2EC Granted2023-11-16

    Sri Lakshmi Durga Metals, Mg.P: Sri V.S.V Sivanarayana

    SRI VENKATA SIVA NARAYANA VEERAMACHA · Non-Coal Mining

  74. Category B2EC Granted2023-11-16

    M/s Sai Sri Lakshmi Venkateswara Stone Crusher, Mg.P: Sri T. Venkatesham

    SAI SRI LAKSHMI VENKATESWARA STONE CRUSHER · Non-Coal Mining

  75. Category B2EC Granted2023-11-16

    Smt. A. Sowjanaya

    SOWJANYA APPALABATHULA · Non-Coal Mining

  76. Category B2EC Granted2023-11-16

    M/s Sri Gowri Earth Movers, Mg.P: Sri M.V.S Prasad

    SRI GOWRIEARTH MOVERS · Non-Coal Mining

  77. Category B2EC Granted2023-11-16

    Sri Raghavendra Metals, Prop: Smt. M . Mrudula

    MEDIKONDA MRUDULA · Non-Coal Mining

  78. Category B2EC Granted2023-11-16

    Sri U. V. P Krishna Rao

    VENKATA PHANI VUPPULURI · Non-Coal Mining

  79. Category B2EC Granted2023-11-16

    Smt Gandham Kasi Vijaya Lakshmi

    KASI GANDHAM · Non-Coal Mining

  80. Category B2EC Granted2023-11-16

    DNR Metals, Prop: Dwarampudi. Naveen Reddy

    NAVEEN REDDY DWARAMPUDI · Non-Coal Mining

  81. Category B2EC Granted2023-11-16

    Sri Talam Ganapathi

    SRI. TALAM GANAPATHI · Non-Coal Mining

  82. Category B2EC Granted2023-11-16

    M/s Surya Chandra Mining & Minerals

    AMMAJI POTHULA · Non-Coal Mining

  83. Category B2EC Granted2023-11-16

    Vijaya Lakshmi Granite Metal Suppliers, Prop: Sri G. Nageswara Rao

    GANDHAM NAGESWARA RAO · Non-Coal Mining

  84. Category B2EC Granted2023-11-14

    Karugorumilli Open Sand Reach

    JAYA GORASA · Non-Coal Mining

  85. Category B2EC Granted2023-11-13

    Teeparru (2023-3) Sand Reach, 4.53 ha.

    SUBRAHMANYAM MANNEM · Non-Coal Mining

  86. Category B2EC Granted2023-11-11

    Nadipudi/2023-1 Open Sand Reach

    JAYA GORASA · Non-Coal Mining

  87. Category B2EC Granted2023-11-03

    Sri. M. Rajaendra Babu Prasad

    RAJENDRA BABU MALLIPEDDI · Non-Coal Mining

  88. Category B1Pending at MS for MoM Creation2023-10-19

    CHINTALAPUDI LIFT IRRIGATION SCHEME

    Department of Irrigation · River Valley and Hydroelectric Projects

  89. Category B1TOR Granted2023-09-29

    M/s Akshaya Granites and Metals; Mg.P. Uma Devi Andru

    AKSHAYA GRANITES AND METALS · Non-Coal Mining

  90. Category B2EC Granted2023-09-17

    SRI PONNAM PRAVEEN

    PRAVEEN PONNAM · Non-Coal Mining

  91. Category AStandard ToR Granted2023-09-06

    Proposed Onshore Oil and Gas Development, Production and Processing Facilities with pipelines within Contract Area of KG/ONDSF/KAVITAM/2021 (Kavitam Block), West Godavari District, Andhra Pradesh By IMC Infrastructure Private Limited

    IMC INFRASTRUCTURE PRIVATE LIMITED · Industrial Projects - 2

  92. Category B1TOR Granted2023-08-10

    M/s Sri Kanaka Durga Stone Crushers

    SRI KANAKA DURGA STONE CRUSHER · Non-Coal Mining

  93. Category B1EC Granted2023-08-08

    M/s Sri Siri Stone Crusher & Company, Mg.P: Sri P.Suryanarayana Raju

    PERICHERLA SURYANARAYANA RAJU · Non-Coal Mining

  94. Category B2EDS raised2023-08-03

    M/s Sri Sri Balaji Granites, Mg.P Smt Kattragadda Vara Lakshmi

    M/S SRI SRI BALAJI GRANITES · Non-Coal Mining

  95. Category B2EDS raised2023-07-26

    Sri Kotla Sundeep

    SUNDEEP KOTLA · Non-Coal Mining

  96. Category B1TOR Granted2023-07-13

    M/s Vara Lakshmi Granite and Metals,

    VARALAKSHMI KANTIPUDI · Non-Coal Mining

  97. Category B2EC Granted2023-06-23

    M/s Isukapalli Veera Raju Granite Metal Suppliers, Prop: Sri Isukapalli Veera Raju

    VEERRAJU ISUKAPALLI · Non-Coal Mining

  98. Category B1TOR Granted2023-05-17

    M/s. SURYA CHANDRA MINING & MINERAL

    AMMAJI POTHULA · Non-Coal Mining

  99. Category B1TOR Granted2023-04-12

    Sri Prasanna Stone Crusher

    SRI PRASANNA STONE CRUSHER · Non-Coal Mining

  100. Category B1TOR Granted2023-04-04

    M/s. Seetha Rama Granite Metals

    SITARAMA GRANITE METALS · Non-Coal Mining

Showing 100 of 119 proposals, newest first. The button below loads the rest.