← All districts

Bidar, Karnataka

Not a Scheduled AreaCensus 2011 district code 558
  1. 17 Sept 2026 · FiledSubmittedBuilding Stone Quarry (QL No. BIDNS-64) "Sri. Prasanna P Khandre"
  2. 2 Sept 2026 · Details soughtEssential details soughtEnvironmental Clearance to Proposed Change in Product Mix with an Increase in Production Capacity of Bulk…

Dated by the portal's own appraisal history, converted to India Standard Time; a proposal with no recorded history appears on its register submission date.

Other clearances these proposals declare

Forest land diversion declared
0
Forest land sought for diversion
None declared
Wildlife board recommendation declared
0
In or near a protected area
0
In an eco-sensitive zone
1

These counts are taken from the application forms of the 42 of 42 proposals naming this district whose forms have been read for these questions. In 31 of those forms at least one question was left blank, and a blank answer is counted as unknown. The forest area is the area stated for forest clearance, with each forest proposal counted once, in the district where its project is primarily sited.

Proposals naming this district
42
Category A proposals
6
Families declared displaced
None declared
Families declared affected
None declared

Displacement figures are the proponents’ own declarations. A project sited across several districts declares one figure for the whole project, and that figure is counted once, in the district where the project is primarily sited.

Fifth Schedule status

Not within a Fifth Schedule Scheduled Area

No Presidential Order under paragraph 6 of the Fifth Schedule declares any Scheduled Area in Karnataka, so no part of this district is one and PESA does not apply.

OrderMinistry of Tribal Affairs, Scheduled Areas declared under paragraph 6 of the Fifth Schedule to the Constitution

Who lives there

Figures from Census 2011, each compared with the all-India value computed on the same definition.

Total population
17,03,300
Households
3,19,937
Average household size
5.32
0.47 above India's 4.85India
Scheduled Tribe share of population
13.9%
5.3 points above IndiaIndia
Scheduled Caste share of population
23.5%
6.8 points above IndiaIndia
Children aged 0-6
13.2%
0.4 points below IndiaIndia
Literacy rate
70.5%
2.5 points below IndiaIndia
Sex ratio
956
13.7 above India's 942.6India

What they live on

How the district's workers earn a living, from Census 2011. The land-dependent share counts cultivators and agricultural labourers as a share of all workers, and it is the group most directly affected when land is acquired.

Total workers
7,02,608
Work participation rate
41.3%
1.5 points above IndiaIndia
Workers dependent on land
60.0%
5.4 points above IndiaIndia
Cultivators
20.1%
4.5 points below IndiaIndia
Agricultural labourers
39.9%
9.9 points above IndiaIndia
Marginal workers
21.5%
3.3 points below IndiaIndia
Household industry workers
2.6%
1.2 points below IndiaIndia

How households live

Land, income and work among rural households, from the Socio Economic and Caste Census 2011, which recorded these where the population census did not. Only the survey's rural part is used here, so urban households do not appear.

Rural households owning land
43.4%
2.7 points below IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households whose highest earner makes over ₹5,000 a month
40.7%
16.3 points above IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households living mainly on manual casual labour
34.5%
17.3 points below IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households with a salaried member
9.0%
0.7 points above IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

When these were filed

Each proposal is dated by the first step in its appraisal history, the dated record of steps the portal keeps for it.

2023-Q42026-Q3

The timeline counts 37 of the 42 proposals here. The first filing date comes from each proposal's appraisal history, and we have not yet read it for the other 5, so they are left out. Most of them are older proposals, so the early part of the timeline undercounts what was filed then. The register itself records a date for each of them; the gap is in our copy of the histories.

Hatched columns undercount, so they cannot be compared with solid ones.

What kind of projects these are

The proposals naming this district, grouped by the sector each was filed under.

  • Industrial Projects - 3 47.6%
  • Non-Coal Mining 45.2%
  • Industrial Projects - 2 4.8%
  • River Valley and Hydroelectric Projects 2.4%

The four largest sectors are shown by name and the rest are grouped as Other.

What is proposed here

These are the proposals in the national environmental clearance register whose application names a site in this district, newest first. A project with sites in several districts appears under each of them.

  1. Category B2Under Verification2026-09-17

    Building Stone Quarry (QL No. BIDNS-64) "Sri. Prasanna P Khandre"

    PRASANNA P KHANDRE · Non-Coal Mining

  2. Category B1Under Verification2026-09-08

    Environmental Clearance to Proposed Change in Product Mix with an Increase in Production Capacity of Bulk Drugs Intermediates and Active Pharmaceutical Ingredients (APIS) by M/s. Satyadeeptha Pharmaceuticals Ltd.

    SATYADEEPTHA PHARMACEUTICALS LTD · Industrial Projects - 3

  3. Category B2Proposal Accepted and Referred to SEAC2026-09-02

    KODAMBAL LATERITE QUARRY

    MANDU BASSI SACHIN · Non-Coal Mining

  4. Category AEC Granted2026-02-07

    Proposed Green Field Project for Establishment of Active Pharmaceutical Ingredients (APIs) and API Intermediates Manufacturing Unit along with R&D Facility located at Sy. No. 140/*/1, Muttangi (V), Chitaguppa Taluk, Bidar District, Karnataka by M/s. Global Organichem Private Limited

    Global Organichem Private Limited · Industrial Projects - 3

  5. Category B2EC Granted2026-01-28

    Laterite Mineral Quarry

    SHIVKUMARPATIL · Non-Coal Mining

  6. Category B1EC Granted2025-12-11

    Modification and Expansion of Active Pharmaceutical Ingredients (APIs), Intermediates, R&D products and Custom Synthesis Manufacturing Unit

    M/S. SAI LIFE SCIENCES LIMITED · Industrial Projects - 3

  7. Category B1ToR Granted2025-10-06

    Environmental Clearance to Proposed Change in Product Mix with an Increase in Production Capacity of Bulk Drugs Intermediates and Active Pharmaceutical Ingredients (APIS) by M/s. Satyadeeptha Pharmaceuticals Ltd.

    SATYADEEPTHA PHARMACEUTICALS LTD · Industrial Projects - 3

  8. Category B2EC Granted2025-09-12

    “Building Stone(Basalt) Quarry”

    NAGNATH · Non-Coal Mining

  9. Category B2Proposal pulled back (withdrawn)2025-09-05

    Proposed Change in Product mix with Increase in Production Capacity of Bulk drugs Intermediates and Active Pharmaceutical Ingredients (APIs) along with Enhancement of Plant Facilities

    SATYADEEPTHA PHARMACEUTICALS LTD · Industrial Projects - 3

  10. Category B2EC Granted2025-09-03

    MEHAKAR LIFT IRRIGATION SCHEME Lifting of 1.00 TMC of water from Manjra River near Manikeshwara Village, Bhalki Taluk, Bidar District TO IRRIGATE 8,475 HA COMMAND AREA

    GNYANESHWAR V MANDE · River Valley and Hydroelectric Projects

  11. Category B2EC Granted2025-08-09

    “Building Stone Quarry” of Sri. Mallikarjun Swamy

    MALLIKARJUN SWAMy · Non-Coal Mining

  12. Category B1EC Granted2025-07-23

    Modification & Expansion of Active Pharmaceutical Ingredients (APIs) & Intermediates Manufacturing unit by M/s. Sanux Laboratories Pvt Ltd

    SANUX LABORATORIES PRIVATE LIMITED · Industrial Projects - 3

  13. Category AProposal returned in present form2025-07-01

    Proposed Green Field Project for Establishment of Active Pharmaceutical Ingredients (APIs) and API Intermediates Manufacturing Unit along with R&D Facility located at Sy. No. 140/*/1, Muttangi (V), Chitaguppa Taluk, Bidar District, Karnataka by M/s. Global Organichem Private Limited

    Global Organichem Private Limited · Industrial Projects - 3

  14. Category B1EC Granted2025-06-25

    M/s Sai Life Pharma Private Limited

    SAI LIFE PHARMA PVT,LTD · Industrial Projects - 3

  15. Category B1ToR Granted2025-06-25

    Modification and Expansion of Active Pharmaceutical Ingredients (APIs), Intermediates, R&D products and Custom Synthesis Manufacturing Unit

    M/S. SAI LIFE SCIENCES LIMITED · Industrial Projects - 3

  16. Category B2EC Granted2025-06-05

    Building Stone Quarry

    JS INFRA PRIVATE LIMITED · Non-Coal Mining

  17. Category B2Pending at MS for Proposal Withdraw2025-05-13

    Building Stone Quarry

    SARDAR PAVIT SINGH · Non-Coal Mining

  18. Category B2EC Granted2025-05-13

    Laterite Quarry” of Sri. Dhanaraj

    dhanraj · Non-Coal Mining

  19. Category B1EC Granted2025-04-16

    PUROGENE LABS PRIVATE LIMITED

    PUROGENE LABS PRIVATE LIMITED · Industrial Projects - 3

  20. Category B1EC Granted2025-04-11

    Transfer of Environmental clearance M/s Corvine Chemicals & Pharmaceutical Private limited .

    CORVINE CHEMICALS AND PHARMACEUTICALS PRIVATE LIMITED · Industrial Projects - 3

  21. Category B2EC Granted2025-04-02

    “Building Stone Quarry”

    NAGANATHRAO NAGARE · Non-Coal Mining

  22. Category B2EC Granted2025-03-18

    Building Stone Quarry

    AKSHAY · Non-Coal Mining

  23. Category B2EC Granted2025-03-12

    “Building Stone Quarry”

    vijay kumar suryakant biradar · Non-Coal Mining

  24. Category B2EC Granted2024-12-18

    Laterite Quarry

    CARBO CARE SOLUTIONS PRIVATE LIMITED · Non-Coal Mining

  25. Category AProposal returned in present form2024-12-07

    Amendment in EC in Specific Condition No. ii & x of the EC granted vide Ltr No. IA-J-11011/51/2018-IA-II (II) dt 07.01.2020 for transportation of wastewater generated by M/s. Meridian Polymers of 67.5 KLD to Common Effluent Treatment Plant operated by M/s. Mother Earth Environ Tech Pvt Ltd for a period of Four (04) years as an interim arrangement till installation of Captive ETP & ZLD treatment systems for Setting up of 2000 TPA Purified Carboxymethyl Cellulose manufacturing unit.

    MERIDIAN POLYMERS · Industrial Projects - 3

  26. Category B2EC Granted2024-12-02

    Building Stone(Basalt) Quarry

    HANMANTHAPPA KHOBA · Non-Coal Mining

  27. Category B2Pending at MS for Proposal Withdraw2024-11-22

    “Building Stone Quarry”

    SANTOSH PATIL · Non-Coal Mining

  28. Category B1ToR Granted2024-10-08

    Modification and Expansion of Active Pharmaceutical Ingredients (APIs), Intermediates, R&D products and Custom Synthesis Manufacturing Unit

    M/S. SAI LIFE SCIENCES LIMITED · Industrial Projects - 3

  29. Category B1EC Granted2024-09-25

    proposed Manufacturing of Bulk Drug & Intermediates unit by Derivate Labs

    DERIVATE LABS PRIVATE LIMITED · Industrial Projects - 3

  30. Category B1EC Granted2024-08-13

    Bulk Drug & Intermediates Unit of Capacity 120 MTA by M/s. Adeep Lifesciences Private Limited

    ADEEP LIFE SCIENCES PRIVATE LIMITED · Industrial Projects - 3

  31. Category B1EC Granted2024-06-14

    Transfer of Environmental Clearance (EC) from Kshatriya Laboratories Pvt. Ltd. to Virupaksha Organics Limited, Unit-VI within the existing area of 3.0 Acre with the existing production capacity of 43.00 TPM.

    VIRUPAKSHA ORGANICS LIMITED · Industrial Projects - 3

  32. Category B1Standard ToR Granted2024-06-14

    Proposed for expansion of existing Bulk Drugs & Drug Intermediates Manufacturing unit from production capacity of 69.0 TPM to 154.0 TPM by M/s. Virupaksha Organics Limited

    VIRUPAKSHA ORGANICS LIMITED · Industrial Projects - 3

  33. Category B1Standard ToR Granted2024-06-06

    Modification & Expansion of Active Pharmaceutical Ingredients (APIs) & Intermediates Manufacturing unit by M/s. Sanux Laboratories Pvt Ltd

    SANUX LABORATORIES PRIVATE LIMITED · Industrial Projects - 3

  34. Category AStandard ToR Granted2024-06-04

    Proposed Green Field Project for Establishment of Active Pharmaceutical Ingredients (APIs) and API Intermediates Manufacturing Unit along with R&D Facility located at Sy. No. 140/*/1, Muttangi (V), Chitaguppa Taluk, Bidar District, Karnataka by M/s. Global Organichem Private Limited

    Global Organichem Private Limited · Industrial Projects - 3

  35. Category B2EC Granted2024-05-22

    LATERITE STONE QUARRY

    MS HARKOOD SHRI MINERALS AND SUPPLIERS · Non-Coal Mining

  36. Category B2EC Granted2024-05-22

    LATERITE STONE QUARRY

    REVANASIDDAPPA · Non-Coal Mining

  37. Category B1Withdrawal Request Accepted2024-01-11

    Transfer of Environmental Clearance (EC) from M/s. Kshatriya Laboratories Pvt. Ltd. to M/s. Virupaksha Organics Limited, Unit-VI

    VIRUPAKSHA ORGANICS LIMITED · Industrial Projects - 3

  38. Category B2EC Granted2023-07-19

    “Building Stone (Basalt) Quarry” of M/s. Mahalaxmi Stone Crusher Narayanpur

    M/S. MAHALAXMI STONE CRUSHER NARAYANPUR · Non-Coal Mining

  39. Category B2EC Granted2023-04-05

    “Building Stone Quarry” of M/s. Shri Swami Samarth Engineers Limited,

    SHRI SWAMI SAMARTH ENGINEERS LIMITED · Non-Coal Mining

  40. Category AEC Granted2023-03-16

    Proposed 120KLPD Molasses based distillery by The Naranja Sahakari Sakkare Karkhane Ltd.

    THE NARANJA SAHAKARI SAKKARE KHARKANE LIMITED · Industrial Projects - 2

  41. Category AUnder Examination2023-01-31

    The Naranja Sahakari Sakkare Karkhane Ltd.

    THE NARANJA SAHAKARI SAKKARE KHARKANE LIMITED · Industrial Projects - 2

  42. Category B2EC Granted2022-10-21

    “Building Stone Quarry” of Sri. Prashanth Rejintal

    PRASHANTH REJINTAL · Non-Coal Mining

All 42 proposals that name this district, newest first.