← All districts

Hardwar, Uttarakhand

Not a Scheduled AreaCensus 2011 district code 68
  1. 10 Oct 2026 · FiledSubmittedSand, Bajri & Boulder (RBM) Deposit at Village- Banjarewala Grant, Tehsil- Bhagwanpur, District -…
  2. 10 Oct 2026 · FiledSubmittedSand, Bajri & Boulder (RBM) Deposit at Village- Banjarewala Grant, Tehsil- Bhagwanpur, District -…
  3. 8 Oct 2026 · FiledSubmittedSand, bajri and boulder Mine (Area- 0.7127 ha) at Village Rampur Raighati Ahatmal, Tehsil Laksar, District…
  4. 6 Oct 2026 · FiledSubmittedHamilton Steel Private limited
  5. 1 Oct 2026 · FiledSubmittedSindhusuta Ganga Valley, A unit of Sindhusuta Infra Developers LLP.
  6. 29 Sept 2026 · ClosedPulled back by the applicantHamilton Steel Private Limited
  7. 29 Sept 2026 · FiledSubmittedHamilton Steel Private Limited
  8. 28 Sept 2026 · ClosedPulled back by the applicantHamilton Steel Pvt. Ltd.
  9. 15 Sept 2026 · FiledSubmittedHamilton Steel Pvt. Ltd.
  10. 11 Sept 2026 · FiledSubmittedMuzaffarpur Gujra Sand, Bajri & Boulder (Water Storage Tank) Mining Project
  11. 11 Sept 2026 · FiledSubmittedRampur Raighatі Aht Sand Bajri Boulder (RBM) Mining Project
  12. 6 Sept 2026 · FiledSubmittedEnvironment Clearance for Proposed PU Foam Manufacturing in existing PU Foam Seat Assembly and Sheet Metal…

Dated by the portal's own appraisal history, converted to India Standard Time; a proposal with no recorded history appears on its register submission date.

Other clearances these proposals declare

Forest land diversion declared
0
Forest land sought for diversion
None declared
Wildlife board recommendation declared
10
In or near a protected area
2
In an eco-sensitive zone
0

These counts are taken from the application forms of the 88 of 88 proposals naming this district whose forms have been read for these questions. In 44 of those forms at least one question was left blank, and a blank answer is counted as unknown. The forest area is the area stated for forest clearance, with each forest proposal counted once, in the district where its project is primarily sited.

Proposals naming this district
88
Category A proposals
6
Families declared displaced
None declared
Families declared affected
None declared

Displacement figures are the proponents’ own declarations. A project sited across several districts declares one figure for the whole project, and that figure is counted once, in the district where the project is primarily sited.

Fifth Schedule status

Not within a Fifth Schedule Scheduled Area

No Presidential Order under paragraph 6 of the Fifth Schedule declares any Scheduled Area in Uttarakhand, so no part of this district is one and PESA does not apply.

OrderMinistry of Tribal Affairs, Scheduled Areas declared under paragraph 6 of the Fifth Schedule to the Constitution

Who lives there

Figures from Census 2011, each compared with the all-India value computed on the same definition.

Total population
18,90,422
Households
3,38,104
Average household size
5.59
0.74 above India's 4.85India
Scheduled Tribe share of population
0.3%
8.2 points below IndiaIndia
Scheduled Caste share of population
21.8%
5.1 points above IndiaIndia
Children aged 0-6
15.1%
1.5 points above IndiaIndia
Literacy rate
73.4%
0.5 points above IndiaIndia
Sex ratio
881
62.1 below India's 942.6India

What they live on

How the district's workers earn a living, from Census 2011. The land-dependent share counts cultivators and agricultural labourers as a share of all workers, and it is the group most directly affected when land is acquired.

Total workers
5,78,121
Work participation rate
30.6%
9.2 points below IndiaIndia
Workers dependent on land
34.0%
20.5 points below IndiaIndia
Cultivators
16.2%
8.4 points below IndiaIndia
Agricultural labourers
17.8%
12.1 points below IndiaIndia
Marginal workers
14.4%
10.4 points below IndiaIndia
Household industry workers
3.5%
0.4 points below IndiaIndia

How households live

Land, income and work among rural households, from the Socio Economic and Caste Census 2011, which recorded these where the population census did not. Only the survey's rural part is used here, so urban households do not appear.

Rural households owning land
27.9%
18.2 points below IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households whose highest earner makes over ₹5,000 a month
33.8%
9.5 points above IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households living mainly on manual casual labour
58.4%
6.6 points above IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

Rural households with a salaried member
10.4%
2.1 points above IndiaIndia

The India figure is computed from 614 of 640 districts, because the source table has no value for the others.

When these were filed

Each proposal is dated by the first step in its appraisal history, the dated record of steps the portal keeps for it.

2023-Q32026-Q4

The timeline counts 75 of the 88 proposals here. The first filing date comes from each proposal's appraisal history, and we have not yet read it for the other 13, so they are left out. Most of them are older proposals, so the early part of the timeline undercounts what was filed then. The register itself records a date for each of them; the gap is in our copy of the histories.

Hatched columns undercount, so they cannot be compared with solid ones. 2 of them cover periods for which we have read few filing dates so far, and they count only the proposals whose date we have. 2026-Q4 was still running when the register was read, so its column counts only the filings made up to that date.

What kind of projects these are

The proposals naming this district, grouped by the sector each was filed under.

  • Non-Coal Mining 54.5%
  • INFRA-2 21.6%
  • Industrial Projects - 1 9.1%
  • Industrial Projects - 2 8%
  • Other (2) 6.8%

The four largest sectors are shown by name and the rest are grouped as Other.

What is proposed here

These are the proposals in the national environmental clearance register whose application names a site in this district, newest first. A project with sites in several districts appears under each of them.

  1. Category B1Under Verification with SCEIA2026-10-10

    Sand, Bajri & Boulder (RBM) Deposit at Village- Banjarewala Grant, Tehsil- Bhagwanpur, District - Haridwar, State- Uttarakhand (Area 2.788 Ha.)

    KAILASH RIVER BED MINERALS LLP · Non-Coal Mining

  2. Category B1Under Verification with SCEIA2026-10-10

    Sand, Bajri & Boulder (RBM) Deposit at Village- Banjarewala Grant, Tehsil- Bhagwanpur, District - Haridwar, State- Uttarakhand (Area 2.00 Ha)

    KAILASH RIVER BED MINERALS LLP · Non-Coal Mining

  3. Category B2Under Verification with SCEIA2026-10-08

    Sand, bajri and boulder Mine (Area- 0.7127 ha) at Village Rampur Raighati Ahatmal, Tehsil Laksar, District Haridwar in the Uttarakhand State by Pawan Singh Rawat.

    PAWAN SINGH RAWAT · Non-Coal Mining

  4. Category B1Forwarded to MS SPCB/PCC by MS2026-10-06

    Hamilton Steel Private limited

    hamilton steel private limited · INFRA-2

  5. Category B2Forwarded to MS SPCB/PCC by MS2026-10-01

    Sindhusuta Ganga Valley, A unit of Sindhusuta Infra Developers LLP.

    SINDHUSUTA INFRA DEVELOPERS LLP · INFRA-2

  6. Category AProposal pulled back (withdrawn)2026-09-29

    Hamilton Steel Private Limited

    hamilton steel private limited · INFRA-2

  7. Category AProposal pulled back (withdrawn)2026-09-15

    Hamilton Steel Pvt. Ltd.

    Hamilton Housewares PRIVATE LIMITED · INFRA-2

  8. Category B2Forwarded to MS SPCB/PCC by MS2026-09-11

    Rampur Raighatі Aht Sand Bajri Boulder (RBM) Mining Project

    archna devi · Non-Coal Mining

  9. Category B2Forwarded to MS SPCB/PCC by MS2026-09-11

    Muzaffarpur Gujra Sand, Bajri & Boulder (Water Storage Tank) Mining Project

    Yogesh Kumar · Non-Coal Mining

  10. Category B2Under Verification with SCEIA2026-09-06

    Environment Clearance for Proposed PU Foam Manufacturing in existing PU Foam Seat Assembly and Sheet Metal automobile components parts manufacturing Unit

    MEENAKSHI POLYMER PRIVATE LIMITED · Industrial Projects - 3

  11. Category B1Under Examination2026-05-28

    7.5 MW co-generation thermal power plant at Khedi Mubarakpur, Tehsil Laksar, Disfrict Haridwar

    JK Tyre & industries limited · Thermal Projects

  12. Category AEC Granted2025-11-10

    M/s Vimlesh Coils & Conductors (Unit-III) Khasra Nos. 351, 352, 356, 210, 211, 212, Village Sikanderpur Bhainswal, Tehsil Roorkee, District Haridwar, Uttarakhand.

    VIMLESH COILS & CONDUCTORS UNIT III · Industrial Projects - 1

  13. Category B2Proposal pulled back (withdrawn)2025-09-26

    Sand, Bajri & Boulder (RBM) Deposit at Village- Navoday Nagar

    KAILASH RIVER BED MINERALS LLP · Non-Coal Mining

  14. Category B2EC Granted2025-09-23

    Sand, Bajri & Boulder (RBM) Deposit at Village- Dadubans. 2.00 Ha

    KAILASH RIVER BED MINERALS LLP · Non-Coal Mining

  15. Category B1ToR Granted2025-09-23

    Sand, Bajri & Boulder (RBM) Deposit at Village- Banjarewala Grant, Tehsil- Bhagwanpur, District - Haridwar, State- Uttarakhand (Area 2.00 Ha)

    KAILASH RIVER BED MINERALS LLP · Non-Coal Mining

  16. Category B2EC Granted2025-09-23

    Sand, bajri & Boulder (RBM) Deposit. Area : 2.00 Ha

    KAILASH RIVER BED MINERALS LLP · Non-Coal Mining

  17. Category B1ToR Granted2025-09-23

    Sand, Bajri & Boulder (RBM) Deposit at Village- Banjarewala Grant, Tehsil- Bhagwanpur, District - Haridwar, State- Uttarakhand (Area 2.788 Ha.)

    KAILASH RIVER BED MINERALS LLP · Non-Coal Mining

  18. Category B2EC Granted2025-09-23

    Sand, Bajri & Boulder (RBM) Deposit at Village- Aurangabad, Gholna, 3.60 Ha.

    KAILASH RIVER BED MINERALS LLP · Non-Coal Mining

  19. Category B2EC Granted2025-09-22

    Sand, Bajri & Boulder (RBM) Deposit at Village- Navoday Nagar, 1.74 Ha.

    KAILASH RIVER BED MINERALS LLP · Non-Coal Mining

  20. Category AEC Granted2025-09-12

    Proposed Expansion in production capacity of Cement Grinding Unit from 1.2 MTPA to 3.0 MTPA at located near Village: Lakeshwari, P.O- Sikanderpur Bhainswal, Bhagwanpur, Roorkee, Distt. Haridwar, Uttarakhand, Pin- 247661 by M/s Ambuja Cements Limited (Unit: Roorkee)

    Ambuja Cement Limited · Industrial Projects - 1

  21. Category B1EC Granted2025-09-06

    Banjarewala Grant Sand, Bajri & Boulder (RBM) mining project

    KAILASH RIVER BED MINERALS LLP · Non-Coal Mining

  22. Category B1EC Granted2025-08-26

    Environmental Clearance for Replacement & Expansion of existing Incinerator & other utilities of Common Bio Medical Waste Treatment Facility (CBWTF) by M/s Medical Pollution Control Committee (MPCC)

    medical pollution control committee · INFRA-2

  23. Category B2EC Granted2025-08-19

    Amendment in Existing Environmental Clearance for Change in Product Mix without increasing Production Capacity and Pollution Load by M/s Marush Overseas Pvt. Ltd. at Khasra No. 652 Kha, Village – Lodiwala Grant Pargana & Tehsil Bhagwanpur, District – Haridwar, Uttarakhand.

    M/S MARUSH OVERSEAS PRIVATE LIMITED · Industrial Projects - 3

  24. Category B2EC Granted2025-08-12

    Proposed RBM (Sand, Bajri, Boulders etc.) Mining Project over an area of 1.2920 Ha from a part of river bed Village- Fatehullahpur (Telpura), Tehsil- Bhagwanpur, District-Haridwar, State: Uttarakhand by Sh. Jameel Ahmad S/o Sh. Majid

    JAMEEL AHMED · Non-Coal Mining

  25. Category B2EC Granted2025-08-05

    Environmental Clearance for Proposed RBM mining project by M/s Surya Stone Crusher for the purpose of water recycling falls in Khasra No. 36 in village- Muzzafarpur Gujra, Tehsil Laksar District- Haridwar, State Uttarakhand (Total Area = 1.4560 Ha.).

    surya stone crusher · Non-Coal Mining

  26. Category B2EC Granted2025-07-23

    Construction of Multi-Modal Cargo Terminal under GCT policy, 2022 on Railway land at Pathri station of Moradabad Division/NR

    CONTAINER CORPORATION OF INDIA LIMITED · INFRA-2

  27. Category B2EC Granted2025-06-30

    Sand, bajri & boulder mine for the construction of a pond for fish farming khasra No. 164 area-0.4450 ha at Village- Musahibpur Majri, Tehsil- Laksar, District- Haridwar, Uttarakhand by Mahendra Singh

    mahendar singh · Non-Coal Mining

  28. Category B1EC Granted2025-06-26

    Expansion of existing Distillery Expansion of Distillery capacity from 62.5 KLD To 72.5 KLD through addition of 10 KLD Malt based distillery plant without change in Cogen Power 3.0 MW at Village: Libberheri, Tehsil: Roorkee, District: Haridwar, Uttarakhand by M/s Uttam Sugar Mills Limited (Distillery Division).

    UTTAM SUGAR MILLS LIMITED · Industrial Projects - 2

  29. Category B1EC Granted2025-06-24

    PROPOSED EXPANSION OF GRAIN BASED DISTILLERY CAPACITY FROM 40 KLD TO 160 KLD ALONG WITH EXPANSION OF CO-GEN POWER FROM 3.0 MW TO 6.0 MW WITHIN EXSITING INDUSTRY PREMISES AT VILLAGE: AHMADPUR GRANT, BLOCK: BAHADRABAD, TEHSIL & DISTRICT: HARIDWAR (UTTARAKHAND) BY M/S UTTAM DISTILLERIES LIMITED

    UTTAM DISTILLERIES LIMITED · Industrial Projects - 2

  30. Category B2Proposal returned in present form2025-05-12

    Sand, bajri & boulder mine for the construction of a pond for fish farming kh. No. 164 area-0.4450 ha at Village- Musahibpur Majri, Tehsil- Laksar, District- Haridwar, Uttarakhand by Mahendra Singh

    mahendar singh · Non-Coal Mining

  31. Category B2EC Granted2025-04-21

    Extraction of Sand, Bajri, and Boulder (Construction of a Pond for Fish Farming)

    babali · Non-Coal Mining

  32. Category B1Proposal returned in present form2025-04-17

    Sand, Bajiri &Boulder (RBM)Deposit Area : 2.00 ha) Village- Bajarewala Grant

    KAILASH RIVER BED MINERALS LLP · Non-Coal Mining

  33. Category B1Withdrawal Request Accepted2025-04-10

    Sand, Bajiri & Boulder (RBM) Deposit Area : 2.00 Ha Village-Bajarewala

    KAILASH RIVER BED MINERALS LLP · Non-Coal Mining

  34. Category B2Proposal returned in present form2025-04-09

    Sand, bajri & Boulder (RBM) Deposit. Area : 2.00 Ha

    KAILASH RIVER BED MINERALS LLP · Non-Coal Mining

  35. Category B1Proposal returned in present form2025-04-09

    Sand, Bajri & Boulder (RBM) Deposit at village- Banjarewala Grant, (area 2.788 Ha)

    KAILASH RIVER BED MINERALS LLP · Non-Coal Mining

  36. Category B2Proposal returned in present form2025-04-09

    Sand, Bajri & Boulder (RBM) Deposit at Village- Aurangabad, (Area 3.60 Ha)

    KAILASH RIVER BED MINERALS LLP · Non-Coal Mining

  37. Category B2Proposal returned in present form2025-04-09

    Sand, Bajri & Boulder (RBM) Deposit at Village- Navoday Nagar, (Area 1.74 Ha)

    KAILASH RIVER BED MINERALS LLP · Non-Coal Mining

  38. Category B2Proposal returned in present form2025-04-09

    Sand, Bajri & Boulder (RBM) Deposit at Village- Dadubans(Area 2.00 Ha)

    KAILASH RIVER BED MINERALS LLP · Non-Coal Mining

  39. Category B2EC Granted2025-04-08

    Soil and RBM (Sand, Bajri, Boulders) Mining for Construction of Fish Pond

    Yuvaraj singh · Non-Coal Mining

  40. Category B2EC Granted2025-03-22

    Environmental clearance for change in product mix and fuel along with enhancement in production capacity of existing unit by M/s Forace Speciality Chem Pvt. Ltd.

    forace polymers pvt ltd · Industrial Projects - 3

  41. Category B1ToR Granted2025-03-17

    Environmental Clearance for Replacement & Expansion of existing Incinerator & other utilities of Common Bio Medical Waste Treatment Facility (CBWTF) by M/s Medical Pollution Control Committee (MPCC)

    medical pollution control committee · INFRA-2

  42. Category B2EC Granted2025-03-03

    Environmental clearance for proposed expansion of existing Aluminium Coil & Sheets/Foils manufacturing unit by M/s Paragon Industries Ltd. at Plot No. 162, 164, 168, 169, 170, 171 & 172 Raipur Industrial Area, Bhagwanpur, Distt- Haridwar, Uttarakhand.

    PARAGON INDUSTRIES LIMITED · Industrial Projects - 1

  43. Category B2EC Granted2025-02-28

    Expansion of DG Set, Boiler Capacity and Manufacturing of Ayurvedic / Herbal extracts and Pharma API, Pharmaceutical /Herbal /Ayurvedic /Cosmetic/Food Products, Plot No-132, Village - Aurenjebpur, Tehsil –Roorkee, District –Haridwar, Uttarakhand By M/s. Harsoria Herbal Care.

    Manish Mittal · Industrial Projects - 3

  44. Category AStandard ToR Granted2025-02-25

    M/s Vimlesh Coils & Conductors (Unit-III) Khasra Nos. 351, 352, 356, 210, 211, 212, Village Sikanderpur Bhainswal, Tehsil Roorkee, District Haridwar, Uttarakhand.

    VIMLESH COILS & CONDUCTORS UNIT III · Industrial Projects - 1

  45. Category B2Proposal returned in present form2025-01-22

    Environmental clearance for proposed expansion of existing Synthetic Resins, Hardners & Catalyst, Formaldehyde and Paratoluene Sulphonic Acid Mono-Hydrate manufacturing unit along with addition of Ethylene Glycol Di Acetate (EGDA), Triacetin, Dibasic Ester (DBE) and Releasing Agent as new products by M/s Forace Speciality Chem Pvt. Ltd.

    forace polymers pvt ltd · Industrial Projects - 3

  46. Category B2EC Granted2025-01-07

    Expansion of Group Housing Project "Amrit Aarogyam"

    EMINENT INFRADEVELOPERS PRIVATE LIMITED · INFRA-2

  47. Category B2EC Granted2024-12-19

    Environmental Clearance for Proposed RBM mining project by Shri Ganesh Stone Crushing Co. for the purpose of water recycling

    shree ganesh stone crushing co · Non-Coal Mining

  48. Category B2EC Granted2024-12-18

    Environmental Clearance for Proposed RBM mining project by Shri Balaji Stone Crusher for the purpose of water recycling

    shri balaji stone crusher · Non-Coal Mining

  49. Category B2EC Granted2024-11-25

    Lamgrant Sand, Bajri & Boulder (RBM) Mining Project

    KAILASH RIVER BED MINERALS LLP · Non-Coal Mining

  50. Category B2EC Granted2024-11-25

    Lamgrant Sand, Bajari & Boulder (RBM) Mining Project

    KAILASH RIVER BED MINERALS LLP · Non-Coal Mining

  51. Category B1ToR Granted2024-11-25

    Banjarewala Grant Sand, Bajri & Boulder (RBM) mining project

    KAILASH RIVER BED MINERALS LLP · Non-Coal Mining

  52. Category B2EC Granted2024-11-12

    “Banjarewala Grant-IV Sand, Bajri and Boulders Mining in Chillawali River” At Khata No. 856, Khasra No. 1501 ख Village- Banjarewala Grant-IV, Tehsil- Bhagwanpur & District- Haridwar, State- Uttarakhand (Area- 3.40 Ha)

    AMIT PATWARI · Non-Coal Mining

  53. Category B2EC Granted2024-11-08

    Budhwashaheed-I Sand, Bajri and Boulders Mining in Modaro River At Khata no 220, 221, 222, 184 Village- Daulatpur Hazratpur Urf Budhwashaheed-I, Tehsil- Bhagwanpur & District- Haridwar, UK (Area- 4.0227 Ha)

    AMIT PATWARI · Non-Coal Mining

  54. Category B2EC Granted2024-11-08

    Budhwashaheed-IV Sand, Bajri and Boulders Mining in Sukhro River At Gata no 260, 224, 225, 223, 220, 216 Village- Daulatpur Hazratpur Urf Budhwashaheed-IV, Tehsil- Bhagwanpur, Hraidwar UK (Area-3.00 Ha)

    AMIT PATWARI · Non-Coal Mining

  55. Category B2Proposal returned in present form2024-11-08

    Group Housing Project “Amrit Aarogyam”

    EMINENT INFRADEVELOPERS PRIVATE LIMITED · INFRA-2

  56. Category B2EC Granted2024-08-20

    Environmental Clearance for Proposed Modification in Existing Group Housing Project by M/s Brazen Arrow Company Private Limited (Mantra Happy Homes) at Khasra No. – 1411, 1412, 1413, 1414, Salempur Mehdood, Raja Biscuit Chowk, Haridwar, Uttarakhand

    Brazen arrow company private limited · INFRA-2

  57. Category B2EC Granted2024-07-07

    Banjarewala Grant-II Sand, Bajri and Boulders Mining in Sukhro River at Khata no 856, Khasra No. 1269 ण (Area- 3.00 Ha)

    AMIT PATWARI · Non-Coal Mining

  58. Category B1ToR Granted2024-07-07

    Budhwashaheed-IV Sand, Bajri and Boulders Mining in Sukhro River At Gata no 260, 224, 225, 223, 220, 216 Village- Daulatpur Hazratpur Urf Budhwashaheed-IV, Tehsil- Bhagwanpur, Hraidwar UK (Area-3.00 Ha)

    AMIT PATWARI · Non-Coal Mining

  59. Category B2EC Granted2024-07-07

    Budhwashaheed-II Sand, Bajri and Boulders Mining in Modaro River At Gata No. 186/4 Village- Daulatpur Hazratpur Urf Budhwashaheed-II, Tehsil- Bhagwanpur & District- Haridwar, UK (Area- 3.50 Ha)

    AMIT PATWARI · Non-Coal Mining

  60. Category B1ToR Granted2024-07-07

    Budhwashaheed-I Sand, Bajri and Boulders Mining in Modaro River At Khata no 220, 221, 222, 184 Village- Daulatpur Hazratpur Urf Budhwashaheed-I, Tehsil- Bhagwanpur & District- Haridwar, UK (Area- 4.0227 Ha)

    AMIT PATWARI · Non-Coal Mining

  61. Category B2EC Granted2024-07-07

    Banjarewala Grant-III Sand, Bajri and Boulders Mining in Chillawali River At Khata No. 856, Khasra No. 1501 ख (Area- 3.40 Ha)

    AMIT PATWARI · Non-Coal Mining

  62. Category B2EC Granted2024-07-07

    Banjarewala Grant-V Sand, Bajri and Boulders Mining in Sukhro River At Khata no 856, Khasra No. 1269 ण, 1019 च, 1091 रा (Area- 4.05 Ha)

    AMIT PATWARI · Non-Coal Mining

  63. Category B2EC Granted2024-07-03

    Budhwashaheed-III Sand, Bajri and Boulders Mining in Sukhro River at Khasra No. 259/15 Village- Daulatpur Hazratpur Urf Budhwashaheed-III, Tehsil- Bhagwanpur & District- Haridwar, State- Uttarakhand (Area- 2.00 Ha)

    AMIT PATWARI · Non-Coal Mining

  64. Category B2Withdrawal Request Accepted2024-07-02

    Budhwashaheed-II Sand, Bajri and Boulders Mining in Modaro River at At Gata No. 186/4 Village- Daulatpur Hazratpur Urf Budhwashaheed-II, Tehsil- Bhagwanpur & District- Haridwar, State- Uttarakhand (Area- 3.50 Ha)

    AMIT PATWARI · Non-Coal Mining

  65. Category B1Withdrawal Request Accepted2024-07-02

    Budhwashaheed-IV Sand, Bajri and Boulders Mining in Sukhro River at At Gata no 260, 224, 225, 223, 220, 216 Village- Daulatpur Hazratpur Urf Budhwashaheed-IV, Tehsil- Bhagwanpur & District- Haridwar, State- Uttarakhand (Area- 3.00 Ha)

    AMIT PATWARI · Non-Coal Mining

  66. Category B1Withdrawal Request Accepted2024-07-02

    Budhwashaheed-I Sand, Bajri and Boulders Mining in Modaro River at At Khata no 220, 221, 222, 184 Village- Daulatpur Hazratpur Urf Budhwashaheed-I, Tehsil- Bhagwanpur & District- Haridwar, State- Uttarakhand (Area- 4.0227 Ha)

    AMIT PATWARI · Non-Coal Mining

  67. Category B2Withdrawal Request Accepted2024-07-01

    Banjarewala Grant-II Sand, Bajri and Boulders Mining in Sukhro River at Khata No. 856, Khasra No. 1269 ण Village- Banjarewala Grant-II, Tehsil- Bhagwanpur & District- Haridwar, State- Uttarakhand (Area- 3.00 Ha)

    AMIT PATWARI · Non-Coal Mining

  68. Category B2Withdrawal Request Accepted2024-07-01

    Banjarewala Grant-V Sand, Bajri and Boulders Mining in Sukhro River at Khata no 856, Khasra No. 1269 ण, 1019 च, 1091 रा Village- Banjarewala Grant-V, Tehsil- Bhagwanpur & District- Haridwar, State- Uttarakhand (Area- 4.05 Ha)

    AMIT PATWARI · Non-Coal Mining

  69. Category B2Withdrawal Request Accepted2024-07-01

    Banjarewala Grant-III Sand, Bajri and Boulders Mining in Chillawali River at Khata No. 856, Khasra No. 1501 ख Village- Banjarewala Grant-III, Tehsil- Bhagwanpur & District- Haridwar, State- Uttarakhand (Area- 3.40 Ha)

    AMIT PATWARI · Non-Coal Mining

  70. Category B2EC Granted2024-06-29

    Banjarewala Grant-I Sand, Bajri and Boulders Mining in Sukhro River” At Khata No. 856, Khasra No. 1269 ण Village- Banjarewala Grant-I, Tehsil- Bhagwanpur & District- Haridwar, State- Uttarakhand (Area- 2.00 Ha)

    AMIT PATWARI · Non-Coal Mining

  71. Category B1EC Granted2024-06-26

    Common Solid Waste Management Facility for Roorkee Cluster at Village Saliyar, Roorkee, Dist.-Haridwar, Uttarakhand.

    NAGAR PALIKA PARISHAD · INFRA-2

  72. Category B1ToR Granted2024-05-31

    Expansion of Distillery capacity from 62.5 KLD To 72.5 KLD through addition of 10 KLD Malt/ Cane Juice Based Distillery Plant without change in Co-Gen Power - 3.0 MW within existing premises at Village: -Khundi Libberheri, Tehsil: – Roorkee, District: - Haridwar, Uttarakhand of M/S Uttam Sugar Mills Limited, (Distillery Division).

    UTTAM SUGAR MILLS LIMITED · Industrial Projects - 2

  73. Category B1ToR Granted2024-04-30

    PROPOSED EXPANSION OF GRAIN BASED DISTILLERY CAPACITY FROM 40 KLD TO 160 KLD ALONG WITH EXPANSION OF CO-GEN POWER FROM 3.0 MW TO 6.0 MW WITHIN EXSITING INDUSTRY PREMISES AT VILLAGE: AHMADPUR GRANT, BLOCK: BAHADRABAD, TEHSIL & DISTRICT: HARIDWAR (UTTARAKHAND) BY M/S UTTAM DISTILLERIES LIMITED

    UTTAM DISTILLERIES LIMITED · Industrial Projects - 2

  74. Category AToR Granted2024-01-18

    Proposed Expansion in production capacity of Cement Grinding Unit from 1.2 MTPA to 3.0 MTPA at located near Village: Lakeshwari, P.O- Sikanderpur Bhainswal, Bhagwanpur, Roorkee, Distt. Haridwar, Uttarakhand, Pin- 247661 by M/s Ambuja Cements Limited (Unit: Roorkee)

    Ambuja Cement Limited · Industrial Projects - 1

  75. Category B1Proposal returned in present form2024-01-04

    Environmental Clearance for the Proposed EWS Housing under Pradhan Mantri Awasiya Yojana by M/s Debi kay Systems Private Limited located at Khasra No. 66 & 68/2, Village Beldi, Tehsil Roorkee, District Haridwar, Uttarakhand

    DEBIKAY SYSTEMS PRIVATE LIMITED · INFRA-2

  76. Category B1EC Granted2023-11-29

    Proposed Expansion in Manufacturing of M.S. Billets and Rolling Mills products by M/s Radiant Bar (P) Limited

    MUHAMMAD IBRAHEEM · Industrial Projects - 1

  77. Category B1EC Granted2023-11-27

    Proposed expansion of Sugar unit from 6250 TCD to 8000 TCD without change in existing co gen power capacity – 26.0 MW existing industry premises at village- Dahiyaki, Khundi, Kulchandi, Mundiaki, Tehsil-Roorkee & District– Haridwar, Uttarakhand

    UTTAM SUGAR MILLS LIMITED · Industrial Projects - 2

  78. Category B1EC Granted2023-08-23

    Affordable housing project under violation by Lakshmi Constructions Co. Ltd

    SACHIN TYAGI · INFRA-2

  79. Category B1TOR Granted2023-06-16

    Proposed Expansion in Manufacturing of M.S. Billets and Rolling Mills products by M/s Radiant Bar (P) Limited

    MUHAMMAD IBRAHEEM · Industrial Projects - 1

  80. Category B1INTIMATED2023-06-01

    Proposed Expansion in Cement production capacity of existing stand-alone Clinker Grinding Unit from 2.0 to 2.5 MTPA At Village - Nalheri Dehviran, PO - Nalhera Anantpur, Tehsil - Roorkee, District - Haridwar (Uttarakhand) by M/s. UltraTech Cement Limited (Unit: Roorkee Cement Works)

    M/s. UltraTech Cement Ltd. · Industrial Projects - 1

  81. Category B1TOR Granted2023-04-26

    Establishment of Common Biomedical Waste Treatment and Disposal Facilities (CBWTF) in Village Kunja, Tehsil-Bhagwanpur, District – Haridwar, Uttarakhand

    ECON WASTE SOLUTION · INFRA-2

  82. Category B1TOR Granted2023-04-19

    Affordable housing project under violation by Lakshmi Constructions Co. Ltd

    SACHIN TYAGI · INFRA-2

  83. Category B2EC Granted2023-04-14

    AROGYAM EDUCATIONAL TRUST

    AROGYAM EDUCATIONAL TRUST · INFRA-2

  84. Category B1TOR Granted2023-03-01

    Common Solid Waste Management Facility for Roorkee Cluster at Village Saliyar, Roorkee, Dist.-Haridwar, Uttarakhand.

    NAGAR PALIKA PARISHAD · INFRA-2

  85. Category B1TOR Granted2023-02-21

    Proposed expansion of Sugar unit from 6250 TCD to 8000 TCD without change in existing co gen power capacity – 26.0 MW existing industry premises at village- Dahiyaki, Khundi, Kulchandi, Mundiaki, Tehsil-Roorkee & District– Haridwar, Uttarakhand

    UTTAM SUGAR MILLS LIMITED · Industrial Projects - 2

  86. Category B1TOR Granted2023-02-17

    Environmental Clearance for the Proposed EWS Housing under Pradhan Mantri Awasiya Yojana by M/s Debi kay Systems Private Limited located at Khasra No. 66 & 68/2, Village Beldi, Tehsil Roorkee, District Haridwar, Uttarakhand

    DEBIKAY SYSTEMS PRIVATE LIMITED · INFRA-2

  87. Category B2EC Granted2023-02-15

    Cico polymers pvt ltd

    CICO POLYMERS PRIVATE LIMITED · INFRA-2

  88. Category B2EC Granted2022-10-19

    Proposed 60 KLPD Grain Based Distillery along with 2.13 MW Co-gen under Ethanol Blending Program by M/s Athley Petrochem Pvt. Ltd. at Survey No. 145, 146M,150M, Village-Mundakheda Khurd, Taluka Laksar, District Haridwar, Uttarakhand

    ATHLEY PETROCHEMS PRIVATE LIMITED · Industrial Projects - 2

All 88 proposals that name this district, newest first.