Theni, Tamil Nadu
Recent activity
All 14 in the last 60 days- 23 Oct 2026 · FiledSubmittedRough stone and Gravel quarry of Tmt.M.Bagyalakshmi
- 21 Oct 2026 · Details soughtEssential details soughtRestoration of the capacity of Vaigai Dam in Periyakulam and Andipatti taluks of Theni District by Desilting
- 18 Oct 2026 · FiledSubmittedRough Stone and Gravel Quarry of Thiru.B.Selvam
- 16 Oct 2026 · FiledSubmittedOrdinary Earth quarry of Thiru.R.Manoharan
- 8 Oct 2026 · FiledSubmittedRough Stone and Gravel Quarry of Thiru.S.Rajasekar
- 6 Oct 2026 · FiledSubmittedRestoration of the capacity of Vaigai Dam in Periyakulam and Andipatti taluks of Theni District by Desilting
- 1 Oct 2026 · FiledSubmittedProposed Rough Stone & Gravel Quarry of Thiru.S.Karthiyasamy
- 29 Sept 2026 · FiledSubmittedProposed Roughstone and Gravel quarry of Thiru.S.P.Palpandi
- 27 Sept 2026 · FiledSubmittedRough Stone and Gravel Quarry of Tmt.P.Rasathi
- 18 Sept 2026 · DecidedEnvironmental clearance grantedThiru. G. Muthugovindan Rough Stone and Gravel Quarry
- 16 Sept 2026 · DecidedEnvironmental clearance grantedOrdinary Earth Quarry of Tmt.S.Bhuvaneshwari
- 2 Sept 2026 · FiledSubmittedOrdinary earth quarry of Tmt.Ashwin Periyasamy
Dated by the portal's own appraisal history, converted to India Standard Time; a proposal with no recorded history appears on its register submission date.
Other clearances these proposals declare
- Forest land diversion declared
- 1
- Forest land sought for diversion
- Area not stated
- Wildlife board recommendation declared
- 3
- In or near a protected area
- 0
- In an eco-sensitive zone
- 2
These counts are taken from the application forms of the 122 of 122 proposals naming this district whose forms have been read for these questions. In 62 of those forms at least one question was left blank, and a blank answer is counted as unknown. The forest area is the area stated for forest clearance, with each forest proposal counted once, in the district where its project is primarily sited.
- Proposals naming this district
- 122
- Category A proposals
- 1
- Families declared displaced
- None declared
- Families declared affected
- None declared
Displacement figures are the proponents’ own declarations. A project sited across several districts declares one figure for the whole project, and that figure is counted once, in the district where the project is primarily sited.
Fifth Schedule status
Not within a Fifth Schedule Scheduled Area
No Presidential Order under paragraph 6 of the Fifth Schedule declares any Scheduled Area in Tamil Nadu, so no part of this district is one and PESA does not apply.
OrderMinistry of Tribal Affairs, Scheduled Areas declared under paragraph 6 of the Fifth Schedule to the Constitution
What the record shows
Agricultural labourers, who work other people's land for wages, make up 53% of workers here. Compensation for acquired land is paid to those who hold title to it, so it does not reach them. They can still claim the rehabilitation and resettlement entitlements of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (RFCTLARR), because its section 3(c) counts a family whose livelihood depends on the land as an affected family, wherever that Act governs how the land is obtained.
Each of these observations appears when a fixed rule is met by the figures on this page, so the same figures always give the same sentences. None of them is a view on whether a project should go ahead.
Who lives there
Figures from Census 2011, each compared with the all-India value computed on the same definition.
- Total population
- 12,45,899
- Households
- 3,38,112
- Average household size
- 3.68
- 1.17 below India's 4.85India
- Scheduled Tribe share of population
- 0.2%
- 8.4 points below IndiaIndia
- Scheduled Caste share of population
- 20.7%
- 4.1 points above IndiaIndia
- Children aged 0-6
- 9.6%
- 4.0 points below IndiaIndia
- Literacy rate
- 77.3%
- 4.3 points above IndiaIndia
- Sex ratio
- 991
- 48.7 above India's 942.6India
What they live on
How the district's workers earn a living, from Census 2011. The land-dependent share counts cultivators and agricultural labourers as a share of all workers, and it is the group most directly affected when land is acquired.
- Total workers
- 5,91,642
- Work participation rate
- 47.5%
- 7.7 points above IndiaIndia
- Workers dependent on land
- 59.8%
- 5.2 points above IndiaIndia
- Cultivators
- 6.5%
- 18.2 points below IndiaIndia
- Agricultural labourers
- 53.3%
- 23.4 points above IndiaIndia
- Marginal workers
- 10.3%
- 14.4 points below IndiaIndia
- Household industry workers
- 2.5%
- 1.3 points below IndiaIndia
How households live
Land, income and work among rural households, from the Socio Economic and Caste Census 2011, which recorded these where the population census did not. Only the survey's rural part is used here, so urban households do not appear.
- Rural households owning land
- 11.4%
- 34.7 points below IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
- Rural households whose highest earner makes over ₹5,000 a month
- 26.4%
- 2.1 points above IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
- Rural households living mainly on manual casual labour
- 78.1%
- 26.3 points above IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
- Rural households with a salaried member
- 7.4%
- 0.9 points below IndiaIndia
The India figure is computed from 614 of 640 districts, because the source table has no value for the others.
When these were filed
Each proposal is dated by the first step in its appraisal history, the dated record of steps the portal keeps for it.
The timeline counts 79 of the 122 proposals here. The first filing date comes from each proposal's appraisal history, and we have not yet read it for the other 43, so they are left out. Most of them are older proposals, so the early part of the timeline undercounts what was filed then. The register itself records a date for each of them; the gap is in our copy of the histories.
Hatched columns undercount, so they cannot be compared with solid ones. One of them covers a period for which we have read few filing dates so far, and it counts only the proposals whose date we have. 2026-Q4 was still running when the register was read, so its column counts only the filings made up to that date.
What kind of projects these are
The proposals naming this district, grouped by the sector each was filed under.
- Non-Coal Mining 96.7%
- INFRA-2 1.6%
- Industrial Projects - 2 0.8%
- River Valley and Hydroelectric Projects 0.8%
The four largest sectors are shown by name and the rest are grouped as Other.
What is proposed here
These are the proposals in the national environmental clearance register whose application names a site in this district, newest first. A project with sites in several districts appears under each of them.
- Category B2Under Verification2026-10-24
Restoration of the capacity of Vaigai Dam in Periyakulam and Andipatti taluks of Theni District by Desilting
Executive Engineer- TNWRD · Non-Coal Mining
- Category B1Under Examination2026-10-23
Rough stone and Gravel quarry of Tmt.M.Bagyalakshmi
M BAGYALAKSHMI · Non-Coal Mining
- Category B2Forwarded to MS SPCB/PCC by MS2026-10-18
Rough Stone and Gravel Quarry of Thiru.B.Selvam
SELVAM B · Non-Coal Mining
- Category B2Forwarded to MS SPCB/PCC by MS2026-10-16
Ordinary Earth quarry of Thiru.R.Manoharan
MANOHARAN R · Non-Coal Mining
- Category B2Proposal Accepted and Referred to SEAC2026-10-08
Rough Stone and Gravel Quarry of Thiru.S.Rajasekar
SANNASI RAJASEKAR · Non-Coal Mining
- Category B2Forwarded to MS SPCB/PCC by MS2026-10-01
Proposed Rough Stone & Gravel Quarry of Thiru.S.Karthiyasamy
S KARTHIYASAMY · Non-Coal Mining
- Category B2Under Verification2026-09-29
Proposed Roughstone and Gravel quarry of Thiru.S.P.Palpandi
PALPANDI S P · Non-Coal Mining
- Category B2Proposal Accepted and Referred to SEAC2026-09-27
Rough Stone and Gravel Quarry of Tmt.P.Rasathi
RASATHI · Non-Coal Mining
- Category B2Proposal Accepted and Referred to SEAC2026-09-02
Ordinary earth quarry of Tmt.Ashwin Periyasamy
ASHWIN PERIYASAMY SURESH · Non-Coal Mining
- Category B2Under Verification2026-09-01
Proposed Rough Stone & Gravel Quarry of Thiru.P.Sivakumar
SIVAKUMAR · Non-Coal Mining
- Category B2EC Granted2026-08-01
Thiru. G. Muthugovindan Rough Stone and Gravel Quarry
G MUTHUGOVINDAN · Non-Coal Mining
- Category B1Referred to SEAC2026-07-22
PROPOSED ROUGH STONE QUARRY OF M/s. ALLINAGARAM NALLAKURUMBAN KALLUDAIKKUM MAGALIR SANGAM,
ALLINAGARAM NALLAKURUMBAN KALLUDAIKUM MAGALIR SANGAM · Non-Coal Mining
- Category B2Proposal returned in present form2026-06-18
Desilting of Existing Vaigai Reservoir
Executive Engineer- TNWRD · Non-Coal Mining
- Category B2EC Granted2026-04-30
Proposed Rough Stone Quarry of Thiru.P.Maheswaran
MAHESWARAN P · Non-Coal Mining
- Category B2EC Granted2026-04-22
Ordinary Earth Quarry of Tmt.S.Bhuvaneshwari
BUVANESWARI M · Non-Coal Mining
- Category B1Referred to SEAC2026-04-21
Proposed Rough Stone Quarry of Tvl.Velli Kalludaikum Magalir Sangam
VELLI KAL UDAIKKUM MAGALIR SANGAM ALLINAGARAM · Non-Coal Mining
- Category B2EC Granted2026-04-13
PROPOSED ROUGHSTONE AND GRAVEL QUARRY OF THIRU.T.K.SAJU
SAJU T K · Non-Coal Mining
- Category B2EC Granted2026-04-10
Proposed Rough Stone and Gravel Quarry of Thiru.M.Dhiyaneshwaran
M DHIYANESHWARAN · Non-Coal Mining
- Category B2EC Granted2026-04-10
Rough Stone and Gravel Quarry of Thiru.A.Sahapdeen
SAHAPDEEN AHAMED IBRAHIM · Non-Coal Mining
- Category B1Referred to SEIAA2026-03-28
Proposed Rough stone Quarry of Tvl.Vannathiparai Nagammal Kalludaikum Magalir Sangam, Tmt.T.Thavamani (President)
VANNATHIPARAI NAGAMMAL KALUDAIKKUM WOMEN SHG · Non-Coal Mining
- Category B1Referred to SEIAA2026-03-28
Proposed Rough stone Quarry of Tvl.Vannathiparai Kalieswari Kalludaikum Magalir Sangam, Tmt.M.Parimala (President)
VANNATHIPARAI KALEESWARI KALUDAIKKUM WOMEN SHG · Non-Coal Mining
- Category B2EC Granted2026-03-26
Rough Stone Quarry of Tmt. K.Nivedha
NIVEDHA K · Non-Coal Mining
- Category B2EC Granted2026-03-24
Rough Stone Quarry of Thiru. M.Kalidass
KALIDASS MURUGAN · Non-Coal Mining
- Category B1EC Granted2026-03-14
C. Selvam, Rough Stone and Gravel Quarry, Extent: 8.76.5ha, S.F.Nos. 927/2, 927/3, 927/4, 927/5, 940/2, 940/3 and 943/1 of Thimmarasanayakkanur Bit-1 Village, Andipatti Taluk, Theni District.
chelladurai selvam · Non-Coal Mining
- Category B2EC Rejected2026-02-18
Rough Stone and Gravel Quarry of Thiru.M.Murugesan
MOOKKAN MURUGESAN · Non-Coal Mining
- Category B2EC Granted2026-02-04
Ordinary Earth Quarry of Thiru.S.M.Santhagunam
SANTHAGUNAM S M · Non-Coal Mining
- Category B2EC Granted2026-01-30
Rough Stone and Gravel Quarry of Thiru.R.Kannan
RAMADASS KANNAN · Non-Coal Mining
- Category B2Proposal returned in present form2026-01-28
M/s. Bojaraj Textile Mills Limited
BOJARAJ TEXTILE MILLS LTD · INFRA-2
- Category B1EC Granted2026-01-13
Rough Stone Quarry of Thiru.M.Suriyachelvan
SURIYACHELVAN M · Non-Coal Mining
- Category B2EC Granted2025-12-24
Rough Stone and Gravel Quarry of Thiru.R.Kannan
RAMADASS KANNAN · Non-Coal Mining
- Category B2EC Granted2025-12-18
Ordinary Earth quarry of Thiru. N.Gubendran
N GUBENDRAN · Non-Coal Mining
- Category B2EC Granted2025-12-18
Rough Stone and Gravel Quarry Project Belongs to Tvl. S.S.Blue Metals
SS BLUE METALS · Non-Coal Mining
- Category B2EC Granted2025-12-14
EARTH QUARRY OF THIRU. R.PALPANDIYAN
PAULPANDIAN · Non-Coal Mining
- Category B2EC Granted2025-12-13
Proposed Rough Stone & Gravel Quarry of Thiru.A.Shanmugamoorthy
SHANMUGAMOORTHY · Non-Coal Mining
- Category B2EC Granted2025-12-10
Rough Stone and Gravel Quarry Project Belongs to Thiru. O.K. SUTHAN
SUTHAN KRISHNAN · Non-Coal Mining
- Category B2EC Rejected2025-09-17
Proposed Rough Stone & Gravel Quarry of Thiru.A.Kannan
ARIVALAGAN KANNAN · Non-Coal Mining
- Category B2EC Granted2025-09-03
Ordinary Earth Quarry of Thiru.C. Balamurugan
BALAMURUGAN · Non-Coal Mining
- Category B2EC Granted2025-07-21
Rough Stone Quarry of Tvl.ALR Constructions
A L R CONSTRUCTIONS · Non-Coal Mining
- Category B2EC Granted2025-07-18
Rough Stone Quarry of Tvl.ALR Constructions
A L R CONSTRUCTIONS · Non-Coal Mining
- Category B1ToR Granted2025-07-02
Rough Stone Quarry of Thiru.M.Suriyachelvan
SURIYACHELVAN M · Non-Coal Mining
- Category B2Proposal returned in present form2025-06-24
Proposed Rough Stone & Gravel Quarry of Thiru.M.Murugesan
MOOKKAN MURUGESAN · Non-Coal Mining
- Category B2EC Granted2025-06-13
Proposed Rough Stone & Gravel Quarry of Thiru. S.Sivakumar
SUBBURAJAN SIVAKUMAR · Non-Coal Mining
- Category B1ToR Granted2025-05-31
Proposed Rough stone Quarry of Tvl.Vannathiparai Kalieswari Kalludaikum Magalir Sangam, Tmt.M.Parimala (President)
VANNATHIPARAI KALEESWARI KALUDAIKKUM WOMEN SHG · Non-Coal Mining
- Category B1ToR Granted2025-05-31
Proposed Rough stone Quarry of Tvl.Vannathiparai Nagammal Kalludaikum Magalir Sangam, Tmt.T.Thavamani (President)
VANNATHIPARAI NAGAMMAL KALUDAIKKUM WOMEN SHG · Non-Coal Mining
- Category B2EC Granted2025-05-18
Rough Stone and Gravel Quarry of Thiru.A.Saravanakumar
ATHIMOOLAM SARAVANAKUMAR · Non-Coal Mining
- Category B2EC Granted2025-05-08
Proposed Rough stone and Gravel Quarry of Tmt.S.Sangeetha Rajeswari
BALASUBRAMANIAN RAJESWARI · Non-Coal Mining
- Category B2EC Granted2025-05-03
Ordinary Earth Quarry of Thiru.T.Ramesh
RAMESH T · Non-Coal Mining
- Category B2EC Granted2025-04-18
ORDINARY EARTH QUARRY OF THIRU. P.PONNAMBALAM
PONNAMBALAM PONRAM · Non-Coal Mining
- Category B1EC Granted2024-12-21
Thiru.R.Seenivasan Over an extent of 3.78.0hectares of Patta land in S.F.Nos.110/3, 110/4, 110/5, 127/1 and 127/2 of Kodangipatti Village, Bodinaickanur Taluk, Theni District, Tamil Nadu State.
RAMASUBBU SEENIVASAN · Non-Coal Mining
- Category B2EC Granted2024-12-17
Proposed Rough stone and Gravel Quarry of Thiru.R.Murugan
MURUGAN R · Non-Coal Mining
- Category B2EC Granted2024-12-10
Rough Stone and Gravel Quarry of Thiru.S.Rajasekar
SANNASI RAJASEKAR · Non-Coal Mining
- Category B2EC Granted2024-12-05
Ordinary Earth Quarry of Thiru S.G.Jayaraj
sg jeyaraj · Non-Coal Mining
- Category B2EC Granted2024-12-05
Rough Stone and gravel Quarry of Tmt. V.Jeyalakshmi
VELUCHAMY JEYALAKSHMI · Non-Coal Mining
- Category B2EC Granted2024-11-27
Gravel Quarry of Thiru. M.Periyasamy
PERIYASAMY M · Non-Coal Mining
- Category B2EC Granted2024-11-27
Rough Stone & Gravel Quarry of Selvi. R.Varshini.
VARSHINI RAMAKRISHNAN · Non-Coal Mining
- Category B2Pending at MS for Proposal Withdraw2024-10-18
Rough Stone and Gravel Quarry of Thiru. G.Sasi
SASI G · Non-Coal Mining
- Category B2EC Granted2024-09-25
Theppampatti ordinary earth project
Veluasari KANNAN · Non-Coal Mining
- Category B2EC Granted2024-09-25
Theppampatti ordinary earth project
KANNAN JOTHIMANI · Non-Coal Mining
- Category B1ToR Granted2024-09-21
C. Selvam, Rough Stone and Gravel Quarry, Extent: 8.76.5ha, S.F.Nos. 927/2, 927/3, 927/4, 927/5, 940/2, 940/3 and 943/1 of Thimmarasanayakkanur Bit-1 Village, Andipatti Taluk, Theni District.
chelladurai selvam · Non-Coal Mining
- Category B2EC Granted2024-09-12
Thiru.S.Deivendran Rough Stone and Gravel Quarry over an extent of 3.86.0 hectares in Kunnur Village
THIRU.S.DEIVENDRAN ROUGH STONE AND GRAVEL QUARRY · Non-Coal Mining
- Category B2EC Granted2024-08-16
Rough Stone and gravel Quarry of Tmt.M.Bagyalakshmi
M BAGYALAKSHMI · Non-Coal Mining
- Category B2EC Granted2024-08-13
Rough Stone & Gravel Quarry of Thiru. A.Muthupandi
MUTHUPANDI · Non-Coal Mining
- Category B2EC Granted2024-08-07
Rough stone & Gravel Quarry of Tvl.Theni Blue Metal Private Limited, Managing Director: Thiru.B.Dhamotharan
THENI BLUE METAL PRIVATE LIMITED · Non-Coal Mining
- Category B2EC Granted2024-08-07
Ordinary earth Quarry of Thiru.R.Ramesh
RAMESH RAMAKRISHNAN · Non-Coal Mining
- Category B2EC Granted2024-08-05
Rough Stone and Gravel Quarry of Tmt. M. Mariyammal
MARIYAMMAL M · Non-Coal Mining
- Category B2EC Granted2024-07-17
Rough Stone Quarry of Tmt. C.Seeniyammal (President), Tvl.Nila Magalir Sangam
CHANDRASEKAR SEENIYAMMAL · Non-Coal Mining
- Category B2EC Granted2024-07-02
Rough Stone and gravel Quarry of Thiru.T.Tamilvendhan
T TAMILVENDHAN · Non-Coal Mining
- Category B1EC Granted2024-06-21
M/S.SANGILI KARUPPAN THANNEER PARAI KALUDAIKUM MAGALIR NALASANGAM ROUGH STONE QUARRY LEASE
SANGILI KARUPPAN THANNEER PARAI KAL UDAIKKUM MAGALEER NALASANGAM · Non-Coal Mining
- Category B1EC Granted2024-06-21
M/S.ANNAI SATHIYA MAGALIR SUYA UTHAVIKUZHU ROUGH STONE QUARRY LEASE
ANNAI SATHYA MAGALIR SUYA UTHAVIKULU · Non-Coal Mining
- Category B1EC Granted2024-06-21
M/S.VARUMAIKOTIRKU KEELVAALUM MAGALIR SUYAUTHAVIKUZHU ROUGH STONE QUARRY LEASE
VARUMAIKOTIRKU KEEL VAALUM WOMEN SELF HELP GROUP · Non-Coal Mining
- Category B1EC Granted2024-06-20
M/s. ANNAI THERASA KALUDAIKUM MAGALIR NALA MUNNETRA SANGAM ROUGH STONE QUARRY LEASE
ANNAI THERESA KALLUDAIKKUM MAHALIR NALA MUNNETRA SANGAM · Non-Coal Mining
- Category B1EC Granted2024-06-20
M/S. SANGILIKARADU KALVUDAIKKUM MAGALIR NALASANGAM ROUGH STONE QUARRY LEASE
SANGILIKARADU KALVUDAIKKUM MAGALIR NALASANGAM · Non-Coal Mining
- Category B1EC Granted2024-06-20
M/S.K.K.PATTI KALUDAYKUM MAGALIR NALASANGAM ROUGH STONE QUARRY LEASE
K K PATTI KAL UDAYKUM MAGALIR NALASHANGAM · Non-Coal Mining
- Category B2EC Granted2024-06-20
Rough Stone and Gravel Quarry of Tmt.P.Rasathi
RASATHI · Non-Coal Mining
- Category B2Proposal returned in present form2024-05-30
Alteration in feed stock by using Sugar Syrup or B Heavy Molasses or C Heavy Molasses without change in consented quantity specified in consent given by Tamilnadu Pollution Control Board for the Existing Molasses Based Distillery Unit producing 45 KLPD of Rectified Spirit or Anhydrous Alcohol and 10 KLPD Neutral Spirit by M/s. Rajshree Sugars & Chemicals Limited (Distillery Division).
RAJSHREE SUGARS & CHEMICALS LTD · Industrial Projects - 2
- Category B2EC Granted2024-04-26
ORDINARY EARTH QUARRY OF THIRU. A.RAJESHKUMAR
ASOKAN RAJESH KUMAR · Non-Coal Mining
- Category B2EC Granted2024-04-25
Thiru. K. Bose Rough Stone and Gravel Quarry
KALIYANI THEVAR BOSE · Non-Coal Mining
- Category B2EC Rejected2024-03-20
Thiru. M. Murugesan
MOOKKAN MURUGESAN · Non-Coal Mining
- Category B2EC Granted2024-02-22
Ordinary Earth Quarry of Tmt.P.Latha Eswari
PONRAM LATHA ESWARI · Non-Coal Mining
- Category B2EC Granted2023-12-12
Thiru. K. Jeganathan Rough Stone Quarry
THIRU.K.JEGANATHAN ROUGH STONE QUARRY · Non-Coal Mining
- Category B2EC Granted2023-12-08
Rough Stone & Gravel Quarry of Thiru. B.Ashokraja
BALAMURUGAN ASHOKRAJA · Non-Coal Mining
- Category B2EC Granted2023-12-07
S.Sivaram Gravel Quarry Project Extent of 4.05.0Ha S.F.No.576/2A Jeyamangalam Bit - I Village, Periyakulam Taluk, Theni District.
SUBBURAJ SIVARAM · Non-Coal Mining
- Category B2EC Granted2023-11-24
Gravel Quarry of Thiru.V.Sellapandian
VELMAIL THEVER SELAPANDIYAN · Non-Coal Mining
- Category B2EC Granted2023-11-24
Earth Quarry of Thiru.R.Murugan
MURUGAN · Non-Coal Mining
- Category B2EC Granted2023-11-24
Gravel Quarry of Thiru.A.Anthonidass,
AROCKIASAMY ANTHONIDASS · Non-Coal Mining
- Category B2EC Granted2023-11-23
Rough Stone and gravel Quarry of Thiru. P.K.Suresh
PAPPUSAMY SURESH · Non-Coal Mining
- Category B2EC Granted2023-11-23
Thiru S Rajasekar Gravel Quarry
SANNASI RAJASEKAR · Non-Coal Mining
- Category B2EC Granted2023-11-22
Thiru.S.Deivendran Rough Stone and Gravel Quarry over an extent of 3.86.0 hectares in Kunnur Village
THIRU.S.DEIVENDRAN ROUGH STONE AND GRAVEL QUARRY · Non-Coal Mining
- Category B2EC Granted2023-11-16
Thiru.V.Venkatasamy Rough Stone and Gravel Quarry
VELAPPA NAICKER VENKATASAMY · Non-Coal Mining
- Category B2EC Granted2023-11-16
Thiru.S.Maharajan Earth Quarry
SIVASAMY MAHARAJAN · Non-Coal Mining
- Category B1TOR Granted2023-11-14
Thiru.R.Seenivasan Over an extent of 3.78.0hectares of Patta land in S.F.Nos.110/3, 110/4, 110/5, 127/1 and 127/2 of Kodangipatti Village, Bodinaickanur Taluk, Theni District, Tamil Nadu State.
RAMASUBBU SEENIVASAN · Non-Coal Mining
- Category B1TOR Granted2023-11-14
M/s. ANNAI THERASA KALUDAIKUM MAGALIR NALA MUNNETRA SANGAM ROUGH STONE QUARRY LEASE
ANNAI THERESA KALLUDAIKKUM MAHALIR NALA MUNNETRA SANGAM · Non-Coal Mining
- Category B2EC Granted2023-11-10
Thiru.R.Subburaj Rough Stone and Gravel Quarry
RAMASUBBU SUBBURAJ · Non-Coal Mining
- Category B1TOR Granted2023-10-18
M/S.VARUMAIKOTIRKU KEELVAALUM MAGALIR SUYAUTHAVIKUZHU ROUGH STONE QUARRY LEASE
VARUMAIKOTIRKU KEEL VAALUM WOMEN SELF HELP GROUP · Non-Coal Mining
- Category B1TOR Granted2023-10-18
M/S. SANGILIKARADU KALVUDAIKKUM MAGALIR NALASANGAM ROUGH STONE QUARRY LEASE
SANGILIKARADU KALVUDAIKKUM MAGALIR NALASANGAM · Non-Coal Mining
- Category B1TOR Granted2023-10-17
Rough Stone Quarry of Tmt. C.Seeniyammal (President), Tvl.Nila Magalir Sangam
CHANDRASEKAR SEENIYAMMAL · Non-Coal Mining
- Category B1TOR Granted2023-10-12
M/S.ANNAI SATHIYA MAGALIR SUYA UTHAVIKUZHU ROUGH STONE QUARRY LEASE
ANNAI SATHYA MAGALIR SUYA UTHAVIKULU · Non-Coal Mining
- Category B1TOR Granted2023-10-12
M/S.SANGILI KARUPPAN THANNEER PARAI KALUDAIKUM MAGALIR NALASANGAM ROUGH STONE QUARRY LEASE
SANGILI KARUPPAN THANNEER PARAI KAL UDAIKKUM MAGALEER NALASANGAM · Non-Coal Mining
- Category B1TOR Granted2023-10-12
M/S.K.K.PATTI KALUDAYKUM MAGALIR NALASANGAM ROUGH STONE QUARRY LEASE
K K PATTI KAL UDAYKUM MAGALIR NALASHANGAM · Non-Coal Mining
- Category B2EDS raised2023-10-05
KUNNUR VILLAGE ROUGH STONE AND GRAVEL QUARRY LEASE
PHINU THOMAS · Non-Coal Mining
Showing 100 of 122 proposals, newest first. The button below loads the rest.