Bidar, Karnataka
Recent activity
All 2 in the last 60 days- 17 Sept 2026 · FiledSubmittedBuilding Stone Quarry (QL No. BIDNS-64) "Sri. Prasanna P Khandre"
- 2 Sept 2026 · Details soughtEssential details soughtEnvironmental Clearance to Proposed Change in Product Mix with an Increase in Production Capacity of Bulk…
Dated by the portal's own appraisal history, converted to India Standard Time; a proposal with no recorded history appears on its register submission date.
Other clearances these proposals declare
- Forest land diversion declared
- 0
- Forest land sought for diversion
- None declared
- Wildlife board recommendation declared
- 0
- In or near a protected area
- 0
- In an eco-sensitive zone
- 1
These counts are taken from the application forms of the 42 of 42 proposals naming this district whose forms have been read for these questions. In 31 of those forms at least one question was left blank, and a blank answer is counted as unknown. The forest area is the area stated for forest clearance, with each forest proposal counted once, in the district where its project is primarily sited.
- Proposals naming this district
- 42
- Category A proposals
- 6
- Families declared displaced
- None declared
- Families declared affected
- None declared
Displacement figures are the proponents’ own declarations. A project sited across several districts declares one figure for the whole project, and that figure is counted once, in the district where the project is primarily sited.
Fifth Schedule status
Not within a Fifth Schedule Scheduled Area
No Presidential Order under paragraph 6 of the Fifth Schedule declares any Scheduled Area in Karnataka, so no part of this district is one and PESA does not apply.
OrderMinistry of Tribal Affairs, Scheduled Areas declared under paragraph 6 of the Fifth Schedule to the Constitution
Who lives there
Figures from Census 2011, each compared with the all-India value computed on the same definition.
- Total population
- 17,03,300
- Households
- 3,19,937
- Average household size
- 5.32
- 0.47 above India's 4.85India
- Scheduled Tribe share of population
- 13.9%
- 5.3 points above IndiaIndia
- Scheduled Caste share of population
- 23.5%
- 6.8 points above IndiaIndia
- Children aged 0-6
- 13.2%
- 0.4 points below IndiaIndia
- Literacy rate
- 70.5%
- 2.5 points below IndiaIndia
- Sex ratio
- 956
- 13.7 above India's 942.6India
What they live on
How the district's workers earn a living, from Census 2011. The land-dependent share counts cultivators and agricultural labourers as a share of all workers, and it is the group most directly affected when land is acquired.
- Total workers
- 7,02,608
- Work participation rate
- 41.3%
- 1.5 points above IndiaIndia
- Workers dependent on land
- 60.0%
- 5.4 points above IndiaIndia
- Cultivators
- 20.1%
- 4.5 points below IndiaIndia
- Agricultural labourers
- 39.9%
- 9.9 points above IndiaIndia
- Marginal workers
- 21.5%
- 3.3 points below IndiaIndia
- Household industry workers
- 2.6%
- 1.2 points below IndiaIndia
How households live
Land, income and work among rural households, from the Socio Economic and Caste Census 2011, which recorded these where the population census did not. Only the survey's rural part is used here, so urban households do not appear.
- Rural households owning land
- 43.4%
- 2.7 points below IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
- Rural households whose highest earner makes over ₹5,000 a month
- 40.7%
- 16.3 points above IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
- Rural households living mainly on manual casual labour
- 34.5%
- 17.3 points below IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
- Rural households with a salaried member
- 9.0%
- 0.7 points above IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
When these were filed
Each proposal is dated by the first step in its appraisal history, the dated record of steps the portal keeps for it.
The timeline counts 37 of the 42 proposals here. The first filing date comes from each proposal's appraisal history, and we have not yet read it for the other 5, so they are left out. Most of them are older proposals, so the early part of the timeline undercounts what was filed then. The register itself records a date for each of them; the gap is in our copy of the histories.
Hatched columns undercount, so they cannot be compared with solid ones.
What kind of projects these are
The proposals naming this district, grouped by the sector each was filed under.
- Industrial Projects - 3 47.6%
- Non-Coal Mining 45.2%
- Industrial Projects - 2 4.8%
- River Valley and Hydroelectric Projects 2.4%
The four largest sectors are shown by name and the rest are grouped as Other.
What is proposed here
These are the proposals in the national environmental clearance register whose application names a site in this district, newest first. A project with sites in several districts appears under each of them.
- Category B2Under Verification2026-09-17
Building Stone Quarry (QL No. BIDNS-64) "Sri. Prasanna P Khandre"
PRASANNA P KHANDRE · Non-Coal Mining
- Category B1Under Verification2026-09-08
Environmental Clearance to Proposed Change in Product Mix with an Increase in Production Capacity of Bulk Drugs Intermediates and Active Pharmaceutical Ingredients (APIS) by M/s. Satyadeeptha Pharmaceuticals Ltd.
SATYADEEPTHA PHARMACEUTICALS LTD · Industrial Projects - 3
- Category B2Proposal Accepted and Referred to SEAC2026-09-02
KODAMBAL LATERITE QUARRY
MANDU BASSI SACHIN · Non-Coal Mining
- Category AEC Granted2026-02-07
Proposed Green Field Project for Establishment of Active Pharmaceutical Ingredients (APIs) and API Intermediates Manufacturing Unit along with R&D Facility located at Sy. No. 140/*/1, Muttangi (V), Chitaguppa Taluk, Bidar District, Karnataka by M/s. Global Organichem Private Limited
Global Organichem Private Limited · Industrial Projects - 3
- Category B2EC Granted2026-01-28
Laterite Mineral Quarry
SHIVKUMARPATIL · Non-Coal Mining
- Category B1EC Granted2025-12-11
Modification and Expansion of Active Pharmaceutical Ingredients (APIs), Intermediates, R&D products and Custom Synthesis Manufacturing Unit
M/S. SAI LIFE SCIENCES LIMITED · Industrial Projects - 3
- Category B1ToR Granted2025-10-06
Environmental Clearance to Proposed Change in Product Mix with an Increase in Production Capacity of Bulk Drugs Intermediates and Active Pharmaceutical Ingredients (APIS) by M/s. Satyadeeptha Pharmaceuticals Ltd.
SATYADEEPTHA PHARMACEUTICALS LTD · Industrial Projects - 3
- Category B2EC Granted2025-09-12
“Building Stone(Basalt) Quarry”
NAGNATH · Non-Coal Mining
- Category B2Proposal pulled back (withdrawn)2025-09-05
Proposed Change in Product mix with Increase in Production Capacity of Bulk drugs Intermediates and Active Pharmaceutical Ingredients (APIs) along with Enhancement of Plant Facilities
SATYADEEPTHA PHARMACEUTICALS LTD · Industrial Projects - 3
- Category B2EC Granted2025-09-03
MEHAKAR LIFT IRRIGATION SCHEME Lifting of 1.00 TMC of water from Manjra River near Manikeshwara Village, Bhalki Taluk, Bidar District TO IRRIGATE 8,475 HA COMMAND AREA
GNYANESHWAR V MANDE · River Valley and Hydroelectric Projects
- Category B2EC Granted2025-08-09
“Building Stone Quarry” of Sri. Mallikarjun Swamy
MALLIKARJUN SWAMy · Non-Coal Mining
- Category B1EC Granted2025-07-23
Modification & Expansion of Active Pharmaceutical Ingredients (APIs) & Intermediates Manufacturing unit by M/s. Sanux Laboratories Pvt Ltd
SANUX LABORATORIES PRIVATE LIMITED · Industrial Projects - 3
- Category AProposal returned in present form2025-07-01
Proposed Green Field Project for Establishment of Active Pharmaceutical Ingredients (APIs) and API Intermediates Manufacturing Unit along with R&D Facility located at Sy. No. 140/*/1, Muttangi (V), Chitaguppa Taluk, Bidar District, Karnataka by M/s. Global Organichem Private Limited
Global Organichem Private Limited · Industrial Projects - 3
- Category B1EC Granted2025-06-25
M/s Sai Life Pharma Private Limited
SAI LIFE PHARMA PVT,LTD · Industrial Projects - 3
- Category B1ToR Granted2025-06-25
Modification and Expansion of Active Pharmaceutical Ingredients (APIs), Intermediates, R&D products and Custom Synthesis Manufacturing Unit
M/S. SAI LIFE SCIENCES LIMITED · Industrial Projects - 3
- Category B2EC Granted2025-06-05
Building Stone Quarry
JS INFRA PRIVATE LIMITED · Non-Coal Mining
- Category B2Pending at MS for Proposal Withdraw2025-05-13
Building Stone Quarry
SARDAR PAVIT SINGH · Non-Coal Mining
- Category B2EC Granted2025-05-13
Laterite Quarry” of Sri. Dhanaraj
dhanraj · Non-Coal Mining
- Category B1EC Granted2025-04-16
PUROGENE LABS PRIVATE LIMITED
PUROGENE LABS PRIVATE LIMITED · Industrial Projects - 3
- Category B1EC Granted2025-04-11
Transfer of Environmental clearance M/s Corvine Chemicals & Pharmaceutical Private limited .
CORVINE CHEMICALS AND PHARMACEUTICALS PRIVATE LIMITED · Industrial Projects - 3
- Category B2EC Granted2025-04-02
“Building Stone Quarry”
NAGANATHRAO NAGARE · Non-Coal Mining
- Category B2EC Granted2025-03-18
Building Stone Quarry
AKSHAY · Non-Coal Mining
- Category B2EC Granted2025-03-12
“Building Stone Quarry”
vijay kumar suryakant biradar · Non-Coal Mining
- Category B2EC Granted2024-12-18
Laterite Quarry
CARBO CARE SOLUTIONS PRIVATE LIMITED · Non-Coal Mining
- Category AProposal returned in present form2024-12-07
Amendment in EC in Specific Condition No. ii & x of the EC granted vide Ltr No. IA-J-11011/51/2018-IA-II (II) dt 07.01.2020 for transportation of wastewater generated by M/s. Meridian Polymers of 67.5 KLD to Common Effluent Treatment Plant operated by M/s. Mother Earth Environ Tech Pvt Ltd for a period of Four (04) years as an interim arrangement till installation of Captive ETP & ZLD treatment systems for Setting up of 2000 TPA Purified Carboxymethyl Cellulose manufacturing unit.
MERIDIAN POLYMERS · Industrial Projects - 3
- Category B2EC Granted2024-12-02
Building Stone(Basalt) Quarry
HANMANTHAPPA KHOBA · Non-Coal Mining
- Category B2Pending at MS for Proposal Withdraw2024-11-22
“Building Stone Quarry”
SANTOSH PATIL · Non-Coal Mining
- Category B1ToR Granted2024-10-08
Modification and Expansion of Active Pharmaceutical Ingredients (APIs), Intermediates, R&D products and Custom Synthesis Manufacturing Unit
M/S. SAI LIFE SCIENCES LIMITED · Industrial Projects - 3
- Category B1EC Granted2024-09-25
proposed Manufacturing of Bulk Drug & Intermediates unit by Derivate Labs
DERIVATE LABS PRIVATE LIMITED · Industrial Projects - 3
- Category B1EC Granted2024-08-13
Bulk Drug & Intermediates Unit of Capacity 120 MTA by M/s. Adeep Lifesciences Private Limited
ADEEP LIFE SCIENCES PRIVATE LIMITED · Industrial Projects - 3
- Category B1EC Granted2024-06-14
Transfer of Environmental Clearance (EC) from Kshatriya Laboratories Pvt. Ltd. to Virupaksha Organics Limited, Unit-VI within the existing area of 3.0 Acre with the existing production capacity of 43.00 TPM.
VIRUPAKSHA ORGANICS LIMITED · Industrial Projects - 3
- Category B1Standard ToR Granted2024-06-14
Proposed for expansion of existing Bulk Drugs & Drug Intermediates Manufacturing unit from production capacity of 69.0 TPM to 154.0 TPM by M/s. Virupaksha Organics Limited
VIRUPAKSHA ORGANICS LIMITED · Industrial Projects - 3
- Category B1Standard ToR Granted2024-06-06
Modification & Expansion of Active Pharmaceutical Ingredients (APIs) & Intermediates Manufacturing unit by M/s. Sanux Laboratories Pvt Ltd
SANUX LABORATORIES PRIVATE LIMITED · Industrial Projects - 3
- Category AStandard ToR Granted2024-06-04
Proposed Green Field Project for Establishment of Active Pharmaceutical Ingredients (APIs) and API Intermediates Manufacturing Unit along with R&D Facility located at Sy. No. 140/*/1, Muttangi (V), Chitaguppa Taluk, Bidar District, Karnataka by M/s. Global Organichem Private Limited
Global Organichem Private Limited · Industrial Projects - 3
- Category B2EC Granted2024-05-22
LATERITE STONE QUARRY
MS HARKOOD SHRI MINERALS AND SUPPLIERS · Non-Coal Mining
- Category B2EC Granted2024-05-22
LATERITE STONE QUARRY
REVANASIDDAPPA · Non-Coal Mining
- Category B1Withdrawal Request Accepted2024-01-11
Transfer of Environmental Clearance (EC) from M/s. Kshatriya Laboratories Pvt. Ltd. to M/s. Virupaksha Organics Limited, Unit-VI
VIRUPAKSHA ORGANICS LIMITED · Industrial Projects - 3
- Category B2EC Granted2023-07-19
“Building Stone (Basalt) Quarry” of M/s. Mahalaxmi Stone Crusher Narayanpur
M/S. MAHALAXMI STONE CRUSHER NARAYANPUR · Non-Coal Mining
- Category B2EC Granted2023-04-05
“Building Stone Quarry” of M/s. Shri Swami Samarth Engineers Limited,
SHRI SWAMI SAMARTH ENGINEERS LIMITED · Non-Coal Mining
- Category AEC Granted2023-03-16
Proposed 120KLPD Molasses based distillery by The Naranja Sahakari Sakkare Karkhane Ltd.
THE NARANJA SAHAKARI SAKKARE KHARKANE LIMITED · Industrial Projects - 2
- Category AUnder Examination2023-01-31
The Naranja Sahakari Sakkare Karkhane Ltd.
THE NARANJA SAHAKARI SAKKARE KHARKANE LIMITED · Industrial Projects - 2
- Category B2EC Granted2022-10-21
“Building Stone Quarry” of Sri. Prashanth Rejintal
PRASHANTH REJINTAL · Non-Coal Mining
All 42 proposals that name this district, newest first.